SS Nut and Bolt with washer-20 pcs, Cable tie-20 pcs, Plastic
tape-3 pcs.
UPS-1KVA-2 Pcs, Plastic tape-2 pcs, Cable tie-50 pcs, Three Pin
Socket with Base-10 pcs, Royal Plug-10 pcs, Cable-4x1.0 rm-45
meter, Cable lugs-4 rm-10 pcs, Magnetic Contactor-30A-2 pcs,
Timer Base-8pin-2 pcs, Timer-220V-AC-2 pcs, Relay base-14
pin-1 pc, Relay-14 pin-1 pc, OLD-MCB-DP-2 pc, Spiral Binding-
5 feet.
N/A
SS Clamp-2 pcs
N/A
Magnetic contactor-32A-01 pc, Thermal overload relay-7 to
11A-01 pc, Plastic tape-1 pc, Cable tie-10 pcs
Nylon shaft
MCC-01 Maintenance.
We stopped the full plant. Then we removed the ACB link for
removing CT. CT is damaged. We installed a new
CT-2500A/5A. We connected the control cable to Ameter.
Link busbar again installed. Work done successfully. Work
done by: Gelman-25802, Kamruzzaman-31945, Unous-WS,
Hirok-WS.
We stopped the full plant. Drained all water from circuit. Then
we removed the faulty valve from pump-1. We cleaned the
surface area. Then we installed new gate valve with new
gasket and nut with bolt. Work done successfully. Work done
by: Maruf-44420, Gelman-25802, Karuzzaman-31945.
We stopped the full plant. Drained all water from circuit. Then
we removed the faulty valve from CT-05. We cleaned the
surface area. Then we installed new gate valve with new
gasket and nut with bolt. Work done successfully. Work done
by: Maruf-44420, Gelman-25802, Karuzzaman-31945.