Professional Documents
Culture Documents
Introduction
Location plan
CSO discharge into River Thames approximately 300 metres to the north GREENWICH Draft limit of land to be acquired or used Proposed tunnel route centreline Local authority boundary Existing sewer Greenwich Pumping Station site
Construction
Maximum extent of construction site for phases 1 and 2 Site hoarding Local authority boundary
Crossfield Street
oad Creek R
Piling rig
Site support/welfare Excavated material storage and processing Maintenance workshop and storage Construction support
Coffey Street
Deptford Creek
LEWISHAM
LEWISHAM
Internal site road Site access Drop shaft Existing footpath to be diverted
Drop shaft
Cro
Footpath diversion
et
Crane
Cro
ssfi
eld
Stre
Footpath diversion
et
Cranes
N
Figure 2C: Illustrative phases 1 and 2 construction plan
N
Figure 2D: Illustrative phase 3 construction plan
Future use
11
Ventilation 12 column
t Coffey Stree
Footpath widened
Cro
ssf
ield
Str ee
Street
Mown lawn
N New shared surface treatment to Coffey Street. Links park to Church grounds Removable bollards for access for maintenance vehicles Ventilation columns Densely planted edge to Deptford Church Street Seasonal bulb planting and wild flower meadow
23
www.thamestunnelconsultation.co.uk
22