JINDAL POWER LIMITED

6X135MW ANGUL CAPTIVE POWER PLANT NISHA , ANGUL CABLE CELLAR DAILY CHECK SHEET UNIT#1,2,3 & BOP
DATE SHIFT

B
CW PUMP HOUSE (0.0 M)

C
COOLING TOWER (0.0 M)

B
CW PUMP HOUSE (0.0 M)

C
COOLING TOWER (0.0 M)

DM PLANT (0.0 M)

1 2 3 4 5 6 7 8 9

CLEANLINESS PROPER ILLUMINATION PRESENCE OF INFLAMMABLE SUBSTANCE PRESENCE OF UNWANTED MATERIALS VISUAL INSPECTION (DAMAGE,BULGING,SPARKING ETC.) VISUAL INSPECTION OF PANEL BOTTOM WATER LOGGING ACCUMULATION OF DUST & UNWANTED MATERIAL IN CABLE TRAYS ENTRANCE DOOR LOCKING

10

REMARKS

11

SIGNATURE

DM PLANT (0.0 M)

U-I & II (5.5 M)

U-I & II (5.5 M)

U-III (-3.5 M)

U-III (-3.5 M)

U-II (-3.5 M)

U-II (-3.5 M)

U-III (5.5 M)

U-III (5.5 M)

U-I (-3.5 M)

U-I (-3.5 M)

JINDAL POWER LIMITED


6X135MW ANGUL CAPTIVE POWER PLANT NISHA , ANGUL
DATEAREA- CHP/AHP

CABLE CELLAR DAILY CHECK SHEET

B
AHP SWITCHGEAR ( 0.0 M) SILO MCC ROOM( 0.0 M)

C
AHP SWITCHGEAR ( 0.0 M)

AHP SWITCHGEAR ( 0.0 M)

SILO MCC ROOM( 0.0 M)

SL.NO

CHECK POINTS

LOCATIONS

1 2 3 4 5 6 7 8 9 10 11

CLEANLINESS PROPER ILLUMINATION PRESENCE OF INFLAMMABLE SUBSTANCE PRESENCE OF UNWANTED MATERIALS VISUAL INSPECTION (ANY DAMAGE,BULGING,SPARKING ETC.) VISUAL INSPECTION OF PANEL BOTTOM WATER LOGGING ACCUMULATION OF DUST & UNWANTED MATERIAL IN CABLE TRAYS ENTRANCE DOOR LOCKING REMARKS SIGNATURE

SILO MCC ROOM( 0.0 M)