GOOD SAFETY PRACTICES

Hoarding constructed accordance with Commissioner of Building Control requirements.

Piling Machine
Inspected by Approved person Daily inspection by designated person Warning sign provided Footing in sound condition

Shoring constructed in accordance to P.E. design for excavation of more than 1.5 metre with the use of mechanical digger

Shoring constructed in accordance to P.E. design for excavation of more than 4.0 metre.

Open side of excavation more than 3 metre depth guarded by adequate barricade

Valid LM certificate Daily check by crane operator Lifting Supervisor supervising lifting operation Rigger and signalman appointed for lifting operation

Material/passenger hoist

Hoist operated by authorized person

Worksite to be kept clean and free from effluents, nuisances and conditions that can be detrimental to the workers and Public health

Materials neatly stacked in safe and orderly manner

Temporary material platform constructed and installed in accordance to PE design.

Generator With Bund Wall

Generator fenced off against unauthorized use.

Main distribution board and switch gear Checked and tested monthly by LEW

DIESEL STORAGE WITH SIGNAGES AND PROVISION OF BUND WALL.

Tower crane base barricaded with warning sign. Free of water and obstructions.

Crawler Crane access laid with steel plate

Crane access properly constructed and weekly check carried out

Scaffold erected in accordance to P.E. design. Working platform at alternate lift. Overlay or screen netting envelope scaffold

Base plate secured to sole plate and on solid ground

Scaffold stair provided access to working platform

Working platform closely decked and continuous with toe board and guardrails

Signboard showing maximum loads

Oxy-acetylene cylinders kept upright in wheeled trolley

Gas cylinder fitted with regulating valve and flashback arrestor

A worker anchored to a safety belt and an independent lifeline when working on a gondola. Materials on gondola are evenly distributed

Peripheral overhead shelter erected around the building

Overhead shelters erected at every point of entry/exit of buildings

Formwork checked before, during and after concreting by formwork supervisor

Formwork shall be design by P.E. where the ceiling height exceed 9.14 metres P.E. shall be responsible for the supervision of the construction and stability of the structure.

All openings are closed barricaded or effectively protected

Lift opening effectively barricaded

Lifting operation

Large bin at lower end of each chute

Storage of material 610 mm away from edge of building

Adequate ventilation provided at work area

Exhaust fan provided to remove dust particle generate from grinding

Safety harness