South Main Construction Co.

Weekly Construction Report

Project:: Engineering Building Contractor: Gilbane Date: 12/1/11 Report Number: 6 Day: Su M T W Th F S

Work Performed: Crane being moved to a different location. Filling the Water Truck. A bobcat was moving material blocking an access road making it easy for a front loader. In the northwest corner from our vantage point there were two excavators removing insitu earth. While another one was being used to fill a dump truck.
.

Weather
Temp: 34 Degrees F Wind: none Condition: Sunny Humidity: None

Subcontractors & Visitors


Clevland Cement CSE

Equipment at Site Crane (1) Caisson Driller (1) Front Loader (1) Bobcat (1) Excavators (4) 3 in use Bulldozer (1) Steam Roller (2)