SOUTHERN PERU COPPER CORPORATION


UNIDAD " TOQUEPALA "
COSTO DE EQUIPO
PERFORADORAS
FECHA: FEBRERO 2013
EQUIPO

C O S T O S
OPERACION

MANTENIMIENTO

DEPRECIACION

TOTAL

HORAS

METROS

COSTO/HORA

COSTO/MT.

OPERACION

PERFORADOS

(USD)

(USD)

(1) Perf. P&H 120A

56,579

44,978

8,523

110,081

392

11,570

280.91

9.51

(2) Perf. P&H 100XP

131,794

71,118

7,856

210,768

727

14,561

290.01

14.48

(3) Perf. BE 49HR

237,294

65,072

109,611

411,977

1,441

31,002

285.99

13.29

(2) Perf. BE 49R

131,736

104,061

21,624

257,421

932

21,844

276.29

11.78

(2) Perf. Pre Corte

77,425

26,919

104,344

514

5,790

203.01

18.02

(1) Perf. P&H 320XPC

24,482

24,482

506

11,954

48.42

2.05

TOTAL

659,311

1,119,073

4,511

96,719

248.10

11.57

312,148

147,614

YTD 2012
EQUIPO

C O S T O S
OPERACION

MANTENIMIENTO

DEPRECIACION

TOTAL

HORAS

METROS

COSTO/HORA

COSTO/MT.

OPERACION

PERFORADOS

(USD)

(USD)

(1) Perf. P&H 120A

125,810

115,148

17,047

258,005

824

22,185

313.00

11.63

(2) Perf. P&H 100XP

272,259

180,239

15,713

468,210

1,589

32,520

294.61

14.40

(3) Perf. BE 49HR

510,502

144,754

219,222

874,478

3,118

69,221

280.48

12.63

(2) Perf. BE 49R

295,346

158,131

43,247

496,724

1,978

47,338

251.12

10.49

(2) Perf. Pre Corte

173,271

76,650

249,921

966

13,742

258.71

18.19

(1) Perf. P&H 320XPC

26,485

26,485

802

17,617

33.03

1.50

2,347,338

8,475

185,006

276.96

12.69

TOTAL

1,377,188

674,922