SECTOR
INSTALLED
CAPACITY
(MW)
UP SHARE (MW)
CGS
2010-11
(March 2011)
Thermal
600
Total
Thermal
(2010-11)
2010-11
231
Hydel
Chamera Stage-III NHPC
46
(Dec 2010)
(3x77)
2010-11
240
Hydel
Uri Stage -II (NHPC)
48
(Feb 2011)
(4x60)
2010-11
Koteshwar HEP (THDC)
100
Hydel
38.75
(Feb 2011)
Uttaranchal
(1x100)
Total
Hydel
132.75
(2010-11)
Aggregate
132.75
2010-11
2011-12
2x600MW Anpara 'C' TPP
Thermal
600
(July 2011)
(Lanco)Unit #2
2011-12
2x300 MW Roza -II TPP
Thermal
300
(March 2012)
Ext.
2011-12
Thermal (Co
(Upto March
5x(2x 45MW) Sugar Mill
450
Gen)
2012)
2011-12
Rihand Super TPP Stage 500
Thermal
170
(March 2012)
III
(1x500)
2011-12
Sasan UMPP (Madhya
660
Thermal
(Dec 31,2011)
Pradesh)
(1x660)
Total
Thermal
170
(2011-12)
2011-12
4x82.5 MW Srinagar Hydro
(Dec 2011Hydel
330
Project
March 2012)
2011-12
800
Hydel
Koldam HEP(NTPC)
189
(Nov -Dec 2011)
(2x400)
2011-12
520
Hydel
Parbati Stage-III (NHPC)
104
(June 2011)
(4x130)
Karacham Wangatu
2011-12
(Himachal Pradesh)
Hydel
1000
200
(Nov -2011)
(Through M/s PTC)
(Private)
2011-12
Teesta Stage -III (Sikkim)
(Aug 2011-Jan
Hydel
(Through M/s PTC)
1200 (6x200)
200
2012)
(Private)
2011-12
(April 2011,
Koteshwar HEP(THPC)
300
Hydel
116.75
June 2011, Aug
Uttaranchal
(3x100)
2011)
Total
Hydel
809.75
(2011-12)
Aggregate
980
2011-12
Thermal
170.00
Grand Total
Hydel
942.5
Aggregate
1112.50
IPP
TOTAL
(MW)
STATE
SHARE
550
550
550
550
46
48
38.75
132.75
550
682.75
550
550
150
150
405
405
170
83
83
1188
1358
290
290
189
104
200
200
116.75
290
1099.75
1478
2457.75
1738
290
2028
1908
1232.5
3140.5
Capacity
500
500
500
Total
1500