BATTERY/CHARGER INSPECTION & MAINTENANCE CHECKLIST

Asset Information
ISC Asset No/ Battery Serial No: Manufacturer: Supplier: Date of Purchase: Warranty Period: Battery Voltage: Equipment Usage: Charge provided Y/N if yes please state charger voltage Checked by:___________________ Date:_____________________

Pre Acceptance Check


Voltage On Arrival (*1) : Inspect cells/units for cracks, leakage, and cover distortion : Inspect for evidence of corrosion at the terminals, connections: Voltage upon Charging (*2): Rated Amp hours (Ah) (*3) : Charger Output voltage Notes:
1. Ask supplier if battery is new or old stock, if they says its new then a minimum voltage for a 12V battery should be 10-10.7V. Anything below that is unacceptable. 2. Charge the battery for 1-2 hours and then check the voltage. The voltage should be between 12.2 12.7V 3. Use the table below to estimate the discharge times and rated capacities

Load:

(A)

Time Period:

(H)

Checked by:___________________ Date:_____________________

Bi Monthly Maintenance Checklist (*1)


Voltage: Inspect cells/units for cracks, leakage, and cover distortion : Inspect for evidence of corrosion at the terminals, connections: (*2) Rated Amp hours: Charger Output Voltage:
Notes: 1. After 12 months the battery can be deemed suitable for replacement. Please initial in column if check has been carried out 2. If there is corrosion on terminals, please clean it off to ensure proper continuity
First Issue By Drawn Rev Description Revised By Approved By Date Checked Approved Muru Ater Ash Doc. No . ISC/EM/001 Page Rev. 0 Date Battery & Charger Inspection & Maintenance

Month 2

Month 4

Month 6

Month 8

Month 10

Month 12