The Competent Authority has accepted your offered rates in connection with
the subject work. The total cost of the work at the accepted rates works out to Rs.
111571778.05 (Rupees Eleven Crore Fifteen Lakh Seventy-One Thousand Seven
Hundred And Seventy-Eight Rupees And Five Paise Only)
The entire work shall be completed within 12 month from the date of issue of
Letter of Acceptance. Date of completion will be up to 27.02.2023
Insurance: You are also requested to take out and keep in force requisite
policy/policies of insurance in accordance with the tender document clause
1.2.19 (Part-1, Chapter-II), of the tender document,Special Conditions of
Contract of the tender document.
Accounting Unit: The account unit for the work is FA & CAO/C/K.Gate, Delhi
Income Tax: As per clause 1.3.11 (Part-1 Chapter-III) of the tender document,
Income Tax Under Section 194-C of the Income Tax Act1961 deduction of 2%
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 2 of 46
GST: As per clause 1.3.11.1 (Part-1 Chapter-III) of the tender document, GST as
applicable will be deducted from your bills for which necessary tax deduction
certificate will be issued and 2% TDS (GST)
Agreement: Please, execute the contract agreement within 15 days after notice
that contract has been awarded to him in terms of para 1.1.17 of (part I chapter 1)
of the tender document, Preamble and General Instructions to Tederers.
Electrical license: As per clause 1.2.21 (o) of tender document, the contractor
shall submit a valid Electrical contractor's licence as appliable from the
concerned statutory authority before signing of Contract Agreement
All Other terms and conditions, as stipulated in the tender documents shall be
applicable.
ANKIT SINGH
Dy.CEE/C/NDLS
Digitally Signed
View Signature Details
Item Item Desc Item Item Qty Unit Rate Escl. Advt.Value Bid Rate/ Bid Amount
Sno. Code Qty Unit (Rs) (%) (Rs) Unit Rate (Rs)
Schedule 1A- General-section1 (Item Directory - SOR GENERAL %
16250617.28 12.00 14300543.21
FINAL(manoj)-Ver-2018) Below
1 SOR General (supply) View Details 119.33 14214531.65
2 SOR General (Erection) View Details 115.73 2036085.63
Schedule Totals 14300543.21
Schedule 1B-SOR CONCRETE section-2 (Item Directory - CONST- % At
3944677.20 0.00 3944677.20
OHE-SOR-2017-Ver-2018) Par
1 SUPPLY ITEMS View Details 191.54 2079263.28
2 ERECTION ITEMS View Details 196.44 1865413.92
Schedule Totals 3944677.20
Schedule 1C- FERROUS SECTION-3 (Item Directory - CONST-OHE- % At
8046792.22 0.00 8046792.22
SOR-2017-Ver-2018) Par
1 SUPPLY ITEMS View Details 89.88 7565793.28
2 ERECTION ITEMS View Details 74.76 480998.94
Schedule Totals 8046792.22
Schedule 1D-NON-FERROUS Section-4 (Item Directory - CONST- %
15056140.18 7.00 14002210.37
OHE-SOR-2017-Ver-2018) Below
1 SUPPLY ITEMS View Details 137.99 14440552.55
2 ERECTION ITEMS View Details 119.98 615587.63
Schedule Totals 14002210.37
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 3 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 4 of 46
Supply of 25 KV Single
Pole Vacuum Type Circuit
Breaker
Supply and erection of
OHE caution board with
supply of fixing material
(Clamp, back flat strip &
11 NS10 4 Each 815.00 At Par 3260.00
fastners) for "Caution
clearance to OHE near by
restricted" Board size
400mmx270mmx2mm
Supply and erection of
OHE caution board with
supply of fixing material
12 (Clamp, back flat strip & NS11 4 Each 560.00 At Par 2240.00
fastners) for Caution live
wire board size
400x270x2mm.
Supply and erection of
OHE caution board with
supply of fixing material
(Clamp, back flat strip &
13 NS12 8 Each 556.00 At Par 4448.00
fastners) for Name Plate
Board for switching
stations, size 5 feet x 2
feet.
Supply and erection of
OHE caution board with
supply of fixing material
14 NS13 4 Each 700.00 At Par 2800.00
(Clamp, back flat strip &
fastners) for for Protective
Area board size 12"x18"
Supply and erection of
shock treatment chart
(glass framed) size
15 NS14 4 Each 781.00 At Par 3124.00
22"x28" complete with
aluminium angle beading
1"x'1" all around
Supply and erection of
Electric shock treatment
chart & its first aid
16 coloured calender in hindi NS15 4 Each 64.00 At Par 256.00
and English size 550 mm
x900 mm with plastic at
the top and bottom
Supply of wooden key box
17 NS16 4 Each 391.00 At Par 1564.00
size of board 75x60x10 cm
Erection of wooden key
18 box size of board NS17 4 Each 100.00 At Par 400.00
75x60x10 cm
Supply and erection of fire
buckets stand as per drg.
No. RE/UMB/FB/SK/07
mod A (approx 51 kg),
stand legs will be grouted
with cement concrete
19 (1:3:6 mix) size NS18 1 Each 6806.00 At Par 6806.00
12"x12"x18" along with
four nos. Of fire fire
buckets 9 ltrs capacity
(approx weight 1.4kg) per
stand filled with dry
flowing stand.
Schedule Totals 2029584.05
Schedule 1G-TSS SOR section 8 (Item Directory - CORE %
35010741.68 4.00 33610312.01
COMPOSITE OHE & TSS SOR 4-Ver-6) Below
1 TSS SUPPLY View Details 344.31 31729789.95
2 TSS ERECTION View Details 328.25 3280951.73
Schedule Totals 33610312.01
Schedule 1H-SOR shunt Capacitor Section-9 (Item Directory - TSS % At
2310424.81 0.00 2310424.81
Shunt Capacitor Manoj-Ver-2018) Par
SOR Shunt Capacitor
1 View Details 265.73 2240527.81
(Supply)
SOR Shunt Capacitor
2 View Details 252.41 69897.00
(Erection)
Schedule Totals 2310424.81
Schedule 2A-SOR General Elect PS Items (Item Directory - 61396.67 0.00 % At 61396.67
ELECTRICAL SOR ITEMS-Ver-4) Par
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 5 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 6 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 7 of 46
terminals as per
explanatory note.
Supply & erection of 7M
pole with double arm
bracket hot dip galvanized
octagonal pole with top 70
mm and bottom 130 mm
around face made of 3 mm
thick, steel base plate size
220x220x12 mm complete
with appropriate sleeve at
the top of the pole for
mounting arm bracket 300
9 mm long suitable for LED NS 9 6 Numbers 19928.00 At Par 119568.00
street light fittings
including casting, muffing
with cement concrete
foundation (1:2:4)
painting, earthing and
foundation GI nut, bolts
with washer and smart
pack junction box with
single pole MCB and
terminals as per
explanatory note.
Supply, erection, testing
and commissioning of the
following Double door wall
mounted Pre-fabricated
L.T. Distribution Boards of
approved make and as per
explanatory note &
10 comprising: i. Incoming NS10 2 Numbers 16769.00 At Par 33538.00
MCCB 4Pole 63 A 35 KA
B/C - 1 No. Ii Outgoing
MCB 16 A SP 10 KA B/C -
3 Nos. iii. Outgoing MCB
10 A. SP 10 KA B/C - 9
Nos. (3 Nos. On each
Phase)
Supply, Installation,
Testing and
Commissioning of 1200
mm sweep, BEE 5 star
rated, ceiling fan with
Brush Less Direct Current
(BLDC) Motor, class of
insulation: B, 3 nos.
blades, 30 cm long down
rod, 2 nos. canopies,
shackle kit, safety rope,
copper winding, Power
Factor not less than 0.9,
Service Value (CMM/W)
minimum 6.85, Air delivery
11 NS11 5 Numbers 2688.00 At Par 13440.00
minimum 215 CMM, 350
RPM (tolerance as per IS :
374-2019), THD less than
10%, remote or electronic
regulator unit for speed
control and all remaining
accessories including
safety pin, nut bolts,
washers, temperature
rise=75 degree C (max.),
insulation resistance more
than 2 mega ohm, suitable
for 230 V, 50 Hz, single
phase AC Supply, earthing
etc. complete as required.
12 Supply, installation, NS12 4 Numbers 3073.00 At Par 12292.00
testing, commissioning of
single phase Propeller type
Exhaust fan, IS 2312 or
latest, 04 poles, 380mm
sweep, ISI marked, heavy
duty complete with
mounting bracket having
anti-corrosive paint
including connection with
PVC insulated multi
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 8 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 9 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 10 of 46
plant/automatic
computerized/electronic
batching plant and placed
using concrete pump
including designing of
concrete mix, finishing the
exposed surface of
concrete, curing of
concrete as required
including all lead by transit
mixer (crossing of stream,
nallahs, railway tracks,
level crossings or any
other obstruction such as
traffic jam etc.), lift,
pumping, ascend,
descend, loading,
unloading, handling,
wastages if any, cost of all
safety works and safety
precautions with all labour,
arrangements for cold
weather and hot weather
concreting as applicable,
taxes and royality etc. as a
complete job as per
specifications and
directions of engineer in
charge. Nothing extra will
be paid on any account.
The rate will also include
cost of OPC cement,
admixture (plasticizer,
super plasticizer, or
retarder etc.) as per
approved mix design.
Payment of reinforcement
steel including cutting,
straightening, hooking,
bending, binding, placing
and keeping and
maintaining in position
including cost of binding
wire and shuttering will be
arranged by contractor
and payment will be made
separately under relevant
items of USOR-2010).
Dismantling CC/RCC/Brick
work in cement/lime
mortar in walls, floors,
stair case, coping,
foundation, metalled road,
water bound macadam etc.
for all depth/height
3 NS3 10 cum 1009.36 At Par 10093.60
manually or by mechanical
means including disposal
of dismantled material
outside Railway land
except rails which will be
the property of the Railway
as a complete job.
4 Providing and laying in NS4 2.5 cum 6415.14 At Par 16037.85
position reinforced cement
concrete of M 25 grade
cast in situ as per
approved plan and mix
design with coarse sand
and stone aggregate of
20mm and down gauge in
building up to plinth for all
height including
compaction of concrete by
electrical/mechanical
vibrator, providing and
using admixture in
recommended proportion
as per IS 456, IS-9103 &
concrete bridge code
applicable as per approved
mix design with minimum
cement content, maximum
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 11 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 12 of 46
exposed surface of
concrete, curing of
concrete as required
including all lead by transit
mixer (crossing of stream,
nallahs, railway tracks,
level crossings or any
other obstruction such as
traffic jam NS-3etc.), lift,
pumping, ascend,
descend, loading,
unloading, handling,
wastages if any, cost of all
safety works and safety
precautions with all labour,
arrangements for cold
weather and hot weather
concreting as applicable,
taxes and royality etc. as a
complete job as per
specifications and
directions of engineer in
charge. Nothing extra will
be paid on any account.
The rate will also include
cost of OPC cement,
admixture (plasticizer,
super plasticizer, or
retarder etc.) as per
approved mix design.
Note-Reinforcement steel
including cutting,
straightening, hooking,
bending, binding, placing
and keeping and
maintaining in position
including cost of binding
wire and shuttering will be
arranged by contractor
and payment will be made
separately under relevant
items of USOR-2010).
6 "Providing and laying in NS6 125 cum 6728.44 At Par 841055.00
position reinforced cement
concrete of M35 grade cast
in situ as per approved
plan and mix design with
coarse sand and stone
aggregate of 20mm and
down gauge in Retaining
wall raft/open foundation
and pile cap for all heights
and depths including
compaction of concrete by
electrical/ mechanical
vibrator, providing and
using admixture in
recommended proportion
as per IS 456, IRC-112,
IS-9103 & concrete bridge
code applicable as per
approved mix design with
minimum cement content,
maximum water cement
ratio and slump as
specified in special
conditions produced by
RMC plant/automatic
computerized/electronic
batching plant and placed
using concrete pump
including designing of
concrete mix, finishing the
exposed surface of
concrete, curing of
concrete as required in
IRC-112, including all lead
by transit mixer (crossing
of stream, nallahs, railway
tracks, level crossings or
any other obstruction such
as traffic jam etc.), lift,
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 13 of 46
pumping, ascend,
descend, loading,
unloading, handling,
wastages if any, cost of all
safety works and safety
precautions with all labour,
arrangements for cold
weather and hot weather
concreting as applicable,
taxes and royality etc. as a
complete job as per
specifications and
directions of engineer in
charge. Nothing extra will
be paid on any account.
The rate will also include
cost of OPC cement,
admixture (plasticizer,
super plasticizer, or
retarder etc.) as per
approved mix
design."Payment of
reinforcement steel
including cutting,
straightening, hooking,
bending, binding, placing
and keeping and
maintaining in position
including cost of binding
wire and shuttering will be
arranged by contractor
and payment will be made
separately under relevant
items of USOR-2010).
Work will be executed as
per Indian Railway Unified
standard specifications
applicable for RCC/PSC
works contained in chapter
4 & 20. " "
"Providing and removing
barricading with the help
of portable fencing along
the running track where
the work is to be done in
close vicinity of the
track.Fencing shall consist
of self supporting steel
angles of size
50x50x6mm, 1.5m high
provided with hooks and
embedded in CC 1:2:4
block of size
0.23x0.23x0.23m placed
at c/c distance of 2.00 m
along the track with
20mmx5mm flat in three
7 NS7 100 Metre 65.50 At Par 6550.00
horizontal layers tack
welded with the angle post
including two coats of
luminous paint with one
coat of red oxide in form of
red & white strips both
side on posts & flats. This
shall include reposting and
repeating of barricading
and provision of suitable
reflectors and red lamps at
night. Note: released
material will be the
property of the contractor
after completion of work,
cost of cementwill be paid
separator. "
8 Rebate for dismantling NS8 10 Sqm 448.34 At Par 4483.40
brick masonry structure
alongwith RCC/AC sheet
roof of existing railway
building in super structure
and foundations with
contractor's own labour
and equipments including
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 14 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 15 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 16 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 17 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 18 of 46
Item Breakup
Schedule 1A- General-section1
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 19 of 46
Total 6480888.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 20 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 21 of 46
Total 943812.00
2(c)Reinforced concrete
Total 713200.00
2(c)Reinforced concrete
Total 629272.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 22 of 46
Total 3984513.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 23 of 46
Total 275234.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 24 of 46
Total 6067714.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 25 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 26 of 46
20 04014309 7(e)Erection of copper cross feeder wires Kilometre 0.5 1584.00 792.00
(37/2.25 mm HDBC) across the track at
SP/SSP/FP/BT locations
Total 279838.00
Total 1349624.72
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 27 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 28 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 29 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 30 of 46
Total 7141363.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 31 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 32 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 33 of 46
Total 766130.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 34 of 46
Total 612618.00
Total 19834.00
9 01014000 Earthing with 50mm dia GI pipe class B, 3 Job 5 883.00 4415.00
meter long earth electrode as per IS:3043
(Latest Version) to achieve earth resistances
less than 5 ohms including construction of
masonry enclosures with hinged cover plate
of cast iron with locking arrangement
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 35 of 46
Total 28183.00
Item - 1 Chapter-1-Earthwork
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 36 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 37 of 46
12 014032 Girth over 60 cm and upto 1.5m Each 100 251.00 25100.00
Total 4876913.50
Total 381029.20
4 042012 Walls (any thickness) including attached Sqm 600 191.20 114720.00
plasters, buttresses, plinth and string courses
etc.
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 38 of 46
Total 181688.78
Total 680337.20
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 39 of 46
Total 251776.05
2 093022 With ordinary cement with pigment Sqm 127.5 229.66 29281.65
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 40 of 46
Total 305155.31
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 41 of 46
Total 101912.08
4 111151 6 mm thick 1:3 (1cement: 3 fine sand) Sqm 150 49.15 7372.50
6 115011 New work (three or more coats) Sqm 500 8.36 4180.00
Total 77883.50
2 121051 Two or more coats on new work Sqm 100 40.81 4081.00
Total 5774.25
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 42 of 46
Total 297554.45
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 43 of 46
Total 181020.62
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 44 of 46
Total 90093.08
Total 60331.38
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 45 of 46
Total 2987.50
Total 109491.00
Total 93987.75
Total 301070.00
Total 1189500.00
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022
Page 46 of 46
https://www.ireps.gov.in/epsn/works/tds/publishLOAWorksLetter.do?Action=ViewP... 28-02-2022