SAFETY PLAN :
1. SAFETY TOOLBOX MEETING BE HELD BEFORE WORK.
2. PPE MUST BE APPLY FOLLOWING THE SITE REGULATION.
3. ALWAY SEPARATE WORKING AREA BY WARNING FLAG.
4. CHECK CRANE, CABLE, SHACKLE AND NECESSORY
ORTHERS BEFORE WORKING.
1560
TRANS 2000KVA
6000
TOILET 1
MOBILE TRUCK
GUARD HOUSE 1
STORAGE
MANAGEMENT OFFICE
TENANT OFFICE 1
TENANT OFFICE 2
QUARANTINE RM
IN
TRANSFORMER YARD
OUT
3700
TRANS.
GENERATOR ROOM
1640
UP
WORKER
500
BY STEEL U100x50
2000
600
STEEL PLATFORM WOOD BASE COVER BY STEEL BASE
BARRICADE U100x50 BY U100x50
STEEL PLATE
C B'
Boundary line
MOBILE TRUCK
B'
C
A
9000
7000
4
STEEL PLATE
50.0000
15.0000
220.0000
200.0000
200.0000
70.0000
70.0000
70.0000
L3
L2
L1
50.0000
15.0000
220.0000
200.0000
200.0000
70.0000
70.0000
70.0000
L3
L2
L1
1000 1000 2500
650
0
7000
PFC-1
OUTGOING-1
INCOMING
TRANS 2000KVA
ACB
3
STEEL BASE 6500
6000
PROJECT NAME:
REVISION LIST: OWNER GENERAL CONTRACTOR NAME SIGNATURE SUB CONTRACTOR NAME SIGNATURE SHOPDRAWN
IG
Approved Checked
DH LOGISTICS MANAGEMENT VIET NAM CO.,LTD.
DATE
S.Torii Shun Otake
DH LOGISTICS MANAGEMENT VIET NAM CO.,LTD. Checked Drawer DRAWING NAME: SCALE
V.S.Tung P.T.Hong
®
13000
B'
C
A
9000
400 1000
3900 600 4500
HANDLE LIFT
4
50.0000
15.0000
220.0000
200.0000
200.0000
70.0000
70.0000
70.0000
L3
L2
L1
50.0000
15.0000
220.0000
200.0000
200.0000
70.0000
70.0000
70.0000
L3
L2
L1
7000
STEEL PLATE
PFC-1
OUTGOING-1
INCOMING
ACB
3
6500
HV PANEL
HANDLE LIFT
WOOD PLATE
PROJECT NAME:
REVISION LIST: OWNER GENERAL CONTRACTOR NAME SIGNATURE SUB CONTRACTOR NAME SIGNATURE SHOPDRAWN
IG
Approved Checked
DH LOGISTICS MANAGEMENT VIET NAM CO.,LTD.
DATE
S.Torii Shun Otake
DH LOGISTICS MANAGEMENT VIET NAM CO.,LTD. Checked Drawer DRAWING NAME: SCALE
V.S.Tung P.T.Hong
®