Welcome to the Arup
Design Yearbook 2010
refined technical
partners and end users.
joined up practical
sustainably creativity on time
Design is the process of working together
with our clients to face real-world practical
design
positive outcome and economic challenges. Our design
value
solutions are always to be seen in the
end users within budget applied the built environment and the business
challenges clients
projects
At any one time, Arup is working on a
vast range of projects in many different
1
Forth Replacement Crossing Client Location
Transport Scotland Edinburgh, UK
Forth dimension
stability and will also keep the towers slender. Although has developed a managed crossing strategy for the FRC
theoretical studies have already shown that such an based on assessment studies made by Arup which takes
approach is possible, this will be the first time it is being into account the existing Forth Road Bridge, which
used in practice on a large scale. provides a dedicated public transport corridor carrying,
buses, pedestrians and cyclists – and in the future, trams.
Although the cable-stayed design complements the other This has enabled a slimmed down and much more
two bridges visually, it also has many practical advantages cost-effective version of the new bridge to be designed, By 2016, Scotland will have the best of 19th, 20th and 21st century
over its neighbours. Unlike the suspension design of the rather than having to provide additional dedicated bridge design with the opening of the new Forth Replacement Crossing.
Forth Road Bridge, which has problems with its two main capacity for provision of trams on the new crossing. When
load-bearing cables, FRC’s cable-stayed design spreads the FRC is completed there will be three working bridges This dramatic cable-stayed bridge will maintain a vital link on what is
the load among many smaller cables, which can be across the Firth of Forth – uniquely, each constructed in
maintained individually. a separate century – which form a coherent infrastructure
Scotland’s busiest highway – boosting the local economy – and is the
that will help Scotland to continue to thrive and develop perfect complement to the Firth of Forth’s existing much-loved bridges.
economically.
03
04
2 3
Denmark Expo Pavilion Location
Shanghai, China
Singapore Expo Pavilion
Expo experience
group) to design the façade for the pavilion the Danish Pavilion as its design deviated so 03 The cantilevered
continuous
and develop the initial architectural designs much from traditional building structures. geometric knot
and drawings. 3D modelling was used to Arup was able to work with the expert panel
04 An open structure
help create a pavilion that looked stunning and review committee so that this design reduces energy use
and was also structurally sound. could be safely built. It was a process that
took time, and which involved demonstrating 05 The Singapore
A particular challenge was hiding the load excellence and safety, working closely with
Pavilion World Expo Shanghai is the largest ever World Exposition. Taking
path to maintain the perception of a floating the contractors before plans were even place from May to October 2010, its theme is ‘Better City, Better
structure. This meant pushing and testing approved. By providing on-site support to
standard engineering rules. the contractors in the build phases, Arup Life’. Over 70 million visitors are expected from around the world
ensured the pavilion would adhere to
Collaboration between Arup’s teams in stringent local codes and deliver the
to see pavilions and exhibitions from more than 240 countries.
London and China was essential to architect’s vision of a beautiful pavilion.
4 5
High Speed Rail Client Location
Various Europe, USA, Asia
Rewind 100 years and rail travel was the only available and on budget in 2007. With a collective 1,400 man years
form of mass overland transport across Europe, Asia and spent designing and project managing the rail link, the
the ‘New World’. It was an enabling technology, but most project trained a new generation of Arup rail specialists
people still lived and worked their whole lives in the across every conceivable area of HSR design: noise and
village or town in which they were born. vibrations, large-diameter tunnelling, bridge design and
01
systems integration, as well as procurement, contracts
Fast forward to today, and it is clear that current transport and PFI/PPF expertise. Their experience will be crucial in
infrastructure cannot cope with the ever-increasing developing this new infrastructure all over the world.
numbers of passengers. In 2009, Earth officially became an
02 urban planet, with over half its population living in cities Arup is the engineering consultant for the conception
or towns. The need for mass transport from city centre to and route planning of High Speed Two, the proposed
city centre has never been greater. If the needs of future first stage of a high speed rail network for the UK. This
generations are to be met, such mass transport systems high-speed connection will link London and London’s
must be planned strategically, integral to urban form. Heathrow Airport with major cities to the north, creating
a high speed network that helps to eradicate the country’s
High speed rail (HSR) does for medium distances what ‘north-south economic divide’ in the process. The firm has
aviation does for long distance travel. Today’s high also proposed an integrated transport hub to be built at
speed trains accelerate to cruising speed, slowing only at Heathrow Airport that will provide even more connectivity
major stops. They are fast, efficient and have far lower by public transport to the airport and high speed network.
01 Tracks in California are carbon emissions per passenger than any other form of
designed to minimise
damage from seismic activity motorised transport. The travelling experience is easier In earthquake-prone California, Arup is currently
too – passengers are not separated from their luggage and designing 380 miles of rail in two sections that will cross
02 The cavernous roof space
of Beijing South Station was so do not waste time being reunited with it. Instead, they the San Andreas Fault line. The firm’s seismic experts are
made possible by Arup’s walk off the train to join metros, light rail, buses or other researching how to engineer tracks that minimise damage
innovative structural and fire transport for their onward journey. from seismic movement, as well as ensuring that a rapid
engineering designs
stop can be triggered by a few seconds’ advance warning
03 Hollandsdieppe Bridge, Provide a high speed railway connection to a city and of earthquake activity.
The Netherlands
the transformative effect is startling. In France, the dying
04 HS2 in the UK is planned to industrial town of Lille has been reborn as a thriving city When Hong Kong’s Express Rail Link connects to
operate at 400km/h thanks to Europe’s high speed rail system. In Portugal, China’s network in 2015, it will become part of the
05 Beijing South Station opened where Arup is technical adviser to the lenders on the first biggest HSR network in the world. Arup’s engineers
on budget and in time for the section of the country’s proposed high speed rail system, have been instrumental in all stages of the design of
2008 Olympics
the new HSR will link the furthest corner of the Iberian this project, from the initial feasibility studies, through
Peninsula with the rest of Europe, transforming trade and preliminary and detailed design stages, and through to
travel to and from Portugal. construction. The team has also advised MTR Corporation
Limited and the Hong Kong Government on using a
Some countries are ahead of the game. Populous Japan long-tunnel fire strategy and emergency rescue sidings to
started developing high speed rail in the 1950s as a solution pass through the mountains in 26km-long tunnels. Arup
to the country’s transport problem. Japan, France, Germany, has also advised on ways to ensure that the new station is
Spain, Italy, The Netherlands, Korea, Taiwan, China and the located right in the centre of Kowloon with ease of access
6 7
06 Train running-speeds
have effectively doubled
in the last 50 years
06
05
07 Eurostar running on
HS1, UK
08 Depot and Emergency
Rescue Sidings – Express
Rail Link, Hong Kong 700
km/hr
Maximum operational speed
600
Maximum test speed How trains got faster
500 Japan set a world speed record for narrow gauge
trains at 145km/h in 1957, which led to its first
400 standard gauge high speed train, the Shinkansen,
which ran at 210km/h in 1964. Nowadays, the
300
European Union defines HSR as rail travelling
200 above 250km/h on existing track and 300km/h
or faster on new track. High-speed trains in many
100 countries now regularly run at 300km/h, while
China’s new high-speed rail systems are operating
0 commercially at up to 350km/h, and 400km/h is
1955 2010
becoming the new design standard. Under test
conditions the world’s fastest steel wheel on steel
rail train recently set a new world record, reaching
a remarkable 574km/h in France. Two Maglev
systems (an alternative technology to steel wheel
on rail) are also operating in Japan and China at
speeds up to 581km/h.
Under pressure
07
HSR brings engineers a new set of challenges.
High-speed trains running through tunnels create
a pressure wave, causing a sudden change in
aural pressure for passengers on the train. Arup’s
engineers are using complex modelling and fluid
dynamic techniques to optimise tunnel sizes.
The firm’s noise and vibration specialists are also
focused on lowering the level of engine and wheel 08
rail noise which increase exponentially at high
speed, both below and above ground.
Cedar Rapids Client Location Palmas Altas Campus Client Location
Sasaki Associates Cedar Rapids, IA, USA Abengoa SA Seville, Spain
Disaster Recovery Business Park
01 Constructive detail
for façade 03
01 Bridges on the Cedar 03
River were submerged 02 Palmas Altas
during the floods Campus
02 The waters reached 03 Natural daylight
well beyond the floods the space
500-year floodline
04 Cooling towers for
03 The Cedar River burst air conditioning
its banks in June 2008
05 Green roofs and
04 The riverfront solar panels
masterplan 04
(Sasaki Associates)
02
01
01
02
This place 05
04
means business
With a carbon footprint around 30% lower than standard Spanish office The design team made sure that active and passive design features were
Flood responsive developments, Abengoa Palmas Altas Campus is Spain’s greenest business
park. It should be the first office development in the country to receive
platinum LEED® accreditation – an achievement due in no small part to
incorporated to achieve such a major reduction in carbon footprint. These
included making sure that the building’s orientation actively aided sustainable
elements such as green roofs, energy-efficient façades, PV panels, thermal
the expertise of Arup. solar concentrators, maximising energy efficiency through water re-use,
It was while the civic leaders of Cedar Rapids were discussing a new riverfront The city hopes that the problem of neighborhood fragmentation will natural lighting, and using chilled beams to air condition office areas. Arup’s
park that unprecedented rainfall caused the Cedar River to overflow beyond be eradicated as a result of the changes proposed, replaced instead by The business park of Palmas Altas Campus lies to the south of Seville in a experience and expertise in sustainable buildings was influential in ensuring
its 500-year floodline. With 10 square miles of the city underwater, the city communities that have pedestrian access to local amenities and that are new urban development area and is the largest commercial technological these were adopted.
immediately went into disaster-recovery mode and turned its attention to revitalised by the integration of arts and culture infrastructure. development in southern Spain. A joint venture between the city council
the need for a major flood defence strategy. and developer Abengoa, the client focused on sustainability from the The end result is an overall reduction in energy consumption of around
To help with the adoption of such measures, Arup created a Sustainability very beginning. 30%, minimising operational costs for the client. Water consumption is also
With the downtown cultural, financial and industrial core submerged and Assessment Matrix as a handheld booklet for the design team to allow them significantly reduced through the use of rainwater for irrigation on site. And
more than 7,000 homes, businesses and municipal facilities damaged or to quickly consider, evaluate and implement sustainability strategies into the Within Spain, the global challenges of climate change, reducing energy for those working in the development, better air conditioning solutions and
destroyed, fast action was needed. Neighborhood Plan process, which proved to be an invaluable tool. consumption and efficient use of resources are all having an impact on increased natural lighting throughout the offices makes it a nicer place to work.
business – and particularly for construction. Abengoa took this opportunity
Led by Sasaki Associates, the Arup sustainability advice team responded In addition, a city-wide pre-flood sustainability baseline assessment, which to establish an exemplar sustainable business park, not only for the obvious By working closely with the architects Rogers Stirk Harbour + Partners and
to the city’s new needs, making full use of its experts in flood prevention looks at 19 ‘indicators’ of a sustainable community, will help city decision- operational and cost benefits, but to help attract investors and tenants. Vidal y Asociados arquitectos and the client on sustainability initiatives from
technologies, and drawing on the firm’s extensive knowledge of working in makers target investment and prioritise effort, and serve as a benchmark to the beginning of the project, decisions could be made much more quickly and
post-disaster areas. All of these inputs were combined to ensure sustainability document and track improvement in sustainability performance. And while it During the first stages of the project Arup developed studies on potential easily – which also helped in meeting the tight budget. The end result – which
measures could be an integral part of a successful recovery effort. will take some time before all of the benefits are felt, the end result should be a sustainable options for the development. These included natural lighting has exceeded client expectations – is a showcase for Arup’s holistic approach to
more sustainable, thriving city and a safer place for its residents to live. studies that compared different building configurations to optimise natural sustainable design.
By taking a look at the far-reaching effects of floods, a systematic review lighting use and different air conditioning options including investment and
of neighbourhood planning in the city could be undertaken – creating pay back periods which saw the selection of a chilled beams solution. Arup’s
an opportunity to address some of the pre-existing economic and social analysis allowed the client to make the best decisions for both investment
challenges, as well as dealing with the consequences of the floods. and energy reduction.
8 9
The Edge Client Location Regeneration of Newton Client Location
State Library of Queensland Brisbane, Australia Nottingham Trent University Nottingham, UK
and Arkwright Buildings
03
01 02
01
02
10 11
Joseph Vance Building Client Location Miami Science Museum Client Location
Jonathan Rose Companies, LLC Seattle, WA, USA Grimshaw Architects Miami, FL, USA
01 Architect’s sketch
02 Original 1920s
ventilation deflectors
02
are now back in use
03 Central position in 01 Architect’s rendering of
downtown Seattle the exterior of the tank
02 Sight lines from the lower
viewing platform
03 The Gulf Stream tank is
the last in a sequence of
exhibits in the Living Core
04 Computer analysis
rendering of the tank
03
01
04
03
02
Renewal at heart
01
The Joseph Vance Building in downtown Seattle, a building that dates from The team explored a range of energy-efficiency strategies, including the
1929, has been restored to its former glory and is now in the top 3% of replacement, upgrade and customisation of the original double-hung sash
US buildings for energy efficiency. As well as its Gold EB LEED® rating for windows. Designed in the 1920s to open, most of the windows have actually
environmental performance in existing buildings, occupancy levels have been sealed shut for years, since the introduction of air conditioning. The
Underwater world
since soared to 97% despite a challenging market. renovation restored them to their original condition returning the building to
its naturally-ventilated state. During an early site visit, the design team noticed
The Joseph Vance Building has always looked good. This building was designed angled glass strips on the inside of the operable windows, around 70cm up
in the 1920s, but over the years has suffered from tinkering – some unwise from the bottom edge. The team initially wanted to get rid of them, but Arup
renovations that had, in some cases, diminished its performance. When a was intrigued. The strips turned out to be 1929-style ventilation deflectors, The design of the showpiece Gulf Stream tank in the new Miami Science This unique view is possible because of the tank’s conical shape. The ‘cone’ is
fund sponsored by a green New York property developer bought it in 2006 it which deflect breezes upwards, giving occupants fresh air but limiting draughts. Museum’s aquarium has long been anticipated as its key attraction. effectively tilted, sliced horizontally to form the open-top surface and then cut
was an ideal candidate for an environmentally–friendly renovation. The plan Innovative thinking from Arup has created a structural solution that on the diagonal to create the circular viewing window at the bottom. It is an
has been an economic and environmental success; a clever combination of Another critical strategy recommended by Arup involved the commissioning moves the aquarium closer to realisation. ambitious design that the client, aquarium exhibit designer, and architect all
relatively small but cost effective measures has put the building in the 97th of the steam system. By simply fitting local thermostats to every radiator, for originally feared may be unachievable.
percentile of US buildings for energy efficiency. The building maintains example, the team gave temperature control to the tenants and halved the One of the main attractions at the new Miami Science Museum will be a
historically high occupancy levels in a challenging leasing environment and building’s steam bills in the process. sequence of aquarium and wildlife habitat exhibits called the Living Core. Visitors But Arup’s solution makes the design feasible. Cast-in-place reinforced concrete,
economy. The key was to devise an economical green strategy for the building will be taken on an aquatic journey through the Living Core, exploring habitats compressed with tensioned cables, will ensure it is watertight and seven
that not only increased efficiency, but enhanced its appeal to tenants. This, Arup, together with the owners and architect, ZGF Architects LLP, produced a as diverse as mangrove swamps, seagrass lagoons and a live coral reef. At this columns positioned around the tilted cone will provide the aquarium with
in turn, has enabled the owners to attract a diverse mix of entrepreneurial ‘green tenant guide’, which specifies how tenants can work with the building’s point, the journey takes visitors outside to look down into the Gulf Stream tank, enough support to carry the enormous weight of the water.
and environmental businesses, some of which rent quite small spaces. natural ventilation and daylight when fitting out their individual space. conceived on an impressive scale and home to sharks and stingrays.
The choice of concrete provides a viable structural solution, but it will also
Arup was initially contracted to work on the façade and preliminary Arup’s methodical and considered approach shows that it is possible to This enormous elliptical pool of between 27.5m and 30.5m in diameter serve another purpose. Unlike structural steel, which interferes with a shark’s
mechanical, electrical and plumbing renovation strategies of the building, combine many small, simple and often inexpensive measures in existing needs almost 2 million litres of natural seawater to fill it. The aquatic journey sensory system, the concrete shell will act as a buffer between the sharks
but ended up taking a much more central role, advising the owner, which buildings to achieve startling results. continues as visitors descend to a subterranean viewing platform. There, a and the structure’s reinforcing steel, providing an ideal living environment.
had ambitious green goals but a limited budget. The team’s first move was 8.5m-diameter window allows an underwater view of the tank’s inhabitants. Construction of the Gulf Stream tank is scheduled to begin in the next two
to understand how the original design was intended to perform. Like many The design is such that from this vantage point the viewer can experience the to three years, with completion of the museum expected in 2015.
older buildings, its performance over time had been compromised by expansiveness of the ocean, since at no point can the sides of the tank be seen
ill-considered renovations over the years. – only the water is visible.
12 13
One Shelley Street Client Location Hunters Point Shipyard Client Location
Brookfield Multiplex Sydney, Australia The City of San Francisco San Francisco, CA, USA
Candlestick Point Redevelopment
01
04
01 With over 50% of residents
also home owners, there is
great community pride
02 The Hunters Point
community web portal
03 The derelict Hunters
03 Point shipyards await
redevelopment
03
People first
Open safety The community-led redevelopment of one of San Francisco’s derelict shipyards stake in their community’s future. Initially, residents thought that a low-carbon
is enabling this area to put its past behind it, and focus instead on the social development would do little for them, so the team had to change the way it
What started off as a standard residential building has ended up as a striking An atrium space is popular with occupants and designers alike, who value the and health needs of its residents. With 10,000 new jobs being created for locals articulated the benefits. While the team’s approach had always focused on
commercial building with a huge atrium, thanks to Arup’s structural and sense of space it can bring to a city building, but in Australia fire codes usually and 32% affordable housing, sustainability in this low-carbon development is the ‘triple bottom line’ of community, environment and economics, it started
fire experts. demand that such open spaces be glassed-in, separating the atrium from the defined as much by social conditions for residents as green technologies. explicitly to define sustainability in terms of its residents.
floors. The atrium at One Shelley Street contains open stairs, bridges between
There is no other building in Sydney like One Shelley Street. The striking office floors and meeting pods that cantilever out from each side. Arup’s team took Less than a mile from some of San Francisco’s most affluent neighbourhoods Stark data on the high incidences in the area of heart disease, cancer and
development – which has a 6-star Green Star rating from the Green Buildings a performance-based approach to how fire, smoke and people behave, to are the former dock-workers’ districts of Bayview and Hunters Point. The respiratory problems – 30% of residents are asthmatic – makes the case for
Council of Australia – employs a unique structural system that sits outside its design an atrium that could safely remain open. The floors can be sealed in an fortunes of these two districts have followed those of the local naval shipyard, a healthier environment. And during the course of hundreds of community
sleek glass façade. It also features an open glass atrium – a comparative rarity in emergency and extractor fans at the top of the atrium will suck out smoke. which at its peak employed thousands of residents at the time of the Second meetings, the team developed a deep and nuanced understanding of residents’
the city because of the need for smoke control under Australian fire codes. World War. But shipyard closures in 1974 left behind a bitter legacy of concerns. Measures to lower carbon emissions and improve air quality started
Typically, buildings that are open and which contain a lot of glass burn out joblessness, pollution and health problems for its residents, and today, over to make more sense when viewed through the prism of their high utility bills
The external steel diagrid structural system supports the whole of the outside very quickly in a fire compared with traditional buildings, which can ‘cook’ 50% of the district’s children live in poverty. and asthmatic children.
of the building, which ‘hangs’ off the external frame. Arup wanted slender, for hours. By analysing how quickly fire could spread within the spaces and
lightweight members for the diagrid that could be fabricated offsite to keep how long it was likely to burn, the team was able to rationalise fire protection It is no wonder, then, that Arup’s sustainability experts found residents were As a result, the development plan now reflects residents’ priorities. Over
costs low. The steel members are straightforward while all the complexity is in measures. Crucial structural elements – such as some steel floor members – often suspicious, cynical even, when first introduced to the concept of a 10,000 new jobs are to be created, and the arrival of high-tech, non-industrial
the design of the four-way joints. As a result, the structure was assembled up to received extra fire protection, while other elements were identified that could mixed use, low-carbon development on the old shipyard site. Residents felt businesses in the area is an opportunity for many residents, who will benefit
the level 12 in just five months. be less heavily protected simply because the load they carry could be taken there were more pressing concerns to address – high crime, poor health and from a US$17.85m workforce development and training fund to develop new
elsewhere without compromising the structure. unemployment. Would the development provide jobs for locals, safe streets skills. Nearly a third (32%) of housing will be affordable and aimed at low-
The diagrid structure removed the need for internal columns, which has liberated and healthy homes, they wanted to know? Or would it only bring ‘yuppie’ jobs income residents and families, who will see lower utility bills thanks to the use
the inside space, which is light and airy. The building also boasts a 10m-wide Arup’s performance-based design enables the elements that architects and expensive housing, forcing residents out? of energy-efficient design. The development plan makes commercial sense for
glass atrium that is open space rather than enclosed. This was made possible by and building occupants value – open space and natural light – without the developer and improves the environment for future generations. It also
the expertise of Arup’s fire engineers, whose understanding of the behaviour of compromising safety. A much higher percentage of houses in this district are owner-occupied – over offers a cleaner and brighter future for today’s residents of Hunters Point.
flames, heat and smoke provided a starting point for the design. 55%, compared to the San Francisco average of 35%, so people feel they have a
14 15
Stonecutters Bridge Client Location
Highways Department, Hong Kong, China
Hong Kong SAR
03
Landmark resilience
03 Anti-vibration
measure: dimples bridge to the fluctuating wind speeds. the normally smooth and cylindrical cable stays. The
in stay cable indentations, which are much like the surface of a golf
To understand the nature of the wind and its potential ball, create friction, disturbing the flow of the water and
interaction with the bridge, Arup carried out exhaustive therefore limiting the vibrations of the cable. Dampers
monitoring and testing. Historical data from the Hong were also added to each stay, acting as shock absorbers
Hong Kong is no stranger to typhoons, with one major event Kong authorities was studied, but it was also important to limit the magnitude of any vibration that may occur.
to analyse the wind climate at the precise location of
at the site of Hong Kong’s Stonecutters Bridge as recently as the bridge. The surrounding terrain impacts on the Arup’s work during the feasibility, detailed design and
September 1999. So for the bridge’s designers, it was crucial that character of wind and in this case there were significant construction phases of the project helped to bring this
variations depending on whether the wind was coming truly iconic and vital piece of infrastructure to life, with
this cable-stayed bridge – with a span of over one kilometre – from the ocean or from the mountains. A wind sensor the assurance that if a typhoon hits, Stonecutters Bridge
was stable and strong enough to cope with such an extreme event. was erected on a 50m-high mast in order to gather the is designed to withstand it.
necessary site-specific data for analysis.
16 17
05
04
04 View of the bridge
from Tsing Yi
05 Tower with two
planes of stay cables
06 Elevation and plan of
Stonecutters Bridge is a landmark on the Hong Kong Stonecutters Bridge,
skyline, visible from the harbour and the densely west back-spans
and cross-section of
populated areas of Hong Kong Island and West steel deck
Kowloon. It complements its surroundings, with its
freestanding monopole towers creating a striking
vertical visual element that works in harmony with
the high-rise buildings of the city.
06
Heron Tower facts Many buildings have a simple concrete core, which acts as
- 46-storey slender glass and a backbone and gives the structure its stability and support.
stainless steel clad structure For Heron Tower, the architect’s wish to achieve an open
- 230m tall including mast, 202m floor plate, with sweeping views to the north, made a central
tall without core out of the question. The site, too, hemmed in by roads
03
- 40,836m2 of office space spread on all sides, gave limited space for construction. The answer
over 36 storeys was a tube structure – to provide the structural stability
- Designed to be rented village- needed by a 46-storey building, while also maximising the
by-village or floor-by-floor open floor space and therefore the lettable area.
- Each 3,252m2 office village has
a three-floor atrium Arup modified the tube structure by cutting out a vertical
- Public restaurant and sky bar ‘chunk’ down one side, which is uncommon for tube-
on floors 38 to 40 stabilised buildings. The strength of a tube structure is
- Three basement levels for in the continuous outside edge, so the team needed to
retail, parking, storage and restore its stability. They did this by devising a framing
the building plant system to ‘stitch’ the open vertical edges of the cut tube
together in key places. This approach, alongside the
careful engineering required to achieve it, has resulted
in office space that is flooded with daylight and has
unimpeded views of the City of London.
New tube
themselves are configured to match the load bearing
demanded of them as construction advances, which made
construction far less costly.
18 19
Marina Bay Sands Client Location
Marina Bay Sands Pte Ltd Singapore
03
01
Well grounded
excavation and subsequent construction work can be
carried out without the need for conventional temporary
strutted supports. While Arup has deployed them before,
the 120m-diameter reinforced concrete cofferdams are
among the largest ever used and are notable for their Raising the roof
depth of up to 18m underground. Their circular design Constructing and lifting the Skypark into place Delivering a 200m-tall development, complete with a
uses hoop compression forces to provide an open on top of the three towers was one of the project’s
underground space – like that of a barrel buried in the many challenges. Arup’s structural and bridge deep basement car park and a podium structure, on a
ground. Its effect is to allow below-ground construction
work to be carried out inside and outside the cofferdams
engineers devised the heavy lifting operation that 16 hectare site of deep soft marine clay would be regarded
is, at 200m, one of the highest strand-jacking
independently. operations ever undertaken. Other Arup specialists by many as a lifetime’s endeavour. Arup was given just
used dynamic studies to investigate and model
The cofferdams enabled the construction timetable to be how the Skypark’s cantilever would behave in the
04 three and a half years.
accelerated. This also minimised the temporary support, face of Singapore’s coastal winds, as well as the
which in turn reduced steel requirements. That this has structure’s response to human activity such as
been achieved in the soft ground conditions of Marina dancing crowds.
Bay Sands is a feat of innovative engineering design.
20 21
Control Towers Client Location The Eight-Hour Bridge & Client Location
Deutsche Flugsicherung Frankfurt/Berlin, Germany Network Rail Dumfriesshire and Wigan, UK
Frankfurt and Berlin Switches and Crossings
the clock
symmetrical reconstructed with new
precast concrete arches
04 The glass was inspected and
subject to extensive testing 02 Modular assembly of the
during production eight-hour temporary bridge
04
05 Installing glass panes at When renewal work is needed 03 Network Rail tilting wagon
Frankfurt Airport delivery of a pre-constructed
on Britain’s Victorian railway modular switch and crossing
infrastructure, finding innovative track panel
solutions that limit disruption to
passengers and save time and
money, is crucial.
03
01
02
02
05
A speedy strategy that could be used to replace at least 70% This modular approach to rail switch and
of the planned underbridge renewals on the UK rail network. crossing unit replacement halves disruption time.
Strong views A successful trial at Holms Farm, Dumfries, has the potential to
revolutionise the way that redundant bridges are replaced. Instead of being
When trials of a new approach to renewing switches and crossing units
began in Bamfurlong, Wigan, the previous best endeavours stood at 40 hours
a one-off solution, the trial validates a strategy developed in collaboration possession time, leading to long disruption of the timetable. A modularised
Air traffic controllers at Frankfurt and Berlin airports will have better, tempering process causes little waves on the surface which would have given with Carillion and Network Rail that can be repeated with confidence on a solution showed that a set of points can be renewed in almost half that time –
and therefore safer, views through window glass that has been specially visual distortions. The team specified double-glazed units with panes that were wide variety of bridge types, spans and associated track arrangements. just 21 hours.
developed to be strong enough to be an integral part of each tower’s façade, laminated with a special interlayer. The panes needed to be thin enough to allow
but thin enough to give a clear view of two of Germany’s busiest airports. an additional high-performance solar coating, to reduce energy consumption. It currently takes at least 54 hours to replace redundant railway Network Rail’s acquisition of tilting wagons gave the platform for a new
underbridges. Any attempt to improve this timescale dramatically would approach to renewing points. The brief was to create a modular unit design
For air traffic controllers, an unimpaired view is essential. All the technology Arup’s façade and structural engineers were able to reduce the mullions from need a radical departure from existing practice, but, the solution is that could be constructed off-site and successfully installed by contractors.
found in a modern control tower is no substitute for being able to see the 300mm to just 100mm deep, and from 200mm to 80mm wide. Having done deceptively simple. Arup’s strategy uses a suite of modular temporary bridges
planes as they descend. Most air traffic control cabins enjoy a 360º view of the so, the next challenge was to convince Germany’s building authorities to allow that can be rapidly assembled and installed without any compromise to Arup worked closely with the installation contractors to ensure that the design
airport through floor-to-ceiling windows. But while the glass is clear, the view glass to be used in the structural bracing of a façade. The approach is not only safety. Parametric 3D modelling was used to develop a prototype of the could be pieced together within the desired timescales, while simultaneously
is often compromised by the mullions – vertical structural elements that carry new to Germany, but is at the cutting edge of what is technically possible, so temporary bridge and its component parts and demonstrate its suitability coping with a lack of uniformity in track width and junction design.
the wind loads of the façade. the glass had to undergo extensive testing and its structural strength calculated for a wide range of applications.
precisely. The team calculated that at minimum two adjacent panes of the 16 The resulting design work leads the way in keeping rail disruption time, due to
Working with architect Ondra & Partner, Arup wanted to find a way of using could fail without compromising the tower’s structural stability. The authorities What has become known as ‘the eight-hour bridge’ eliminates the need to renewal and maintenance, to a minimum. It delivers a solution that will help to
the glass as a structural element, rather than as infill. This would allow the were duly persuaded. demolish and rebuild bridges before allowing trains to operate on the line. increase train speeds and improve passenger comfort. Building the units off-site
team to reduce the width and depth of the mullions and therefore improve the Instead, trains are safely carried on the temporary bridge, while the existing also improves their reliability and durability as they are fully constructed and
air traffic controllers’ view. The panes are not standard, and require several weeks’ production lead time. bridge is replaced. All works that affect the operation of the line can be tested prior to being delivered to site in modular panels.
The two towers have the same geometry, however, being 16-corner polygons, completed within eight-hour night-time possessions.
The team worked closely with the glass supplier to create a built-up glass strong so both airport owners will keep spare panes of glass on hand to be used in Each of these very different projects show Arup’s ability to deliver innovative
enough to take on a structural role but not so thick as to cause production either tower in case of breakages. Such practical thinking significantly reduces The strategy can deliver solutions that are safe and cost effective, help to solutions with as little disruption to the rail system as possible.
or installation problems. Annealed low iron glass was chosen for its clarity. the likelihood of either control tower at Germany’s two busiest airports being introduce greater flexibility for programming bridge replacement works and
Though tempered glass would have offered excellent structural strength, the closed for lengthy maintenance. avoid passenger disruption.
22 23
Terminal 5 Development, Client Location Fishlake – Biodiversity Action Client Location
JetBlue New York, NY, USA Environment Agency Doncaster, UK
JFK International Airport Plan Habitat Creation
01 01
02
02
01 3D model showing
passenger movement
around the terminal 03
It helped that the terminal is designed from the ground up with efficiency After initial investigations to understand the variations in the daily water This project will help to replace habitats and ecology lost for almost 400 years,
in mind, and has been planned to be expanded to provide extra space where flows at the site, Arup planned the dynamics of waterflow around the contributing to the region’s green infrastructure, while managing flood-risk.
24 25
Life Cycle Tower Client Location Horizon House Client Location
Rhomberg Bau GmbH Austria Westmark Development Bristol, UK
02 03
20%
0%
Management Health & Energy & Water Materials Land Use Pollution
Wellbeing Transport & Ecology
01
03
Green determination
Timber tower 04
With the Environment Agency as the ultimate occupier, Arup, the developer, Horizon House benefited from having a highly determined client. In an
the contractor, and his design team ensured that Horizon House in Bristol unusual move, the Environment Agency and, subsequently, the developer
Timber is one of the most sustainable materials available, yet its use for worked on the Life Cycle Tower, they were designing with structural achieved an exceptional score under the BREEAM rating system. The result introduced a tapering financial penalty to all those involved in the project to
anything more than low-rise structures in Europe has been prohibited by performance in mind. The building had to perform at least as well as is the UK’s highest-rated office building to date, with an unprecedented provide an ‘incentive’ to achieve the agreed BREEAM credits. This galvanised
building regulations. But when Austria recently relaxed its building codes, conventional buildings in the case of fire. The team started by understanding environmental score of 85.06%. all parties to aim high, particularly the contractors, who developed a much
Arup designed the Life Cycle Tower, a prototype timber high-rise that – in timber and how it behaves, which led to the idea of using the timber itself more focused approach to site management. The contractors agreed to monitor
the event of fire – will safely protect the structure and its occupants. as fire protection. Obviously timber burns when exposed to fire and will When the UK’s environmental regulator assesses a building, it awards the carbon, energy and water impact of the construction site and committed
continue to burn as long as there is oxygen available. As it burns, however, it is credits over a range of categories such as carbon emissions, transport, water to using timber certified under ISO guidelines. They also recorded deliveries
Imagine a high-rise that has a carbon footprint of just 10% of what it transformed into charcoal, an excellent insulator, which protects the remaining conservation and re-use of materials. The threshold for the highly coveted and where they were from, and tracked recycling rates and the destination of
would normally be. It is built from timber, a highly sustainable material, is timber from the heat. excellent rating is 70%. It is relatively easy to achieve the early points, demolition and site waste. Arup specified that when the former building on
inexpensive and quick to build. Yet historically, even with these advantages, but they become progressively harder (and more costly) to achieve as you the site was demolished concrete from its superstructure was to be crushed and
timber high-rise buildings have not been allowed under European building Arup designed a sacrificial layer of timber, behind which the load-bearing go up the scale. graded, and used again in the new building sub-base.
codes because of their perceived vulnerability to fire. timber core of the building remains safe. The structural core of the tower is
glulam, which is created from strips of wood that are glued together to form Most designers and developers aspiring to a high BREEAM score therefore focus The design did particularly well against other excellent rated buildings in
The result of such conservatism has been a dearth of timber buildings of long, strong and stable vertical beams – of which about 10 are fixed together their energies on the easy wins up to the 70% ‘excellent’ threshold. Working the tricky category of land use and ecology, and for its contribution to the
any height in Europe and consequently there is a limited understanding of to form a panel. The glulam panels are joined together at each end via steel with its committed client however, Arup set the strategic direction of the wellbeing of occupants; they will enjoy a large open office, with mixed mode
their performance. Now, building codes in Austria have been changed to plates which allow the horizontal movement that may arise from the wood design early on: to aim high, maximise the building’s performance in every ventilation, external views and a sophisticated lighting control system, which
allow timber high-rise buildings, as long as they can be shown to be as safe moving or shrinking. On top of the glulam is an interlayer of fire-resistant glass category and avoid a ‘tickbox’ approach. For example, a biomass boiler is a provides both presence detection and daylight linked dimming.
as conventional buildings. Other European countries have also adapted their fibre mesh, which is laminated with epoxy glue for further fire resistance. The fashionable and relatively low-cost means of winning credits, but it was ruled
codes to give designers more freedom to use timber. 63mm deep sacrificial layer on top is designed to withstand the 90 minutes of out, primarily because of the need for constant deliveries of fuel from outside The team credits its success to developing a strategic approach from the outset
fire required by safety codes. As this layer is carbonised, it ceases to burn and the city, which was not considered sustainable. along with the commitment of the contractors and wider team. The building is
When Arup’s structural and fire engineers, together with Austrian architects protects the underlying material from the fire, maintaining the tower’s stability a local landmark for the city and proof that, given enough determination, the
Herrmann Kaufmann, developer Rhomberg Bau and contractor Wiehag while its occupants are evacuated and the fire is extinguished. UK’s commercial real estate sector can become more sustainable.
26 27
Rossington All Saints School Client Location Building the Education Revolution Client Location
Church of England, Diocese of Sheffield Doncaster, UK Department of Education and Victoria, Australia
Early Childhood Development
04
01
Fast-track
value
05 With the Federal Government’s Arup’s long experience of working on capital The Arup team did this by encouraging the use
expenditure projects has stood the firm in good of design templates across all of the projects.
economic stimulus package stead for managing the delivery of the Federal Templates offered quality and flexibility and have
for Victoria putting nearly Government’s Economic Stimulus Plan (ESP) enabled the construction of world-class education
AUS$2.5bn into nearly 3,000 in Victoria. Keeping the Building the Education facilities.
Revolution (BER) programme on track – with
Government education projects
construction projects across primary and secondary The unrelenting pace of the programme demanded
between June 2009 and March
A bright school 2011, a new approach to
programme delivery was
schools throughout the state – meant Arup working
closely with the Department of Education and
Early Childhood Development.
a new approach to the procurement process. The
key to success was the ability to get projects started
as quickly as possible. From initial commission
in April 2009, the team delivered contract awards
Rossington All Saints School in South Yorkshire is a model for sustainability Air circulation is further improved by the strategic placement of chimneys needed. The task of keeping A new programme management delivery for 240 competitively-tendered projects valued
on a budget. With natural ventilation streaming into the classrooms and the throughout the building, creating a natural through-flow of air from the inlet this complex and massive framework was designed using methodologies at AUS$450m by the end of June 2009. This was
entire building bathed in light, this new school shows its students how louvers integrated into the façade, detailed to minimise cold draft and acoustic programme on schedule fell to developed for the UK Government to manage an unprecedented achievement for the Victoria
choosing an environmental approach can help them to learn. problems. External shading on the outside of the building also helps to keep major projects. construction industry.
the classrooms cool in the summer by minimising solar gain, resulting in a
Arup, who rose to the challenge
The new design for the school was always going to be a challenge. Budget comfortable space for lessons to take place. of keeping focused on quality A core element of Arup’s framework was a From the outset, Arup worked closely with the
constraints meant that the building had to be affordable to both build and as much as quantity. Programme Management Office (PMO) providing client and government lawyers to ensure that
run, but Arup showed that this need not limit the desire for creating Daylight pours into the school’s corridors through a polymer roof, and a centre of excellence for financial management, the procurement process was as streamlined as
a supportive and sustainable environment for learning. double-storey light wells placed at regular intervals along the corridors help reporting and design template expertise. possible while meeting all of the State and Federal
to capitalise on natural lighting at ground level. With such a high-profile project, the need for Government’s probity requirements. By adopting
Central to achieving this was the elimination of mechanical cooling from extensive reporting is essential, so a bespoke a pragmatic and standardised approach, the team
basic teaching classrooms. Not only is air-conditioning costly to run, but Finally, a central meeting area provides a place for the whole school to database system, PRiSM, was developed to was able to progress through the detailed design,
artificially-sealed air-conditioning units are widely considered to hamper assemble, something that staff felt was crucial and which had been lacking track project status, finance and programming tender and award stages of literally hundreds of
concentration in the classroom. in the previous school building. The classrooms feed off this central space – of all 2,904 projects. projects within a matter of weeks.
a layout that helps promote circulation of both people and air, and enhances
Exposed concrete ceilings provided enough thermal mass to make the use of natural daylighting throughout the building. In this way, the The Arup team took on the task of managing The result is a flexible approach that has proved
natural ventilation a viable option, and great care in the specification architect’s innovative layout and the passive building service elements work not just delivery of the challenging programme, vital to the Australian construction industry during
and execution of the concrete works ensures they are an attractive feature closely together to create a better learning environment, and a school that but also ensuring that quality would not be the recent economic downturn and will provide a
within the school. teaches green design by example. compromised by the extremely tight timescales. lasting educational legacy for the State of Victoria.
28 29
Integrated Development Plan Client Location
Ninh Thuan Planning and Ninh Thuan, Vietnam
for Ninh Thuan Province Investment Department
01
Finely balanced
destination for tourism and eco-tourism.
- Improving urban-rural connections and
preserving high-value agricultural land
01 Arup’s strategic
and forest preservation zones plan aims to
- Educating and training the future improve the
quality of life for
workforce, improving access to education local people
A new vision for a sustainable future has been created - Cultivating and promoting a distinct 02 The integrated
identity for Ninh Thuan by leveraging its spatial To capitalise on the growth and to ensure future
for one of Vietnam’s poorest areas, Ninh Thuan province. development
main commodities and resources investment, Arup was commissioned as planning
As a demonstrator project, the integrated development plan for Ninh
Thuan province and urban design consultant on a strategic
plan that balances social, economic and environmental development plan for the province, working
factors can be replicated in other parts of the country. with the business strategy advisory firm Monitor
Company Group.
30 31
03
03 Bicycles are a
common form of
transport in rural
Vietnam
economic and social growth in the region, while 04 Dense urban village,
balancing environmental considerations and while creating an
ensuring continued access to key resources such intense community
identity, pose a
as water, energy and land. In order to make the challenge for future
detailed technical information accessible, Arup to-energy, or closed loop systems. Year-round sun upgrades to the
organised the development plan into five distinct and wind make the area ideal for the development urban fabric and
infrastructure
networks – economic integration, quality of life of clean energy industries such as wind and
and infrastructure, ecosystems and heritage, clean solar power. Ninh Thuan’s selection as the site of 05 Visitors to the
villages are a rare
energy and climate change resilience – which Vietnam’s first nuclear power plant gives further attraction as yet
together aim to achieve the overall objectives. opportunity to benefit from its resources and create
a dynamic economy.
By structuring the plan into these networks,
each of which explored both spatial and
operational issues, the Arup team ensured that
the sustainability principles underlying the plan
This was the first time were effectively communicated, achieving buy-in
from the government and the community, and
a Vietnamese provincial supporting the delivery process.
government had chosen
international consultants 04
to develop a strategic plan
for an entire province.
The resulting integrated
development plan creates Ninh Thuan’s path towards sustainable living and
a sustainable vision for the quality of life is made up of two main strands:
sustainable urbanisation and an integrated
long-term development of infrastructure plan. A sensitive approach to
the area. development will preserve as much of the existing
fabric of the province as possible, minimising the
need for relocation of villages, and helping to
A hierarchical approach to implementation means protect and strengthen existing rural communities,
low-cost, simple strategies can be done first, so integrating them into the future economy.
communities can start to benefit from the changes
as early as possible, without the need for huge up-
front investment.
Design
at greater depth but, unlike water pressure, it is
not homogeneous, because the rock itself is not Some refuge areas are sized to accommodate as
uniform. Temperatures at the bottom of the mine few as five people and others more than 240
03 are 30-40ºC higher than at the surface. Elements people near the main shafts. The chambers are
in deep Equivalent to
6.5
Empire State
Engineering
such as cryogenic liquids must be kept cold or they
risk volatilising so fast as to push the air – and
therefore oxygen – out of the mine faster than
occupants can be evacuated.
electronically interlinked, allowing people to
communicate both with each other and with
the surface.
Buildings Geoscience 05
underground
Converting a former mine into a Arup’s fire and life-safety strategy for the
underground campus is a case in point. No US
deep underground scientific research fire code exists for underground facilities at such
laboratory is a uniquely challenging depths. The US mining codes focus on short-term
project. Such extreme engineering stability and safety – just long enough for minerals
is utilising every ounce of Arup’s to be extracted and for miners to abandon the
mine. By contrast, scientists at DUSEL will work
creativity and flexibility. underground in conditions that are very different
from life above ground and for which they have
The tunnels, shafts, boreholes and waterflow no special preparation, unlike astronauts or
patterns in the area will allow scientists to submariners, who are trained to live and work
Homestake Mine, in the frontier town of Lead, study the dynamics of the earth’s crust, carbon in abnormal conditions. Arup’s behavioural
South Dakota, was the largest, deepest and most sequestration and rock mechanics over long time psychologists, too, have therefore contributed to
famous goldmine in America. Its depths have periods. The dedicated access and the diverse some of the concept design principles.
yielded more than US$1bn worth of gold and geology at Homestake are well suited for studies While life safety is paramount, Arup is also
04
its closure in 2002, after more than 125 years of of microbiology and life at extreme depth. focusing on continuity of services. Many of
operation, marked the end of an era. Its second The campus’s two levels are 1,480m deep and DUSEL’s experiments will be immense in scale and
incarnation, as America’s Deep Underground 2,255m deep respectively. Between them, they value. A power failure in the middle of a nine-
Science and Engineering Laboratory (DUSEL), will provide scientists with the ideal environment for month experiment would be disastrous. Many
yield greater treasures still. Its scientists will be experiments, devoid of background noise and of the underground experiments will generate
exploring and expanding the frontiers of science. 01 shielded from cosmic rays. The more strategic, data, which must be captured and processed,
and larger, experiments are focused on studying necessitating data centres on the surface. The
Homestake Mine was considered alongside neutrinos and their interaction with other sub- services between the campus and the surface
multiple other bids in a Federal Government atomic and dark matter, and the search for the include robust electrical, mechanical, plumbing
competition to secure the US$750m DUSEL elusive Higgs boson particle. and IT utilities, as well as exhaust systems, lighting
project. Although not part of the original bid Biology systems and oxygen supplies to refuge areas during
team, Arup became involved thanks to its breadth Astrophysics The very qualities that make this deep emergencies. As if this were not enough, that part
of expertise, and was awarded two of the four Physics underground location ideal for scientists, however, of the campus which is below the water table must
preliminary design contracts for the project. make it extremely difficult to engineer. The scale be pumped constantly to keep dry.
This includes the underground infrastructure of the endeavour, too, complicates matters;
and underground laboratory design, as well as everything, from dealing with piped liquids at great Unlike a tall building, which is designed to allow Arup is extending its own engineering knowledge
the associated construction costing, scheduling 01 Conceptual design cut depth, to understanding underground ventilation a fast, mass evacuation in case of emergency, and is helping to give scientists the room to
away diagram shows
and risk assessment services. Currently in the underground campuses and microclimates, must be approached from base DUSEL’s design ensures that its scientists avoid push boundaries. At DUSEL, they will be able to
preliminary design stage, construction is set engineering principles. The original Homestake the elevators (called hoists in the mining investigate some of the biggest mysteries of our
02 Homestake Mine water
to begin in 2014. Arup’s team includes diverse treatment facility Mine’s working environment was typically 2m industry) at the main shafts and retire instead to universe – the nature of the neutrino; the origin
engineering discipline specialists to deal with the high and 1.5m wide, reaching the gold ore underground refuge areas. They can stay there of the elements; identification of the dark matter
03 Miners and scientists
unique challenges of this huge project. in Homestake’s
deposits. For DUSEL, alongside SRK, Golder and for several days if necessary, while they wait to be that makes up five times the mass of the universe
02 underground tunnels HDR, Arup is part of the integrated team designing rescued. The team has minimised evacuation time compared to normal matter; the dominance of
DUSEL will provide office and laboratory space cathedral-sized caverns, infrastructure and by factoring-in walking distances and even the matter over anti-matter; exotic forms of life in the
04 The headframe building
for scientists to investigate astrophysics, dark contains the original laboratory campuses to hold large tanks for water, number of doors to the shelters, which in some underground; and understanding the processes in
matter, particle and nuclear physics, geology, vertical conveyance cryogenic liquids and other chemicals. For a project cases double as everyday communal break rooms, the earth’s crust. When DUSEL is built it will be a
hydrogeology, geo-engineering, biology, and 05 Open cut mine at of this magnitude, a traditional approach to design offices and conference centres, making them testament to the determination and creativity of all
biochemistry. Homestake engineering simply will not work. familiar in an emergency. those involved in the project.
32 33
C40 Client Location
C40 Global
A city in Europe
C40 is a group of 40 of the world’s Toronto (to be confirmed)
C40: Practical
Arup is a strategic expert adviser to
the C40 group for a period of two years.
São Paulo
As strategic expert adviser to the C40 group of Toronto, Canada São Paulo, Brazil Addis Ababa, Ethiopia
Mayors, Arup is helping some of the world’s largest Mayor Miller, while chairing the C40, has made São Paulo, Brazil’s largest city, has one of the lowest Addis Ababa, the self-styled ‘political capital of
cities to become more energy efficient and address Toronto one of the world’s leading cities in carbon footprints of any city in the C40. But its Africa’, is a dynamic, forward-looking city that
the challenges of climate change. By taking a tackling climate change. Yet, despite an electricity ambition to be carbon neutral by 2020 is being put hosts the headquarters of both the African Union
multidisciplinary approach and fusing the practical grid that is rich in renewable energy, high levels under significant pressure from an ever-increasing and the United Nations Economic Commission for
with the political, Arup is supporting city mayors of energy consumption still leave the people population and economic growth. Africa. The city’s built infrastructure has improved
and other government stakeholders in delivering of Toronto with a higher than average carbon significantly over the last decade, with massive new
robust, realistic solutions specific to particular footprint. For the city’s administration, achieving carbon housing and road building programmes, and a raft
cities’ needs and problems. neutrality means moving to a new economic of new schools, hospitals and clinics.
This C40 UrbanLife workshop focused on the development model. Their goal is to use renewable
Its combination of design and technical know- challenges of translating the Mayor’s energy resources more efficiently and to deliver improved Mayor Demeksa wants to ensure that this growth
how with an understanding of policy and politics and climate change targets into action at a quality of life rather than following the 20th is sustainable. Arup will be helping build capacity
takes Arup beyond the role of a traditional neighbourhood level, using a real community century western model of measuring success in the city administration to create a low-carbon
consultant. A deep knowledge of the engineering as a case study. Alongside the technical in terms of consumption growth. Arup’s C40 development framework across waste, water,
and infrastructure implications of policy objectives considerations inherent in retrofitting buildings workshop explored how a new approach to transport, energy and agriculture.
Melbourne, Australia Ho Chi Minh City, Vietnam
enables consistent advice from policy to delivery. and creating community energy systems, the waste management could create a renewable
Given Australia’s reliance on coal for the majority The rapidly growing Vietnamese city of Ho Chi
project also considered the bureaucratic challenges energy resource, reduced healthrisk and creating Europe
of its power needs, it is almost inevitable that the Minh ranks in the World Bank’s top ten cities most
The workshops are a collaborative process between of delivering far-reaching programmes that cut new economic opportunities in the ‘favela’ areas At the time of going to press, it had yet to be
country is responsible for some of the largest per- vulnerable to the effects of climate change. The
Arup and the city. Each one is the culmination across the traditional departmental boundaries of the city. agreed which European city would join the C40
capita carbon emissions in the world. Patterns of UrbanLife project here focussed on how to marry
of several months of research and site visits by of city government. UrbanLife programme.
consumption in Melbourne, where there is high car the city’s rapid development with greater resilience
Arup during which knowledge transfer works
and home appliance usage, inflate this further. to the threats of flooding and potable water
both ways. The workshop then brings together a
shortages.
wide group of participants – from government,
Beginning with the principle that people make
non-governmental organisations and the private
bad decisions because of poor information, the From new land-use policies that would create
sector – and fuses Arup’s global expertise with
focus of the C40 UrbanLife project in Melbourne natural flood defences, to hi-tech underground
best practice in individual cities. Arup believes
was to explore how the city could use information water storage facilities, the workshop considered
that taking an integrated approach to addressing
technology to encourage its citizens to change an integrated programme of new infrastructure,
city-scale problems – for example, involving energy
their behaviour and enable city managers to better based on Arup’s practical knowledge of
and transport officials in a discussion about waste
understand the impact of their climate policies and international best practice.
management – is the only way to deliver solutions
to manage services more efficiently.
that are sustainable in the long-term.
From energy meters to smart travel cards and artistic
public visualisations, the workshop considered
the many different elements that could be used to
create an ‘Information Architecture’ for Melbourne.
34 35
Springvale Road and Rail Client Location
VicRoads Victoria, Australia
Grade Separation Project
04
Fast, safe
and reliable 01 05
When it came to helping the The Springvale Road and Rail Grade Separation
Project is a major step forward for the Victoria
Governments of Australia and State Government’s AUS$38bn Transport Plan.
Victoria create a safer and more As it is one of Melbourne’s busiest level crossings –
reliable rail network, Springvale with more than 50,000 cars, 218 trains and 5,000
pedestrians using the same space every day – the
Road level crossing was the first
design challenge was considerable. However, by
project to be tackled. By locating the locating the new station outside of the rail operating Arup, KBR Pty Ltd, the Department of Transport,
station outside of the operating rail corridor, the station and rail shutdown was reduced previous rail operator Connex and Metro Trains
corridor, the design team was able from 35 to 10 days. Also, by carefully studying traffic Melbourne (MTM) the current rail operator. The
flows and assessing multiple options, the team was proactive way in which the alliance operated
to significantly reduce disruption able to reduce the Springvale Road disruption from throughout and it’s work methods was key to the
and minimise on-site construction 12 weeks of temporary lane closures to a planned project’s success – the work methods were highly
– saving precious time and money. 10 day road closure. It was actually achieved with integrated, creative and innovative.
five days of 24 hour round-the-clock construction.
The end result is safer and more reliable travel for From the beginning, an alternative but compliant
train passengers, drivers and pedestrians.
design was proposed. It showed how a different
approach would save significant time and
This AUS$140m project was designed and built
money, while meeting the demanding timescales
in just seven months by the Springvale Road Rail
and reducing disruption to commuters and
Alliance (SRRA) including VicRoads, John Holland,
local residents.
36 37
Pedra Branca Client Location
Pedra Branca Empreendimentos Imobiliarios SA Florianópolis, Brazil
Sustainable Urbanism
03
Too good
to waste 01 Pedra Branca sits at the
bottom of White Rock
Climate+
Pedra Branca is one of 16 global projects
to be selected as part of the Climate+
programme from former US President Bill
Residents of this new downtown development 02 Brazil’s litter pickers,
the catadores, are well
Clinton’s Clinton Foundation. Climate+
won't be the only beneficiaries of the sustainable equipped and an integral supports the development of large-scale
part of favela life urban projects, demonstrating that cities can
infrastructure strategies as it is envisaged to also grow in a climate-positive way. Developers
03 Pedra Branca unit
improve the lives of people living in a nearby interface and smart panel and local government have agreed to work
favela. And as one of 16 cities sponsored by the together on clean energy, outdoor lighting,
transportation and water management.
Clinton Foundation, these low-carbon strategies The project receives no funding from the
are likely to be echoed in the planning of future Clinton Foundation, but the link means
cities elsewhere. that good practice in Pedra Branca will
influence other global urban developments.
01
38 39
Climate Change Resilience Client Location
Asian Development Bank Wuhan, China
for Water Infrastructure
01 Wuhan is a
transportation hub 03
located where the
Yangtze and Hanshui
rivers merge
Water + energy Government
02 Distribution of urban
Arup’s integrated approach paid water infrastructure Private
off given the inherent relationship in Wuhan
between energy and water. It 03 Stakeholders in
takes lots of energy to treat water, Wuhan’s water
so if you have better wastewater infrastructure
standards, you use less energy.
Russia
The solid waste by-product from
wastewater treatment plants can
Water futures
Mongolia
itself be used as fuel.
Beijing
China
Japan
Wuhan
A new ‘guidebook’ from Arup – with Chongqing
Shanghai
a methodology for assessing a city’s
vulnerability to climate change – is India
Hong Kong
helping Wuhan in China prepare its
water infrastructure for the future. Thailand Vietnam
40 41
15% Reduction in Carbon From Client Location Sadar-e-Kabuli Girls School Client Location
Strategic Forum for Construction and UK United Nations Office for Project Services Kabul, Afghanistan
Construction Processes by 2012 Carbon Trust (UNOPS)
construction
construction industry set itself the ambitious target
A legacy of
to reduce carbon emissions from construction
processes and associated transport by 15%,
measured against 2008 levels.
to achieve its ambitious target action plan has been shaped by stakeholders across
many industry associations, individual companies As Afghanistan continues its
to reduce carbon emissions from and policy makers; Arup has been instrumental in rebuilding efforts, a new school
construction processes by 15% facilitating this process.
design in Kabul could provide
by 2012, measured against 2008
An initial study has set a precedent by analysing a framework through which
levels. The action plan offers quick carbon from construction processes across the others in the region can be
win solutions for the industry. sector. Arup developed a carbon accounting
methodology to measure construction emissions
built. In this earthquake-prone
and to work out the 2008 baseline carbon footprint area, a simple but robust
for the industry. This new methodology can be approach to construction is
used to repeat calculations year-on-year, helping to key to providing safe schools
track performance in the future.
for the future.
With the deadline for the reductions approaching
rapidly, the action plan needed to focus on 02
measures that would make the biggest difference
in the shortest timeframe. The industry operates
on slim profit margins, so the most practicable When Arup, working collaboratively with UNOPS,
measures are those that offer financial benefits set about designing a 3,000-pupil girls school
quickly, without large capital costs. These are most in Kabul, making the building earthquake-
likely to be adopted straight away. resistant was one of the most important design
considerations. If an earthquake strikes, its
Eleven areas for action have been identified to inhabitants must have the best chance of exiting
03
tackle the key contributors to carbon emissions. safely, and the engineering team went to great
Arup has provided clear guidance on how long lengths to show how and why the design offered
these will take to implement, how much carbon an appropriate solution. The final design for the Sadar-e-Kabuli school
will be saved, and the fuel cost savings available to consists of five three-storey blocks with uniformly
the industry. Fuel-efficient driving and operation of Ensuring the design met rigorous international reinforced walls for both the façade and the
plant on site, as well as the replacement of portable standards informed the team’s detailed decisions. internal walls. This eliminates the need for
buildings with green cabins have been identified At each stage of the design process their thinking complex movement joints in the internal and
as straightforward changes that will make a big was shared with the client and accompanied by in- external walls and simplifies the building’s
difference to emissions. depth explanations. This meant that the principles foundation design by spreading the loads
behind the design process could be repeated locally uniformly. This made it straightforward for the
If the industry’s voluntary 15% reduction target in the future. local workforce to build. The design also satisfies
is to be achieved, the diverse community of International Building Code (IBC 2006), delivering
construction professionals must collaborate. The Although a map of Afghanistan’s earthquake a structurally-sound solution that goes beyond all
action plan is channelling the industry’s carbon 01 Construction of
hazards already existed, Arup was able to help local requirements.
reduction efforts into a focused and coordinated concrete masonry the client interpret the seismic levels and work
response. The plan raises all-important awareness unit walls out the appropriate code building loads for the Concepts and technologies used in this school
about carbon in construction processes, and gives 02 Afghan schoolgirls school design. Similarly, the hazard map enabled design are already being applied to many
clear direction about the measures now available modifications to the building design to be made in other projects in Afghanistan, promoting safer
03 Detail of concrete
that offer benefits both for the industry and the masonry unit wall response to different levels of seismic risk around construction and having a far wider impact than
environment. at column the country. envisaged at the outset of the project.
42 43
Arup Interactive Reports Location 1200 Buildings Retrofitting Client Location
Global Department of Innovation, Industry Melbourne, Australia
Project Stimulus and Regional Development, Victoria
01 Analysis of predicted
activity, clustered
02 by level of retrofit
01 A navigable 3D project opportunity
model of fire safety
interventions
02 Interactive 3D model
shows planned
engineering work by
discipline
01
Data made
scenario, with the results embedded in a detailed
and complex report. The use of a scenario model
meant that Arup would need to run variations to
the base case on the client’s behalf, limiting the
simple
exploration of different conditions.
Information
changed this by presenting the results of the
detailed analysis in an appealing and clearly
accessible way. The tool, which is accessed via the
Arup has developed an interactive internet, is dynamic and gives control to the client,
innovations
visualisation tool that makes who can change the model without the need for
large amounts of complex data intervention. A simple slider can be used to adjust
the number of buildings in the programme, with
easy to understand. the impact of a new scenario instantly clear.
44 45
Decentralised Energy Client Location
London Development Agency London, UK
Master Plan (DEMaP)
London
Network Vision Map clusters, producing a viable heat load profile for
01 03 The British Library, a Combined Heat and Power (CHP) and DH network
potential participant opportunities. As such, the map provides an
in the Euston Road 04
District Energy evidence base for the networks to be installed.
Scheme Arup is now custodian of the Heat Map, and is
collating local-level data to fully populate it.
04 Combined Heat and
Power plant Once key opportunities have been identified and
If the Mayor of London is to meet his prioritised for decentralised energy projects, land Why decentralised energy?
can be identified and safeguarded for the energy
targets of reducing London’s carbon A decentralised energy system removes
emissions by 60% and decarbonising the need for homes and other buildings
25% of its energy supply by 2025, centre and more detailed development work to produce their own heat energy (using a
can begin. boiler or electricity) by using hot water that
a radical shift in the way electricity
is produced centrally within a community
and heat are generated and delivered The Heat Map also highlights opportunities for by either a gas fired Combined Heat and
is needed. The Decentralised developers and boroughs to work together, by Power (CHP) plant, or from other low and
Energy Master Planning (DEMaP) taking advantage of their proximity to networks, zero carbon sources, such as locally produced
as regional planning policy in London requires biomass. This hot water is delivered to
programme is helping to create and any new building development to link to either an the community via a network of pipes.
accelerate this shift. existing heating network, or one that is planned. Individual and collective users can then
To help deliver district energy projects, local connect to this central hot water distribution
planning policy is being reinforced to make the network.
Decentralised energy is the generation of electricity process more effective.
close to the point of use, enabling heat released
during the power generation process to be Part of Arup’s role is to assess the technical
captured, distributed and used locally via a District feasibility and financial viability of decentralised 67km of pipework, saving almost 100,000 tonnes
Heating (DH) network. A mayoral initiative, led energy projects and to develop plans for of CO2 emissions each year. The LTGHN ‘Vision
by the London Development Agency (LDA) is implementation. This is a complex process. Map’ created by Arup has helped to communicate
underway to increase London’s use of decentralised It involves engaging stakeholders, identifying the ambition for this project and the overall
energy and the potential positive impact of this infrastructure routes and constraints, testing programme.
programme is enormous, with almost half of all alternative supply plant and operational scenarios
CO2 emissions in the UK arising from heat used and understanding the economic and commercial With several schemes now close to being
in homes, business and industry. Changes in this implications of different options. delivered, and suppliers, funders and customers
area are therefore critical to achieving the Mayor of negotiating contracts, London will soon see more
London’s targets. Infrastructure projects of this nature often carry community energy projects appear in the market.
large up-front costs, and attracting investors is By developing self-sustaining programmes and
Arup has been heavily involved in formulating key. Arup’s work is helping to show that the risk ensuring that solutions are market-tested and
the LDA’s DEMaP programme – with Arup staff for certain projects is at an acceptable level by proven commercially, Arup is supporting delivery
seconded to run the Programme Management demonstrating financial viability through secure of the Mayor’s initiatives. In doing so, it is helping
Office. The firm has also been instrumental in revenue streams. Procurement and funding options to pave the way for the creation of a new heat
bringing forward a number of decentralised energy and strategies for future expansion are all identified industry, with jobs and skills to support it. All of
projects on behalf of the LDA, across all phases of to help instill investor confidence. this will help London’s endeavour to reduce carbon
the development cycle. emissions and meet its 2025 targets.
Following the development of community
To succeed, the programme relies on the London scale projects in the Royal Docks area, the wider
Boroughs to implement it, and a support London Thames Gateway Heat Network (LTGHN)
programme has been developed to enable them was developed. This flagship scheme has the
to deliver energy masterplanning in their local potential to connect up to 120,000 homes and
area. The support programme effectively carries many public and private buildings through
02
46 47
Industry-Based Sustainability Client Location Rainwater Harvesting Client Location
Initiative for Responsible Investment, USA Arup Bristol, UK
Reporting on Key Issues Harvard University
Flushing Tank
SVP to terminate
Blucher above overflow level
attenuation of roof rainwater 02
outlet storage
automobiles Rainwater flushing
cistern collection pipe SVP
Mains water top up to
conventional electricity
Heater access chamber
02 Final product ready
for installation
Hot and cold water Hot and cold water
supplies to sink supplies to sink
Flushing valve
control boxes
Materiality
01
Tundish connects Rainwater tank SVP Incoming
to grey water overflow to grey water connects mains
drainage system drainage system to foul drain water
48 49
SAFElink Alliance Client Location
Department of Transport and Main Roads Queensland, Australia
SAFElink collaboration
01
An interesting aspect of the project – and key
to its success – is the delivery model. SAFElink
Alliance is a virtual company. Individual company
badges are left at the door, but members bring
in values from their parent companies. The
arrangement is strengthened by a 50-page
contract that underpins the risk-sharing nature
of the Alliance – a project worth AUS$824m.
Unanimous decision-making, mandated by the
contract, cultivated a highly productive working
atmosphere – memorably described by one of
Arup’s team as ‘partnership on steroids’.
02
03
The growth in south east improved as a quid pro quo for to align with the driver’s ultimate making it far easier to design for email. This improved collaboration compliance levels. Where the
Queensland’s western corridor the disruption caused during the direction where possible, so that it key driver responses. on the project, and squeezed every original, bulky, three-level 04
road traffic prompted a progressive construction phase. would feel intuitive. ounce of benefit from working interchange was noisy, generally
upgrade of the Ipswich motorway, Technology was a key contributor across different time zones. Project intrusive and blocked light, the
including the 5km section All over the world, safety in road The design minimises visual to the project. Arup modelled all managers would arrive in the replacement two-and-a-half- 01 Early sketch of
the interchange
Clear
between Wacol and Darra. One design is codified, with designers distractions such as roads crossing aspects of the interchange and morning to find files that had been level interchange is 8m lower.
challenge was that around working to at least meet relevant each other. In several cases it road upgrades in 3D, complete updated overnight, with version This makes it far less intrusive to 02 CAD modelling of
100,000 vehicles a day had to standards. The team wanted to was necessary to design ramps with GPS control so that managers control and a full audit trail. the surrounding landscape, and the interchange
50 51
Dubai Towers Client Location Upton Square Client Location
tvsdesign Dubai, UAE Mansell Construction Northampton, UK
01 Revised geometry
02 Rendering of the 01
Code 6 living
Dubai Towers
before (left) and
after adjustments An eco-development in
03 Construction Northamptonshire shows
sequence analysis
zero-carbon residential design
in practice with the UK’s
02
highest sustainable home
rating, Code 6. More than a
theoretical example, Upton
Square’s terrace of eco-homes
are occupied and fully
functioning.
Refine and The Dubai Towers taper, rotate In a relatively short timeframe, to help decrease cumulative that all new dwellings will be zero fed back to the grid. Introduction homes.
A community-scale
and curve until they reach their the team was able to evaluate horizontal loads. carbon. of ‘feed-in tariffs’, which came centralised wood bio-fuel A south-facing ‘sunspace’
peaks, which range from 365m a number of different design in after Upton Square was built,
reduce
plant and local distribution creates a modern living area.
to 550m. The engineering strategies. Each iteration was The geometry created other Upton Village is an extension to an have made PV generation on new system eliminates the Highly functional, it provides
challenge was to find a assessed based on the balance structural challenges. The rotation existing town and has an overall schemes increasingly attractive, by need for gas supplies to passive solar heating.
structurally efficient form and of the tower, reduction in internal of the tower itself created torsion, target of achieving a 60% carbon reducing payback periods. the properties, provides all
detailed geometry within this shears, and aesthetics. The team and without structural intervention reduction. Six properties within Passive natural ventilation is
With a vision more sculptural required heating, and allows
complex aesthetic concept. By adjusted the geometry by degrees the tower would literally try to the eco-development were set the As a result of this Metropolitan incorporated on the roof and
than architectural, the design an efficiently sized system to
working with the principle of the to find a workable solution as ‘untwist’ itself. This was overcome challenge of achieving zero-carbon Housing Partnership development, heat from extracted air is
serve a local cluster of several
of these four towers presented tower appearance and making close to the original architect’s by introducing a perimeter diagrid status by incorporating the latest the broader community has homes.
used to pre-warm incoming
quite an engineering minor adjustments, Arup was intent as possible. brace that sloped in the opposite thinking in sustainable design. an increased awareness of fresh air.
able to make positive technical direction to the columns. sustainability-related issues which 300mm mineral wool
challenge. To remain true Water conservation, rainwater
interventions. The geometry proposed by Arup As well as providing helps to promote a low-carbon insulation was installed
to the architect’s vision, throughout the walls, floor
harvesting, green roofs and a
ensures the towers would be These engineering strategies led multidisciplinary engineering lifestyle. It also demonstrates to drainage system incorporating
Arup found a way to optimise Beginning with a process of ‘form balanced and stable. Conceptually, to a dramatic reduction in the services, Arup was appointed as the construction industry that and roof of the building –
wetland landscape and runoff
the geometry, devising a finding’, Arup explored multiple the goal was to create a vertical sizes of the perimeter braces the code assessor for the project, a zero-carbon – and Code 6 – much thicker than that found
channels, allows a natural
structural solution that configurations for the towers, building with a flowing perimeter and columns, as well as greatly working closely with the Building solution is possible using current in a standard house, this
surface drainage strategy and
evaluating the performance that could ‘hang’ from it. The reducing the amount of concrete Research Establishment (BRE) and readily-available technology. minimises energy usage.
would be efficient, limits outflow to sewers.
and cost of each. By using Arup central core would therefore do needed for the foundations. The Group to meet exemplary Code 6 Such developments will steadily
economical and buildable. Air-tightness, three times
optimisation software, the the primary structural work of the revised design would save 95,000 status. An ongoing collaborative become more affordable through the mandatory requirement,
process could be streamlined. The building. As a result, the layout tonnes of steel and 96,000m3 of relationship helped speed up the government incentive, new
geometry was fed into the scripted was revised to increase the loads concrete – a reduction of 40% in design process and make the high suppliers to the market, and
software which then generated carried by the vertical core, and the materials originally proposed sustainability rating achievable. greater production to meet
models of the entire structure and stability was further enhanced by – with a cost saving estimated at demand and combat the issue of
loads, providing results for each reducing the slope of the columns US$600m. The energy strategy was crucial increasing fossil fuel energy costs.
proposed modification. towards the bottom of the tower to Code 6 achievement, and
52 53
Natural Terrain Hazard Client Location Pilot Seismic Client Location
Geotechnical Engineering Office, West Lantau Island, Hong Kong, China Geotechnical Engineering Office, North-West New Territories,
Mitigation Works Hong Kong SAR Government
Microzonation Study Hong Kong SAR Government Hong Kong, China
the risks
thousand rain-induced landslides areas’ geological conditions and on the valley floor, for example, is coordinating specialist ground The study will provide the Hong
following torrential rain. Debris geomorphology (how the hills are would be particularly vulnerable, investigations and input from Kong Government with a set
hit houses, blocked vital roads formed) and record all findings on as the debris ‘fan’ – rather like Chinese methodologies. of 3D maps, which are zoned
and left villages at the bottom of digital maps using a Geographical a flood plain at a river mouth – according to seismic motion at
natural hill slopes isolated and Information System (GIS) database. indicates notable accumulation 02
Hong Kong is one of the In this project seismic engineering ground level and that show areas
without power for over a week. The GIS database incorporates of past landslide material. and geology is being combined to of slopes likely to move in the
world’s most densely populated the location and extent of all Arup assigned a hazard and formulate seismic risk assessment, event of tremors. These provide
areas, with seven million In the aftermath, Arup was previous landslides within the consequence value to each hillside with the team developing new a methodology for future seismic
people living in just 25% of its challenged by the Hong Kong study area, documenting over catchment in order to create a techniques in the process. Arup microzonation studies. They also
landmass. Much of its urban Government to develop a way 5,000 landslides that had been matrix of risk. The result is a is working with seismologists inform the Government’s new
development lies on relatively of quantifying the risk of rain- identified using nearly 50 years valuable planning tool. from the Guangdong Engineer town planning and help it to
induced landslides in an 18.5km² of aerial photograph records. By Earthquake Resistance Research quantify the risk of developments
flat land in the lee of hills and area of West Lantau Island, which examining the geomorphological Arup’s peer-reviewed, world- Institute to combine approaches in different areas.
mountains. So when heavy alone experienced over 500 conditions in association with the class study extends the science
rains fall or earthquakes strike, landslips in June 2008. Working landslide data, the team was able and practice of risk assessment
landslips are a major problem. with a local joint venture partner, to understand how the frequency in urban planning, as well
The Hong Kong Government the team devised a new approach and type of landslides were related as providing Hong Kong’s
to analysing available data and to various different parts of the Government with the means of
is working to reduce the risk of mapping a risk profile for the area. hillsides within the study area. identifying those areas where
landslip on urban development This allowed it to define zones of mitigation work is most likely to
in the future, even as it The team developed a differing levels of landslide hazard. save lives. Hong Kong’s deaths
protects the most vulnerable methodology that examined the from landslides have been
areas in the present. physical conditions and processes Next, the team prioritised and dropping steadily, thanks to Arup’s
evident within the site, such as ranked the hillside catchments previous work on a comprehensive
soil type and condition, and its according to risk; a challenging risk assessment framework for
distribution. For example, if soil piece of analysis. The catchments manmade slopes. This project does
does not ’match’ its immediate were divided into two sets – the same for the natural terrain,
surroundings, it may have been those affecting villages and those making Hong Kong a world leader
moved there by previous landslides affecting infrastructure – and the in risk assessment in this area.
and may indicate a higher risk of 30 areas with the highest risk 03
54 55
Dubai Pedway Development Client Location Xdisp – Building Damage Client Location
Strategic Planning Department, Dubai, UAE Global
Strategy Roads and Transport Authority (RTA)
Assessment Tool
02
01 Xdisp’s graphical interface
incorporates a 3D model
01 of the tunnelling site
Scenario 1 Simulation Time
September 5:00pm 02 Ground movement
curve: surface and
Overall Thermal Sensation
sub-surface movements
02
01
No Shade
Shaded
Pedway Scenario 1
Time (Minutes)
Automating
Dubai’s blue skies and warm Dubai’s air-conditioned buildings distances. This led to the proposal
pedestrians move in
comfort in a low energy weather have made it a popular are regularly set at temperatures that the pedway would need air
pedway (in red) as magnet for tourists. But getting of around 18ºC, which means conditioning at regular intervals
compared with walking in
direct sunlight (in black)
and in the shade (in green)
around this sprawling city during
the hot and humid summers can
be a challenge. Air-conditioned cars
that people experience thermal
shock when they walk out into
temperatures that can exceed 45ºC
to bring thermal sensation back
down between naturally ventilated
sections.
assessment
02 Naturally ventilated section
with fans and canopy roof
prevail as the most comfortable in the summer months. Arup’s
option for many in the heat approach is to ‘split the difference’ The team provided three case With increasing urbanisation In many construction projects, Traditionally, the prediction of Multiple iterations of ground
of summer. Pedestrians face a between these two extremes and studies to illustrate the proposition: comes greater need for major mitigation measures to ground movements and resulting movement analysis can
number of difficulties, including develop a range of options that one tunnel, one low-energy open protect existing buildings and impact due to tunnels and be carried out with the software
urban infrastructure much of
poor continuity of footpaths, mitigate the problem. One of these structure, and one that is enclosed infrastructure are a major excavations is labour-intensive. tool. A design team can use
the dominance of traffic and the is a naturally-ventilated pedway and AC cooled. The study created
which is situated underground consideration. There is already It can often be difficult to extract it to explore different tunnelling
fact that whole communities are that increases pedestrian safety a flexible framework for pedway in the form of tunnelling a well-established method for results, manipulate them and scenarios to understand the
intersected by 12-lane highways. and mobility without the need development and implementation projects for roads, railways and assessing impact on masonry draw conclusions rapidly. What’s potential for damage to buildings
for extensive energy-hungry air that could be developed water. Arup-developed software structures proposed in recent more, because the process has and decide on the most
Dubai’s new metro system has so conditioning. organically, connecting more UK legislation. Arup has now largely been manual and appropriate and cost-effective
that automates the prediction
Cooler far exceeded its targets. However,
the local climate means that, The team looked at pedway
and more commercial and leisure
buildings to become a vital part of
of ground movements and
building damage assessments
developed an automated software-
driven approach that can
cumbersome, there is always
the possibility that errors might
mitigation solution.
walking
unless people live within a few precedents in other cities, the city’s transport infrastructure. calculate 3D ground movements creep in. From recent experience
paces of a bus or metro stop, they including Mumbai, Hong Kong, It also explored funding and is helping to save clients both from excavations and tunnels. using the tool on Arup projects,
face an uncomfortable walk in Toronto, and Chicago. They revenue models that would offset time and money. It can automate the process of Working alongside colleagues in the automation of building
the heat. Keen to build on the proposed a shaded structure with the capital costs. determining building damage Oasys (Arup’s software house), the damage assessment calculations
A new study is exploring metro’s initial success, Dubai RTA high thermal mass as the best assessments in an integrated and firm’s engineers have developed saves a significant sum per
asked Arup to develop proposals way to avoid the problem of solar Arup’s feasibility study shows dynamic way. Xdisp – short for Excavation iteration. This gives clients a cost
the feasibility of a system Displacement – which automates advantage, especially on medium-
to extend the walking catchments, gain, while capitalising on the how a Dubai pedway could be
of city walkways to extend with particular emphasis on low heat retention of the structure developed, increasing access to To put building damage the calculations necessary to carry to large-scale projects. Given the
the catchment of the energy options. One answer is a itself to keep cool, with fans to public transport and bringing assessment into context, the out building impact assessments. important role and proportionately
public transport network, pedestrian walkway – ‘pedway’ create airflow. Arup’s microclimate with it commercial sponsorship mitigation measures on the 1990s high cost of building damage
including the recently for short – that provides a quick experts modelled thermal comfort opportunities such as retail kiosks London Underground Jubilee Line Xdisp’s graphical interface assessment calculations in
and convenient means of moving and sensations over time. They and advertising space. It also sets extension accounted for one sixth incorporates a 3D model of the underground infrastructure
opened Dubai Metro. of the total civil engineering proposed tunnelling site and projects, a tool that improves
between public transport and started from a benchmark of out guidelines and mechanisms
residences, offices, shopping malls walking in the winter sun to define for a flexible system of connected spend, at more than £100m. provides clear visualisation of the their efficiency is invaluable.
and community facilities, while a comfortable transient sensation walkways that could continue So any improvements in the relationships between tunnels,
protecting pedestrians both from level. They analysed transient to develop and grow, alongside assessment process influence an excavations and buildings, making
the traffic that dominates the city comfort, considering walking the city itself. important and expensive it a useful communication tool for
and from the aggressive heat. speed, metabolic rate and walking aspect of such major works. both designers and clients.
56 57
Detail A
D Detail B
Detail C
20000
Detail C
2 2 Detail D
ASFALT AARDEBAAN AANPASSEN OP 2 2 Detail E
NIEUW NIVEAU CONFORM FASERING
Renovation of Client Location
Rijkswaterstaat, Dutch Directorate-General The Netherlands TUSSEN (O - 20
Eight Steel Bridges HSB OVERLAGING
IN OVERSTEMMING MET FASERING for Public Works and Water Management
LAMELLE LOOP
1
03 3500 3500 3500
3500 3500
BESTAAND ASFALT OP DE BRUG 1500
M
S4 20000
LIJNEN WAAROP SENSOREN KUNNEN
WORDEN GEPLAATST DWARSDRAGER 01 Waalbrug Bridge, O - 20
AAN TE PASSEN ASFALT
(INDICATIEF) 9468 9468 70532 71532 90468 51596 9468 9468 Nijmegen
D
322000
02 Galecopper Bridge
GEEN SENSOREN (BINNEN 500 mm 01
D VANAF RANDDETAIL) BOVENAANZICHT 03 CAD of Boogbrug Bridge
1:500
04
04 Boogbrug Bridge rail
crossing
De epoxyhars ge
05 Brienenoord Bridge,
AFHANKELIJK HOOGTEVERSCHIL
HSB/ BESTAAND ASFALT
Rotterdam
HSB/ BESTAAND ASFALT
De druksterkte g
Sterkte op dag 3
AANBRENGEN BESTAAND
Gietasfalt / strijkasfalt ASFALT ZOAB
Treksterkte gete
en 21 N/mm2 op
Afschuifsterkte g
en 13 N/mm2 op
Bij een test temp
D
D
SENSOREN
500 500 500 500 Trekstijfheid get
389 02 WERKGEBIED HSB - 36450 ASFALT - 6999
Dichtheid dient t
36839
De volumekrimp
de FIP methode
27667
Bewerktijd van h
en de goede inb
19419
05
Omstandighede
D
10917 Het hechtmiddel
Afgezien hiervan
DETAIL A
389 FASE 1 - 10528 FASE 2 -8502 FASE 3 -8248 FASE 4 -9172 gemeten in de s
DETAIL C worden tegen ex
DETAIL B DETAIL D Tenzij anders be
DETAIL E
van het stalen d
O - 200 O
F F + 200 verwekingstemp
200
200 De coëfficient vo
Het hechtmiddel
Positie sensoren
NOORD
Take 8 bridges
Sensoren mogen
ZUID
In the 1960s and 1970s, over 200 dramatically extend their design government agencies for the Arup’s retrospective analysis has information model, that will en moeten derha
Positie van de se
steel bridges were built in The life through carefully planned benefit of The Netherlands shown that the concrete overlay provide RWS with a system to store, opdrachtgever.
Netherlands. At the time, they renovation. as a whole. is a good and reliable solution control, communicate and manage Getoonde dikte H
dikte HSB voor d
were expected to last around 100 which should ensure the future information and knowledge. With 9V3171-30-CS-D
Due to higher traffic loads years, but this expectation changed After the problem had first been The answer has been a new of these steel bridges. In the this, the team is equipped to model Om een goede h
aangehouden te
several of The Netherlands’ in 1996, when a crack was found identified, fatigue on steel deck contract for local engineering firms, past, future levels of traffic were both new and existing bridges and voorzichtig de ra
Prepareer de sto
most important steel bridges in the deck plate of5375a six-year-old plates was considered an issue, under which
16400 Arup has taken on underestimated and the designers to refine
16400 general principles for steel 5375 spijkerpistool of
othotropic steel bridge deck. While so RWS’s proposed solution to the renovation and strengthening 43550
could not have foreseen the bridges in general, as well as the betonnen overla
are showing signs of fatigue (Noot: indien in d
fatigue cracks between 100mm and the cracks was to replace the of eight steel bridges from start to BRUGDEK development
MET HSB of slower, heavier eight bridges in the sample. The verband met het
damage. Arup – working almost 1.5m long have since been asphalt layer with a concrete finish, including responsibility for freight trucks (with ‘super single
1:50 plan is to add 3D models showing
ter vooorbereidin
De beton behan
closely with the country’s found in many Dutch bridges, this overlay of the same thickness. managing the contractors together tyres’ for juggernauts which the appropriate information for
te verwijderen. T
Voorafgaand aa
to build a nuanced and such damage. Still structurally safe, the weight, this was not expected Haskoning. Arup is drawing on its smaller wheel surface) becoming clients to take a virtual walk over epoxy slijtlaag
Het hechtmiddel
ca. 8 mm
epoxy-polymeer,
VOOR AFSTAND B.K. RANDLAMELLE
even with cracks on the deck plate to be a problem. The idea was global TOT
expertise and developing standard within just 10 years. The individual bridges. Bewijs van voldo
detailed understanding of VOEGOVERGANG B.K.
DEKPLAAT T.P.V. EINDDWARSDRAGER oppervlaktes die
as large as this, the findings have studied tested in two pilot projects a nuanced understanding of
ZIE TABEL B.K.the Netherlands is one of the most
how these bridges behave
RANDLAMELLE =
B.K. EPOXY SLIJTLAAG EPOXY SLIJTLAAG
nevertheless prompted urgent and appeared to work. By doing eight landmark bridges, which congested countries in Europe Of course, building such expertise
and how their design life can investigations. this RWS ensured a steep learning range from 100m to more than and also provides key access to in bridge design and performance EPOXY SLIJTLAAG
min. 65 fase 2
HSB
Arup together with a Dutch joint market. Eventually, a development in length. All are strategically EPOXY HECHTLAAG that the lives of the country’s steel body of knowledge in this area
epoxy hechtlaag
venture partner Royal Haskoning partnership with contractors was important to the Dutch highway bridges must be extended. and will be applicable elsewhere.
won the tender for the investigation able to come up with a reasonable network and carry heavy loads. DEKPLAAT
HSB In Germany, for example, similar
of eight of the most crucial bridges and acceptable means of extending In developing a methodology
DRSN 2-2
Arup is working closely with
EPOXY RWS
HECHTLAAG problems are arising with existing bauxiet
2 -3 epoxy
epoxy
1:5 DETAIL
in the highways network, which the remaining life of the two pilot to suit these eight bridges, Arup consolidating expertise1:20 in steel pre-stressed concrete bridges.
WAPENING
is overseen by national agency, bridges. will be producing a blueprint bridge design, much of which Germany has approximately 5,000 HSB
Rijkswaterstaat (RWS), Directorate- for renovating the rest of the is neither regulated nor written pre-stressed concrete bridges and DEKPLAAT
EPOXY HECHTLAAG
General for Public Works and In 2000, RWS consciously decided country’s steel bridges and perhaps down. The firm’s programmers more than 500 steel bridges. stalen The
brugdek Algemene doorsnede HSB
1:1
WAPENING
Water Management, part of the to leave a bigger part of the others further afield. 37 have linked sophisticated 3D bridge need for the assessment of existing DETAIL
Ministry of Transport, Public design work to agencies in the design modelling with static and bridges in Europe is expected to 1:20
51
Works and Water Management. private sector. This left them with The team is assessing the bridges fatigue-modelling programmes. grow and Arup’s capacity23 to carry- ASFALT AANBRENGEN OM
Arup is applying its bridge design the challenge of ensuring that with a view to strengthening Using the expertise of bridge out such analysis is increasing HOOGTEVERSCHIL TUSSEN HSB
EN ASFALT TE OVERBRUGGEN
expertise from all over the world expertise and understanding of
STRIJKASFALT
them and extending their useful 529 experts in three of the firm’s commensurately.
IN HET WERK TE
to analyse these bridges and steel bridge design exists outside life bySLIJTLAAG
EPOXY at least 30 years. offices,
KNIKPUNTArup
HSB is developing a bridge EPOXY SLIJTLAAG
D
EPOXY SLIJTLAAG BEPALEN IN OVERLEG
389 EPOXY SLIJTLAAG GIETASFALT MET DE OG BESTAAND De aangege
EPOXY SLIJTLAAG C1 KNIKPUNT DEKPLAAT C2 ZOAB
239 150 B D indicatief en
HSB
HOEKSTAAL NIEUW E 100 ca. 200
Voorgestelde
A aannemer d
min. 65
min. 75
min.75
D 14-05
min.75
58 59
min.75
C 29-04
B 14-04
73
A 08-03
279 21 26 274 0 11-02
95 205 Rev. no. Da
GIETASFALT
EPOXY HECHTLAAG EPOXY HECHTLAAG EPOXY HECHTLAAG Status
EPOXY HECHTLAAG
Hong Kong West Drainage Client Location
Drainage Services Department, Hong Kong, China
Tunnel Hong Kong SAR Government
Down to earth
of 3.9km with an inside diameter of 6.25m and
a western section of 6.6km with an inside
diameter of 7.25m.
• The adits that connect the dropshafts with the
main tunnel total just under 8km and are generally
Hong Kong Island’s drainage
2.3m in diameter.
system is under pressure. The
• There are 32 dropshafts, with the deepest
rapid rate of urbanisation has 180m deep.
caused a sharp increase in • There are a total of 34 intakes, these intercept and
flooding, but a new drainage divert the existing flows into the 32 dropshafts.
tunnel – Hong Kong’s largest • The western portal provides an outlet to the sea
ever – will soon help protect at Cyberport and includes an energy dissipating
the island’s Northern districts. stilling basin to control the velocity outflows.
• The eastern portal is the largest intake structure
and includes a maintenance entry point to
the tunnel.
The Hong Kong West Drainage (TBM) methods with some long is planned to be finished in 2012, Rather than carry out a full Another significant departure This method needs to be
Tunnel (HKWDT) will be the largest drill and blast adits connecting allowing sufficient clear time evacuation of the tunnel, a safety from conventional tunnel meticulously planned, since it
drainage tunnel constructed on the tunnel to the drop shafts. to carry out full testing of the zone would be established around construction techniques was creates a number of dependencies
the island. At over 10km long Blasting was the preferred option system before the onset of the the point of detonation at a to adopt a raise boring method in the construction process. The
and with a diameter ranging from for the construction of the adits wet season. With this deadline in minimum safe distance from the for excavating the intake shafts. main tunnel and adits need to
6.25m to just over 7m, it is a major as they have to be constructed mind, Arup has worked hard to blast. Personnel would evacuate Conventionally, the shafts would be completed prior to the raise
undertaking that is not made while the main tunnel works are minimise any risk of delay during to a safe refuge chamber located have been sunk as machine-dug boring commencing, and blasting
any easier by being located below in progress. the construction process, and has on the back of the TBM, so once shafts, or as hand-dug caissons has to be choreographed with
dense, wealthy, urban areas. The even created an unconventional the blast was complete and safety from ground level. These methods the main tunnel construction.
challenge is further compounded by The whole scheme lies within approach to tunnel blasting. checks carried out, work could are inherently less safe and can With a project of this magnitude,
steep terrain, narrow streams and and below exclusive, prime resume promptly. Importantly, the put an increased burden on the even the movement and hire of
restricted access on sloping sites. residential properties, which Normally, everyone underground blasting need not interrupt work local road network, as excavated boring machines must be carefully
gives the project an exceptionally is evacuated prior to the blasting, elsewhere on site. material has to be removed by planned and implemented.
By putting the drainage tunnel high profile, not least in the regardless of where they are truck from the top of the shaft.
uphill from the areas prone to local media. From the beginning, located in the tunnel network. Safety is of paramount importance By proposing unconventional
flooding, including Central, the community engagement has They would only be allowed back and the proposal went through By contrast, the raise boring construction methods and
main financial business district, the been pivotal to the success of in after the tunnel conditions a stringent safety review by method meant less impact on processes, Arup is helping to
tunnel will capture stormwater flows the project. With extensive and have stabilised and it was deemed all the relevant government local residents with reduced ensure that the Hong Kong West
before they drain into the low-lying, exhaustive consultation, it has to be safe to re-enter. To evacuate bodies before being authorised levels of dust, fumes and noise Drainage Tunnel will be handed
flat, reclaimed commercial and gained strong community buy-in. such a long tunnel with numerous for implementation. This new as well as significant energy over on time, as well as delivering
residential areas. This will help to The final design’s minimal visual adits and shafts deep underneath approach offers a significant and environmental savings for an effective design solution. Once
relieve floods and ensure these areas impact helped to allay community Hong Kong Island would take a improvement to working practices the local community and the complete, the drainage tunnel
have a sustainable economic future. concerns. significant amount of time and not just on this project, but across project. Importantly, huge savings should ensure that the city’s vital
cause major disruption to the the tunnel construction industry were also made in alleviating business district is effectively
The tunnel is being constructed by The construction programme construction programme. in Hong Kong. construction-related road protected from flood risk.
mechanised Tunnel Boring Machine runs over a four-year period and Arup proposed a new approach. congestion.
60 61
Long Span Bridge Research Client Location Light Neville Street Client Location
GS Engineering & Global Holbeck Urban Village Leeds, UK
Construction Corporation Bauman Lyons Architects
Long span bridges fall into two types: The challenge is to work out the
the suspension bridge and the cable- most efficient way for the bridge to
stayed bridge. Although they look reach its ‘kissing point’ – where the A dark, noisy and unwelcoming approach to
similar, they depend on different two sides meet in the middle and the the city of Leeds has been transformed by a
structural solutions. load is shared out along the span and
reduced (conventionally, bridges are
sound and light art installation that provides
01
Suspension bridge: engineered to bear the loads of the a modern counterpoint to this historic city.
how does it work? construction process, as well as the
Light aloud
Two large cables sag between two live load they must ultimately bear). 01 Using design elements of
towers and are ground-anchored both bridge types, the new
at each end. Suspended from these The design team tore up the rulebook approach to construction
both increases the span and
main cables are many smaller cables and came up with a method of reduces the steel required
or hangers, which support the bridge building the bridge from the middle
02 Unreel the cables at the
deck. The main cables carry most of of the span outwards. top of the towers and feed
the load of the deck. them down the aerial cable/
An aerial cable/walkway is hung walkway
Cable-stayed bridge: between two towers and the middle 03 Unreel the cables on the deck
how does it work? deck segments are suspended from and then use a suspended
The bridge deck is supported by this cable. Shown below are the two hanger from the aerial cable/
walkway to traverse the
many parallel cables. The cables pull methods used to get the stay cables cable to the central part in a Can an underpass be uplifting? The The art installation on the east side,
to the sides rather than upwards, out to the middle segment. see-saw motion experience of commuters in Leeds designed collaboratively by the
putting horizontal compression loads suggests that it can. Previously, team with international artist Hans
into the deck. Because the horizontal you would have been hard pressed Peter-Kuhn, features a grid of acrylic
forces are balanced, the bridge is to hold a conversation under the light rods, with 3,200 light-emitting
self-anchored rather than ground- bridge in Neville Street. People diodes (LEDs), which change daily
Stability anchored.
Partially ground-anchored
would rush ‘head down’ along the
narrow pavements to escape this
to a randomly-generated pattern.
The west side panels, designed
at length
railway underpass. Neville Street in collaboratively by the team with
cable-stayed bridge: 02 2010 is almost unrecognisable and local artist Andy Edwards, overlay
how does it work? a completely different experience: a graphic design with a moiré
For very long spans, the horizontal wide footpaths take you through a effect, which creates animations
compression loads in the deck quieter and subtly-lit thoroughfare, for passersby. The team integrated
Cable-stayed bridges are
become too great. By anchoring bathed in the sound and light art essential highway lighting into the
cheaper to build than some of the cables to the ground of two artists. It is the result of an top of the cantilevered ceiling panels
suspension bridges, but the compression is kept within the extraordinary, cross-disciplinary along with the permanent sound
conventional wisdom says limits that the deck can bear but the effort from Arup’s acoustic, lighting, system and control systems.
they have a natural span limit anchor block is much smaller than structural and electrical designers,
would be required for a conventional who worked closely with the The design team used Arup’s
of around 1,100m. Arup’s
suspension bridge. architects and artists. SoundLab, a room-sized auralisation
bridge designers, drawing 03
tool, to enable stakeholders to hear
on experience gained on Arup has joined forces with a By realigning the road and relocating for themselves the benefits of the
Stonecutters, aim to extend Korean contractor, GS Engineering bus stops, the team widened the sound-absorbing cladding and the
this limit with a new & Construction Corporation, and footpaths. Both sides of the tunnel sound art, long before any work was
Professor Niels Gimsing, a renowned are lined with sound-absorbent done on site. It also allowed the team
approach that combines
Danish bridge expert, to test the cladding, with an air gap behind to to establish that the project would
elements of both bridge types. limits of cable-stayed bridges and reduce noise, especially the low- improve the experience of all users
design new construction techniques. frequency boom of buses and goods of the underpass including the
These techniques could produce a vehicles. The panels are designed to visually impaired.
longer span but still cost less to build look good long-term, deter vandalism
than a suspension bridge. and provide a blank canvas for One regular commuter commented,
the sound and light installations. “It looks sleek, smooth and rather
They also conceal a multiplicity of futuristic. You have a sense of
equipment, services and access for something thoughtful. I will never
the essential maintenance of the linger in front of the installations –
bridge abutments, which support the it’s not an art gallery – but it does get
railway crossing above. my day off to a better start.”
62 63
Regent’s Place Pavilion Client Location Samsung Green Tomorrow – Client Location
British Land London, UK Samsung C&T Corporation Yongin, South Korea
Zero Energy and Emission House
Arup’s work with Samsung on the be opened during the hot summer into the design, enhancing internal units. It is a system widely adopted in
design of a zero-energy, -carbon and months, while during the winter thermal comfort and reducing Korea, that offers far greater heating
-waste emissions house has delivered time, the double skin façade of the indoor cooling loads. Photovoltaic efficiency than a conventional boiler
major advances in sustainable east side of the building helps to blinds provide shading as well as and far greater cooling efficiency
building design. It incorporates minimise heat loss. generating electricity, and natural than a standard AC unit.
passive elements based on traditional daylighting and a solar hot water
Korean building design as well as Radiant floor heating, a system often system both add to the efficiency of What makes Green Tomorrow
state-of-the-art green technology used in residential properties locally, the building. Green Tomorrow also such a successful project is the
and IT. Korea’s construction industry is incorporated into both the Korean has a Direct Current Electric Power careful integration of the building’s
is expanding rapidly and Green room and bedroom. This type of System, further improving its energy design features – a total of 68 green
Tomorrow has set a precedent for heating is typically more comfortable efficiency by reducing the power strategies – that each provide an
exemplary sustainable homes, with due to the fact that the feet and body conversion loss from AC to DC. incremental improvement to the
the country’s first LEED® Platinum are warmed first, so the thermostat overall energy efficiency of the
rating. can be set to a lower temperature, To cope with seasonal temperature building. Its LEED® Platinum rating
which helps to reduce energy variations a ground source heat gives the project a high profile,
One of the rooms recalls the consumption. pump, which warms water by using setting a positive example to Korea’s
prototype of a Korean summer the earth’s natural geothermal construction industry and to the
pavilion. The south-facing façade is To keep temperatures comfortable energy, is connected to the building’s wider community.
made up of folding windows that can natural ventilation is incorporated air-conditioning and air-handling
Simply slender
Regent’s Place Pavilion greets visitors The success of the design relied on was also welded to the roof plane in and elegant method of providing
to one of British Land’s newest office Arup working from first principles – order to create a more rigid overall damping without compromise to the
developments. Both ornamental and design calculations, methodologies structure. And while conventional aesthetics of the pavilion design was Samsung’s Green Tomorrow project sets a
functional, the Carmody Groarke and assumptions – all verified by a methodologies indicated that such devised. Impact damping – involving
RIBA Award winning design was technical review at Imperial College, a welded structure would have hidden rods encased in plastic
new benchmark for sustainable residential
conceived following an Architectural London. They also underwent sufficient inherent damping to and suspended within each of the design in East Asia. Awarded both LEED®
Foundation competition that looked thorough physical testing in a wind avoid resonant wind vibration, columns – effectively deadens any Platinum and the highest level of Green
to add life to the public space tunnel and at the UK’s Building this did not prove to be the case in vibrations and prevents resonance,
between the buildings. Research Establishment. testing. It transpired that the actual with the physical test results proving Building Certification in Korea, it
structure effectively had no inherent the preliminary calculations correct. demonstrates that zero-energy, -carbon
258 columns together create the Understanding the wind and damping and even in a slight
vertical structure of the pavilion. dynamic response of the columns breeze, the columns would oscillate By using impact damping, the
and -waste emissions targets are achievable.
At 7.8m in height, but just 50mm was essential. The way in which uncontrollably. columns could be kept at their
At home in Korea
square and with a wall thickness of the columns were to be arranged original dimensions – slender beyond
only 4mm, they defy conventional helped factor in a degree of wind- The Arup team set about creatively anything previously conceived – and
codified calculation methods and rely resistance to the design, with one solving this problem, which was made possible through thoughtful
on creative engineering. column sheltering another from key to the success of the project. and creative design.
the prevailing winds. Each column After much deliberation a simple
64 65
Renoma Retail Client Location
Centrum Development & Investments Wrocław, Poland
and Office Centre
The Renoma store, built in Wrocław, was possible. As a result, the top
in 1930, is an early example of a three floors were to be refurbished as
multi-storey steel-framed building. office space and, once occupied, the
Designed at a time when the restoration works would carry
use of structural steel sections in on below.
construction was still in its infancy,
on opening it was the largest steel- This approach required the
framed retail centre in Europe. It was implementation of advanced load
therefore necessary to investigate transfer systems below the occupied
the existing structure, including the area as well as a continuation of
physical and chemical composition all services, such as fire safety,
of the steel, at an early stage in heating and ventilation. Careful
the redevelopment of this heritage consideration of the construction
building and to plan the structural sequence was also needed to control
works accordingly. the timing of works, particularly with
regard to noise, dust and vibration
So when the team began the impacts.
restoration process and uncovered
Credits
a steel beam with large deflection, By combining its design and project
All images are copyright Arup except those stated below:
it warranted further investigation. management skills, Arup successfully
Page 2-3 01-02 Transport Scotland
Findings from advanced material addressed the challenges as they arose
Page 4-5 01 Arup/Hufton+Crow
investigations contradicted earlier to ensure this complex restoration 04 Arup/Hufton+Crow
tests and demonstrated that the and retrofit was completed smoothly 05 Arup/Kingkay Architectural Photography
Background image Arup/Hufton+Crow
steel could not be welded. Indeed, with new tenants already in place.
Page 6-7 01 NC3D
if welding had been carried out as 03 Jannes Linders/Benthem Crouwel Architects
planned, it could have weakened 04 HS2 Ltd
the steel frame and rendered the 05 Arup/Zhou Ruogu Architecture Photography
06 UIC: International Union of Railways
structure unsafe. Bolted connections 07 Arup/Daniel Clements
and strengthening had to be 08 MTR Corporation Ltd
introduced instead of the welding. Page 8 01-03 City of Cedar Rapids – Community
Development Department
04 Sasaki Associates
A complete technical redesign was
Page 10 04 The Edge
required. Arup had to find a safe
Page 11 01-05 Arup/Nottingham Trent University
and practical structural solution
Page 12 01 ZGF Architects
that would work within the existing 03 William Wright Photography
framework, without compromising Page 13 01-03 Grimshaw Architects
the architectural layout for the new Page 14 01, 03 Brookfield Multiplex
commercial space. Page 15 01 Arup/rolaesphotography.com
Page 18-19 01-04 KPF
When the developer was presented Page 20-21 01 Marina Bay Sands Pte Ltd 2009
with the opportunity to place tenants 02 Lian Beng Construction Pte Ltd
in the building prior to completion, 04 Marcel Lam Photography
Arup prepared a detailed feasibility Page 22 01, 02, 04, 05 Ed. Züblin AG
restoring the building from the top Page 24 02-03 Nic Lehoux_Gensler
Printed by Beacon Press using their
Page 28 01-04 Arup/Morley von Sternberg
environmental print technology. The printing inks are made
Page 32-33 01 Zina Deretsky, National Science Foundation
from vegetable based oils, 95% of cleaning solvents are
The careful restoration and redevelopment Page 36-37 01-05 Peter Hyatt
recycled for further use and no harmful industrial alcohol is
Page 43 02 Rachel Robb
of Renoma, a major department store in Page 46-47 01-02 LDA
used in the printing process. The electricity was generated
from 100% renewable sources and on average 98% of any
Poland, has preserved its original character Page 50-51 01-04 SAFElink alliance
dry waste associated with this production will be diverted
Background image SAFElink Alliance
while revitalising this historic building as a Page 52 02 TVS International from landfill. Beacon is certificated to Environmental
modern mixed-use office and shopping centre. Page 53 ZEDfactory Ltd Management System, ISO 14001 and registered to EMAS,
Page 54-55 03 GEO the Eco Management and Audit Scheme.
66
www.arup.com