Project Manager Preparation of plans with datelines 1)Site utilization layout plan including power supply 2)Piling sequence

plan 3)Pilecap excavation plan 4)Excavator and lorry transportation plan 5)Super-structure construction plan 6)Material storage plan for preliminary periods, next 3 months , next 6 months, next 9 months 7)Project Quality Plan compilation Mandatory Reports & submission 1)Weekly Progress photo every Tuesday 2)Monthly progress photo and reports for progress comparison with master program 3)Any other authority report 4)Compilation of test reports 5)RFI & EOT Meeting with consultant/subcon 1)Consultant weekly meeting at Tuesday 2 pm 2)Subcon weekly/fortnight meeting at Wednesday 10 am Field work 1)Coordinate with specialist work on commencement, shopdrawing submission . 2)Update and monitor daily progress 3)Implement catchup progress plan where require

Project Engineer (Assisting project manager) Preparation of plans with datelines 1)Detail piling sequence plan 2)Detail pilecap excavation plan 3)Detail material storage plan and crane access 4)Detail temporary drainage system 5)Detail super structure casting plan Reports & testings 1)2 weeks lookahead schedule to tie with master program individual bar chart 2)Cube test, steel test, all others Material , machinery and manpower requisition 1)Items require base on minimum 2 week lookahead schedule Meeting with consultant/subcon 1)Consultant weekly meeting at Tuesday 2 pm 2)Subcon weekly/fortnight meeting at Wednesday 10 am

Field work 1)Gather all relevant parties for discussion to perform daily operation 2)Perform daily planning including coordination work with all relevant parties to perform daily operation. 3)Conduct daily meeting with subcon for daily forecast progress 4)Detect discrepancy between arch and all other drawings ahead of construction date 5)Overcome external services work flow without disrupting main access

EHS supervisor cum housekeeper (Assisting Project Manager) Preliminary Preparation 1)Pre construction Hazard analysis 2)Fire escape routing plan 3)Emergency Response Team Organisation 4)First Aid 5)Plan chart with dates for briefing to be conducted at different stage of construction period Reports and submission 1)Mandatory sound monitoring, pest control . 2)Weekly tool box meeting (Monday) 3)Compilation of all relevant plant certificate. 4)Compilation of method of statement for safe work execution submission of various subcon 5)Compilation of workers identity prior work commencement Field work 1)Uphold all safety compliance with regular induction 2)Conduct safety awareness briefing for all new comers for potential hazard before work commencement. 3)Conduct daily routine check . 4)Ensure proper material storage and segregation 5)Ensure rubbish bin to empty promptly 6)Identify unsafe working spot and perform spot rectification. 7)Inject all environmental awareness including maintainence of Earth Control Measure

Public Relation Officer(Assisting Project Manager) 1)As main contact point of receiving complaints from client, consultant, public 2)Distribute all relevant complaints to relevant party for resolution, inform and feedback to all complaint source about the resolution method and estimated time to resolve. 3)Ensuring the whole process of complain resolution is implemented including monitoring, liasing with the executor and feedback constantly to the Project Manager about status.

Site Coordinator ( C&S : Assisting Project Manager ) Preparation of site work, execute site activities according to plan 1)Prepare , execute substructure works : excavation, piling works etc. 2)Daily maintenance of site, crane access, road cleanliness after RC activities eg concrting 3) Daily maintenance of temporary drainage system 4)Prepare, execute superstructure work. eg. Order concrete pump, concrete for casting work Testings 1) Arrange with COW on all relevant C&S testing Material , machinery and manpower requisition 1)Assisting and feedback to APE in advance pertaining to the above requirement Meeting with consultant/subcon 1)Subcon weekly/fortnight meeting at Wednesday 10 am Field work 1)Liaise with RC subcon., supplier to perform daily operation 2)Ensure advance ordering of concrete and all others material to ensure smooth field work 3)Check work according to approved material , drawings 4)Arrange COW for RC inspection

Site Coordinator ( Arch : Assisting Project Manager ) Preparation of site work, execute site activities according to plan 1)Preparation of workplace , monitor, execute arch. works according to plan 2 Daily maintenance, housekeeping of workplace after Arch. Activities eg. Brickwork 3) Detect discrepancies between arch and all other drawings ahead of construction date 4)Liaise & coordinate with subcons on submission of material, shopdrawings etc 5) Liaise with Consultants and subcons. on solving the technical matters 6) Monitor the Arch. Progress against schedule Testings 1) Arrange with COW on all relevant Arch. testing Material , machinery and manpower requisition 1)Assisting and feedback to APE in advance pertaining to the above requirement Meeting with consultant/subcon 1) Consultant weekly meeting at Tuesday 2 pm 1)Subcon weekly/fortnight meeting at Wednesday 10 am Field work 1)Liaise with arch to submit 1)Liaise with arch subcon., supplier to perform daily operation 2)Order of material in advance to ensure smooth field work 3)Check work according to approved material, drawings 4) Arrange COW for Arch inspection

Public Relation Officer(Assisting Project Manager) 1)As main contact point of receiving complaints from client, consultant, public 2)Distribute all relevant complaints to relevant party for resolution, inform and feedback to all complaint source about the resolution method and estimated time to resolve. 3)Ensuring the whole process of complain resolution is implemented including monitoring, liasing with the executor and feedback constantly to the Project Manager about status.