You are on page 1of 2

CS

PRAN DAIRY LIMITED


Bagpara, Palash, Narsingdi

Revision No.: 03
Document No: PDyL-CS-SOP-002 Issue Date : 20.06.17
Revision Date: 17.06.20

SOP OF SUB-STATION DIESEL GENERATOR OPERATION

A. CHANGE HISTORY

Date Revision No Description of Change


25.07.17 1 Document Coding Procedure Change
03.07.19 2 Signing authority Change
17.06.20 3 Document Coding Change

A. DISTRIBUTION

SI
DOCUMENT STATUS
DATE DEPARTMENT G
HOLDER (COPY/ORIGINAL)
N
20.06.17 HEAD OF FACTORY ADMIN COPY

20.06.17 HEAD OF ENGINEERING ENGINEERING COPY

20.06.17 HEAD OF QC QUALITY CONTROL COPY

1.0 PURPOSE:

To ensure operating procedure of Diesel generator, Model: D3512A.

2.0 SCOPE:

All inter Applies to the Generator used for PRAN Dairy Limited of Sub-station areas.

3.0 RESPONSIBILITY:

3.1 Head of Engineering Division is responsible to ensure that concern maintenance personnel
followed this SOP properly.
3.2 Sectional In-charges is responsible to execute this SOP properly

4.0 RELATED DOCUMENTS: Manual

5.0 PROCEDURE:

 PREPARATION
5.1 Check the radiator water level with coolant level.

5.2 Check the lube oil level as per standard deep scale.
5.3 Check the Fuel Level (at least 50%) from Fuel Service Tank.
5.4 Check the battery voltage (23 to 26 Volt DC).
5.5 Check the Utility leakage.
Confidentiality Company Confidential
AUTHOR: I/C PPS. CHECKED BY : Asst. Chief APPROVED BY: General
Eng. Manager- PIP

Page 1 of 2
CS

PRAN DAIRY LIMITED


Bagpara, Palash, Narsingdi

Revision No.: 03
Document No: PDyL-CS-SOP-002 Issue Date : 20.06.17
Revision Date: 17.06.20

SOP OF SUB-STATION DIESEL GENERATOR OPERATION

5.6 Check the Canopy door close.


5.7 Check the Canopy room neat & clean.

 HOW TO START ( At Control Panel):


5.11 Prelubrication pump must be operated manually (Oil pressure 05-10 psi at
EMCP).
5.13 Press “Manual” on the control Touch screen.
5.14 Press Start button.
5.15 Inspect the Jacket water Temp up to 140-150⁰F (At EMCP).
5.16 Raise the Voltage (405-410 Volt AC & Frequency-50 Hz by pressing “Manual Raise
Voltage” & “Manual Raise Speed”.
5.17 Press “Auto” on the control touch screen.
5.18 Touch to the “Hand On Load” position for load applies.
5.19 Go to AC metering screen.

 HOW TO STOP ( At Control Panel):


5.20 Press “Hand OFF Load” at control touch screen
5.21 Ensure Generator load is zero and idle position
5.22 Then press “STOP/OFF” at control touch screen

Confidentiality Company Confidential


AUTHOR: I/C PPS. CHECKED BY : Asst. Chief APPROVED BY: General
Eng. Manager- PIP

Page 2 of 2

You might also like