Deptford Church Street

Introduction

Location plan
CSO discharge into River Thames approximately 300 metres to the north GREENWICH Draft limit of land to be acquired or used Proposed tunnel route centreline Local authority boundary Existing sewer Greenwich Pumping Station site

Phases one and two construction plan


GREENWICH

Construction

Phase three construction plan

Deptford Church Street


GREENWICH Maximum extent of construction site for phase 3 Site hoarding Piling rig Two way traffic flow Local authority boundary Site support/welfare Excavated material storage and processing
Coffey Street

Maximum extent of construction site for phases 1 and 2 Site hoarding Local authority boundary

Crossfield Street

igh Street Deptford H


Deptford Station St Josephs RC Primary School LEWISHAM
Figure 1A: Deptford Church Street location plan

oad Creek R

treet Deptford Church S

Piling rig

Site support/welfare Excavated material storage and processing Maintenance workshop and storage Construction support

St Pauls Church Coffey Street

Coffey Street

Maintenance workshop and storage Construction support

Sue Godfrey Nature Reserve Wavelengths Leisure Centre

Deptford Creek

LEWISHAM

Internal site road Site access

LEWISHAM

Internal site road Site access Drop shaft Existing footpath to be diverted

Drop shaft

Cro

Existing footpath to be diverted


ssfi eld Stre

Footpath diversion
et

Crane

Cro

ssfi

eld

Stre

Footpath diversion

et

Cranes

Deptford Church Street


Aerial view of the completed works

Deptford Storm Relief CSO

N
Figure 2C: Illustrative phases 1 and 2 construction plan

N
Figure 2D: Illustrative phase 3 construction plan

Future use

Layout of site once construction works complete


Fenced informal play area with scented planting Timber seating Fruit trees Planters Low ornamental hedges Parking Green feature screen with climbing plants Electrical and control kiosk and integrated information board

11

Ventilation 12 column
t Coffey Stree

Hardstanding for maintenance access

Footpath widened

Cro

ssf

ield

Str ee

rch Deptford Chu

Line of seasonal bulb planting marking position of wall

Street

Mown lawn

N New shared surface treatment to Coffey Street. Links park to Church grounds Removable bollards for access for maintenance vehicles Ventilation columns Densely planted edge to Deptford Church Street Seasonal bulb planting and wild flower meadow

Figure 3C: Aerial view of the completed works

Figure 3D: Layout of site once construction works complete