Problem 1: Carolyn Barrett, a marketing surveyor, takes an average of 10 minutes to complete a particular questionnaire. Carolyns performance rating (pace) is 110% and there is an allowance of 15%. Mean= 10 mins PR= 110% AF=15%
What is the Normal time for completing this questionnaire? = (10)(1.00)(1.10)/1 = 11 minutes What is the Standard time for completing this questionnaire? Standard time = Total Normal time 11 11 = = = 12.9 minutes 1-Allowance factor 1 0.15 .85
Problem 2: Tom Leonard, of Leonard, Spitz, and Wareham, takes 3 hours and 25 minutes to write an end of month report. Tom is rated at 95% (work pace is 95%) and the office has a personal time allowance of 8%. There is no delay time or fatigue time. 1 report = 205 minutes PR= 95% PT= 8% no FT, no DA.- AF= 8% What is the Normal time for writing an end of month report? = (205 minutes)(1.00)(0.95)/1 = 194.75 minutes What is the Standard time for writing an end of month report? Standard time = Problem 3: The two steps in preparing chocolate candy bars are molding and packaging. Personal fatigue and delay allowances are set at 15%. The molding machine operator is rated at 110% and the packer is rated at 80%. Observed times per batch are given below. PT+FT+ DA = 15% 1 Total Normal time 194.75 194.75 = = = 211.68 minutes 1-Allowance factor 1 0.08 .92
45
50
35
30
For Molding: Average for the actual Molding cycle = 29 minutes per batch Normal time = (total time)(% working)(rating)/(number of units produced) = (29)(1.00)(1.10) /1 = 31.9 minutes per batch Standard time = (Normal time)/(1-Allowance) = 31.90 /(1 0.15) = 37.5 minutes per batch
For Packing: Average actual Packing time = 40 minutes = (40)(1.00)(.80) = 32 minutes per batch Standard time = (Normal time)/(1-Allowance) = (32)/(1 0.15) = 37.6 minutes
Problem 4: A work-study sample of a manufacturing activity conducted over a 40-hour period shows that a worker with an 85% rating produced 12 parts. The workers idle time was 10% and the allowance factor was 12% Mean= 40 hrs PR= 85% AF-IT= 2%+PR = 85% Find the Normal and Standard time for this activity. = (40hrs)(0.90)(0.85)/(12) = 2.55 hours per part Standard time = (Normal time)/(1-Allowance) = 2.55 / 0.88 = 2.90 hours per part Problem 5: Jim and Bob recently time-studied a janitorial task. From a sample of 75 observations, they computed an average cycle time of 15 minutes with a standard deviation of 2 minutes. Was their sample large enough that one can be 99% confident that the standard time is within 5% of the true value? n= 75 mean=15 mins sd= 2 mins h= 0.05 Problem 6: Consider the following task broken down into 5 MTM elements: produced= 12 parts idle time= 10% AF=12%
TMUs Reach to tool box Grasp a tool Separate tool by pressing Turn tool Move and focus eyes 14.2 3.5 10.6 3.5 13.4
z n= where h is the accuracy desired and z is the confidence level hx 2.575* 2 5.15 n= = = 47.15 or 48 samples 0.05*15 .75 Therefore, the sample size of 75 is sufficient.
2 2