You are on page 1of 5

52084 Federal Register / Vol. 70, No.

169 / Thursday, September 1, 2005 / Notices

(Authority: 35 U.S.C. 207, 37 CFR Part 404.) Assistant Secretary for the Office of priority must focus on child outcomes,
Dated: August 25, 2005. Special Education and Rehabilitative rather than on parent or professional
I.C. Le Moyne Jr., Services may change the maximum outcomes. Child outcomes can include
Lieutenant, Judge Advocate General’s Corps,
amount through a notice published in improved academic or pre-academic
U.S. Navy, Alternate Federal Register Liaison the Federal Register. skills, improved behavioral or social
Officer. Estimated Range of Awards: See functioning, improved functional
[FR Doc. 05–17409 Filed 8–31–05; 8:45 am] Chart. performance, etc., provided that valid
Estimated Average Size of Awards: and reliable measurement instruments
BILLING CODE 3810–FF–P
See Chart. are employed to assess the outcomes.
Estimated Number of Awards: See Technology-based approaches intended
Chart. for use by professionals or parents are
DEPARTMENT OF EDUCATION not appropriate for funding under this
Project Period: See Chart.
Office of Special Education and priority unless child-level benefits are
Full Text of Announcement clearly demonstrated. Technology-based
Rehabilitative Services; Overview
Information; Technology and Media I. Funding Opportunity Description approaches for professional
development will not be funded under
Services for Individuals With Purpose of Program: The purpose of
this priority;
Disabilities—Steppingstones of the program is to: (1) Improve results for
(c) Provide a detailed plan for
Technology Innovation for Children children with disabilities by promoting conducting work in one of the following
With Disabilities; Notice Inviting the development, demonstration, and two phases:
Applications for New Awards for Fiscal use of technology, (2) support (1) Phase 1—Development: Projects
Year (FY) 2006 educational media services activities funded under Phase 1 must develop and
designed to be of educational value in refine a technology-based approach, and
Catalog of Federal Domestic Assistance the classroom setting to children with test its feasibility for use with children
(CFDA) Number: 84.327A. disabilities, and (3) provide support for with disabilities. Activities under Phase
Note: This notice includes one priority captioning and video description that is I of the priority may include
with two phases, and funding information for appropriate for use in the classroom development, adaptation, and
each phase of the competition. setting. refinement of technology, materials, or
Dates: Applications Available: Priority: In accordance with 34 CFR methodologies. Activities under Phase 1
September 1, 2005. 75.105(b)(2)(iv) and (v), this priority is of the priority must include formative
Deadline for Transmittal of from allowable activities specified in evaluation of usability and feasibility.
Applications: See the chart in section II. the statute, or otherwise authorized in The primary product of a project funded
Award Information section in this the statute (see sections 674 and 681(d) under Phase 1 should be a promising
notice (Chart). of the Individuals with Disabilities technology-based approach that is
Deadline for Intergovernmental Education Act (IDEA)). suitable for field-based evaluation of
Review: See Chart. Absolute Priority: For FY 2006 this effectiveness in improving results for
Eligible Applicants: State educational priority is an absolute priority. Under 34 children with disabilities.
agencies (SEAs); local educational CFR 75.105(c)(3), we consider only (2) Phase 2—Research on
agencies (LEAs); public charter schools applications that meet this priority. Effectiveness: Projects funded under
that are LEAs under State law; This priority is: Phase 2 must select a promising
institutions of higher education (IHEs); Technology and Media Services for technology-based approach that has
other public agencies; private nonprofit Individuals With Disabilities— been developed and tested in a manner
organizations; outlying areas; freely Steppingstones of Technology consistent with the criteria for activities
associated States; Indian tribes or tribal Innovation for Children With funded under Phase 1, and subject the
organizations; and for-profit approach to rigorous field-based
Disabilities
organizations. research to determine effectiveness in
Estimated Available Funds: The Applicants must— educational or early intervention
Administration has requested (a) Describe a technology-based settings. Approaches studied through
$31,992,000 for the Technology and approach for improving the results of projects funded under Phase 2 may have
Media Services for Individuals with early intervention, response-to- been developed with previous funding
Disabilities program for FY 2006, of intervention assessment techniques, or under Phase 1 of this priority or with
which we intend to use an estimated preschool, elementary, middle school, funding from other sources. Phase 2 of
$3,000,000 for the Steppingstones of or high school education for children this priority is primarily intended to
Technology Innovation for Children with disabilities. The technology-based produce sound research-based evidence
with Disabilities competition. The approach must be an innovative that demonstrates the approach can
actual level of funding, if any, depends combination of new technology and improve educational or early
on final congressional action. However, additional materials and methodologies intervention results for children with
we are inviting applications to allow that enable the technology to improve disabilities in a defined range of real
enough time to complete the grant educational, assessment, or early world contexts.
process if Congress appropriates funds intervention results for children with Projects funded under Phase 2 of this
for this program. disabilities; priority must conduct research that
Funding information regarding each (b) Present a justification, based on poses a causal question and must
phase of the priority is listed in the scientifically rigorous research or employ randomized assignment to
Chart. theory, that supports the potential treatment and comparison conditions,
Maximum Award: Phase 1: $200,000 effectiveness of the technology-based unless a strong justification is made for
and Phase 2: $300,000. We will reject approach for improving the results of why a randomized trial is not possible.
any application that proposes a budget education, assessment, or early If a randomized trial is not possible, the
exceeding the maximum award for a intervention for children with applicant must employ alternatives that
single budget period of 12 months. The disabilities. Results studied under this substantially minimize selection bias or

VerDate Aug<18>2005 16:30 Aug 31, 2005 Jkt 205001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1
Federal Register / Vol. 70, No. 169 / Thursday, September 1, 2005 / Notices 52085

allow it to be modeled. These based approach is widely available if disabilities, ages birth to age 3, and to
alternatives include appropriately sufficient evidence of effectiveness has fund at least two projects focusing on
structured regression-discontinuity been obtained. Applicants should technology-based approaches to
designs and natural experiments in document the availability and/or response-to-intervention assessment
which naturally occurring participation of dissemination or techniques.
circumstances or institutions (perhaps marketing resources. Applicants are Waiver of Proposed Rulemaking:
unintentionally) divide people into encouraged to plan these collaborative Under the Administrative Procedure Act
treatment and comparison groups in a relationships early in their projects, (APA) (5 U.S.C. 553), the Department
manner akin to purposeful random even in Phase 1 (if applicable), but generally offers interested parties the
assignment. In their applications, should refrain from widespread opportunity to comment on proposed
applicants proposing to use an dissemination to practitioners until priorities. However, section 681(d) of
alternative system must (1) make a evidence of effectiveness has been the IDEA makes the public comment
compelling case that randomization is obtained; requirements of the APA inapplicable to
not possible, and (2) describe in detail (e) Budget for the project director to the priority in this notice.
how the procedures will result in attend an annual two-day Project
Directors’ meeting in Washington, DC, Program Authority: 20 U.S.C. 1474 and
substantially minimizing the effects of 1481.
selection bias on estimates of effect size. and another annual two-day trip to
Choice of randomizing unit or units Washington, DC to collaborate with the Applicable Regulations: The
(e.g., students, classrooms, schools) Federal project officer and the other Education Department General
must be grounded in a theoretical projects funded under this priority to Administrative Regulations (EDGAR) in
framework. Observational, survey, or share information, and discuss findings 34 CFR parts 74, 75, 77, 79, 80, 81, 82,
qualitative methodologies may and methods of dissemination; and 84, 85, 86, 97, 98, and 99.
complement experimental (f) If the project maintains a Web site, Note: The regulations in 34 CFR part 79
methodologies to assist in the include relevant information and apply to all applicants except federally
identification of factors that may documents in a format that meets a recognized Indian tribes.
explain the effectiveness or government or industry-recognized
standard for accessibility. If the project Note: The regulations in 34 CFR part 86
ineffectiveness of the approach. apply to IHEs only.
Applications must provide research produces instructional materials for
designs that permit the identification dissemination, it must produce them in
accessible formats, including complying II. Award Information
and assessment of factors impacting the
fidelity of implementation. Mediating with the National Instructional Type of Award: Discretionary grants.
Materials Accessibility Standard
and moderating variables that are both Estimated Available Funds: The
(NIMAS) for textual materials.
measured in the practice or model Administration has requested
Within this absolute priority, we
condition and are likely to affect intend to fund at least two projects led $31,992,000 for the Technology and
outcomes in the comparison condition by a project director or principal Media Services for Individuals with
must be measured in the comparison investigator in the initial phase of his or Disabilities program for FY 2006, of
condition (e.g., student time-on-task, her career. For purposes of this priority, which we intend to use an estimated
teacher experience, and time in the initial phase of an individual’s $3,000,000 for the Steppingstones of
position). career is considered to be the first three Technology Innovation for Children
Projects funded under Phase 2 of this years after the individual completes and with Disabilities competition. The
priority must conduct research that is of graduates from a doctoral program (i.e., actual level of funding, if any, depends
sufficient power to provide convincing for FY 2006 awards, projects may on final congressional action. However,
evidence of the effectiveness or support individuals who completed and we are inviting applications to allow
ineffectiveness of the technology-based graduated from a doctoral program no enough time to complete the grant
approach under study, at least within a earlier than the 2003–2004 academic process if Congress appropriates funds
defined range of settings. Applicants year). To qualify for this consideration, for this program.
must provide documentation that the applicant must explicitly state and Maximum Award: Phase 1: $200,000
available sample sizes, methodologies, document that the project director or and Phase 2: $300,000. We will reject
and treatment effects are likely to result principal investigator is in the initial any application that proposes a budget
in conclusive findings regarding the phase of his or her career. At least 50 exceeding the maximum award for a
effectiveness of the technology-based percent of the initial career researcher’s single budget period of 12 months. The
approach; time must be devoted to the project. Assistant Secretary for the Office of
(d) Provide a plan for forming Within this absolute priority, we also Special Education and Rehabilitative
collaborative relationships with vendors intend to fund at least two projects Services may change the maximum
and/or other dissemination or marketing focusing on technology-based amount through a notice published in
resources to ensure that the technology- approaches for children with the Federal Register.

STEPPINGSTONES OF TECHNOLOGY INNOVATION FOR CHILDREN WITH DISABILITIES APPLICATION NOTICE FOR FISCAL
YEAR 2006
Deadline for Deadline for Estimated Estimated av- Estimated
Estimated
CFDA number and name transmittal of intergovern- range of erage size of number of
available funds
applications mental review awards awards awards

84.327A—Steppingstones of Technology
Innovation for Children with Disabil-
ities:
Phase 1—Development ........................... 10/18/2005 12/17/2005 $1,200,000 $100,000– $200,000 6
$200,000

VerDate Aug<18>2005 16:30 Aug 31, 2005 Jkt 205001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1
52086 Federal Register / Vol. 70, No. 169 / Thursday, September 1, 2005 / Notices

STEPPINGSTONES OF TECHNOLOGY INNOVATION FOR CHILDREN WITH DISABILITIES APPLICATION NOTICE FOR FISCAL
YEAR 2006—Continued
Deadline for Deadline for Estimated Estimated av- Estimated
Estimated
CFDA number and name transmittal of intergovern- range of erage size of number of
available funds
applications mental review awards awards awards

Phase 2—Research on Effectiveness ..... 10/18/2005 12/17/2005 1,800,000 200,000– 300,000 6


300,000

Project Period: Projects funded under large print, audiotape, or computer delivery, please refer to section IV. 6.
Phase 1 will be funded for up to 24 diskette) by contacting the Grants and Other Submission Requirements in this
months. Projects funded under Phase 2 Contracts Services Team listed under notice.
will be funded for up to 24 months FOR FURTHER INFORMATION CONTACT in We do not consider an application
unless a compelling rationale is section VII of this notice. that does not comply with the deadline
provided for funding up to 36 months. 2. Content and Form of Application requirements.
Note: The Department of Education is not Submission: Requirements concerning Deadline for Intergovernmental
bound by any estimates in this notice. the content of an application, together Review: See Chart.
with the forms you must submit, are in 4. Intergovernmental Review: This
III. Eligibility Information the application package for this program is subject to Executive Order
competition. 12372 and the regulations in 34 CFR
1. Eligible Applicants: SEAs; LEAs;
Page Limit: The application narrative part 79. Information about
public charter schools that are LEAs
under State law; IHEs; other public (Part III of the application) is where you, Intergovernmental Review of Federal
agencies; private nonprofit the applicant, address the selection Programs under Executive Order 12372
organizations; outlying areas; freely criteria that reviewers use to evaluate is in the application package for this
associated States; Indian tribes or tribal your application. You must limit Part III competition.
to the equivalent of no more than 50 5. Funding Restrictions: We reference
organizations; and for-profit
pages, using the following standards: regulations outlining funding
organizations.
2. Cost Sharing or Matching: This • A ‘‘page’’ is 8.5″ x 11″, on one side restrictions in the Applicable
competition does not involve cost only, with 1″ margins at the top, bottom, Regulations section of this notice.
sharing or matching. and both sides. 6. Other Submission Requirements:
3. Other: General Requirements—(a) • Double space (no more than three Applications for grants under this
The projects funded under this lines per vertical inch) all text in the competition may be submitted
competition must make positive efforts application narrative, including titles, electronically or in paper format by mail
to employ and advance in employment headings, footnotes, quotations, or hand delivery.
qualified individuals with disabilities references, and captions, as well as all a. Electronic Submission of
(see section 606 of the IDEA). text in charts, tables, figures, and Applications.
(b) Applicants and grant recipients graphs. We have been accepting applications
funded under this competition must • Use a font that is either 12 point or electronically through the Department’s
involve individuals with disabilities or larger or no smaller than 10 pitch e-Application system since FY 2000. In
parents of individuals with disabilities (characters per inch). order to expand on those efforts and
ages birth through 26 in planning, The page limit does not apply to Part comply with the President’s
implementing, and evaluating the I, the cover sheet; Part II, the budget Management Agenda, we are continuing
projects (see section 682(a)(1)(A) of the section, including the narrative budget to participate as a partner in the new
IDEA). justification; Part IV, the assurances and government wide Grants.gov Apply site
certifications; the one-page abstract, the in FY 2006. Steppingstones of
IV. Application and Submission resumes, the bibliography, the Technology Innovation for Children
Information references, or the letters of support. with Disabilities-CFDA Number
1. Address to Request Application However, you must include all of the 84.327A is one of the competitions
Package: Education Publications Center application narrative in Part III. included in this project. We request
(ED Pubs), P.O. Box 1398, Jessup, MD We will reject your application if— your participation in Grants.gov.
20794–1398. Telephone (toll free): 1– • You apply these standards and If you choose to submit your
877–433–7827. FAX: (301) 470–1244. If exceed the page limit; or application electronically, you must use
you use a telecommunications device • You apply other standards and the Grants.gov Apply site at http://
for the deaf (TDD), you may call (toll exceed the equivalent of the page limit. www.Grants.gov. Through this site, you
free): 1–877–576–7734. 3. Submission Dates and Times: will be able to download a copy of the
You may also contact ED Pubs at its Applications Available: September 1, application package, complete it offline,
Web site: http://www.ed.gov/pubs/ 2005. and then upload and submit your
edpubs.html or you may contact ED Deadline for Transmittal of application. You may not e-mail an
Pubs at its e-mail address: Applications: See Chart. electronic copy of a grant application to
edpubs@inet.ed.gov. Applications for grants under this us.
If you request an application from ED competition may be submitted You may access the electronic grant
Pubs, be sure to identify this electronically using the Grants.gov application for the Steppingstones of
competition as follows: CFDA Number Apply site (Grants.gov), or in paper Technology Innovation for Children
84.327A. format by mail or hand delivery. For with Disabilities-CFDA Number
Individuals with disabilities may information (including dates and times) 84.327A competition at: http://
obtain a copy of the application package about how to submit your application www.grants.gov. You must search for
in an alternative format (e.g., Braille, electronically, or by mail or hand the downloadable application package

VerDate Aug<18>2005 16:30 Aug 31, 2005 Jkt 205001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1
Federal Register / Vol. 70, No. 169 / Thursday, September 1, 2005 / Notices 52087

for this program by the CFDA number. for Federal Education Assistance (ED system. We will not grant you an extension
Do not include the CFDA number’s 424), Budget Information—Non- if you failed to fully register to submit your
alpha suffix in your search. Construction Programs (ED 524), and all application to Grants.gov before the deadline
Please note the following: date and time or if the technical problem you
necessary assurances and certifications. experienced is unrelated to the Grants.gov
• Your participation in Grants.gov is If you choose to submit your application system.
voluntary. electronically, you must attach any
• When you enter the Grants.gov site, narrative sections of your application as b. Submission of Paper Applications
you will find information about files in a .DOC (document), .RTF (rich by Mail.
submitting an application electronically If you submit your application in
text) or .PDF (Portable Document)
through the site, as well as the hours of paper format by mail (through the U.S.
format. If you upload a file type other
operation. Postal Service or a commercial carrier),
than the three file types specified above
• Applications received by Grants.gov or submit a password protected file, we
you must mail the original and two
are time and date stamped. Your copies of your application, on or before
will not review that material.
application must be fully uploaded and the application deadline date, to the
• Your electronic application must
submitted, and must be date/time Department at the applicable following
comply with any page limit
stamped by the Grants.gov system no address:
requirements described in this notice. By mail through the U.S. Postal
later than 4:30 p.m., Washington, DC • After you electronically submit
time, on the application deadline date. Service: U.S. Department of Education,
your application, you will receive an Application Control Center, Attention:
Except as otherwise noted in this automatic acknowledgment from
section, we will not consider your (CFDA Number 84.327A) 400 Maryland
Grants.gov that contains a Grants.gov Avenue, SW., Washington, DC 20202–
application if it is date/time stamped by tracking number. The Department will
the Grants.gov system later than 4:30 4260; or
retrieve your application from By mail through a commercial carrier:
p.m., Washington, DC time, on the Grants.gov and send you a second
application deadline date. When we U.S. Department of Education,
confirmation by e-mail that will include Application Control Center—Stop 4260,
retrieve your application from a PR/Award number (an ED-specified
Grants.gov, we will notify you if we are Attention: (CFDA Number 84.327A),
identifying number unique to your 7100 Old Landover Road, Landover, MD
rejecting your application because it application).
was date/time stamped by the 20785–1506.
• We may request that you provide us Regardless of which address you use,
Grants.gov system after 4:30 p.m., original signatures on forms at a later
Washington, DC time, on the you must show proof of mailing
date. consisting of one of the following:
application deadline date.
• The amount of time it can take to Application Deadline Date Extension in (1) A legibly dated U.S. Postal Service
upload an application will vary Case of System Unavailability postmark,
depending on a variety of factors (2) A legible mail receipt with the
If you are prevented from date of mailing stamped by the U.S.
including the size of the application and electronically submitting your
the speed of your Internet connection. Postal Service,
application on the application deadline (3) A dated shipping label, invoice, or
Therefore, we strongly recommend that date because of technical problems with receipt from a commercial carrier, or
you do not wait until the application the Grants.gov system, we will grant you (4) Any other proof of mailing
deadline date to begin the application an extension until 4:30 p.m., acceptable to the Secretary of the U.S.
process through Grants.gov. Washington, DC time, the following Department of Education.
• You should review and follow the If you mail your application through
business day to enable you to transmit
Education Submission Procedures for the U.S. Postal Service, we do not
your application electronically, or by
submitting an application through accept either of the following as proof
hand delivery. You also may mail your
Grants.gov that are included in the of mailing:
application by following the mailing
application package for this competition (1) A private metered postmark, or
instructions as described elsewhere in
to ensure that you submit your (2) A mail receipt that is not dated by
this notice. If you submit an application
application in a timely manner to the the U.S. Postal Service.
after 4:30 p.m., Washington, DC time, on
Grants.gov system. You can also find the If your application is postmarked after
the deadline date, please contact the
Education Submission Procedures the application deadline date, we will
person listed elsewhere in this notice
pertaining to Grants.gov at http://e- not consider your application.
under FOR FURTHER INFORMATION
Grants.ed.gov/help/
CONTACT, and provide an explanation of Note: The U.S. Postal Service does not
GrantsgovSubmissionProcedures.pdf.
the technical problem you experienced uniformly provide a dated postmark. Before
• To submit your application via
with Grants.gov, along with the relying on this method, you should check
Grants.gov, you must complete the steps with your local post office.
Grants.gov Support Desk Case Number
in the Grants.gov registration process
(if available). We will accept your c. Submission of Paper Applications
(see http://www.Grants.gov/GetStarted)
application if we can confirm that a by Hand Delivery.
and provide on your application the
technical problem occurred with the If you submit your application in
same D–U–N–S Number used with this
Grants.gov system and that that problem paper format by hand delivery, you (or
registration. Please note that the
affected your ability to submit your a courier service) must deliver the
registration process may take five or
application by 4:30 p.m., Washington, original and two copies of your
more business days to complete.
• You will not receive additional DC time, on the application deadline application by hand, on or before the
point value because you submit your date. The Department will contact you application deadline date, to the
application in electronic format, nor after a determination is made on Department at the following address:
will we penalize you if you submit your whether your application will be U.S. Department of Education,
application in paper format. accepted. Application Control Center, Attention:
• You may submit all documents Note: Extensions referred to in this section (CFDA Number 84.327A), 550 12th
electronically, including all information apply only to the unavailability of or Street, SW., Room 7041, Potomac Center
typically included on the Application technical problems with the Grants.gov Plaza, Washington, DC 20202–4260.

VerDate Aug<18>2005 16:30 Aug 31, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1
52088 Federal Register / Vol. 70, No. 169 / Thursday, September 1, 2005 / Notices

The Application Control Center information on various aspects of the Dated: August 29, 2005.
accepts hand deliveries daily between 8 quality of the Technology and Media John H. Hager,
a.m. and 4:30 p.m., Washington, DC Services for Individuals with Assistant Secretary for Special Education and
time, except Saturdays, Sundays and Disabilities program. These measures Rehabilitative Services.
Federal holidays. will focus on: The extent to which [FR Doc. 05–17448 Filed 8–31–05; 8:45 am]
Note for Mail or Hand Delivery of projects are of high quality and are BILLING CODE 4000–01–P
Paper Applications: If you mail or hand relevant to the needs of children with
deliver your application to the disabilities. Data on these measures will
Department: be collected from the projects funded DEPARTMENT OF ENERGY
(1) You must indicate on the envelope
under this competition.
and—if not provided by the Environmental Impact Statement: Site
Department—in Item 4 of ED 424 the Grantees also will be required to Selection for the Expansion of the
CFDA number—and suffix letter, if report information on their projects’ Strategic Petroleum Reserve
any—of the competition under which performance in annual reports to the
you are submitting your application. Department (34 CFR 75.590). AGENCY: Department of Energy.
(2) The Application Control Center ACTION:Notice of Intent to Prepare an
We will notify grantees of the
will mail a grant application receipt Environmental Impact Statement and
performance measures once they are
acknowledgment to you. If you do not Conduct Public Scoping Meetings.
developed.
receive the grant application receipt SUMMARY: The Energy Policy Act of 2005
acknowledgment within 15 business VII. Agency Contact
(EPACT), enacted on August 8, 2005,
days from the application deadline date, directs the Secretary of Energy to
you should call the U.S. Department of FOR FURTHER INFORMATION CONTACT:
Tom Hanley, U.S. Department of acquire petroleum to fill the Strategic
Education Application Control Center at Petroleum Reserve (SPR) to its
(202) 245–6288. Education, 400 Maryland Avenue, SW.,
room 4066, Potomac Center Plaza, authorized 1 billion-barrel capacity as
V. Application Review Information Washington, DC 20202–2550. expeditiously as possible, and, no later
Selection Criteria: The selection than 1 year after enactment, to select
Telephone: (202) 245–7369.
criteria for this competition are from 34 sites necessary to expand the SPR from
If you use a telecommunications its current 727 million-barrel capacity to
CFR 75.210 and are listed in the device for the deaf (TDD), you may call
application package. 1 billion barrels. DOE has determined
the Federal Relay Service (FRS) at 1– that the site selection and expansion
VI. Award Administration Information 800–877–8339. required by EPACT constitute a major
1. Award Notices: If your application Individuals with disabilities may Federal action which may have a
is successful, we notify your U.S. obtain this document in an alternative significant impact upon the
Representative and U.S. Senators and format (e.g., Braille, large print, environment within the meaning of the
send you a Grant Award Notification audiotape, or computer diskette) on National Environmental Policy Act
(GAN). We may also notify you request by contacting the following (NEPA). For this reason, DOE intends to
informally. office: The Grants and Contracts prepare an environmental impact
If your application is not evaluated or Services Team, U.S. Department of statement (EIS) to assess the proposed
not selected for funding, we notify you. Education, 400 Maryland Avenue, SW., capacity expansion at three of the four
2. Administrative and National Policy Potomac Center Plaza, Washington, DC existing SPR storage sites and the
Requirements: We identify development of a new storage site in the
20202–2550. Telephone: (202) 245–
administrative and national policy Gulf Coast region.
7363. DOE will prepare the EIS in
requirements in the application package
and reference these and other VIII. Other Information accordance with NEPA, the Council on
requirements in the Applicable Environmental Quality (CEQ) NEPA
Regulations section of this notice. Electronic Access to This Document: regulations (40 CFR Parts 1500–1508)
We reference the regulations outlining You may view this document, as well as and the DOE NEPA regulations (10 CFR
the terms and conditions of an award in all other documents of this Department Part 1021).
the Applicable Regulations section of published in the Federal Register, in DATES: DOE invites interested agencies,
this notice and include these and other text or Adobe Portable Document organizations, Native American tribes,
specific conditions in the GAN. The Format (PDF) on the Internet at the and members of the public to submit
GAN also incorporates your approved following site: http://www.ed.gov/news/ comments or suggestions to assist in
application as part of your binding fedregister. identifying significant environmental
commitments under the grant. To use PDF you must have Adobe issues and in determining the
3. Reporting: At the end of your Acrobat Reader, which is available free appropriate scope of the EIS. The public
project period, you must submit a final at this site. If you have questions about scoping period starts with the
performance report, including financial using PDF, call the U.S. Government publication of this notice in the Federal
information, as directed by the Printing Office (GPO), toll free, at 1– Register and will continue until October
Secretary. If you receive a multi-year 888–293–6498; or in the Washington, 14, 2005. Written and oral comments
award, you must submit an annual will be given equal weight and DOE will
DC, area at (202) 512–1530.
performance report that provides the consider all comments received or
most current performance and financial Note: The official version of this document postmarked by October 14, 2005, in
expenditure information as specified by is the document published in the Federal defining the scope of the Draft EIS.
the Secretary in 34 CFR 75.118. Register. Free Internet access to the official Written comments postmarked or sent
4. Performance Measures: Under the edition of the Federal Register and the Code after this date will be considered to the
Government Performance and Results of Federal Regulations is available on GPO degree practicable.
Act (GPRA), the Department is currently Access at: http://www.gpoaccess.gov/nara/ DOE invites oral comments and
developing measures that will yield index.html. suggestions at public scoping meetings

VerDate Aug<18>2005 16:30 Aug 31, 2005 Jkt 205001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1

You might also like