Tender Name Construction of 66kV GIS S/stn Kheri Gujran 2x12.5/16 MVA 66/11 kV Power Transformers on Turnkey basis
S.
Description SUPPLY Civil Installation TOTAL %
No.
CM1 6.24
CM2 4.23
CM3 1.00
Note:
1. Contract Value : 14,25,00,000/- and Expected 20 Lakhs PV
2. PV applicable for items like Battery, Equipment structures & HT Cables
Prepared by Accepted by
Name : Name :
(Project Coordinator) (Operations - PMO)
Agreed by Approved by
Page 1 of 236
TENDER SUMMARY
Currency - Indian Rupees
Tender Name Construction of 66kV GIS S/stn Kheri Gujran 2x12.5/16 MVA 66/11 kV Power Transformers on Turnkey basis
Client HVPNL
B/G Amount 29.20 Estimate Value: 14.60 Cr
Opening Date Completion period: 15 Months
S.
Description SUPPLY Civil Installation TOTAL %
No.
Total ACE
Amount-Rev-01
80,814,236.50
3,808,456.73
23,774,143.40
108,396,836.63
Sl. No. Item Description
Mtrs 330
Sr.
Item Description
No.
1 2
72.5kV, 1250A, single 3 - 0 or three 1 -e. sF6 gas insulated, metal enclosed bus bars
arrangement, consisting of 1250A single 3 - e or three 1 -e SF6 gas insulated
switchgears, each Bus Bar comprising of :-
i) Bus bar enclosures running through the length of the switchgear to interconnect each of
the circuit breaker bay modules in double main bus system.
ii) Three, 2-core, single phase or single 3 - Ovoltage transformers/ PTs.
iii) 1250A, One 3 - 0 or three 1 -x0, single pole, group operated isolator/disconnector
and one, 3 - 0 or three 1 — ., single pole, group operated earthing switch with manual
1
and motor driven operating mechanisms.
iv) 1250A, One high speed fault make 3 — 0 or three 1 —@, single pole, group
operated earthing switches, complete with manual and motor driven operating
mechanisms.
v) Each GIS compartment with gas monitoring device, pressure switch etc. as required.
vi) Terminal boxes/ Local Control Cubicle.
vii) Interconnecting wiring/ piping.
viii) Grounding, support structures and platforms.
72.5kV, 800A, single 3 - e or three 1 —0, Bus coupler bay module, consisting of 800A
single 3 - 0 or three 1 -e sr6 gas insulated switchgears, comprising of:
i 800A, One 3 - 0 or three 1 —0, SF6 gas insulated circuit breaker, complete with operating
mechanism.
ii Three,3-core,single phase current transformers(600-300-150/1-1-1A)
iii Two sets of isolator/disconnector switches each of 800A, One 3 — €0 or three 1 — 0,
2 single pole, group operated isolator/disconnector switches each with 3 — 0 or three 1
— 0, single pole, group operated earthing switch and complete with manual and
motor driven operating mechanisms.
iv Each GIS compartment with gas monitoring device, pressure switch etc. as required. v
Terminal boxes/ Local Control Cubicle.
vi Interconnecting wiring/ piping.
vii Grounding, support structures and platforms.
72.5kV, 800A, single 3 - 0 or three 1 -e, Transmission line feeder circuit breaker bay
modules, consisting of 800A single 3 - e or three 1 -e sFs has insulated
switchgears, each comprising of:-
i 800A, One 3 - 0 or three 1 —0, SF6 gas insulated circuit breaker, complete with operating
mechanism for outgoing feeder.
ii Three, 66kV LAs and Voltage detectors /sensors iii Three, 3-core, single phase current
transformers (600-300-150/1-1-1A)
iv 800A, One 3 — 0 or three 1 — 0, single pole, group operated isolator/disconnector
without earthing switch, complete with manual and motor driven operating mechanisms.
v 800A, One 3 — 0 or three 1 — 0, single pole, group operated isolator/disconnector
3
with one 3 —0 or three 1 -0, single pole, group operated earthing switch, complete with
manual and motor driven operating mechanisms.
vi 800A, One 3 - 0 or three 1 — 0, single pole, group operated isolator/disconnector with
one normal and one high speed fault make 3 -& or three 1 — 0, single pole, group
operated earthing switches, complete with manual and motor driven operating
mechanisms.
vii Each GIS compartment with gas monitoring device, pressUre switch etc. as required.
viii Terminal boxes/ Local Control Cubicle.
ix Interconnecting wiring/ piping.
x Grounding, support structures and platforms.
72.5kV, 400A, single 3 - e or three 1 -IO, Transformer feeder circuit breaker bay
modules, consisting of 400A single 3 —0 or three 1 -e SF6 gas insulated switchgears
for 66/11kV transformer, each comprising of: -
i One 3 - 0 or three 1 — 0, SF6 gas insulated circuit breaker, complete with
operating
mechanism for incomer bay from 66/11kV transfomer.
ii Three, 3-core, single phase current transformers (300-150/1-1-1A).
iii 400A, One 3 —0 or three 1 —‹P, single pole, group operated isolator/disconnector
without earthing switch, complete with manual and motor driven operating mechanisms.
iv 400A, One 3 - 9 or three 1 — 0, single pole, group operated isolator/disconnector with
4
one 3 — 0 or three 1 —@, single pole, group operated earthing switch, complete with
manual and motor driven operating mechanisms.
v 400A, One 3 - 0 or three 1 — @, single pole, group operated isolator/disconnector with
two earthing switches each comprising of one 3 — ¢P or three 1 -x0, single pole, group
operated earthing switches complete with manual and motor driven operating
mechanisms.
vi Each GIS compartment with gas monitoring device, pressure switch etc. as required. vii
Local Control Cubicle.
viii Interconnecting wiring/piping.
ix Grounding, support structures and platforms.
66kV XLPE copper Cable 1XC (400mm2) along with one no. spare cable coated with
5
fire retardant Paint for connecting 66kV side of 66/11kV transformer with GIS.
6 Termination kit for both ends for 66kV XLPE copper Cable 1XC (400mm2).
66kV XLPE copper Cable 1XC (800mm2) along with one no. spare cable coated with
7
fire retardant Paint for each line feeder bay
8 Termination kit for both ends for 66kV XLPE copper Cable 1XC (800mm2).
9 12.5/16 MVA, 66/11 kV Power T/F (To be Provided by HVPNL)
10 220V 100 AH Battery
11 66 kV Surge Arrestor
12 11kV Surge Arrestor
13 66 kV CVT
14 66 kV NCT For 66/11kV T/F (300-200-150/1A)
15 11 kV NCT For 66/11T/F (1800-900/5A)
66 kV C&R Panels :
16
i) Line Protection & Circuit Breaker control panel ( without auto reclose)
17 ii) Transfomer protection & Ckt breaker control Panel ( without auto reclose)
18 iii) Bus Coupler Protection & Ckt breaker control Panel ( without auto reclose)
19 Time synchronization equipment
11 kV 15 Panel Board (2000A) with one SEM on each T/F I/C Panel (including one no. bus
20
sectionalizer panel)
11 kV Power Cable XLPE 1C x1000mm2 coated with fire retardant paint for T/F to
21 11kV incomer with termination kit for both ends (2 runs per phase for each transformer
allocating them 1 runs per phase for each 11kV I/C)
11 kV Power Cable XLPE 3C x 185sq mm coated with fire retardant Paint for Capacitor
22
Bank with temination kit for both ends (2 runs)
11 kV Power Cable XLPE 3C x 50 sq mm coated with fire retardant Paint for station T/F
23
with termination kit for both ends
3.4 MVAR 11 kV rating Capacitor Bank with 11 kV L&E Switch, RVTs and 11KV LA,
24
reactor etc. as per technical specification.
25 220 V 100 AH Battery charger (20A F+30A B)
26 220 V 100 AH D.C.D.B.
27 415 V LT AC Distribution Board 300 A
28 11/0.4 kV Station T/F 200 KVA
29 1.1 kV Copper
EOT-Crane Control
as per Cable Section-1
clause 1.10.7 armouredand
(FRLS)
Clausefor
24.066kV bays
of GIS & 11kV side of sizes
Specification.
7CX4mm2, 2CX4mm2, 4CX4mm2, 2CX6mm2, 16CX2.5mm2, 10CX2.5mm2,
30 7CX2.5mm2
3CX2.5mm2 etc. including junction box (as per Section-6 of copper control cable
31 specification
650/1100 Voltsand
3.5Section-7
core 240of Switchyard
mm2 Erection).
aluminium power cable (FRLS) from Aux. T/F to ACDB
32 650/1100 Volt 3.5 core 70 mm2 aluminium cable (FRLS) for oil filtration set.
650/1100 Volt 4 core 16 mm2 armoured (FRLS) copper power cable for MLDB etc and
33 other
cable required as per contract for 66kV bays.
Grounding system of the substation. Earthing Mat Material. The earth mat will
be designed/quoted for soil resistivity of 50ohm-m. In case soil resistivity is more than
50ohm-m then the earth mat will be designed for actual soil resistivity. The payment of
34
extra material to be used for earth mat shall be made on pro rata basis. The approximate
area of earth mat to be laid is given in the corresponding columns of the substations.
However, item will remain a Lot item.
Complete Lightning of control room building, switchyard area, road and street as per
section-7 of technical Specifications
43 Supply and installation of 2 fittings of 240W LED lamps with all accessories for
Complete lighting of outdoor Switch yard area as per clause 16.0 of section 7 of the
specifications.
Supply and installation of 35W LED tube on tubular steel poles along with the boundary
44 wal
at a distance of 30 meter as per as per clause 16.0 of section 7 of the specification
Complete lighting of road and street by providing 90W LED lamps on tubular steel poles
at a
45
distance of 15meter along the roads and streets as per as per clause 16.0 of section 7 of the
specification.
Supply and installation of post top lantern 40W LED Lamps with all complete accessories
46 at
the entrance gate of sub-station.
Supply and installation of 40W LED Lamps with all complete accessories on corners
47 of
control room building.
High wall type split AC unit of 2 Ton capacity for computer room and specifically C&R
48 Pane
room (as per technical specification)
Bolted type 11kV Single tension string assembly with 3 numbers Anti FOG type
disc
insulators (E&M strength 9000 kg) per string with all hardware accessories including
ball & socket connections and tension clamp sets suitable for Twin tarantulla
52
Conductor Alternatively the bidder may quote silicon polymer composite insulator string
in place of Disc Insulators (type of insulator whether disc or polymer insulator to be
identified at the time of bidding and quoted accordingly which will not be altered at later
stage by the bidder).
Fibre cleats, Aluminium clamps, bolts, nuts, washers etc for fixing control cables in
56
trenches
Galvanized iron perforated tray with side coupler plate bolts, nuts, washers and clamps
etc. of
57
size 75x25x2 mm, 150x25x2mm, 100x25x2mm etc. & G.I. Conduits of 50mm/100mm dia
from equipment to main trench as per Section-7, Switchyard erection.
Painted lattice type steel trays of adequate size as per site requirement for laying control
and
58
power cables from panels to GIS & Transformers and for 11kV Outgoing cables &
other cables identified as per site requirement confirming to Section-7 & 9.
61 7/3.15 Earthwire
66kV Cable structure of galvanized iron along with foundation to be designed by bidder as
72 per
site requirement/size of cable
Equipments for maintenance
73
i) Portable circuit breaker operation analyzer.
ii) Digital Micro-Ohm meter for contact resistance measurement Ranges
(0-100 ohm)
74
(0-1 milliohm),
(0-10 milliohm).
82 ii) Pressure gauges (of each type) along with coupling device
83 iii)Rubber Gaskets, “ o’ Rings and seals for SF6 Gas (each type)
84 iv) Molecular filter for SF6 Gas with filter bags (20°/» of total weight)
86 vi) All types of Control Valves for SF6 Gas (each type)
viii) Enclosures, Insulators & main circuit to replace on each phase, any
88 compartment of
Busbar, bay & duct (each type)
ix) Covers with all accessories necessary to close a compartment in case of dismantling
of
89
any part of the enclosure to ensure the sealing of this compartment (as applicable)
a) For 3 Phase Enclosure
93 xii) Pipe length (Copper or Steel as applicable) for SF6 Circuit of each type
94 xiii) SF6 to air bushing (66 KV of each type & rating) (each)
96 ii) Fixed, moving and arcing contacts including insulating nozzles, (3 Nos. of each type)
97 iii) Rubber gaskets, ”O' rings and seals for SF6 gas of each type
98 iv) Trip coil assembly with resistor as applicable, 3 Nos. of each type
100 vi) Molecular filter for SF6 gas with filter bags (10 °4 of total quantity used)
vii) SF6 Pressure gauge cum switch OR Density monitors and pressure switch as
101 applicable
3 Nos. of each type
viii) Coupling device for pressure gauge cum switch/ for connecting Gas handling
102 plant, 3
Nos. of each type
103 ix) Corona rings if applicable
104 x)Relays, Power contactors, push buttons, timers & MCBs etc of each type & rating
110 xvi) Wind scope/ Observing window, 3 Nos. of each type, if applicable
111 xvii) Spring operated closing mechanism, 1 No. of each type, if applicable
vii) Limit switch and Aux. Switches for complete 3 phase equipment
119
a) For isolator
130 xiii) Interlocking coil with resistors, timers, key interlock for complete 3 phase
xiv) Relays, Power contactors, resistors, fuses, push buttons & MCBs
131
a) For isolator
xv) Terminal pad and connectors (complete for one 3 phase equipment)
133
a) For isolator
135 xvi) Aux. switch assembly (complete) with 10 NO & 10 NC OR more contacts
xvii) 72.5 kV, 1250 A, 3 - f or 1 —f high speed fault making grounding 9witch, Internal
136 parts
complete with all necessary gaskets mounting hardware etc.
xviii) 72.5 kV, 1250 A, 3 - f or 1 —f high speed fault making grounding switch
137 operating
mechanism complete with all necessary gaskets connecting apparatus.
Current Transformer,
138 i) 66kV 1 ph CT ratio 600-300-150/1-1-1A complete with all gaskets and mounting
hardware
139 ii) 66kV 1 ph CT ratio 300-150/1-1-1A complete with all gaskets and mounting hardware
11 kV Side
149
NCT
CABLE SUPPORT STRUCTURE FOUNDATIONS Design, Engineering, supply of
labour
material and construction of cable support structure foundations including all
150 associated works, RCC, PCC, reinforcement steel, misc. structural steel and other items
not mentioned herein but required for the completion of work as per technical
specification.
66 kV cable Support Structure
ii)Design, Engg, supply of labour, matarial and construction of station T/F foundation
including all associated works, RCC, PCC, Reinforcement steel, misc. structural steel and
153
other items not mentioned herein but required for the completion of work as per technical
specifications. 200KVA, 11/0.433kV station T/F foundation.
ROADS & PCC PAVEMENT : Supply of labour, material and construction of cement
concrete
157 roads and walkways/shoulders from NH/SH/etc. to Switch yard/switch house building
as per GELO/CLO as per sectional detail drawing no. HCO/SK-181 R1 and technical
specification. i)6.0M wide
iii) PCC in front and rear of parking area of SH Building as per tech. specification
159 and
drawing HCD/SK-172.
ROAD CULVERTS: Design, Engineering and const. of Pipe culvert(s) at suitable locations
under the approach road (from main PWD/ HUDA/Municipal/Village road to the sub-
160
station entry point) including, cost of labour, material complete in all respects as per I.R.C.
Standards.
BOUNDARY WALL: Supply of labour, material and construction of front, C & U/C
boundary
walls including main gate foundations as per GELO/CLO, technical specifications. &
161
HVPNL drg. HCD/TS-1176 R3 including excavation backfilling, lean & DPC complete in
all respect.
i. 6 ft. high with GI barbed wire on angles at top.
162 ii. 4’7z ft. high front wall with grill at top.
Supply of labour, T&P, matenal and construction of front, side & U/C boundary walls
164 including main gate(s) (brickwork below DPC level) as per GELO/CLO, tech. spec. &
HVPNL drawings complete in all respects.
The successful bidder shall evolve design & drawing for drain, manholes with RCC covers
on
settlement tank including preparation of drainage layout drawing for disposal of
rain water from building's roof top & switch yard (s/stn.) area into bore well in such a way
that there shal be no ponding of water on the roof and switch yard (s/stn.). The layout so
developed shall be got approved from the employer. The location of sump-pit-
cum-pump chamber shal preferably be located on corner(s) of the s/stn. and shall be
167
got decided from the concerned XEN/Civil Works Division on the basis of surroundings
of the substation(s). The successfu bidder will also supply labour and material for
construction of 1 no. sump-pit-cum-pump chamber as per HVPNL drgs. & provide one
no. non clog pump(s) of SHP of reputed make capacity with main switch, starter, volt
meter, Amp. Mtr. etc. (for each sump pit) for disposa of excess water to outfall point. Any
other item(s) not mentioned herein but is/are required for œmpletion of works shall be
done by the successful bidder without any extra cost to the employer.
RCC M-20 inclusive of labour, matenal, shuttering, Steel reinforcement etc. complete
in al
respects to compensate excess quantity required to be executed due to difference in
170
existing ground level and the formation level to be fixed after contouring or difference on
account of revised drg issued at the time of construction and the standard drawings
attached with the tender.
Total
(Supply) Unit Price (Supply) Sub-total
(including Ex- works Price (including Ex
Item/ Part
price, F&I and all works price, F&I and
Code Quantity Units
other taxes, duties, all other taxes, duties,
v
levies/cess excluding levies/cess excluding
GST) (INR) GST) (INR)
3 4 5 6.00 7
sq meter
1 (approx) 2,489,585.28 2,489,585.28
3650
4 No 15,314.63 61,258.52
4 No 12,146.19 48,584.76
4 No 5,069.51 20,278.04
2 No 5,386.85 10,773.70
2 No 1,795.95 3,591.90
1 No 1,675.95 1,675.95
1 NO 1,742.39 1,742.39
1 US 249,509.51 249,509.51
1 US 60,079.39 60,079.39
1 US 790,288.48 790,288.48
2 No 10,271.90 20,543.80
3 No 6,865.45 20,596.35
11500 Cum - -
4 No. - -
3 No. - -
2 No. - -
2 No. - -
12 No. - -
2 No. - -
2 No. - -
2 No. - -
12 No. - -
2 Set - -
2 No. - -
1 NO. - -
1 Lot - -
500 Sqm. - -
100 Sqm. - -
20 Mtr - -
220 Mtr - -
150 Sqm. - -
1 NO. - -
160 M - -
15 M - -
175 M - -
750 Cum - -
125 M - -
1 Lot - -
1 Lot - -
4914 Sqft - -
3197 Sqft - -
5 Cum - -
87,212,451.53
87,212,451.53
1
-
(Civil) Unit price for (Civil) Sub-total
(Erection) Unit Price (Erection) Sub- total
Civil Sr. No. 74.1 to 85 price (including Ex-
(including Ex- works Price (including Ex-
(including Ex-worka works price, F&I and
price, F&I and all worke price, F&I and
price, F&I and all other all other taxes,
other taxes, duties, all other taxes, duties,
taxes, duties, duties, levies/cess
levies/cess excluding levies/cess excluding
levies/cess excluding excluding GST)
GST) (INR) GST)(INR)
GST) (INR) (INR)
8 9 10 11
245,177.82 490,355.64 - -
273,038.28 273,038.28 - -
273,038.28 546,076.56 - -
284,182.86 568,365.72 - -
223.13 55,782.50 - -
10,029.93 160,478.88 - -
367.92 294,336.00 - -
11,701.91 187,230.56 - -
178,311.32 356,622.64 - -
5,014.96 5,014.96 - -
2,006.18 24,074.16 - -
1,059.12 6,354.72 - -
2,229.31 4,458.62 - -
2,006.18 4,012.36 - -
1,059.12 2,118.24 - -
9,472.60 18,945.20 - -
9,472.60 18,945.20 - -
9,472.60 9,472.60 - -
1,671.98 1,671.98 - -
61,294.21 122,588.42 - -
223.13 156,191.00 - -
100.16 20,032.00 - -
44.63 4,463.00 - -
9,472.60 18,945.20 - -
2,785.65 2,785.65 - -
2,006.18 2,006.18 - -
5,572.29 5,572.29 - -
13,930.23 13,930.23 - -
20,059.85 20,059.85 - -
280,461.06 280,461.06 - -
20,327.61 20,327.61 - -
19,057.25 19,057.25 - -
7,800.61 7,800.61 - -
118,153.59 118,153.59 - -
111.07 444.28 - -
111.07 444.28 - -
55.53 222.12 - -
55.53 111.06 - -
55.53 111.06 - -
167.60 167.60 - -
55.53 55.53 - -
223.13 446.26 - -
55,721.92 445,775.36 - -
1,671.98 20,063.76 - -
2,785.65 41,784.75 - -
389.73 779.46 - -
278.66 2,786.60 - -
2,785.65 8,356.95 - -
222,888.66 222,888.66 - -
27,861.45 27,861.45 - -
1,671.98 20,063.76 - -
1,170.19 14,042.28 - -
1,114.66 1,114.66 - -
13,372.90 13,372.90 - -
50,344.99 50,344.99 - -
21,315.33 21,315.33 - -
10,419.66 10,419.66 - -
203,100.53 203,100.53 - -
223.13 55,782.50 - -
167.60 16,760.00 - -
1,783.05 1,783.05 - -
1,716.61 1,716.61 - -
5,663.53 22,654.12 - -
4,026.25 12,078.75 - -
1,693.80 6,775.20 - -
3,466.94 6,933.88 - -
2,373.11 4,746.22 - -
2,010.15 4,020.30 - -
1,642.23 3,284.46 - -
610.88 7,330.56 - -
610.88 1,221.76 - -
668.40 8,020.80 - -
20,059.85 20,059.85 - -
1,114.35 1,114.35 - -
2,229.31 2,229.31 - -
1,114.66 1,114.66 - -
7,800.61 7,800.61 - -
1,114.66 1,114.66 - -
1,671.98 1,671.98 - -
1,114.66 1,114.66 - -
5,572.29 16,716.87 - -
1,114.66 1,114.66 - -
1,114.66 1,114.66 - -
1,114.66 1,114.66 - -
1,114.66 1,114.66 - -
1,114.66 1,114.66 - -
1,671.98 1,671.98 - -
2,229.31 2,229.31 - -
1,448.86 2,897.72 - -
1,225.73 3,677.19 - -
4,457.63 4,457.63 - -
1,671.98 1,671.98 - -
1,114.66 1,114.66 - -
1,114.66 1,114.66 - -
11,701.91 35,105.73 - -
1,671.98 1,671.98 - -
1,114.66 1,114.66 - -
1,114.66 2,229.32 - -
1,114.66 2,229.32 - -
1,114.66 1,114.66 - -
1,671.98 1,671.98 - -
1,114.66 1,114.66 - -
891.53 891.53 - -
1,114.66 1,114.66 - -
1,448.86 2,897.72 - -
1,448.86 2,897.72 - -
1,559.92 1,559.92 - -
1,559.92 1,559.92 - -
1,559.92 1,559.92 - -
1,114.66 1,114.66 - -
1,114.66 1,114.66 - -
334.20 334.20 - -
7,800.61 7,800.61 - -
7,800.61 7,800.61 - -
891.53 891.53 - -
891.53 891.53 - -
891.53 891.53 - -
557.33 557.33 - -
1,337.79 4,013.37 - -
1,448.86 1,448.86 - -
2,563.51 5,127.02 - -
1,448.86 1,448.86 - -
2,563.51 7,690.53 - -
1,448.86 1,448.86 - -
891.53 891.53 - -
557.33 1,671.99 - -
334.20 334.20 - -
1,671.98 8,359.90 - -
1,671.98 1,671.98 - -
1,337.79 1,337.79 - -
1,337.79 4,013.37 - -
1,281.26 1,281.26 - -
446.26 892.52 - -
1,671.98 1,671.98 - -
1,448.86 1,448.86 - -
6,129.62 6,129.62 - -
6,129.62 6,129.62 - -
1,671.98 5,015.94 - -
1,671.98 5,015.94 - -
1,671.98 1,671.98 - -
- - 122.97 1,414,155.00
- - 117,016.12 468,064.48
- - 117,016.12 351,048.36
- - 94,727.95 189,455.90
- - 94,727.95 189,455.90
- - 22,177.10 266,125.20
- - 22,177.10 44,354.20
- - 22,177.10 44,354.20
- - 21,731.83 43,463.66
- - 14,376.49 172,517.88
- - 94,727.95 189,455.90
- - 325,863.48 651,726.96
- - 59,647.01 59,647.01
- - 1,025,287.62 1,025,287.62
- - 546.42 273,210.00
- - 161.65 16,165.00
- - 13,930.23 278,604.60
- - 10,029.93 2,206,584.60
- - 768.56 115,284.00
- - 50,149.63 50,149.63
- - 3,900.31 624,049.60
- - 4,303.92 64,558.80
- - 4,234.50 741,037.50
- - 5,014.96 3,761,220.00
- - 3,120.84 390,105.00
- - 835,832.71 835,832.71
- - 167,166.74 167,166.74
- - 1,671.98 8,216,109.72
- - 1,671.98 5,345,320.06
- - 6,129.62 30,648.10
5,325,101.98 28,225,158.33
5,325,101.98 28,225,158.33
1 1.00
-0.00 -
Gross total
including GST-
Total ACE
Total Price Supply , Total price x
ACE Unit Supply Rate Total Price Supply ,
Erection and Civil 1.18 (INR)
Erection and Civil
(INR) prevailing rate of
(INR)
GST on wOFk
contract=18%
12 13
123,625.71 145,878.34
36,750.94 43,366.11
36,751.93 43,367.28
36,752.93 43,368.46
36,753.92 43,369.63
36,754.91 43,370.79
37,314.21 44,030.77
37,872.53 44,689.59
23,441.52 27,660.99
24,273.54 28,642.78
27,692.86 32,677.57
80,883.00 95,441.94
16,956.86 20,009.09
371,972.97 438,928.10
2,243,508.99 2,647,340.61
102,005.94 120,367.01
7,135.19 8,419.52
6,243.68 7,367.54
4,236.50 4,999.07
2,118.25 2,499.54
46,822.51 55,250.56
22,185.04 26,178.35
3,003.82 3,544.51
7,135.19 8,419.52
14,938.78 17,627.76
14,938.78 17,627.76
7,580.45 8,944.93
7,580.45 8,944.93
34,670.37 40,911.04
4,124.43 4,866.83
5,973,512 5,973,512
231,883.26 273,622.25
1,707.69 2,015.07
308,802.49 364,386.94
308,802.49 364,386.94
30,992.21 36,570.81
30,992.21 36,570.81
10,925.42 12,892.00
2,564.51 3,026.12
13,042.68 15,390.36
4,458.63 5,261.18
23,187.62 27,361.39
10,266.94 12,114.99
31,770.69 37,489.41
9,475.58 11,181.18
3,003.82 3,544.51
6,426.15 7,582.86
1,390.35 1,640.61
63,542.35 74,979.97
12,708.47 14,995.99
12,374.28 14,601.65
19,064.22 22,495.78
6,298.21 7,431.89
3,639.50 4,294.61
3,573.04 4,216.19
5,462.22 6,445.42
121,513.43 143,385.85
121,513.43 143,385.85
812,968.35 959,302.65
812,968.35 959,302.65
242,473.48 286,118.71
1,414,155.00 1,668,702.90
468,064.48 552,316.09
351,048.36 414,237.06
189,455.90 223,557.96
189,455.90 223,557.96
266,125.20 314,027.74
44,354.20 52,337.96
44,354.20 52,337.96
43,463.66 51,287.12
172,517.88 203,571.10
189,455.90 223,557.96
651,726.96 769,037.81
59,647.01 70,383.47
1,025,287.62 1,209,839.39
273,210.00 322,387.80
16,165.00 19,074.70
278,604.60 328,753.43
2,206,584.60 2,603,769.83
115,284.00 136,035.12
50,149.63 59,176.56
624,049.60 736,378.53
64,558.80 76,179.38
741,037.50 874,424.25
3,761,220.00 4,438,239.60
390,105.00 460,323.90
835,832.71 986,282.60
167,166.74 197,256.75
8,216,109.72 9,695,009.47
5,345,320.06 6,307,477.67
30,648.10 36,164.76
80,814,237
1 0
- 0.03
80,814,237
Total Civil Budget Total ACE - Civil
6.0% 33.3%
5.8% 24.3%
15.7% 24.5%
13.8% 20.0%
1.5% 0.0% 0
2.1% 0.0%
7.5% -1.3% 100.00
2.4% 0.0%
0.0%
0.4% 28.3%
0.5% -5.7%
0.1% 64.3%
0.3% 55.1%
0.1% 13.8%
0.1% -5.5%
0.8% -25.0%
1.0% -25.0%
0.2% -25.0%
0.2% 0.0%
10.1% -12.3%
0.9% 0.0%
0.2% 0.0%
0.1% 0.0%
3.6% 0.0%
0.2% 0.0%
0.2% 21.8%
0.2% -0.1%
0.4% 33.9%
0.8% 0.0%
3.2% -7.6%
0.3% 0.0%
0.1% 0.0%
0.3% 0.0%
2.0% -31.3%
0.1% 0.0%
0.1% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.1% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.2% 0.0%
2.7% -30.8%
0.8% 0.0%
0.1% 5.0%
0.0% -78.4%
0.0% 0.0%
0.1% 0.0%
0.3% 0.0%
0.1% 0.0%
0.2% 0.0%
0.9% 0.0%
0.2% 0.0%
0.0% 0.0%
0.0% 0.0%
0.0% 0.0%
0.5% 0.0%
0.3% 0.0%
0.1% 0.0%
0.1% 0.0%
0.1% 0.0%
0.1% 0.0%
0.1% 21.2%
0.2% 0.0%
0.0% 0.0%
0.2% 0.0%
1.4% 21.9%
0.3% -88.2%
0.2% -515.1%
1.3% 0.0%
0.4% -191.4%
0.1% -26.5%
0.1% 33.9%
0.0% -25.0%
7.4%
1,265,000.00 1,239,700.00
420,000.00 411,600.00
315,000.00 308,700.00
170,000.00 166,600.00
170,000.00 166,600.00
238,800.00 234,024.00
39,800.00 39,004.00
39,800.00 39,004.00
39,000.00 38,220.00
154,800.00 151,704.00
170,000.00 166,600.00
584,800.00 573,104.00
53,500.00 52,430.00
920,000.00 901,600.00
245,000.00 240,100.00
14,500.00 14,210.00
220,000.00 215,600.00
1,760,000.00 1,724,800.00
103,500.00 101,430.00
45,000.00 44,100.00
560,000.00 548,800.00
57,930.00 56,771.40
665,000.00 651,700.00
3,375,000.00 3,307,500.00
350,000.00 343,000.00
750,000.00 735,000.00
150,000.00 147,000.00
6,879,600.00 6,742,008.00
4,475,800.00 4,386,284.00
27,500.00 26,950.00
24,259,430 23,774,143
24,259,330
Civil
-
-100.00
Unit Budget Total Budget Total ACE Diff. wrt to
Erection Erection Erection Budget vs ACE
-
-
-
-
- 527000
-
-
-
4,758,270.92 4,758,270.92
Civil Civil
- -
-2,300.00 949,814.18
13.87
Equipment Summary
Supply F&I
TOTAL
Sl No Item Unit Qty (U/R) _Apx % Contrbn Cost
Exworks
1 GIS Set 7 3,610,194 25,271,360 32.48% -
2 Cable Mtr. 2,054 6,192 12,719,239 16.35% -
3 CRP Set 7 1,598,020 11,186,140 14.38% -
4 Spares No. 89 69,216 6,160,186 7.92%
5 Testing Equipments Set 8 564,010 4,512,077 5.80% -
6 SAS lot 2 1,763,580 3,527,160 4.53%
7 Cable Termination Set 32 113,475 3,631,200 4.67% 9,581
8 Capacitor Bank Set 2 1,440,000 2,880,000 3.70% -
9 Earthing material sq meter (approx) 3650 1 2,095,319 2,095,319 2.69% -
10 Structure No 45 29,583 1,331,219 1.71%
TOTAL 77,807,898 100%### 9,581
- 78
2 FOUNDATIONS Supply of labour, T&P, material and construction of RCC footings & pedestals
etc. for steel gantry and equipment structures complete in all respects as per technical specifications
& drawings attached with the tender document including cost of excavation, concreting, cement,
reinforcement steel, form work, grouting, holding down bolts, backfilling etc. and other items not
mentioned herein but required for the completion of work.
A. Gantry Towers
i) CT-4
3 ii) CT-5
4 iii) DT-2
5 iv) DT-3
6 EQUIPMENT (66 kV Side)
i) LA
7 ii) CVT
8 iii) NCT
9 11 kV Side
NCT
10 CABLE SUPPORT STRUCTURE FOUNDATIONS Design, Engineering, supply of labour,
material and construction of cable support structure foundations including all associated works,
RCC, PCC, reinforcement steel, misc. structural steel and other items not mentioned herein but
required for the completion of work as per technical specification.
66 kV cable Support Structure
11 CAPACITOR BANK FOUNDATIONS Design, Engg. & supply of labour, material & construction
of foundations for following rating capacitor bank with capacitor unit (with allied equipments) &
series Reactor etc. including chain link fencing 1.8M height around cap. bank complete in all
respect including any other items not specifically mentioned herein but required for completion of
job as per technical specification.
i) 3.4 MVAr 11 kV Capacitor Bank
13 ii)Design, Engg, supply of labour, matarial and construction of station T/F foundation including all
associated works, RCC, PCC, Reinforcement steel, misc. structural steel and other items not
mentioned herein but required for the completion of work as per technical specifications.
200KVA, 11/0.433kV station T/F foundation.
14 CABLE TRENCHES : Supply of labour, material such as cement, reinforcement steel, GI angles,
flats, PCC & brick pillars below cable trenches for construction of Out-Door Cable Trenches
(ODCT) of required depth/ type with pre-cast RCC covers including associated works like Cable
Trench Culverts crossings for roads and sump- pit-cum-pump chamber with 2HP motor of reputed
make, starter, volt meter, amp-meter etc. as per approved Trench layout plan, HVPNL drgs. & tech.
specs. complete in all respect.
27 The successful bidder shall evolve design & drawing for drain, manholes with RCC covers on
settlement tank including preparation of drainage layout drawing for disposal of rain water from
building’s roof top & switch yard (s/stn.) area into bore well in such a way that there shall be no
ponding of water on the roof and switch yard (s/stn.). The layout so developed shall be got
approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be
located on corner(s) of the s/stn. and shall be got decided from the concerned XEN/Civil Works
Division on the basis of surroundings of the substation(s). The successful bidder will also supply
labour and material for construction of 1 no. sump-pit-cum-pump chamber as per HVPNL drgs. &
provide one no. non clog pump(s) of 5HP of reputed make capacity with main switch, starter, volt
meter, Amp. Mtr. etc. (for each sump pit) for disposal of excess water to outfall point. Any other
item(s) not mentioned herein but is/are required for completion of works shall be done by the
successful bidder without any extra cost to the employer.
29 66 kV GIS HALL/BUILDING
Design, Engineering including architectural, supply of labour, material and construction of GIS
building with ventilation system including erection of crane hoisting system (EOT), equipment
foundations as detailed in the bill of quantities under Section-I of bid/contract documents, indoor
cable trenches, electrification including wiring, receptacle, modular switches, maximum 20W 4ft.
long LED tubes with fittings minimum 1960 lumens , bulkhead LED lights including fixtures,
ceiling/exhaust fans, stair case etc. interior & exterior acrylic emulsion, paint cement based white
(with putty), RCC paving/plinth protection starting from the building up to 1.5 mtr. clear distance
for the full length width of the building etc. complete in all respect for below mentioned GIS
hall/building and any other item not mentioned herein but required for completion of job as per
specifications.
33 72.5kV, 800A, single 3 – Φ or three 1 –Φ, Bus coupler bay module, consisting of 800A single 3 –
Φ or three 1 –Φ SF6 gas insulated switchgears, comprising of:
i 800A, One 3 – Φ or three 1 –Φ, SF6 gas insulated circuit breaker, complete with operating
mechanism.
ii Three,3-core,single phase current transformers(600-300-150/1-1-1A)
iii Two sets of isolator/disconnector switches each of 800A, One 3 – Φ or three 1 – Φ, single pole,
group operated isolator/disconnector switches each with 3 – Φ or three 1 – Φ, single pole, group
operated earthing switch and complete with manual and motor driven operating mechanisms.
iv Each GIS compartment with gas monitoring device, pressure switch etc. as required.
v Terminal boxes/ Local Control Cubicle.
vi Interconnecting wiring/ piping.
vii Grounding, support structures and platforms.
34 72.5kV, 800A, single 3 – Φ or three 1 –Φ, Transmission line feeder circuit breaker bay modules,
consisting of 800A single 3 – Φ or three 1 –Φ SF6 gas insulated switchgears, each comprising of:-
i 800A, One 3 – Φ or three 1 –Φ, SF6 gas insulated circuit breaker, complete with operating
mechanism for outgoing feeder.
ii Three, 66kV LAs and Voltage detectors /sensors
iii Three, 3-core, single phase current transformers
(600-300-150/1-1-1A)
iv 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector without
earthing switch, complete with manual and motor driven operating mechanisms.
v 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector with one, 3 –Φ
or three 1 –Φ, single pole, group operated earthing switch, complete with manual and motor driven
operating mechanisms.
vi 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector with one
normal and one high speed fault make 3 –Φ or three 1 – Φ, single pole, group operated earthing
switches, complete with manual and motor driven operating mechanisms.
vii Each GIS compartment with gas monitoring device, pressure switch etc. as required.
viii Terminal boxes/ Local Control Cubicle.
ix Interconnecting wiring/ piping.
x Grounding, support structures and platforms.
35 72.5kV, 400A, single 3 – Φ or three 1 –Φ, Transformer feeder circuit breaker bay modules,
consisting of 400A single 3 –Φ or three 1 –Φ SF6 gas insulated switchgears, for 66/11kV
transformer, each comprising of: -
i One 3 – Φ or three 1 – Φ, SF6 gas insulated circuit breaker, complete with operating mechanism
for incomer bay from 66/11kV transformer.
ii Three, 3-core, single phase current transformers (300-150/1-1-1A).
iii 400A, One 3 –Φ or three 1 –Φ, single pole, group operated isolator/disconnector without
earthing switch, complete with manual and motor driven operating mechanisms.
iv 400A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector with one, 3 –
Φ or three 1 –Φ, single pole, group operated earthing switch, complete with manual and motor
driven operating mechanisms.
v 400A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector with two
earthing switches each comprising of one 3 – Φ or three 1 –Φ, single pole, group operated earthing
switches complete with manual and motor driven operating mechanisms.
vi Each GIS compartment with gas monitoring device, pressure switch etc. as required.
vii Local Control Cubicle.
viii Interconnecting wiring/piping.
ix Grounding, support structures and platforms.
36 66kV XLPE copper Cable 1XC (400mm2) along with one no. spare cable coated with fire retardant
Paint for connecting 66kV side of 66/11kV transformer with GIS.
37 Termination kit for both ends for 66kV XLPE copper Cable 1XC (400mm2).
38 66kV XLPE copper Cable 1XC (800mm2) along with one no. spare cable coated with fire retardant
Paint for each line feeder bay
39 Termination kit for both ends for 66kV XLPE copper Cable 1XC (800mm2).
40 12.5/16 MVA, 66/11 kV Power T/F (To be Provided by HVPNL)
41 220V 100 AH Battery
42 66 kV Surge Arrestor
43 11kV Surge Arrestor
44 66 kV CVT
45 66 kV NCT For 66/11kV T/F (300-200-150/1A)
46 11 kV NCT For 66/11T/F (1800-900/5A)
47 66 kV C&R Panels
i) Line Protection & Circuit Breaker control panel ( without auto reclose)
48 ii) Transformer protection & Ckt breaker control Panel ( without auto reclose)
49 iii) Bus Coupler Protection & Ckt breaker control Panel ( without auto reclose)
50 Time synchronization equipment
51 11 kV 15 Panel Board (2000A) with one SEM on each T/F I/C Panel (including one no. bus
sectionalizer panel)
52 11 kV Power Cable XLPE 1C x1000mm2 coated with fire retardant paint for T/F to 11kV incomer
with termination kit for both ends (2 runs per phase for each transformer allocating them 1 runs per
phase for each 11kV I/C)
53 11 kV Power Cable XLPE 3C x 185sq mm coated with fire retardant Paint for Capacitor Bank
with termination kit for both ends(2 runs)
54 11 kV Power Cable XLPE 3C x 50 sq mm coated with fire retardant Paint for station T/F with
termination kit for both ends
55 3.4 MVAR 11 kV rating Capacitor Bank with 11 kV L&E Switch, RVTs and 11KV LA, reactor
etc. as per technical specification.
56 220 V 100 AH Battery charger
57 220 V 100 AH D.C.D.B.
58 415 V LT AC Distribution Board 300 A
59 11/0.4 kV Station T/F 200 KVA
61 1.1 kV Copper Control Cable armoured (FRLS) for 66kV bays & 11kV side of sizes 7CX4mm2,
2CX4mm2, 4CX4mm2, 2CX6mm2, 16CX2.5mm2, 10CX2.5mm2, 7CX2.5mm2, 3CX2.5mm2 etc.
including junction box (as per Section-6 of copper control cable specification and Section-7 of
Switchyard Erection).
62 650/1100 Volts 3.5 core 240 mm2 aluminium power cable (FRLS) from Aux. T/F to ACDB
63 650/1100 Volt 3.5 core 70 mm2 aluminium cable (FRLS) for oil filtration set.
64 650/1100 Volt 4 core 16 mm2 armoured (FRLS) copper power cable for MLDB etc and other cable
required as per contract for 66kV bays.
74 Complete Lightning of control room building, switchyard area, road and street as per section-7 of
technical Specifications
Supply and installation of 2 fittings of 240W LED lamps with all accessories for Complete lighting
of outdoor Switch yard area as per clause 16.0 of section 7 of the specifications.
80 Complete Substation automation system of 66/11kV substations including hardware (along with
transducers) for 5 No. 66kV present bays and software (for present bays as well as 3 No. 66kV
future bays) along with associated equipment for the bays (bay as defined in the technical
specification, sec-sub-station automation system) as per technical specification.
Note: signals from protection relays in 11kV incomer would also be wired to substation automation
system (SAS)
88 Galvanized iron perforated tray with side coupler plate bolts, nuts, washers and clamps etc. of size
75x25x2 mm, 150x25x2mm, 100x25x2mm etc. & G.I. Conduits of 50mm/100mm dia from
equipment to main trench as per Section-7, Switchyard erection.
89 Painted lattice type steel trays of adequate size as per site requirement for laying control and power
cables from panels to GIS & Transformers and for 11kV Outgoing cables & other cables identified
as per site requirement confirming to Section-7 & 9.
20,106,094
Basic Unit Total
Unit Qty
Rate Amount
Cum 11500 110 1,265,000
6.29%
No. 4 105,000 420,000
2.09%
No. 3 105,000 315,000 1.57%
No. 2 85,000 170,000 0.85%
No. 2 85,000 170,000 0.85%
No. 12 19,900 238,800
1.19%
No. 2 19,900 39,800 0.20%
No. 2 19,900 39,800 0.20%
No. 2 19,500 39,000
0.19%
No. 12 12,900 154,800
0.77%
Set 2 85,000 170,000
0.85%
No. 2 292,400 584,800
2.91%
No. 1 53,500 53,500
0.27%
Lot 1 920,000 920,000
4.58%
0 0 - -
Set 2 110,000 220,000
GIS 2
GIS 3
GIS 4
Cable 5
Cable 6
Termination
Cable 7
Cable 8
Termination
PTR 9
Battery 10
Switch Gear 11
Switch Gear 12
Switch Gear 13
Switch Gear 14
Switch Gear 15
CRP 16
CRP 17
CRP 18
MISC 19
CRP 20
Cable 21
Cable 22
Cable 23
Capacitor 24
Bank
Battery 25
Misc 26
Misc 27
Station TRF 28
EOT Crane 29
Cable 30
Cable 31
Cable 32
Cable 33
Earthing 34
material
Fire Fighting 35
Fire Fighting 36
Fire Fighting 37
Fire Fighting 38
Fire Fighting 39
Fire Fighting 40
Fire Fighting 41
Fire Fighting 42
Lightning 43
Lightning 44
Lightning 45
Lightning 46
Lightning 47
Misc 48
SAS 49
SAS 50
H/W 51
H/W 52
H/W 53
H/W 54
H/W 55
H/W 56
Cable Tray 57
Cable Tray 58
Conductor 59
Conductor 60
Misc 61
H/W 62
Structure 63
Structure 64
Structure 65
Structure 66
Structure 67
Structure 68
Structure 69
Structure 70
Structure 71
Structure 72
Testing 73
Equipments
Testing 74
Equipments
Testing 75
Equipments
Testing 76
Equipments
Testing 77
Equipments
Testing 78
Equipments
Testing 79
Equipments
Testing 80
Equipments
Spares 81
Spares 82
Spares 83
Spares 84
Spares 85
Spares 86
Spares 87
Spares 88
Spares 89
Spares 90
Spares 91
Spares 92
Spares 93
Spares 94
Spares 95
Spares 96
Spares 97
Spares 98
Spares 99
Spares 100
Spares 101
Spares 102
Spares 103
Spares 104
Spares 105
Spares 106
Spares 107
Spares 108
Spares 109
Spares 110
Spares 111
Spares 112
Spares 113
Spares 114
Spares 115
Spares 116
Spares 117
Spares 118
Spares 119
Spares 120
Spares 121
Spares 122
Spares 123
Spares 124
Spares 125
Spares 126
Spares 127
Spares 128
Spares 129
Spares 130
Spares 131
Spares 132
Spares 133
Spares 134
Spares 135
Spares 136
Spares 137
Spares 138
Spares 139
Spares 140
ITEM DESCRIPTION Unit Total Qty
NNEXURE
72.5kV, 1250A, single 3 – Φ or three 1 –Φ, SF6 gas insulated, metal enclosed bus Set 2
bars arrangement, consisting of 1250A single 3 – Φ or three 1 –Φ SF6 gas insulated
switchgears, each Bus Bar comprising of :-
i) Bus bar enclosures running through the length of the switchgear to interconnect
each of the circuit breaker bay modules in double main bus system.
ii) Three, 2-core, single phase or single 3 – Φvoltage transformers/ PTs.
iii) 1250A, One 3 – Φ or three 1 –Φ, single pole, group operated isolator/disconnector
and one, 3 – Φ or three 1 – , single pole, group operated earthing switch with manual
and motor driven operating mechanisms.
iv) 1250A, One high speed fault make 3 – Φ or three 1 –Φ, single pole, group operated
earthing switches, complete with manual and motor driven operating mechanisms.
v) Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
vi) Terminal boxes/ Local Control Cubicle.
vii) Interconnecting wiring/ piping.
viii) Grounding, support structures and platforms.
72.5kV, 800A, single 3 – Φ or three 1 –Φ, Bus coupler bay module, consisting of Set 1
800A single 3 – Φ or three 1 –Φ SF6 gas insulated switchgears, comprising of:
i 800A, One 3 – Φ or three 1 –Φ, SF6 gas insulated circuit breaker, complete with
operating mechanism.
ii Three,3-core,single phase current transformers(600-300-150/1-1-1A)
iii Two sets of isolator/disconnector switches each of 800A, One 3 – Φ or three 1 – Φ,
single pole, group operated isolator/disconnector switches each with 3 – Φ or three 1 –
Φ, single pole, group operated earthing switch and complete with manual and motor
driven operating mechanisms.
iv Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
v Terminal boxes/ Local Control Cubicle.
vi Interconnecting wiring/ piping.
vii Grounding, support structures and platforms.
72.5kV, 800A, single 3 – Φ or three 1 –Φ, Transmission line feeder circuit breaker Set 2
bay modules, consisting of 800A single 3 – Φ or three 1 –Φ SF6 gas insulated
switchgears, each comprising of:-
i 800A, One 3 – Φ or three 1 –Φ, SF6 gas insulated circuit breaker, complete with
operating mechanism for outgoing feeder.
ii Three, 66kV LAs and Voltage detectors /sensors
iii Three, 3-core, single phase current transformers
(600-300-150/1-1-1A)
iv 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
without earthing switch, complete with manual and motor driven operating
mechanisms.
v 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with one, 3 –Φ or three 1 –Φ, single pole, group operated earthing switch, complete
with manual and motor driven operating mechanisms.
vi 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with one normal and one high speed fault make 3 –Φ or three 1 – Φ, single pole, group
operated earthing switches, complete with manual and motor driven operating
mechanisms.
vii Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
viii Terminal boxes/ Local Control Cubicle.
ix Interconnecting wiring/ piping.
x Grounding, support structures and platforms.
72.5kV, 400A, single 3 – Φ or three 1 –Φ, Transformer feeder circuit breaker bay Set 2
modules, consisting of 400A single 3 –Φ or three 1 –Φ SF6 gas insulated
switchgears, for 66/11kV transformer, each comprising of: -
i One 3 – Φ or three 1 – Φ, SF6 gas insulated circuit breaker, complete with operating
mechanism for incomer bay from 66/11kV transformer.
ii Three, 3-core, single phase current transformers (300-150/1-1-1A).
iii 400A, One 3 –Φ or three 1 –Φ, single pole, group operated isolator/disconnector
without earthing switch, complete with manual and motor driven operating
mechanisms.
iv 400A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with one, 3 – Φ or three 1 –Φ, single pole, group operated earthing switch, complete
with manual and motor driven operating mechanisms.
v 400A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with two earthing switches each comprising of one 3 – Φ or three 1 –Φ, single pole,
group operated earthing switches complete with manual and motor driven operating
mechanisms.
vi Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
vii Local Control Cubicle.
viii Interconnecting wiring/piping.
ix Grounding, support structures and platforms.
66kV XLPE copper Cable 1XC (400mm2) along with one no. spare cable coated with Mtr. 250
fire retardant Paint for connecting 66kV side of 66/11kV transformer with GIS.
Termination kit for both ends for 66kV XLPE copper Cable 1XC (400mm2). Set 16
66kV XLPE copper Cable 1XC (800mm2) along with one no. spare cable coated with Mtr. 800
fire retardant Paint for each line feeder bay
Termination kit for both ends for 66kV XLPE copper Cable 1XC (800mm2). Set 16
Supply and installation of 35W LED tube on tubular steel poles along with the No. 12
boundary wall at a distance of 30 meter as per as per clause 16.0 of section 7 of the
specification
Complete lighting of road and street by providing 90W LED lamps on tubular steel No. 15
poles at a distance of 15meter along the roads and streets as per as per clause 16.0 of
section 7 of the specification.
Supply and installation of post top lantern 40W LED Lamps with all complete No. 2
accessories at the entrance gate of sub-station.
Supply and installation of 40W LED Lamps with all complete accessories on corners of No. 10
control room building.
High wall type split AC unit of 2 Ton capacity for computer room and specifically Nos. 3
C&R Panel room (as per technical specification)
Complete Substation automation system of 66/11kV substations including hardware lot 1
(along with transducers) for 5 No. 66kV present bays and software (for present bays as
well as 3 No. 66kV future bays) along with associated equipment for the bays (bay as
defined in the technical specification, sec-sub-station automation system) as per
technical specification.
Note: signals from protection relays in 11kV incomer would also be wired to
substation automation system (SAS)
ii) Pressure gauges (of each type) along with coupling device Set 1
iii)Rubber Gaskets, “ o” Rings and seals for SF6 Gas (each type) Set 1
iv) Molecular filter for SF6 Gas with filter bags (20% of total weight) Set 1
v) Density Monitors for SF6 Gas (each type) No. 1
vi) All types of Control Valves for SF6 Gas (each type) Set 1
vii) SF6 Gas of total gas requirement 20% (each no. 1) Set 1
viii) Enclosures, Insulators & main circuit to replace on each phase, any compartment Set 1
of Busbar, bay & duct (each type)
ix) Covers with all accessories necessary to close a compartment in case of dismantling No 2
of any part of the enclosure to ensure the sealing of this compartment (as applicable)
a)
b) For isolator
For earth switch Set 1
viii) Rotor housing bearing assembly for complete 3 phase equipment Sets 2
a) For
b) For earth
isolator
switch Set 1
ix) Motor with gear assembly for complete 3 phase equipment Sets 3
a) For isolator
b) For earth switch Set 1
x). Corona shield rings as applicable Set 1
xi) Hinge pins for complete 3 phase equipment Sets 3
a) For isolator
b) For earth switch Set 1
xii) Bearings for complete 3 phase equipment Sets 5
a) For isolator
b) For earth switch Set 1
xiii) Interlocking coil with resistors, timers, key interlock for complete 3 phase Set 1
xiv) Relays, Power contactors, resistors, fuses, push buttons & MCBs Sets 3
a) For isolator
b) For earth switch Set 1
xv) Terminal pad and connectors (complete for one 3 phase equipment) Sets 2
a)
b) For isolator
For earth switch Set 1
xvi) Aux. switch assembly (complete) with 10 NO & 10 NC OR more contacts Set 1
xvii) 72.5 kV, 1250 A, 3 – f or 1 –f high speed fault making grounding switch, Internal Set 1
parts
xviii) complete
72.5 kV, with
1250 all
A,necessary
3 – f or gaskets mounting
1 –f high hardware
speed fault etc. grounding switch
making Set 1
operating mechanism complete with all necessary gaskets connecting apparatus.
Current Transformer, Nos. 3
i) 66kV 1 ph CT ratio 600-300-150/1-1-1A complete with all gaskets and mounting
hardware
ii) 66kV 1 ph CT ratio 300-150/1-1-1A complete with all gaskets and mounting Nos. 3
hardware
Voltage Transformer/PT(66 KV), Nos. 1
i) 66kV, 1-phase VT as per technical specifications complete with all gaskets and
mounting hardware.
LPP EX WORKS BFR DISC
HYOSUNG
CGL
CGL
CGL
KEI
COMPAQ
KEI
COMPAQ
HVPNL SCOPE
OBLUM
OBLUM
MEHRU
HEPTACARE
HEPTACARE
POPULAR SWG
POPULAR SWG
POPULAR SWG
AVANA
MEGAWIN
TIRUPATI
TIRUPATI
TIRUPATI
SHREEM
RADETRON
NITYA
RADETRON
Danish
MAHAVIR
MAHAVIR
HYOSUNG
HYOSUNG
HYOSUNG
HYOSUNG
HYOSUNG
HYOSUNG
HYOSUNG
CGL
CGL
HYOSUNG
CGL
CGL
CGL
HYOSUNG
CGL
HYOSUNG
CGL
CGL
HYOSUNG
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
CGL
EX WORKS BFR DISC DISCOUNT EX WORKS AFTER DISC
- - -
215,000 215,000 215,000
37,000 444,000 10.0% 33,300
5,150 30,900 10.0% 4,635
70,000 140,000 10.0% 63,000
23,000 46,000 10.0% 20,700
30,000 60,000 10.0% 27,000
471,000 942,000 10.0% 423,900
- 1.04 - - 1.04 -
215,000 1.04 223,600 223,600 1.04 -
399,600 1.04 34,632 415,584 1.04 -
27,810 1.04 4,820 28,922 1.04 -
126,000 1.04 65,520 131,040 1.04 -
41,400 1.04 21,528 43,056 1.04 -
54,000 1.04 28,080 56,160 1.04 -
847,800 1.04 440,856 881,712 1.04 -
80,930,265
31,165,768
112,096,033
132,273,319
-10,226,684
10760.8957168
10045.1312000
715.76452
F&I SALES
TOTAL
1,689,667.00 - 1,689,667.00
3,683,680.00 - 3,683,680.00
-
4,964,960.00 - 4,964,960.00
4,644,640.00 - 4,644,640.00
-
5,041.00 - 5,041.00
-
111,384.00 - 111,384.00
-
7,959.00 - 7,959.00
-
124,644.00 - 124,644.00
- - - -
- 223,600.00 - 223,600.00
- 34,632.00 - 34,632.00
- 4,820.00 - 4,820.00
- 65,520.00 - 65,520.00
- 21,528.00 - 21,528.00
- 28,080.00 - 28,080.00
-
440,856.00 - 440,856.00
- 506,376.00 - 506,376.00
- 231,192.00 - 231,192.00
- 135,720.00 - 135,720.00
-
4,753,965.00 - 4,753,965.00
-
1,118.00 - 1,118.00
-
981.00 - 981.00
-
472.00 - 472.00
-
1,497,600.00 - 1,497,600.00
- 192,660.00 - 192,660.00
-
101,705.00 - 101,705.00
- 192,660.00 - 192,660.00
- 232,180.00 - 232,180.00
- 691,600.00 - 691,600.00
-
3,975,399.00 - 3,975,399.00
-
258,311.00 - 258,311.00
- 114,840.00 - 114,840.00
-
225,983.00 - 225,983.00
-
2,179,132.00 - 2,179,132.00
-
15,080.00 - 15,080.00
- 11,960.00 - 11,960.00
- 4,992.00 - 4,992.00
- 5,304.00 - 5,304.00
- 1,768.00 - 1,768.00
80.60 1,612.00 81.00 1,693.00
- 1,716.00 - 1,716.00
- 6,469.00 - 6,469.00
-
13,520.00 - 13,520.00
-
780.00 - 780.00
-
2,600.00 - 2,600.00
-
5,720.00 - 5,720.00
-
780.00 - 780.00
-
55,120.00 - 55,120.00
-
2,992,246.00 - 2,992,246.00
- 676,000.00 - 676,000.00
-
6,521.00 - 6,521.00
-
5,938.00 - 5,938.00
- 11,700.00 - 11,700.00
- 89,700.00 - 89,700.00
- 245,695.00 - 245,695.00
-
59,160.00 - 59,160.00
-
154,024.00 - 154,024.00
-
778,206.00 - 778,206.00
- 614.00 - 614.00
- 390.00 - 390.00
- 7,176.00 - 7,176.00
- 41,642.00 - 41,642.00
-
101,742.00 - 101,742.00
- 72,321.00 - 72,321.00
- 30,430.00 - 30,430.00
9,964.53 62,278.00 4,982.00 67,260.00
- 42,635.00 - 42,635.00
- 36,116.00 - 36,116.00
-
29,510.00 - 29,510.00
- 10,971.00 - 10,971.00
- 10,971.00 - 10,971.00
-
12,012.00 - 12,012.00
-
936,000.00 - 936,000.00
-
491,260.00 - 491,260.00
-
972,400.00 - 972,400.00
-
1,060,800.00 - 1,060,800.00
-
1,060,800.00 - 1,060,800.00
-
105,270.00 - 105,270.00
-
30,940.00 - 30,940.00
-
35,091.00 - 35,091.00
-
35,092.00 - 35,092.00
- 35,092.00 - 35,092.00
- 35,093.00 - 35,093.00
- 35,094.00 - 35,094.00
- 35,095.00 - 35,095.00
- 35,096.00 - 35,096.00
-
35,097.00 - 35,097.00
-
35,098.00 - 35,098.00
-
10,115.00 - 10,115.00
- 6,760.00 - 6,760.00
-
22,880.00 - 22,880.00
-
78,000.00 - 78,000.00
- 15,600.00 - 15,600.00
- 365,189.00 - 365,189.00
-
724,880.00 - 724,880.00
-
98,800.00 - 98,800.00
- 5,928.00 - 5,928.00
- 1,976.00 - 1,976.00
- 988.00 - 988.00
- 988.00 - 988.00
-
44,460.00 - 44,460.00
-
20,748.00 - 20,748.00
- 2,080.00 - 2,080.00
-
5,928.00 - 5,928.00
- 5,928.00 - 5,928.00
- 5,928.00 - 5,928.00
- 5,928.00 - 5,928.00
- 5,928.00 - 5,928.00
- 32,604.00 - 32,604.00
- 2,964.00 - 2,964.00
- 215,280.00 - 215,280.00
- 1,352.00 - 1,352.00
-
280,800.00 - 280,800.00
-
296,400.00 - 296,400.00
-
29,640.00 - 29,640.00
-
29,640.00 - 29,640.00
-
9,880.00 - 9,880.00
- 1,976.00 - 1,976.00
-
2,964.00 - 2,964.00
- 2,964.00 - 2,964.00
-
8,892.00 - 8,892.00
- 8,892.00 - 8,892.00
-
7,904.00 - 7,904.00
- 7,904.00 - 7,904.00
- 2,080.00 - 2,080.00
-
1,560.00 - 1,560.00
- 1,040.00 - 1,040.00
-
10,868.00 - 10,868.00
- 10,868.00 - 10,868.00
- 10,868.00 - 10,868.00
- 4,940.00 - 4,940.00
- 4,940.00 - 4,940.00
-
1,352.00 - 1,352.00
- 1,872.00 - 1,872.00
- 3,952.00 - 3,952.00
- 113,620.00 - 113,620.00
- 113,620.00 - 113,620.00
-
265,200.00 - 265,200.00
- 265,200.00 - 265,200.00
- 237,120.00 - 237,120.00
10,045
304,140.06 1,993,807.06 3,987,614.12
- - -
40,248.00 263,848.00 263,848.00
6,233.76 40,865.76 490,389.12
867.60 5,687.60 34,125.60
11,793.60 77,313.60 154,627.20
3,875.04 25,403.04 50,806.08
5,054.40 33,134.40 66,268.80
2CX6 mm2 1.1 kV, PVC Copper LT Cable armoured (FRLS) 4305 Mtrs
4CX4 mm2 1.1 kV, PVC Copper Control Cable armoured (FRLS) 5131 Mtrs
10CX2.5 mm2 1.1 kV, PVC Copper Control Cable armoured (FRLS) 5043 Mtrs
16CX2.5 mm2 1.1 kV ,PVC Copper Control Cable armoured (FRLS) 5173 Mtrs
31 650/1100 Volts 3.5 core 240 mm2 aluminium power cable (FRLS) from Aux. T/F to ACDB item31 0.95 Lot
650/1100 Volts 3.5 core 240 mm2 aluminium power cable (FRLS) from Aux. T/F to ACDB 304 Mtrs
32 650/1100 Volt 3.5 core 70 mm2 aluminium cable (FRLS) for oil filtration set. item32 0.95 Lot
650/1100 Volt 3.5 core 70 mm2 aluminium cable (FRLS) for oil filtration set. 428 Mtrs
33 650/1100 Volt 4 core 16 mm2 armoured (FRLS) copper power cable for MLDB etc and item33 1 Lot
other cable required as per contract for 66kV bays.
650/1100 Volt 4 core 16 mm2 armoured (FRLS) copper power cable for MLDB etc and other cable required as per
350 Mtrs
contract for 66kV bays.
34 Grounding system of the substation. Earthing Mat Material. The earth mat will be item34 1 sq meter
designed/quoted for soil resistivity of 50ohm-m. In case soil resistivity is more than 50ohm- (approx)
m then the earth mat will be designed for actual soil resistivity. The payment of extra 3650
material to be used for earth mat shall be made on pro rata basis. The approximate area of
earth mat to be laid is given in the corresponding columns of the substations. However,
item will remain a Lot item.
40 mm dia MS Rod 2547 Mtrs
75x12 mm GS Flat 450 Mtrs
50x6 mm GS Flat 500 Mtrs
100 mm dia CI pipe with 13 mm thickness 40 Nos.
50X6 mm Cu Flat for Transformer Neutral Earthing 100 Mtrs
CI 450X450 mm Pit Cover 40 Nos.
Charcoal 1100 kg
Salt 4950 kg
Water Tap, Pipe etc for treated pit 1 Sets
53 Boltless C- Type Wedge connectors matching with conductor size. item53 1 Lot
Double compression type tinned/nickel plated brass cable glands for 2CX6 mm2 1.1 kV, PVC Copper LT Cable
110
Nos.
armoured (FRLS)
Double compression type tinned/nickel plated brass cable glands for 4CX4 mm2 1.1 kV, PVC Copper Control Cable
130
Nos.
armoured (FRLS)
Double compression type tinned/nickel plated brass cable glands for 10CX2.5 mm2 1.1 kV, PVC Copper Control
150
Nos.
Cable armoured (FRLS)
Double compression type tinned/nickel plated brass cable glands for 16CX2.5 mm2 1.1 kV ,PVC Copper Control
165
Nos.
Cable armoured (FRLS)
Double compression type tinned/nickel plated brass cable glands for 2 Pair 1.5 mm2 PVC,Cu Shielded Cable 30
Nos.
Double compression type tinned/nickel plated brass cable glands for 650/1100 Volts 3.5 core 240 mm2 aluminium
30
Nos.
power cable (FRLS) from Aux. T/F to ACDB
Double compression type tinned/nickel plated brass cable glands 650/1100 Volt 3.5 core 70 mm2 aluminium cable
30
Nos.
(FRLS) for oil filtration set.
Double compression type tinned/nickel plated brass cable glands for 650/1100 Volt 4 core 16 mm2 armoured (FRLS)
30
Nos.
copper power cable
PIN Type Insulated Lugs for 2.5 Sq mm Cables 1400 Nos.
Ring Type Insulated Lugs for 2.5 Sq mm Cables 4800 Nos.
Ring Type Insulated Lugs for4 Sq mm Cables 800 Nos.
Ring Type Insulated Lugs for 6 Sq mm Cables 500 Nos.
Ring Type Lugs for 16 Sq mm Cables 50 Nos.
Ring Type Lugs for 70 Sq mm Cables 30 Nos.
Ring Type Lugs for 240 Sq mm Cables 30 Nos.
Insulation Tap RED 30 Nos.
Insulation Tap Tellow 30 Nos.
Insulation Tap Blue 30 Nos.
Insulation Tap Black 30 Nos.
Insulation Tap Green 30 Nos.
PVC Tube for Cable Ferrule 2.5 Sq mm 300 Nos.
PVC Tube for Cable Ferrule 6 Sq mm 300 Nos.
56 Fibre cleats, Aluminium clamps, bolts, nuts, washers etc for fixing control cables in item56 1 L/S
trenches
Fibre glass Trafoil Clamps with necessary fixing GI nuts, bolts, washers etc. for 66 kV Power Cables 175 Nos
Fibre glass Trafoil Clamps with necessary fixing GI nuts, bolts, washers etc. for 11kV Power Cables 117 Nos
25 mm wide and 2 mm thick Aluminium strip for Vertcal run cable supports 50 Nos
Cable Tags (Al Stip) (LXWXT) - 100 mm x 20 mm x 3 mm thick size 700 Nos
20 SWG GI Wire for Fixing cable Tag 30 kg
100mm tie(Nylon) 500 Nos
150mm tie(Nylon) 500 Nos
200mm tie(Nylon) 1000 Nos
250mm tie(Nylon) 1000 Nos
57 Galvanized iron perforated tray with side coupler plate bolts, nuts, washers and clamps item57 1 L/S
etc. of size 75x25x2 mm, 150x25x2mm, 100x25x2mm etc. & G.I. Conduits of
50mm/100mm dia from equipment to main trench as per Section-7, Switchyard erection.
Tower type CT-5 (HW/ST-5195) Weight with Nut & Bolts Per Structure. with foundation bolts 903 kg/No
Drg. No. HTD/ST-89R Weight with Nut & Bolts Per Structure. with foundation bolts 137 kg/No
71 11 kV NCT Drg. No. HTD/ST-88 (if required) item71 2 No.
HTD/ST-88 (if required) Weight with Nut & Bolts Per Structure. with foundation bolts 137 kg/No
GROUPING SL.NO.
SS-Fdns 141
SS-Fdns 142
SS-Fdns 143
SS-Fdns 144
SS-Fdns 145
SS-Fdns 146
SS-Fdns 147
SS-Fdns 148
SS-Fdns 149
SS-Fdns 150
SS-Fdns 151
SS-Fdns 152
SS-Fdns 153
SS-Fencing 165
SS Erection 1
SS Erection 2
SS Erection 3
SS Erection 4
SS Erection 5
SS Erection 6
SS Erection 7
SS Erection 8
SS Erection 9
SS Erection 10
SS Erection 11
SS Erection 12
SS Erection 13
SS Erection 14
SS Erection 15
SS Erection 16
SS Erection 17
SS Erection 18
SS Erection 19
SS Erection 20
SS Erection 21
SS Erection 22
SS Erection 23
SS Erection 24
SS Erection 25
SS Erection 26
SS Erection 27
SS Erection 28
SS Erection 29
SS Erection 30
SS Erection 31
SS Erection 32
SS Erection 33
SS Erection 34
SS Erection 35
SS Erection 36
SS Erection 37
SS Erection 38
SS Erection 39
SS Erection 40
SS Erection 41
SS Erection 42
SS Erection 43
SS Erection 44
SS Erection 45
SS Erection 46
SS Erection 47
SS Erection 48
SS Erection 49
SS Erection 50
SS Erection 51
SS Erection 52
SS Erection 53
SS Erection 54
SS Erection 55
SS Erection 56
SS Erection 57
SS Erection 58
SS Erection 59
SS Erection 60
SS Erection 61
SS Erection 62
SS Erection 63
SS Erection 64
SS Erection 65
SS Erection 66
SS Erection 67
SS Erection 68
SS Erection 69
SS Erection 70
SS Erection 71
SS Erection 72
SS Erection 73
SS Erection 74
SS Erection 75
SS Erection 76
SS Erection 77
SS Erection 78
SS Erection 79
SS Erection 80
SS Erection 81
SS Erection 82
SS Erection 83
SS Erection 84
SS Erection 85
SS Erection 86
SS Erection 87
SS Erection 88
SS Erection 89
SS Erection 90
SS Erection 91
SS Erection 92
SS Erection 93
SS Erection 94
SS Erection 95
SS Erection 96
SS Erection 97
SS Erection 98
SS Erection 99
SS Erection 100
SS Erection 101
SS Erection 102
SS Erection 103
SS Erection 104
SS Erection 105
SS Erection 106
SS Erection 107
SS Erection 108
SS Erection 109
SS Erection 110
SS Erection 111
SS Erection 112
SS Erection 113
SS Erection 114
SS Erection 115
SS Erection 116
SS Erection 117
SS Erection 118
SS Erection 119
SS Erection 120
SS Erection 121
SS Erection 122
SS Erection 123
SS Erection 124
SS Erection 125
SS Erection 126
SS Erection 127
SS Erection 128
SS Erection 129
SS Erection 130
SS Erection 131
SS Erection 132
SS Erection 133
SS Erection 134
SS Erection 135
SS Erection 136
SS Erection 137
SS Erection 138
SS Erection 139
SS Erection 140
ITEM DESCRIPTION Unit
Total Qty
CIVIL WORKS
Civil Works Cum 11500
EARTH WORK
Earth filling with good earth (as per satisfaction of Executive Engineer/Civil Works
Division), laying in layers (as per specification), dressing, including carriage,
irrespective of lead, loading, unloading, watering and compaction in layers with roller
including compensation of earth complete in all respect.
FOUNDATIONS Supply of labour, T&P, material and construction of RCC footings No. 4
& pedestals etc. for steel gantry and equipment structures complete in all respects as
per technical specifications & drawings attached with the tender document including
cost of excavation, concreting, cement, reinforcement steel, form work, grouting,
holding down bolts, backfilling etc. and other items not mentioned herein but
required for the completion of work.
A. Gantry Towers
i) CT-4
CAPACITOR BANK FOUNDATIONS Design, Engg. & supply of labour, material & Set 2
construction of foundations for following rating capacitor bank with capacitor unit
(with allied equipments) & series Reactor etc. including chain link fencing 1.8M height
around cap. bank complete in all respect including any other items not specifically
mentioned herein but required for completion of job as per technical specification.
i) 3.4 MVAr 11 kV Capacitor Bank
TRANSFORMER FOUNDATION :Construction of transformer foundation including No. 2
all associated works, RCC, PCC, reinforcement steel, misc. structural steel and other
items not mentioned herein but required for completion of work as per technical
specifications & drawing attached. In case extra foundation(s) has/have to be
constructed (as per approved T/F drawing) to complete the job, nothing extra would
be paid on this count.
i) 12.5/16 MVA 66/11 kV T/F Foundation
ii)Design, Engg, supply of labour, matarial and construction of station T/F foundation No. 1
including all associated works, RCC, PCC, Reinforcement steel, misc. structural steel
and other items not mentioned herein but required for the completion of work as per
technical specifications.
200KVA, 11/0.433kV station T/F foundation.
CABLE TRENCHES : Supply of labour, material such as cement, reinforcement steel, Lot 1
GI angles, flats, PCC & brick pillars below cable trenches for construction of Out-Door
Cable Trenches (ODCT) of required depth/ type with pre-cast RCC covers including
associated works like Cable Trench Culverts crossings for roads and sump- pit-cum-
pump chamber with 2HP motor of reputed make, starter, volt meter, amp-meter etc.
as per approved Trench layout plan, HVPNL drgs. & tech. specs. complete in all
respect.
Providing, supplying & laying two layers of uncrushed/crushed/broken stone/ Sqm. 100
pebbles gravel fill. The first layer after compaction shall make min. 50mm thickness
course/layer of 40mm nominal size, including dressing, rolling & compaction
complete as per specs., GELO and instructions of XEN/CWD.
ROADS & PCC PAVEMENT : Supply of labour, material and construction of cement Mtr 20
concrete roads and walkways/shoulders from NH/SH/etc. to Switch yard/Switch
house building as per GELO/CLO as per sectional detail drawing no. HCD/SK-181
R1 and technical specification.
i)6.0M wide
The successful bidder shall evolve design & drawing for drain, manholes with RCC Lot 1
covers on settlement tank including preparation of drainage layout drawing for
disposal of rain water from building’s roof top & switch yard (s/stn.) area into bore
well in such a way that there shall be no ponding of water on the roof and switch yard
(s/stn.). The layout so developed shall be got approved from the employer. The
location of sump-pit-cum-pump chamber shall preferably be located on corner(s) of
the s/stn. and shall be got decided from the concerned XEN/Civil Works Division on
the basis of surroundings of the substation(s). The successful bidder will also supply
labour and material for construction of 1 no. sump-pit-cum-pump chamber as per
HVPNL drgs. & provide one no. non clog pump(s) of 5HP of reputed make capacity
with main switch, starter, volt meter, Amp. Mtr. etc. (for each sump pit) for disposal of
excess water to outfall point. Any other item(s) not mentioned herein but is/are
required for completion of works shall be done by the successful bidder without any
extra cost to the employer.
RCC M-20 inclusive of labour, material, shuttering, Steel reinforcement etc. complete Cum 5
in all respects to compensate excess quantity required to be executed due to difference
in existing ground level and the formation level to be fixed after contouring or
difference on account of revised drg issued at the time of construction and the
standard drawings attached with the tender.
PRICE BID ANNEXURE – ERECTION CHARGES
72.5kV, 1250A, single 3 – Φ or three 1 –Φ, SF6 gas insulated, metal enclosed bus Set 2
bars arrangement, consisting of 1250A single 3 – Φ or three 1 –Φ SF6 gas insulated
switchgears, each Bus Bar comprising of :-
i) Bus bar enclosures running through the length of the switchgear to interconnect
each of the circuit breaker bay modules in double main bus system.
ii) Three, 2-core, single phase or single 3 – Φvoltage transformers/ PTs.
iii) 1250A, One 3 – Φ or three 1 –Φ, single pole, group operated isolator/disconnector
and one, 3 – Φ or three 1 – , single pole, group operated earthing switch with manual
and motor driven operating mechanisms.
iv) 1250A, One high speed fault make 3 – Φ or three 1 –Φ, single pole, group operated
earthing switches, complete with manual and motor driven operating mechanisms.
v) Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
vi) Terminal boxes/ Local Control Cubicle.
vii) Interconnecting wiring/ piping.
viii) Grounding, support structures and platforms.
72.5kV, 800A, single 3 – Φ or three 1 –Φ, Bus coupler bay module, consisting of Set 1
800A single 3 – Φ or three 1 –Φ SF6 gas insulated switchgears, comprising of:
i 800A, One 3 – Φ or three 1 –Φ, SF6 gas insulated circuit breaker, complete with
operating mechanism.
ii Three,3-core,single phase current transformers(600-300-150/1-1-1A)
iii Two sets of isolator/disconnector switches each of 800A, One 3 – Φ or three 1 – Φ,
single pole, group operated isolator/disconnector switches each with 3 – Φ or three 1 –
Φ, single pole, group operated earthing switch and complete with manual and motor
driven operating mechanisms.
iv Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
v Terminal boxes/ Local Control Cubicle.
vi Interconnecting wiring/ piping.
vii Grounding, support structures and platforms.
72.5kV, 800A, single 3 – Φ or three 1 –Φ, Transmission line feeder circuit breaker Set 2
bay modules, consisting of 800A single 3 – Φ or three 1 –Φ SF6 gas insulated
switchgears, each comprising of:-
i 800A, One 3 – Φ or three 1 –Φ, SF6 gas insulated circuit breaker, complete with
operating mechanism for outgoing feeder.
ii Three, 66kV LAs and Voltage detectors /sensors
iii Three, 3-core, single phase current transformers
(600-300-150/1-1-1A)
iv 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
without earthing switch, complete with manual and motor driven operating
mechanisms.
v 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with one, 3 –Φ or three 1 –Φ, single pole, group operated earthing switch, complete
with manual and motor driven operating mechanisms.
vi 800A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with one normal and one high speed fault make 3 –Φ or three 1 – Φ, single pole, group
operated earthing switches, complete with manual and motor driven operating
mechanisms.
vii Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
viii Terminal boxes/ Local Control Cubicle.
ix Interconnecting wiring/ piping.
x Grounding, support structures and platforms.
72.5kV, 400A, single 3 – Φ or three 1 –Φ, Transformer feeder circuit breaker bay Set 2
modules, consisting of 400A single 3 –Φ or three 1 –Φ SF6 gas insulated
switchgears, for 66/11kV transformer, each comprising of: -
i One 3 – Φ or three 1 – Φ, SF6 gas insulated circuit breaker, complete with operating
mechanism for incomer bay from 66/11kV transformer.
ii Three, 3-core, single phase current transformers (300-150/1-1-1A).
iii 400A, One 3 –Φ or three 1 –Φ, single pole, group operated isolator/disconnector
without earthing switch, complete with manual and motor driven operating
mechanisms.
iv 400A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with one, 3 – Φ or three 1 –Φ, single pole, group operated earthing switch, complete
with manual and motor driven operating mechanisms.
v 400A, One 3 – Φ or three 1 – Φ, single pole, group operated isolator/disconnector
with two earthing switches each comprising of one 3 – Φ or three 1 –Φ, single pole,
group operated earthing switches complete with manual and motor driven operating
mechanisms.
vi Each GIS compartment with gas monitoring device, pressure switch etc. as
required.
vii Local Control Cubicle.
viii Interconnecting wiring/piping.
ix Grounding, support structures and platforms.
66kV XLPE copper Cable 1XC (400mm2) along with one no. spare cable coated with Mtr. 250
fire retardant Paint for connecting 66kV side of 66/11kV transformer with GIS.
Termination kit for both ends for 66kV XLPE copper Cable 1XC (400mm2). Set 16
66kV XLPE copper Cable 1XC (800mm2) along with one no. spare cable coated with Mtr. 800
fire retardant Paint for each line feeder bay
Termination kit for both ends for 66kV XLPE copper Cable 1XC (800mm2). Set 16
12.5/16 MVA, 66/11 kV Power T/F (To be Provided by HVPNL) No. 2
220V 100 AH Battery Set 1
66 kV Surge Arrestor No. 12
11kV Surge Arrestor No. 6
66 kV CVT No. 2
66 kV NCT For 66/11kV T/F (300-200-150/1A) No. 2
11 kV NCT For 66/11T/F (1800-900/5A) No. 2
66 kV C&R Panels Set 2
i) Line Protection & Circuit Breaker control panel ( without auto reclose)
ii) Transformer protection & Ckt breaker control Panel ( without auto reclose) Set 2
iii) Bus Coupler Protection & Ckt breaker control Panel ( without auto reclose) Set 1
Time synchronization equipment No. 1
11 kV 15 Panel Board (2000A) with one SEM on each T/F I/C Panel (including one no. Set 2
bus sectionalizer panel)
11 kV Power Cable XLPE 1C x1000mm2 coated with fire retardant paint for T/F to Mtr. 700
11kV incomer with termination kit for both ends (2 runs per phase for each
transformer allocating them 1 runs per phase for each 11kV I/C)
11 kV Power Cable XLPE 3C x 185sq mm coated with fire retardant Paint for Mtr. 200
Capacitor Bank with termination kit for both ends(2 runs)
11 kV Power Cable XLPE 3C x 50 sq mm coated with fire retardant Paint for station Mtr. 100
T/F with termination kit for both ends
3.4 MVAR 11 kV rating Capacitor Bank with 11 kV L&E Switch, RVTs and 11KV LA, Set 2
reactor etc. as per technical specification.
220 V 100 AH Battery charger Set 1
220 V 100 AH D.C.D.B. Set 1
415 V LT AC Distribution Board 300 A No. 1
11/0.4 kV Station T/F 200 KVA No. 1
EOT-Crane as per clause 1.10.7 Section-1 and Clause 24.0 of GIS Specification. No. 1
1.1 kV Copper Control Cable armoured (FRLS) for 66kV bays & 11kV side of sizes Lot 1
7CX4mm2, 2CX4mm2, 4CX4mm2, 2CX6mm2, 16CX2.5mm2, 10CX2.5mm2,
7CX2.5mm2, 3CX2.5mm2 etc. including junction box (as per Section-6 of copper
control cable specification and Section-7 of Switchyard Erection).
650/1100 Volts 3.5 core 240 mm2 aluminium power cable (FRLS) from Aux. T/F to Lot 1
ACDB
650/1100 Volt 3.5 core 70 mm2 aluminium cable (FRLS) for oil filtration set. Lot 1
650/1100 Volt 4 core 16 mm2 armoured (FRLS) copper power cable for MLDB etc and Lot 1
other cable required as per contract for 66kV bays.
Grounding system of the substation. Earthing Mat Material. The earth mat will be sq meter 1
designed/quoted for soil resistivity of 50ohm-m. In case soil resistivity is more than (approx)
50ohm-m then the earth mat will be designed for actual soil resistivity. The payment 3650
of extra material to be used for earth mat shall be made on pro rata basis. The
approximate area of earth mat to be laid is given in the corresponding columns of the
substations. However, item will remain a Lot item.
Supply and installation of 35W LED tube on tubular steel poles along with the No. 12
boundary wall at a distance of 30 meter as per as per clause 16.0 of section 7 of the
specification
Complete lighting of road and street by providing 90W LED lamps on tubular steel No. 15
poles at a distance of 15meter along the roads and streets as per as per clause 16.0 of
section 7 of the specification.
Supply and installation of post top lantern 40W LED Lamps with all complete No. 2
accessories at the entrance gate of sub-station.
Supply and installation of 40W LED Lamps with all complete accessories on corners of No. 10
control room building.
High wall type split AC unit of 2 Ton capacity for computer room and specifically Nos. 3
C&R Panel room (as per technical specification)
Complete Substation automation system of 66/11kV substations including hardware lot 1
(along with transducers) for 5 No. 66kV present bays and software (for present bays as
well as 3 No. 66kV future bays) along with associated equipment for the bays (bay as
defined in the technical specification, sec-sub-station automation system) as per
technical specification.
Note: signals from protection relays in 11kV incomer would also be wired to
substation automation system (SAS)
Bolted type 11kV Single tension string assembly with 3 numbers Anti FOG type disc No. 12
insulators (E&M strength 9000 kg) per string with all hardware accessories including
ball & socket connections and tension clamp sets suitable for Twin tarantulla
Conductor. Alternatively the bidder may quote silicon polymer composite insulator
string in place of Disc Insulators (type of insulator whether disc or polymer insulator
to be identified at the time of bidding and quoted accordingly which will not be
altered at later stage by the bidder).
a)
b) For isolator
For earth switch Set 1
viii) Rotor housing bearing assembly for complete 3 phase equipment Sets 2
a) For
b) For earth
isolator
switch Set 1
ix) Motor with gear assembly for complete 3 phase equipment Sets 3
a) For isolator
b) For earth switch Set 1
x). Corona shield rings as applicable Set 1
xi) Hinge pins for complete 3 phase equipment Sets 3
a) For isolator
b) For earth switch Set 1
xii) Bearings for complete 3 phase equipment Sets 5
a) For isolator
b) For earth switch Set 1
xiii) Interlocking coil with resistors, timers, key interlock for complete 3 phase Set 1
xiv) Relays, Power contactors, resistors, fuses, push buttons & MCBs Sets 3
a)
b) For isolator
For earth switch Set 1
xv) Terminal pad and connectors (complete for one 3 phase equipment) Sets 2
a)
b) For isolator
For earth switch Set 1
xvi) Aux. switch assembly (complete) with 10 NO & 10 NC OR more contacts Set 1
xvii) 72.5 kV, 1250 A, 3 – f or 1 –f high speed fault making grounding switch, Internal Set 1
parts complete with all necessary gaskets mounting hardware etc.
xviii) 72.5 kV, 1250 A, 3 – f or 1 –f high speed fault making grounding switch Set 1
operating mechanism complete with all necessary gaskets connecting apparatus.
3% 1.11
Installation Cost Installation Sales
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
2,300 1.11 - -
1,300 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
- 1.11 - -
27,978,051 31,165,768
144.61 1,662,986.75
138,034.47 552,137.89
138,034.47 414,103.42
111,742.19 223,484.39
111,742.19 223,484.39
26,160.82 313,929.83
26,160.82 52,321.64
26,160.82 52,321.64
25,634.97 51,269.95
16,958.52 203,502.25
111,742.19 223,484.39
384,393.14 768,786.29
70,331.85 70,331.85
1,209,444.91 1,209,444.91
644.16 322,080.44
190.62 19,061.90
14,460.75 289,215.09
10,516.91 2,313,720.70
907.08 136,062.55
59,157.63 59,157.63
4,601.15 736,183.86
5,077.04 76,155.59
4,995.53 874,218.33
5,915.76 4,436,822.36
3,680.92 460,114.91
985,960.52 985,960.52
197,192.10 197,192.10
1,840.46 9,044,018.70
1,840.46 5,883,949.49
7,230.38 36,151.89
31,891,655.65
144,607.54 289,215.09
161,040.22 161,040.22
161,040.22 322,080.44
167,613.29 335,226.58
262.92 65,730.70
11,831.53 189,304.42
433.82 347,058.10
13,803.45 220,855.16
210,338.25 420,676.49
5,915.76 5,915.76
2,366.31 28,395.66
1,248.88 7,493.30
2,629.23 5,258.46
2,366.31 4,732.61
1,248.88 2,497.77
11,174.22 22,348.44
11,174.22 22,348.44
11,174.22 11,174.22
1,971.92 1,971.92
72,303.77 144,607.54
262.92 184,045.96
118.32 23,663.05
52.58 5,258.46
11,174.22 22,348.44
3,286.54 3,286.54
2,366.31 2,366.31
6,573.07 6,573.07
16,432.68 16,432.68
23,663.05 23,663.05
330,835.44 330,835.44
23,978.56 23,978.56
22,479.90 22,479.90
9,202.30 9,202.30
139,375.38 139,375.38
131.46 525.85
131.46 525.85
65.73 262.92
65.73 131.46
65.73 131.46
197.19 197.19
65.73 65.73
262.92 525.85
65,730.70 525,845.61
1,971.92 23,663.05
3,286.54 49,298.03
460.11 920.23
328.65 3,286.54
3,286.54 9,859.61
262,922.81 262,922.81
32,865.35 32,865.35
1,971.92 23,663.05
1,380.34 16,564.14
1,314.61 1,314.61
15,775.37 15,775.37
59,387.69 59,387.69
25,144.18 25,144.18
12,291.64 12,291.64
239,580.52 239,580.52
262.92 65,730.70
197.19 19,719.21
2,103.38 2,103.38
2,024.51 2,024.51
5,010.65 20,042.61
3,561.68 10,685.05
Construction of 66kV GIS S/stn Kheri Gujran 2x12.5/16 MVA 66/1
Contract Period
Contract Value (Cr.)
Description
PBG
EMD of Contract Value
Security Deposit on sigining of contract
Particular
Avg Investment
FD Value-BG's
Weighted Investment
Projected PBT
ROI
eri Gujran 2x12.5/16 MVA 66/11 kV Power Transformers on Turnkey basis
BG Charges Calculation
Completion period: 15 Months
14.25
Validity as
Validity
% of Price Amount per Tender Over Stay
Considered
Condition
Crs. Months
3% 0.43 27 Months 3 Months 30 Months
6 Months 0 Months 6 Months
0.00% - 15 Months 2 Months 17 Months
ROI Calculation
ZW FD Margin
Bank Guarantee Net Interest
Net BG % Financing Receivable on Money %
Charges Rate
Rate BG on 100%
0.05
0.36%
0.43%
Construction of 66kV GIS S/stn Kheri Gujran 2x12.5/16 MVA 66/11 kV Power Transformers on Turnkey basis
Sr.
No. Particular Cost in Lacs Revenue Overhead Margin
17%
Overhead
Duration in
Material recipt at site month per
month
5%
8.00 2.00 2.23 0.54% 100 5 20
8.00 2.00 140.77 33.89%
8.00 2.00 70.85 17.06%
10.00 3.00 41.54 10.00%
7.00 2.00 34.31 8.26%
7.00 2.00 25.13 6.05%
7.00 2.00 19.65 4.73%
7.00 2.00 20.28 4.88%
7.00 2.00 16.04 3.86%
7.00 2.00 11.67 2.81%
7.00 2.00 7.42 1.79%
7.00 2.00 4.99 1.20%
7.00 2.00 3.61 0.87%
7.00 2.00 3.70 0.89%
7.00 2.00 3.20 0.77%
7.00 2.00 3.23 0.78%
7.00 2.00 1.24 0.30%
7.00 2.00 1.03 0.25%
7.00 2.00 0.94 0.23%
7.00 2.00 0.85 0.20%
7.00 2.00 - 0.00%
370.81
Duration 15.00
Value 1,178.65
Supply 866.95
Service 311.70
Description 1
Month Sep-21
Inflow
Supply
1 Battery 4.46 -
2 GIS 281.54 -
3 Cable 141.70 -
4 CRP 124.62 -
5 Spares 68.63 -
6 Testing Equipments 50.27 -
7 SAS 39.30 -
8 Cable Termination 40.56 -
9 Capacitor Bank 32.09 -
10 Earthing material 23.34 -
11 Structure 14.83 -
12 Cable Tray 9.99 -
13 Switch Gear 7.23 -
14 EOT Crane 7.41 -
15 H/W 6.40 -
16 Misc 6.46 -
17 Station TRF 2.49 -
18 Conductor 2.06 -
19 Lightning 1.88 -
20 Fire Fighting 1.70 -
21 PTR - -
Receipt - Gross Amount 866.95 -
0% Advance- 10% against BG (Interest Bearing) -
90.00% 90% against receipt of material at site 780.25
0.00% 0% against receipt of material at site -
10.00% 10% after 1 month of completion and TOC 86.69
10% upon submission of full performance security
Total Supply Inflow -
Construction
SS-Erection - -
Line-Erection - -
SS-Civil 311.70 -
Line-Civil - -
work done - Gross Amount 311.70 0.00
Outflow
10% Supply - Advance 77.82 11.12
90% Supply (90% in 60Days), from Material receipt at store 700.36 -
Construction
0% Civil&Erection Works-10% Advance interest bearing
90% Civil&Erection Works-90% progressive 251.80
10% Civil& Erection-10% upon completion 27.98
Overheads 108.90 7.09
Total Outflow 18.21
Net Monthly Cash Flow including GST - 18.21
Cum. Cash Flow - 18.21
13.50% interest @ per month ----> 13.5% - 0.20
1 Max Negative in Cr. -3.59
Avg Negative in Cr. -0.92
Chart Title
500.00
400.00
300.00
200.00
100.00
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-100.00
-200.00
-300.00
100.00
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-100.00
-200.00
-300.00
Financing 1.49%
Civil % against Supply
Month 35.95%
Lac
Lac Er. % against Supply
Lac 0.00%
2 3 4 5 6 7 8
Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22
- - - - - 2.23 2.23
- - - - - 140.77 140.77
- - - - - 70.85 70.85
- - - - - - 41.54
- - - - 34.31 34.31 -
- - - - 25.13 25.13 -
- - - - 19.65 19.65 -
- - - - 20.28 20.28 -
- - - - 16.04 16.04 -
- - - - 11.67 11.67 -
- - - - 7.42 7.42 -
- - - - 4.99 4.99 -
- - - - 3.61 3.61 -
- - - - 3.70 3.70 -
- - - - 3.20 3.20 -
- - - - 3.23 3.23 -
- - - - 1.24 1.24 -
- - - - 1.03 1.03 -
- - - - 0.94 0.94 -
- - - - 0.85 0.85 -
- - - - - - -
- - - - 157.31 371.16 255.39
-
- - - - - 141.58 334.05
- - - -
- - - - - 141.58 334.05
- - - - - - -
- - - - - - -
44.53 44.53 44.53 44.53 44.53 44.53 44.53
- - - - - - -
44.53 44.53 44.53 44.53 44.53 44.53 44.53
-
- 40.08 40.08 40.08 40.08 40.08 40.08
- 40.08 40.08 40.08 40.08 40.08 40.08
- 40.08 40.08 40.08 40.08 181.66 374.12
23 24 25
23 24 25
Supply Factor 1.11
F&I Factor 1.11
Erection Factor
Civil Factor 1.11
PROJECTED CASH F
9 10 11 12 13 14 15
May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22
- - - - - - -
- - - - - - -
- - - - - - -
41.54 41.54 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
41.54 41.54 - - - - -
-
229.85 37.39 37.39 - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00
40.08 - - - - - -
40.08 - - - - - -
269.93 37.39 37.39 - - - -
- - - - - - -
33.56 33.56 - - - - -
35.97 35.97 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
86.69
- - 86.69 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
31.17
- - 31.17 - - - - -
- - 117.86 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
27.98
0.86 - 3.96 - - - - -
0.86 - 31.94 - - - - -
- 0.86 - 85.93 - - - - -
- 76.82 - 76.82 9.11 9.11 9.11 9.11 9.11 9.11
- 0.86 - 0.86 - - - - - -
0.86 - 3.96 - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.86
- - - - - - 4.46
- - - - - - 281.54
- - - - - - 141.70
- - - - - - 124.62
- - - - - - 68.63
- - - - - - 50.27
- - - - - - 39.30
- - - - - - 40.56
- - - - - - 32.09
- - - - - - 23.34
- - - - - - 14.83
- - - - - - 9.99
- - - - - - 7.23
- - - - - - 7.41
- - - - - - 6.40
- - - - - - 6.46
- - - - - - 2.49
- - - - - - 2.06
- - - - - - 1.88
- - - - - - 1.70
- - - - - - -
- - - - - - - 866.95
-
- - - - - - - 780.25
- - - - - - - -
86.69
-
- - - - - - 866.95
-
- - - - - - - -
- - - - - - -
- - - - - - 311.698
- - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 311.698
-
- - - - - - - 280.53
31.17
- - - - - - - 311.70
- - - - - - - 1,178.65
-
-
77.82
- - - - - - - 700.36
-
- - - - - - - 251.80
27.98
- - - - - - - 111.58
- - - - - - 1,169.54
- - - - - - 9.11
9.11 9.11 9.11 9.11 9.11 9.11 9.11 9.11
- - - - - - - 17.57
- - - - - - - 111.58
0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.03
5.18
3.62
0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.076
- - - - - - - 15.45
0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.076
24.153
0.00 0.00 0.00 0.00 0.00 0.00 0.00 -
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
-
-
1.00
1.00
28.98
1.00
-
-
-
2.68
26.01 9.11 48.78
- 358.92 -30.45%
1
1
1
1
1
1
1
1
LC OPN C 121,221
LC INT C 727,328
848,549
0.70%
Fin Charges 2.19%
0
Duration 15.00
Value 1,178.65
Supply 866.95
Service 311.70
Description 1
Month Sep-21
Inflow
Supply
1 Battery 4.46 -
2 GIS 281.54 -
3 Cable 141.70 -
4 CRP 124.62 -
5 Spares 68.63 -
6 Testing Equipments 50.27 -
7 SAS 39.30 -
8 Cable Termination 40.56 -
9 Capacitor Bank 32.09 -
10 Earthing material 23.34 -
11 Structure 14.83 -
12 Cable Tray 9.99 -
13 Switch Gear 7.23 -
14 EOT Crane 7.41 -
15 H/W 6.40 -
16 Misc 6.46 -
17 Station TRF 2.49 -
18 Conductor 2.06 -
19 Lightning 1.88 -
20 Fire Fighting 1.70 -
21 PTR - -
Receipt - Gross Amount 866.95 -
0% Advance- 10% against BG (Interest Bearing) -
90.00% 90% against receipt of material at site 780.25
0.00% 0% against receipt of material at site -
10.00% 10% after 1 month of completion and TOC 86.69
10% upon submission of full performance security
Total Supply Inflow -
Construction
SS-Erection - -
Line-Erection - -
SS-Civil 311.70 -
Line-Civil - -
work done - Gross Amount 311.70 0.00
Outflow
10% Supply - Advance 77.82 11.12
90% Supply (90% in 60Days), from Material receipt at store 700.36 -
Construction
0% Civil&Erection Works-10% Advance interest bearing
90% Civil&Erection Works-90% progressive 251.80
10% Civil& Erection-10% upon completion 27.98
Overheads 108.90 7.09
Total Outflow 18.21
Net Monthly Cash Flow including GST - 18.21
Cum. Cash Flow - 18.21
12.00% interest @ per month ----> 12% - 0.18
1 Max Negative in Cr. -0.77
Avg Negative in Cr. -0.49
Chart Title
500.00
400.00
300.00
200.00
100.00
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-100.00
-200.00
-300.00
100.00
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
-100.00
-200.00
-300.00
Financing 0.58%
Civil % against Supply
Month 35.95%
Lac
Lac Er. % against Supply
Lac 0.00%
2 3 4 5 6 7 8
Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22
- - - - - 2.23 2.23
- - - - - 140.77 140.77
- - - - - 70.85 70.85
- - - - - - 41.54
- - - - 34.31 34.31 -
- - - - 25.13 25.13 -
- - - - 19.65 19.65 -
- - - - 20.28 20.28 -
- - - - 16.04 16.04 -
- - - - 11.67 11.67 -
- - - - 7.42 7.42 -
- - - - 4.99 4.99 -
- - - - 3.61 3.61 -
- - - - 3.70 3.70 -
- - - - 3.20 3.20 -
- - - - 3.23 3.23 -
- - - - 1.24 1.24 -
- - - - 1.03 1.03 -
- - - - 0.94 0.94 -
- - - - 0.85 0.85 -
- - - - - - -
- - - - 157.31 371.16 255.39
-
- - - - - 141.58 334.05
- - - -
- - - - - 141.58 334.05
- - - - - - -
- - - - - - -
44.53 44.53 44.53 44.53 44.53 44.53 44.53
- - - - - - -
44.53 44.53 44.53 44.53 44.53 44.53 44.53
-
- 40.08 40.08 40.08 40.08 40.08 40.08
- 40.08 40.08 40.08 40.08 40.08 40.08
- 40.08 40.08 40.08 40.08 181.66 374.12
23 24 25
23 24 25
Supply Factor 1.11
F&I Factor 1.11
Erection Factor
Civil Factor 1.11
PROJECTED CASH F
9 10 11 12 13 14 15
May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22
- - - - - - -
- - - - - - -
- - - - - - -
41.54 41.54 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
41.54 41.54 - - - - -
-
229.85 37.39 37.39 - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00
40.08 - - - - - -
40.08 - - - - - -
269.93 37.39 37.39 - - - -
- - - - - - -
299.84 206.32 33.56 33.56 - - -
35.97 35.97 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
86.69
- - 86.69 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - - -
31.17
- - 31.17 - - - - -
- - 117.86 - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
27.98
0.86 - 3.96 - - - - -
0.86 - 31.94 - - - - -
- 0.86 - 85.93 - - - - -
- 76.82 - 76.82 9.11 9.11 9.11 9.11 9.11 9.11
- 0.77 - 0.77 - - - - - -
0.86 - 3.96 - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.86
- - - - - - 4.46
- - - - - - 281.54
- - - - - - 141.70
- - - - - - 124.62
- - - - - - 68.63
- - - - - - 50.27
- - - - - - 39.30
- - - - - - 40.56
- - - - - - 32.09
- - - - - - 23.34
- - - - - - 14.83
- - - - - - 9.99
- - - - - - 7.23
- - - - - - 7.41
- - - - - - 6.40
- - - - - - 6.46
- - - - - - 2.49
- - - - - - 2.06
- - - - - - 1.88
- - - - - - 1.70
- - - - - - -
- - - - - - - 866.95
-
- - - - - - - 780.25
- - - - - - - -
86.69
-
- - - - - - 866.95
-
- - - - - - - -
- - - - - - -
- - - - - - 311.698
- - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 311.698
-
- - - - - - - 280.53
31.17
- - - - - - - 311.70
- - - - - - - 1,178.65
-
-
77.82
- - - - - - - 700.36
-
- - - - - - - 251.80
27.98
- - - - - - - 111.58
- - - - - - 1,169.54
- - - - - - 9.11
9.11 9.11 9.11 9.11 9.11 9.11 9.11 9.11
- - - - - - - 6.79
- - - - - - - 111.58
0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.03
5.18
3.62
0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.076
- - - - - - - 15.45
0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.076
24.153
0.00 0.00 0.00 0.00 0.00 0.00 0.00 -
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
-
-
1.00
1.00
28.98
1.00
-
-
-
2.68
26.01 9.11 48.78
- 76.82 -6.52%
1
1
1
1
1
1
1
1
LC OPN C 121,221
LC INT C 727,328
848,549
0.70%
Fin Charges 1.28%
1 2 3 4 5
Month
Sep-21 Oct-21 Nov-21 Dec-21 Jan-22
Total I/F 0 0 40 40 40
Total O/F 18 14 22 53 52
Value % on C.V
Max Negative in Cr. 0.77 6.52%
1 2 3 4 5
Month
Sep-21 Oct-21 Nov-21 Dec-21 Jan-22
Total I/F 0 0 40 40 40
Total O/F 18 14 22 53 52
Net CFL (18) (14) 18 (13) (12)
Cum CFL (18) (32) (14) (27) (39)
Value % on C.V
Max Negative in Cr. 0.77 0.00%
Avg Negative in Cr. 0.77 0.00%
6 7 8 9 10 11 12 13 14
Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22
40 182 374 270 37 37 0 0 0
W/o LC With LC
DSO DPO CCC DSO DPO CCC
63 3 60 63 69 -6
6 7 8 9 10 11 12 13 14
Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22
40 182 374 270 37 37 0 0 0
58 56 176 352 247 37 42 3 3
(18) 125 198 (82) (209) 0 (42) (3) (3)
(57) 68 266 184 (25) (25) (67) (71) (73)
15 16 17 18 0 0 0 0
Total
Nov-22 Dec-22 Jan-23 Feb-23 0 0 0 0
0 0 0 118 1,178.65
3 1 0 32 1,169.54
66% 30 7% -90
7% 330 66% -10
24% 30 24% 30
3% 440 3% 330
15 16 17 18
Total
Nov-22 Dec-22 Jan-23 Feb-23 3.06
0 0 0 118 1,178.65
3 1 0 32 1,169.54
(3) (1) 0 86 9.11
(76) (77) (77) 9.11
0 0 0
0 0 0
7% -90
66% 90
24% 30
3% 330
68.76
-68.76
No.of No.of Vehicle
S.No Description Qty. Monthly Total
Month Month Monthly
Systems:
Laptops Nos 3 35,000 105,000
Hp Printer Nos 1 25,000 25,000
Computer Tables Nos 3 8,000 24,000
Exec. Chairs Nos 6 5,000 30,000
Normal chairs Nos 6 1,500 9,000
Stationery month 12 1,500 18,000
Steel Almirah Nos 1 15,000 15,000
Kitchen Items Ls 1 20,000 20,000
Cots & Beds Nos 4 8,000 32,000
278,000
Office Rent/ Store
V.type Total Total Grand Total
Set Up Estab
3.23% 120,762,714