6X135MW ANGUL CAPTIVE POWER PLANT NISHA , ANGUL CABLE CELLAR DAILY CHECK SHEET UNIT#1,2,3 & BOP
DATE SHIFT
B
CW PUMP HOUSE (0.0 M)
C
COOLING TOWER (0.0 M)
B
CW PUMP HOUSE (0.0 M)
C
COOLING TOWER (0.0 M)
DM PLANT (0.0 M)
1 2 3 4 5 6 7 8 9
CLEANLINESS PROPER ILLUMINATION PRESENCE OF INFLAMMABLE SUBSTANCE PRESENCE OF UNWANTED MATERIALS VISUAL INSPECTION (DAMAGE,BULGING,SPARKING ETC.) VISUAL INSPECTION OF PANEL BOTTOM WATER LOGGING ACCUMULATION OF DUST & UNWANTED MATERIAL IN CABLE TRAYS ENTRANCE DOOR LOCKING
10
REMARKS
11
SIGNATURE
DM PLANT (0.0 M)
U-III (-3.5 M)
U-III (-3.5 M)
U-II (-3.5 M)
U-II (-3.5 M)
U-III (5.5 M)
U-III (5.5 M)
U-I (-3.5 M)
U-I (-3.5 M)
B
AHP SWITCHGEAR ( 0.0 M) SILO MCC ROOM( 0.0 M)
C
AHP SWITCHGEAR ( 0.0 M)
SL.NO
CHECK POINTS
LOCATIONS
1 2 3 4 5 6 7 8 9 10 11
CLEANLINESS PROPER ILLUMINATION PRESENCE OF INFLAMMABLE SUBSTANCE PRESENCE OF UNWANTED MATERIALS VISUAL INSPECTION (ANY DAMAGE,BULGING,SPARKING ETC.) VISUAL INSPECTION OF PANEL BOTTOM WATER LOGGING ACCUMULATION OF DUST & UNWANTED MATERIAL IN CABLE TRAYS ENTRANCE DOOR LOCKING REMARKS SIGNATURE