You are on page 1of 1

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Fence and Gate Components Receiving Inspection- SSD/1
SAIC-O-1001 18-May-05 CIVIL-
Fence
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Fencing line wire, stirrup wire, tying wire, barbed wire and wire fabric SAES-O-101
A1
shall be PVC coated. Sec. 5.1.12
SAES-O-101
A2 Fence Post fittings shall be galvanized in accordance with ASTM A153.
Sec. 5.1.13
AA-036757
A3 Wire fabrics shall be vinyl-clad, dark green color and 2.45 meter high.
Sht. NO. 2
Line wire shall be vinyl-clad, dark green color and 4.75mm over all AA-036757
A4
diameter. Sht. NO. 2
AA-036757
A5 Tie wire shall be vinyl-clad, dark green color and 2mm over all diameter.
Sht. NO. 2
Stirrup wire shall be vinyl-clad, dark green color and 3.55mm over all AA-036757
A6
diameter. Sht. NO. 2
AA-036757
A7 Barbed wire shall be vinyl-clad and dark green in color.
Sht. NO. 2
AA-036757
A8 Stretcher bars shall be galvanized steel 5 x 25 x 2400mm.
Sht. NO. 2
AA-036757
A9 Dropper Bar shall be galvanized Steel 5 x 25 x 450mm, with fixing clips.
Sht. NO. 2
AA-036757
A10 Cleat shall be galvanized Steel angle 75 x 50 x 6mm.
Sht. NO. 2
Washer shall be galvanized Steel 45mm OD x 4mm thickness for M16 AA-036757
A11
Bolts. Sht. NO. 2

Two-Way Eyebolt Strainers shall be galvanized steel M10 diameter, AA-036757


A12
300mm long w/ nuts/washers; Field cut bolts to 220mm. Sht. NO. 2

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-O-101 -- Standard Security Fence - Category 1, 29 February 2004
2- AE-036757 Sht. No. 2 -- L/M for Category 1, Security Perimeter Fencing, 03 March 1994

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1

You might also like