Professional Documents
Culture Documents
Heading Desc.
Removal, Dismantle and Replace of Damage Components Removal, dismantle and dispose the damaged guardrail beam.
Page No. 29
a) Machinery Cost i) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 day @ RM 150.00 per day = RM 150.00 per day
ii)
Backhoe operation, overhead cost incl. maintenance cost :1 x 1 day @ RM 270.00 per day = RM 270.00 per day
iii)
Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :1 x 1 day @ RM 250.00 per day = RM 250.00 per day
iv)
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools) Allow a est. sum for 1 day @ RM 100.00 per day = RM 100.00 per day
v)
= RM
770.00
per
day
: : RM
91 770.00
m /
b) Workmen & Manpower Cost i) Ganger daily basic salary :1 x 1 day @ RM 65.00 per day = RM 65.00 per day
ii)
General Worker daily basic salary :5 x 1 day @ RM 38.00 per day = RM 190.00 per day
iii)
= RM
255.00
per
day
: : RM
91 255.00
m /
c) Total Machinery + Workmen & Manpower Cost so, ADD Total Rate per Unit Profit & Overhead : 15%
= RM = RM = RM
m m m
PROPOSED RATE
RM
13.00
per
Guardrail - Page 1 / 31
Heading Desc.
Removal, Dismantle and Replace of Damage Components Removal, dismantle & dispose the damaged End Wing or Fish Tail (Terminal end Type 1)
Page No. 29
a) Machinery Cost i) Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 day @ RM 150.00 per day = RM 150.00 per day
ii)
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) = RM 100.00 per day
iii)
= RM
250.00
per
day
: : RM
33 250.00
nos. /
b) Workmen & Manpower Cost I) Ganger daily basic salary :1 x 1 day @ RM 65.00 per day = RM 65.00 per day
ii)
General Worker daily basic salary :4 x 1 day @ RM 38.00 per day = RM 152.00 per day
iii)
= RM
217.00
per
day
: : RM
33 217.00
nos. /
c) Total Machinery + Workmen & Manpower Cost so, ADD Total Rate per Unit Profit & Overhead : 15%
= RM = RM = RM
m m m
PROPOSED RATE
RM
16.50
per
Guardrail - Page 2 / 31
Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day
ii)
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) = RM Total= RM Productivity Per Day Machinery Cost Per NO : : RM 17 250.00 NO / 17 = RM 14.71 per No. 100.00 250.00 per per Day Day
I)
ii)
General Worker : 4 x 1 Day @ RM 38.00 per Day = RM RM Productivity Per Day Workmen Cost Per NO : : RM 17 217.00 NO / 17 = RM 12.76 per No. 152.00 217.00 per per Day Day
TOTAL MACHINERY +WORKMEN & MANPOWER COST :- ADD TOTAL RATE PER UNIT Say; P&O : 15%
= RM = RM = RM RM
Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day
ii)
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) = RM Total= RM 100.00 250.00 per per Day Day
Guardrail - Page 3 / 31
: : RM
17 250.00
I)
ii)
General Worker : 4 x 1 Day @ RM 38.00 per Day = RM = RM Productivity Per Day Workmen Cost Per NO : : RM 17 217.00 NO / 17 = RM 12.76 per No. 152.00 217.00 per per Day Day
TOTAL MACHINERY +WORKMEN & MANPOWER COST :- ADD TOTAL RATE PER UNIT Say; P&O : 15%
= RM = RM = RM RM
Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00
: : RM
17 250.00
B) Workmen
I)
Guardrail - Page 4 / 31
ii)
: : RM
17 217.00
NO / 17 = RM ##
= RM
##
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 5 / 31
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged guardrail post Item c, page 29
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
iii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 520.00
: : RM
27 520.00
NO / 27 = RM ##
B) Workmen
I)
ii)
: : RM
27 179.00
NO / 27 = RM ##
RM
##
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 6 / 31
Guardrail - Page 7 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Dismantle and removed existing damaged nose yellow Item d, page 29
A) MACHINERY
I)
ii)
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 280.00 Per day Total RM RM 280.00 700.00
: : RM
6 700.00
NO / 6 = RM ##
B) Workmen
I)
ii)
: : RM
6 179.00
NO / 6 = RM ##
= RM
##
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 8 / 31
Guardrail - Page 9 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Dismantle and removed existing damaged cartridge Item e, page 29
A) MACHINERY
I)
ii)
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day Total RM RM 150.00 570.00
: : RM
3 570.00
NO / 3 = RM ##
B) Workmen
I)
ii)
: : RM
3 179.00
NO / 3 = RM ##
RM
##
ADD:
P& O
15%
RM
##
= Take
RM RM
## ##
Guardrail - Page 10 / 31
Guardrail - Page 11 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Dismantle and removed existing beam panel Item f, page 29
A) MACHINERY
I)
ii)
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day Total RM RM 150.00 570.00
: : RM
5 570.00
NO / 5 = RM ##
B)
I)
ii)
: : RM
5 179.00
NO / 5 = RM ##
= RM
###
ADD:
P& O
15%
= RM
###
= RM Take RM
### ###
Guardrail - Page 12 / 31
Guardrail - Page 13 / 31
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level) Item g, page 29
Realign and straighten the line of existing guardrail including correct the level and verticality position of existing guardrail post.
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
: : RM
97 520.00
M / 97 = RM ##
B) Workmen
I)
ii)
: : RM
97 255.00
M / 97 = RM ##
= RM
##
ADD:
P& O
15%
= RM
##
Rate Per M
= RM
##
Guardrail - Page 14 / 31
Take
RM
##
Guardrail - Page 15 / 31
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level) Supply and replace missing delinator piece on guardrail Item h, page 29
A) MATERIAL
I)
G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set)
= RM
##
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :
Day
RM
150.00
per day
RM
150.00
ii)
Allow sum :
RM
80.00
I)
General worker
Day
RM
38.00
RM RM
114 344.00
: : RM
43 344.00
NO / 43 = RM ##
= RM
##
ADD :
P&O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 16 / 31
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised new guardrail beams Item a, page 30
A) MATERIAL
I)
RM
35.00
ii)
Transportation(per M)
RM
10.00
= RM
##
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00
: : RM
71 250.00
M / 71 = RM ##
I)
ii)
: : RM
71 255.00
M / 71 = RM ##
= RM
##
Guardrail - Page 17 / 31
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 18 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised End wing or Fish Tail (Terminal unitType 1) Item b i, page 30
A) MATERIAL
I)
RM
58.00
ii)
Transportation(per No)
RM
5.00
= RM
##
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00
: : RM
29 250.00
NO / 29 = RM ##
I)
ii)
: : RM
29 190.00
NO / 29 = RM ##
= RM
###
Guardrail - Page 19 / 31
ADD:
P& O
15%
= RM
###
= RM RM
### ###
Guardrail - Page 20 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised Terminal anchorage unit Type 2 Item b ii, page 30
A) MATERIAL
i)
RM
380.00
ii)
Transportation(per No)
RM
5.00
= RM
##
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00
: : RM
80 250.00
NO / 80 = RM ##
I)
ii)
: : RM
80 255.00
NO / 80 = RM ##
= RM
##
Guardrail - Page 21 / 31
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 22 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised 90 degrees Twist Unit Type 3 Item b iii, page 30
A) MATERIAL
I)
RM
550.00
ii)
Transportation(per No)
RM
5.00
= RM
##
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00
: : RM
9 250.00
NO / 9 = RM ##
I)
ii)
: : RM
9 255.00
NO / 9 = RM ##
= RM
##
Guardrail - Page 23 / 31
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 24 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised Terminal section 1:6 / Sloping End Type 4 Item b iv, page 30
A) Material
I)
RM
158.00
ii)
Transportation(per No)
RM
5.00
= RM
##
B) Machinery.
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00
: : RM
14 250.00
NO / 14 = RM ##
I)
ii)
: : RM
14 255.00
NO / 14 = RM ##
= RM
##
Guardrail - Page 25 / 31
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 26 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised guadrail post complete with packer Item c, page 30
A) MATERIAL
I)
RM
87.00
ii)
Transportation(per No)
RM
2.00
= RM
##
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00
ii)
iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 550.00
: : RM
52 550.00
NO / 52 = RM ##
I)
ii)
52
NO
Guardrail - Page 27 / 31
RM
255.00
52
= RM
##
= RM
##
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 28 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Item d, page 30
Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.
A) MATERIAL
I)
Nose Yellow
= RM
##
ADD:
P& O
15%
RM
##
RM RM
## ##
Guardrail - Page 29 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work. Item e, page 30
A) MATERIAL
I)
Cartridge
= RM
##
ADD:
P& O
15%
= RM
##
= RM RM
## ##
Guardrail - Page 30 / 31
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and replace new beam panel. Item g, page 30
A) MATERIAL
I)
Cartridge
= RM
##
ADD:
P& O
15%
= RM
##
= RM Take RM
## ##
Guardrail - Page 31 / 31