CHEMICAL PROCESS TECHNOLOGY CENTRE Grand Total for Lump Sum Contract Price CHIYODA SINGAPORE (PTE) LIMITED

1. GRAND TOTAL FOR LUMP SUM CONTRACT PRICE ITEM A 1 2 Base Item (exclude Optional Items) Preliminaries (Breakdown and Summary to be prepared by JTC) Summary of Engineering Cost (Brought forward from Section 2) Mechanical (Brought forward from Section 3) Electrical (Brought forward from Section 4) Piping (Brought forward from Section 5) Instrumentation (Brought forward from Section 6) Civil & Structural (Brought forward from Section 7) Others (All other works that are missing in the above list, but are necessary to complete the whole Work as described in BOD, PDP, EPCPS up to receipt of 'Final Acceptance Certificate' issued from the CLIENT (to attach list) 1,328,482.00 DESCRIPTION AMOUNT (S$)

4,875,297.00

2,455,883.00

3,370,297.00

1,706,750.00

3,341,093.00

1,744,330.00

Page 1 of 2

CHEMICAL PROCESS TECHNOLOGY CENTRE Grand Total for Lump Sum Contract Price CHIYODA SINGAPORE (PTE) LIMITED 1. GRAND TOTAL FOR LUMP SUM CONTRACT PRICE ITEM B 1 2 3 Optional Items Gas Compressor Pigging System Fuel Gas Let-Down System 143,457.00 60,527.00 112,892.00 DESCRIPTION AMOUNT (S$)

Total Lump Sum (excluding Optional Items)

18,822,132.00

Note: 1 2 Cost preparation shall strictly follow to 'Cost Allocation' description attached. The above lump sum price excluded all preliminary cost and coordination cost for the NSC required for the execution of the Works, JTC to input the necessary cost to complete the total Contract Obligatory Cost.