SCOPE OF INSTALLATION WORKS Civil works i.

Laying refrigerant piping and connecting both the indoor and outdoor units after drilling hole/holes in the wall, if required. Mounting/Fitting indoor and outdoor units at the respective locations. Preparing the platforms required for mounting the outdoor units at the respective locations (split unit).

ii. iii.

Electrical works i. ii. Suitable electric wiring shall be carried out between indoor and outdoor. Providing of electric points, wiring, cabling & distribution boards etc. (including MCB Box etc.)

Mechanical works i. Provision of flare nuts, union, capillary etc. for connecting the copper line with the indoor unit and outdoor units. Charging refrigerant gas in the unit. Installation of the condensate drains line terminating in the floor drain. Leak testing the entire system. Insulating the suction pipe with expanded polythene foam tubing.

ii. iii. iv. v.