Professional Documents
Culture Documents
CONSTRUCTION UPDATE
July 22, 2011
MAJOR DETOUR COMING TO NORTH MAIN BETWEEN NAYLOR AND FRANKLIN
Construction for the new North light rail line will require the closure of portions of North Main between Naylor and Franklin streets. This closure is required to rebuild the northern section of the Main Street Bridge and to construct the southern portion of new light rail bridge over the UPRR (Union Pacific Railroad) tracks. The detour is scheduled to begin the week of Monday, August 8, 2011 and will continue for approximately twelve (12) months.
N GA HO Y NE CK PIN N TO ING RR HA
LORRAINE
MILLS
HARRINGTON
ELYSIAN
BROOKS
AIN NM
KS OO BR
ETT RN BU
MAURY
TRAFFIC DETOUR
Z DE AN RN EL HE TUNN
Northbound traffic on Main (see map) will be detoured right on Franklin, then left on San Jacinto. Traffic will then be diverted right on Rothwell, left on Hardy, right on Lyons, and left on Maury. At Lorraine, traffic will take a left to connect back to North Main via Hogan. Southbound traffic on North Main will take a left on Hogan which turns into Lorraine, then right on Maury. At Lyons, traffic will take a right and then a left onto McKee. At Providence, traffic will take right and then a left on North San Jacinto and connect back to Main via Commerce.
LYONS
McKEE
HARDY
N PMA CHA
LOR NAY
T LNU WA
VINE
I-10
N MA IN
WOO D
U of H DOWNTOW
PEDESTRIAN ACCESS
Pedestrians will be detoured to the sidewalk on the east side of North Main. Pedestrian access will be provided to University of Houston Downtown and the METRO Rail station on the Main Street Bridge.
U OF H DOWNTOWN STATION
FA NN IN
AIN NM
FR AN KL IN
U of H WN TO DOWN
E NC DE VI RO P
I-10
ELYSIAN
L EL W TH RO
LOR NAY
I-10
SH EA
STERRET
ALLE N
BAK ER
BUSINESS ACCESS
Access to local businesses, schools and residences will be maintained at all times during construction. Be on the lookout for further updates related to this detour or contact your Community Outreach Office for more information. Please note that the dates and times relating to construction in your area are approximate and subject to change. For the latest information on the construction activities in your area, please visit us at gometrorail.org.
CO MM ER CE
N IA YS EL
NC52-7.22.11
LORRAINE
MILLS
HARRINGTON
ELYSIAN
BROOKS
AIN NM
KS OO BR
ETT RN BU
MAURY
Z DE AN RN EL HE TUNN
LYONS
McKEE
HARDY
N PMA CHA
LOR NAY
T LNU WA
VINE
I-10
N MA IN
WOO D
U of H DOWNTOW
U OF H DOWNTOWN STATION
AIN NM
U of H WN TO DOWN
E NC DE VI RO P
I-10
ELYSIAN
L EL W TH RO
LOR NAY
I-10
SH EA
STERRET
ALLE N
ACCESO PEATONAL
Los peatones sern desviados a la acera en el lado este de la calle Main Norte. Se proporcionar acceso peatonal a la Universidad de Houston, plantel Centro (Downtown), y a la estacin del Tren Ligero de METRO que se encuentra en el Puente de la Calle Main.
FA NN IN
BAK ER
FR AN KL IN
CO MM ER CE
N IA YS EL
ACCESO COMERCIAL
El acceso a los comercios, escuelas y residencias de la localidad se mantendr abierto en todo momento durante la etapa de construccin. Por favor, siga las actualizaciones relacionadas con esta desviacin o dirjase a su Oficina de Difusin a la Comunidad para mayor informacin. Asimismo, agradeceremos que recuerde que las fechas y horarios son aproximados y que estn sujetos a cambio. Para la informacin ms reciente acerca de las obras de construccin en su zona, por favor visite gometrorail.org.
DESVIACIN HACIA DE LA CALLE MAIN NORTE CON DIRECCIN HACIA EL NORTE DESVIACIN DE LA CALLE MAIN NORTE CON DIRECCIN HACIA EL SUR
NC52-7.22.11