Sr.No
Description of items
Qty.
Unit
Rate
Amount
8 Providing & casting in situ R.C.C. for all R.C.C. works like
column fottings, superstructure beasms, columns, lintels slabs, pardies, landings, staircae, equipment foundations etc including de-watering if necessary,compacting finishing etc complete ( excluding MS/Tor steel reinforcement), but including centering, shuttering curing etc. complete as directed. with 1:2:4 cement concrete with 1:1.5:3 cement concrete Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No9 a,b Fixing MS/Tor steel bar reinforcement of various diameters. for all R.C.C. works including cutting, bending , binding hooking, etc. as per schedule and drawing with cost of binding wire etc. complete as directed. (steel will be issued by Department under Procedure"A" ) Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.10 Providing & constructing U.C.R.masonry with quarry stone in cement mortar 1:6 in plinth, foundation and superstructure including de-watering striking joints on unexposed faces, & pointing with cement mortar 1:3 on outside faces, watering, curing, scaffolding etc. complete as directed. Market Rate. Providing & constructing B.B. masonry second sort with conventional typebricks in C.M. 1:6 in plinth, foundation and superstructure including striking joints, raking out joints, watering scaffoldig etc. complete as directed. Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.12 Providing cement plaster 12 mm thick in single coat in C.M. 1:4 without neeru finishing to concrete or brick surface in all position including scaffolding and curing etc. complete as directed. Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.13-a Providing cement plaster 20 mm thick in two coats in C.M. 1:4 with sponge finish surface to stone and brick masonry surface in all position including scaffolding curing etc. completed. Market Rate. Providing & laying I.P.S. 50 mm thick with 1:2:4 cement concrete laid to proper level and slope in alternate bays including compaction, filling joints, making lines, smooth finishing and curing complete as directed Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No15 Supplying oversize metal (50mm ) at work site including speading uniformly to the required slope etc complete Rate Analysis attached.
a) b) 9
2.00 2.00
M3 M3
0.40
MT
10
5.00
M3
11
4.00
M3
12
100.00
M2
13
100.00
M2
14
10.00
M2
15
6.00
M3
Sr.No
Description of items
Qty.
Unit
Rate
Amount
CONTRACTOR
Since Prive
285.60
--
--
3328.00 1276.00
--
6290.00
--
-11048.00