Piling Machine
Inspected by Approved person Daily inspection by designated person Warning sign provided Footing in sound condition
Shoring constructed in accordance to P.E. design for excavation of more than 1.5 metre with the use of mechanical digger
Shoring constructed in accordance to P.E. design for excavation of more than 4.0 metre.
Open side of excavation more than 3 metre depth guarded by adequate barricade
Valid LM certificate Daily check by crane operator Lifting Supervisor supervising lifting operation Rigger and signalman appointed for lifting operation
Material/passenger hoist
Worksite to be kept clean and free from effluents, nuisances and conditions that can be detrimental to the workers and Public health
Main distribution board and switch gear Checked and tested monthly by LEW
Tower crane base barricaded with warning sign. Free of water and obstructions.
Scaffold erected in accordance to P.E. design. Working platform at alternate lift. Overlay or screen netting envelope scaffold
Working platform closely decked and continuous with toe board and guardrails
A worker anchored to a safety belt and an independent lifeline when working on a gondola. Materials on gondola are evenly distributed
Formwork shall be design by P.E. where the ceiling height exceed 9.14 metres P.E. shall be responsible for the supervision of the construction and stability of the structure.
Lifting operation
Safety harness