LEVELS Platform level Rail level Concourse level Road level Pile cap top level Pile cap

depth Height of rail + track plinth at centre line of alignment Thickness of floor finish on track level Depth of box girder Depth of bearing + pedestal Depth of pier cap Depth of platform main beams Thickness of floor finish on platform CG of cross girder from top Height of vertical members in staad End Module Platform level to track level cross girder Cross grider to bearing top Bearing top to pier cap top Pier cap Top portion Bottom portion Bottom of pier cap to pile cap top Pile cap top to mid of pile cap Mid of pile cap to bottom of pile cap

PL RL CL RdL FL PC TP FT BG BP PC1 PC2 PB FP GC

240.638 239.548 234.188 226.238 225.738

m m m m m

1.500 m 0.479 0.000 2.250 0.250 1.300 0.500 m m m m m m

Top portion Bottom portion

1.420 m 0.150 m 1.000 m

= PB/2 + GC = BG - GC = BP = PC1 = PC2 = RL - TP - BG - BP - PC1 -PC2 - FL = PC/2 = PC/2

= = = = = = = =

1.710 1.250 0.250 1.300 0.500 9.031 0.750 0.750

m m m m m m m m

Calculation of Track beam top level Rail level to track beam top level at centre line of alignment Top of track beam level at centre line of alignment Required vertical clearance at concourse Track beam depth available Platform beam depth available Calculation of CG of track beam from top L1 L1 (m) = L2 (m) = H1 H1 (m) = H2 H2 (m) = CG from top of cross girder = Min of above = 18.916 25.918 30.706 4.100 4.100 4.100 0.750 0.750 0.750 1.850 1.850 1.850 1.036 1.008 0.995 0.995 m

= = = = = = =

0.479 239.069 3.375 3.850 1.506 1.031 1.419

m m m m m m m