Civil Works Construction Proposed Advertisements

CIVIL WORKS CONSTRUCTION AND SUPPLY AND SERVICE ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS

Construction and Supply and Service projects listed in this document are scheduled to be advertised for award during Fiscal Year 07.

The Engineer of Choice for the 21st Century

Civil Works Construction Proposed Advertisements

CIVIL WORKS CONSTRUCTION ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS
Proposed Advertising Date Cost Range

Project and Item

Description of Work

MISSISSIPPI RIVER LEVEES MRL, Item 457-R Lower Mississippi River Museum Levee Enlargement and Berm Construction of Museum Building Jun-07 Jul-07 $5million to $10 million $5 million to $10 million

YAZOO BASIN Upper Yazoo Projects Upper Yazoo Projects Big Sunflower Big Sunflower Channel Item 6B May-07 Lambfish Bridge Relocation Aug-07 Bank Stabilization/Sediment Reduction Jun-07 Phase II Channel Relocation Jul-07 More than $10 million $1 million to $5 million $1 million to $5 million $1 million to $5 million

The Engineer of Choice for the 21st Century

Civil Works Construction Proposed Advertisements

CIVIL WORKS CONSTRUCTION ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS
Project and Item Description of Work Proposed Advertising Date Cost Range

J.BENNETT JOHNSTON WATERWAY JBJWW-LCB Sediment Barrier Wall Construction JBJWW- Fausse/ Natchitochies/ Clareance Revetmeny JBJWW- Philip Bayou Revetment OUACHITA RIVER LEVEES Monroe to Sandy Bayou- Phase I I Gravel Resurfacing Apr-07 $1 million to $5million Feb-07 Mar-07 Feb-07 $5million to $10million $1million to $5million $1million to $5million

RED RIVER EMERGENCY BANK PROTECTION Bois DArc Revetment Phase II RED RIVER BELOW DENISON DAM Levee Item 9A Roads on Levee Crown Phase II Levee Rehabilitation Gravel Resurfacing Apr-07 Jun-07 $1 million to $5 million $1 million to $5 million Revetment Jun-07 $1 million to $5 million

The Engineer of Choice for the 21st Century

Civil Works Construction Proposed Advertisements

CIVIL WORKS CONSTRUCTION ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS Proposed Advertising Date Cost Range

Project and Item

Description of Work

MISSISSIPPI DELTA HEADWATERS PROJECT RP-04-02 (8a) BC-03-01 BC-04-03 FW-90-04 BC-02-05 DR-03-01 LD-03-01 LD-03-02 LD-04-05 BS-04-01 BC-04-01 CI-03-01 RP-02-04 RP-03-04 BS-04-02 BS-04-03 RP-06-03 RP-04-03 13 RPGCS 3 BCGCS 1 BCGCS FWRS #35 3 BCGCS Debris Removal 3 LCGCS 3 LCGCS 1 LDGCS Bank Stab/Camp Creek 2 BCGCS Channel Improv/ East Goose Creek 15 RPGCS 15 RPGCS Bank Stab/Perry Creek Bank Stab/Coila Creek Riser Pipe Riser Pipe Jan-07 May-07 May-07 Mar-07 Arp-07 May-07 Apr-06 May-07 May-07 Jun-07 Jun-07 May-07 Jan-07 May-07 Jul-07 Aug-07 Jul-07 Aug-07 $500,000 to $1million $1 million to $5 million $500,000 to $1 million $1million to $5million $1million to $5 million $500,000 to $1million $1million to $5 million $500,000 to $1million $250,000 to $500,000 $500,000 to $1 million $500,000 to $1 million $1million to $5 million $500,000 to $1 million $500,000 to $1 million $1 million to $5 million $1 million to $5 million $500,000 to $1 million $500,000 to $1 million

The Engineer of Choice for the 21st Century

Civil Works Construction Proposed Advertisements


CIVIL WORKS CONSTRUCTION ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS Proposed Description of Work Advertising Date

Project and Item CHANNEL IMPROVEMENT Island 84/Warfield Point FY07 Stone Bank Paving FY07 Stone Repairs O&M Arkabutla Lake Bayou Bodcau Sardis Lake Sardis Lake Sardis Lake J. Bennett Johnson Waterway Grenada Lake Tensas River, Red River Backwater Lower AR River, North Bank Lower AR River, South Bank

Cost Range

Dike Construction Riprap Various Locations Riprap Various Locations

Mar-07 May-07 May-07

$1 million to $5 million $500,000 to $1 million $500,000 to $1 million

IDIQ Road Repair Jan-07 Project Office Mar-07 Realign Direct Access-Coontown Mar-07 Realign Direct Access-Wyatts Crossing Mar-07 Realign Direct Access-Coles Point Mar-07 Tainter Valves Mar-07 Repairs to Visitor Center May-07 Mile 0.2 Setback Jun-07 Placement of Crushed Stone Jun-07 Placement of Crushed Stone Jun-07

$1million to $5 million $100,000 to $500,000 $100,000 to $500,000 $500,000 to $1,000,000 $100,000 to $500,000 $100,000 to $500,000 $100,000 to $500,000 $1 million to $5 million $100,000 to $500,000 $100,000 to $500,000

The Engineer of Choice for the 21st Century

Civil Works Supply and Services Proposed Advertisements

CIVIL WORKS SUPPLY AND SERVICE ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS

Project and Item


O&M Red River Ouachita River/Harbors Mississippi River Levees Greenwood

Description of Work

Proposed Advertising Date

Cost Range

Navigation Dredging Navigation Dredging Placement of Crushed Stone Mile 182-L Bank Stabilization

Mar-07 Mar-07 Jun-07 Aug-07

$1 million to $ 5 million $1 million to $5 million $1 million to $5 million $500,000 to $1 million

MSU MSU MSU MSU MSU MSU MSU MSU Navigation Navigation Navigation Navigation Red River -5 Locks & Dams

Launching Strand, 3/8 & 7/16 Straight Wires Nuts, Ubolts, Saddles Hydrated Lime Towboat Rental (30 Days) Tender Rental Crew Boat Rental Wire Rope A/E Survey (option year) Channel Patrol Boat (Base Year) Tender Boat (Jadwin)(Option Year) Survey Boat (Jadwin)(Option Year) Operation &Maintenance

May 07 Feb 07 Feb-07 Feb-07 May-07 May-07 May-07 May-07 May-07 May-07 Apr-07 Apr-07 Nov-07

The Engineer of Choice for the 21st Century

Civil Works Supply and Services Proposed Advertisements

CIVIL WORKS SUPPLY AND SERVICE ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS Proposed Advertising Date Cost Range

Project and Item O&M Bodcau, Caddo Red River Ouachita Black MRL MRL MRL DeGray Dam Blakely Dam

Description of Work

Cleaning and Mowing, Wallace Cleaning & Mowing, L&Ds 1,2,3,4,5 and CMU Cleaning and Mowing Locks & Dams Maintenance Gravel (West Bank MRL, LA) Maintenance Gravel (East Bank MRL, MS) Maintenance Gravel (West Bank MRL, AR) Rewind Generators (Unit 2) Rewind Generators (Unit 2)

Jan-07 May-07 Jun-07 May-07 May-07 May-07 Jun-07 Jun-07

The Engineer of Choice for the 21st Century

Civil Works Supply and Services Proposed Advertisements

CIVIL WORKS SUPPLY AND SERVICE ADVERTISING SCHEDULE 1 October 2006 to 30 September 2007 DEPARTMENT OF THE ARMY VICKSBURG DISTRICT, CORPS OF ENGINEERS Proposed Advertising Date Sep-07 Jan-07 Jun-07 Cost Range

Project and Item LMO MVK/MVD MVK MVD MISC MVD/MRC MVK MVK MVK A-E CONTRACTS Survey Contract (1 Competitive 8a) Design Contract (1 Competitive 8a)

Description of Work Material Handling & Coordination Support Material Handling for Logistics MVD Flight Operations

Cleaning Services Cultural Resources Environmental & Eco Studies Planting Seedings & Vegetation Mgt.

Aug-07 Nov-07 Apr-07 May-07

IDIQ Survey Services IDIQ Design Services

Feb-07 Mar-07

The Engineer of Choice for the 21st Century