You are on page 1of 31

Build-Up Rates Road Furnitures - Guardrails

Heading Desc.

Removal, Dismantle and Replace of Damage Components Removal, dismantle and dispose the damaged guardrail beam.

Item No. (a)

Page No. 29

a) Machinery Cost i) Pick-up truck (3.0T) for carring,materials, workers and tools :1 x 1 day @ RM 150.00 per day = RM 150.00 per day

ii)

Backhoe operation, overhead cost incl. maintenance cost :1 x 1 day @ RM 270.00 per day = RM 270.00 per day

iii)

Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :1 x 1 day @ RM 250.00 per day = RM 250.00 per day

iv)

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools) Allow a est. sum for 1 day @ RM 100.00 per day = RM 100.00 per day

v)

Sub - Total Overall Cost for Machinery

= RM

770.00

per

day

Productivity of Work Machinery Cost per Metre

: : RM

91 770.00

m /

per day 91 m = RM 8.51 per m

b) Workmen & Manpower Cost i) Ganger daily basic salary :1 x 1 day @ RM 65.00 per day = RM 65.00 per day

ii)

General Worker daily basic salary :5 x 1 day @ RM 38.00 per day = RM 190.00 per day

iii)

Sub - Total Overall Cost for Workmen & Manpower

= RM

255.00

per

day

Productivity of Work Manpower Cost per Metre

: : RM

91 255.00

m /

per day 91 m = RM 2.82 per m

c) Total Machinery + Workmen & Manpower Cost so, ADD Total Rate per Unit Profit & Overhead : 15%

= RM = RM = RM

11.33 1.70 13.02

per per per

m m m

PROPOSED RATE

RM

13.00

per

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 1 / 31

Build-Up Rates Road Furnitures - Guardrails

Heading Desc.

Removal, Dismantle and Replace of Damage Components Removal, dismantle & dispose the damaged End Wing or Fish Tail (Terminal end Type 1)

Item No. (bi)

Page No. 29

a) Machinery Cost i) Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 day @ RM 150.00 per day = RM 150.00 per day

ii)

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) = RM 100.00 per day

iii)

Sub - Total Cost for Machinery

= RM

250.00

per

day

Productivity of Work Machinery Cost per no.

: : RM

33 250.00

nos. /

per day 33 nos. = RM 7.69 per no.

b) Workmen & Manpower Cost I) Ganger daily basic salary :1 x 1 day @ RM 65.00 per day = RM 65.00 per day

ii)

General Worker daily basic salary :4 x 1 day @ RM 38.00 per day = RM 152.00 per day

iii)

Sub - Total Cost for Workmen & Manpower

= RM

217.00

per

day

Productivity of Work Manpower Cost per no.

: : RM

33 217.00

nos. /

per day 33 nos. = RM 6.68 per no.

c) Total Machinery + Workmen & Manpower Cost so, ADD Total Rate per Unit Profit & Overhead : 15%

= RM = RM = RM

14.37 2.16 16.52

per per per

m m m

PROPOSED RATE

RM

16.50

per

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 2 / 31

Build-Up Rates Road Furnitures - Guardrails

Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)

Item b ii, page 29

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day

ii)

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) = RM Total= RM Productivity Per Day Machinery Cost Per NO : : RM 17 250.00 NO / 17 = RM 14.71 per No. 100.00 250.00 per per Day Day

B) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 per Day = RM 65.00 per Day

ii)

General Worker : 4 x 1 Day @ RM 38.00 per Day = RM RM Productivity Per Day Workmen Cost Per NO : : RM 17 217.00 NO / 17 = RM 12.76 per No. 152.00 217.00 per per Day Day

TOTAL MACHINERY +WORKMEN & MANPOWER COST :- ADD TOTAL RATE PER UNIT Say; P&O : 15%

= RM = RM = RM RM

27.47 4.12 31.59 31.60

per per per per

No. No. No. No.

Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3

Item b iii, page 29

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 per Day = RM 150.00 per Day

ii)

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) = RM Total= RM 100.00 250.00 per per Day Day

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 3 / 31

Build-Up Rates Road Furnitures - Guardrails

Productivity Per Day Machinery Cost Per NO

: : RM

17 250.00

NO / 17 = RM 14.71 per No.

B) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 per Day = RM 65.00 per Day

ii)

General Worker : 4 x 1 Day @ RM 38.00 per Day = RM = RM Productivity Per Day Workmen Cost Per NO : : RM 17 217.00 NO / 17 = RM 12.76 per No. 152.00 217.00 per per Day Day

TOTAL MACHINERY +WORKMEN & MANPOWER COST :- ADD TOTAL RATE PER UNIT Say; P&O : 15%

= RM = RM = RM RM

27.47 4.12 31.59 31.60

per per per per

No. No. No. No.

Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4

Item b iv, page 29

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00

Productivity Per Day Machinery Cost Per NO

: : RM

17 250.00

NO / 17 = RM 14.71 per No.

B) Workmen

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 4 / 31

Build-Up Rates Road Furnitures - Guardrails

ii)

General Worker : 4 x 1 Day @ RM 38.00 Per day RM RM 152.00 217.00

Productivity Per Day Workmen Cost Per NO

: : RM

17 217.00

NO / 17 = RM ##

Row cost Per NO

= RM

##

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 5 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Removal, dismantle and dispose the damaged guardrail post Item c, page 29

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Backhoe : 1 x 1 Day @ RM 270.00 Per day RM 270.00

iii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 520.00

Productivity Per Day Machinery Cost Per NO

: : RM

27 520.00

NO / 27 = RM ##

B) Workmen

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 3 x 1 Day @ RM 38.00 Per day RM RM 114.00 179.00

Productivity Per Day Workmen Cost Per NO

: : RM

27 179.00

NO / 27 = RM ##

Row cost Per NO

RM

##

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 6 / 31

Build-Up Rates Road Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 7 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Dismantle and removed existing damaged nose yellow Item d, page 29

A) MACHINERY

I)

Backhoe 1 x 1 Day @ RM 270.00 Per day RM 270.00

ii)

Miscellaneous Allow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 280.00 Per day Total RM RM 280.00 700.00

Productivity Per Day Machinery Cost Per NO

: : RM

6 700.00

NO / 6 = RM ##

B) Workmen

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 3 x 1 Day @ RM 38.00 Per day RM RM 114.00 179.00

Productivity Per Day Workmen Cost Per NO

: : RM

6 179.00

NO / 6 = RM ##

Row cost Per NO

= RM

##

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 8 / 31

Build-Up Rates Road Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 9 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Dismantle and removed existing damaged cartridge Item e, page 29

A) MACHINERY

I)

Backhoe 1 x 1 Day @ RM 270.00 Per day RM 270.00

ii)

Miscellaneous Allow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day Total RM RM 150.00 570.00

Productivity Per Day Machinery Cost Per NO

: : RM

3 570.00

NO / 3 = RM ##

B) Workmen

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 3 x 1 Day @ RM 38.00 Per day RM RM 114.00 179.00

Productivity Per Day Workmen Cost Per NO

: : RM

3 179.00

NO / 3 = RM ##

Row cost Per NO =

RM

##

ADD:

P& O

15%

RM

##

Rate Per NO.

= Take

RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 10 / 31

Build-Up Rates Road Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 11 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components Dismantle and removed existing beam panel Item f, page 29

A) MACHINERY

I)

Backhoe 1 x 1 Day @ RM 270.00 Per day RM 270.00

ii)

Miscellaneous Allow sum (per day) RM 150.00

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day Total RM RM 150.00 570.00

Productivity Per Day Machinery Cost Per NO

: : RM

5 570.00

NO / 5 = RM ##

B)

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 3 x 1 Day @ RM 38.00 Per day RM RM 114.00 179.00

Productivity Per Day Workmen Cost Per NO

: : RM

5 179.00

NO / 5 = RM ##

Row cost Per NO

= RM

###

ADD:

P& O

15%

= RM

###

Rate Per NO.

= RM Take RM

### ###

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 12 / 31

Build-Up Rates Road Furnitures - Guardrails

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 13 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level) Item g, page 29

Realign and straighten the line of existing guardrail including correct the level and verticality position of existing guardrail post.

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Hydraulic jack 1 x 1 Day @ RM 100.00 Per day RM 100.00

iii) Backhoe : 1 x 1 Day @ RM 270.00 Per day Total RM RM 270.00 520.00

Productivity Per Day Machinery Cost Per M

: : RM

97 520.00

M / 97 = RM ##

B) Workmen

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day Workmen Cost Per M

: : RM

97 255.00

M / 97 = RM ##

Row cost Per M

= RM

##

ADD:

P& O

15%

= RM

##

Rate Per M

= RM

##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 14 / 31

Build-Up Rates Road Furnitures - Guardrails

Take

RM

##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 15 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level) Supply and replace missing delinator piece on guardrail Item h, page 29

A) MATERIAL

I)

G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set)

= RM

##

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :

Day

RM

150.00

per day

RM

150.00

ii)

Miscellaneous items (Temporary traffic signs, cleaning tools and equipments)

Allow sum :

RM

80.00

C) WORKMEN & MANPOWER

I)

General worker

Day

RM

38.00

per day Total

RM RM

114 344.00

Productivity Per day Workmen Cost Per No.

: : RM

43 344.00

NO / 43 = RM ##

Raw cost per No.

= RM

##

ADD :

P&O

15%

= RM

##

Rate Per No. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 16 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised new guardrail beams Item a, page 30

A) MATERIAL

I)

Guardrail (supply price/M)

RM

35.00

ii)

Transportation(per M)

RM

10.00

iii) Material cost (per M)

= RM

##

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, workers and tools : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00

Productivity Per Day Machinery Cost Per M

: : RM

71 250.00

M / 71 = RM ##

C) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day Workmen Cost Per M

: : RM

71 255.00

M / 71 = RM ##

Row cost Per M

= RM

##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 17 / 31

Build-Up Rates Road Furnitures - Guardrails

ADD:

P& O

15%

= RM

##

Rate Per M Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 18 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised End wing or Fish Tail (Terminal unitType 1) Item b i, page 30

A) MATERIAL

I)

Terminal End Type l (supply price/No)

RM

58.00

ii)

Transportation(per No)

RM

5.00

iii) Material cost (per No) :

= RM

##

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00

Productivity Per Day Machinery Cost Per No

: : RM

29 250.00

NO / 29 = RM ##

C) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day Workmen Cost Per No

: : RM

29 190.00

NO / 29 = RM ##

Row cost Per No

= RM

###

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 19 / 31

Build-Up Rates Road Furnitures - Guardrails

ADD:

P& O

15%

= RM

###

Rate Per NO. Take

= RM RM

### ###

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 20 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised Terminal anchorage unit Type 2 Item b ii, page 30

A) MATERIAL

i)

Terminal anchorage unit Type 2 (supply price/No)

RM

380.00

ii)

Transportation(per No)

RM

5.00

iii) Material cost (per No) :

= RM

##

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00

Productivity Per Day Machinery Cost Per No

: : RM

80 250.00

NO / 80 = RM ##

C) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day Workmen Cost Per No

: : RM

80 255.00

NO / 80 = RM ##

Row cost Per No

= RM

##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 21 / 31

Build-Up Rates Road Furnitures - Guardrails

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 22 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised 90 degrees Twist Unit Type 3 Item b iii, page 30

A) MATERIAL

I)

Twist unit type 3 (supply price/No)

RM

550.00

ii)

Transportation(per No)

RM

5.00

iii) Material cost (per No) :

= RM

##

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00

Productivity Per Day Machinery Cost Per No

: : RM

9 250.00

NO / 9 = RM ##

C) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day Workmen Cost Per No

: : RM

9 255.00

NO / 9 = RM ##

Row cost Per No

= RM

##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 23 / 31

Build-Up Rates Road Furnitures - Guardrails

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 24 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised Terminal section 1:6 / Sloping End Type 4 Item b iv, page 30

A) Material

I)

Terminal Anchorage Type 4 (supply price/No)

RM

158.00

ii)

Transportation(per No)

RM

5.00

iii) Material cost (per No) :

= RM

##

B) Machinery.

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 250.00

Productivity Per Day Machinery Cost Per No

: : RM

14 250.00

NO / 14 = RM ##

C) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day Workmen Cost Per No

: : RM

14 255.00

NO / 14 = RM ##

Row cost Per No

= RM

##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 25 / 31

Build-Up Rates Road Furnitures - Guardrails

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 26 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and install galvanised guadrail post complete with packer Item c, page 30

A) MATERIAL

I)

Guardrail post (supply price / No)

RM

87.00

ii)

Transportation(per No)

RM

2.00

iii) Material cost (per No) :

= RM

##

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1 x 1 Day @ RM 150.00 Per day RM 150.00

ii)

Arrow Rammer : 1 x 1 Day @ RM 300.00 Per day RM 300.00

iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total RM RM 100.00 550.00

Productivity Per Day Machinery Cost Per No

: : RM

52 550.00

NO / 52 = RM ##

C) WORKMEN & MANPOWER

I)

Ganger : 1 x 1 Day @ RM 65.00 Per day RM 65.00

ii)

General Worker : 5 x 1 Day @ RM 38.00 Per day RM RM 190.00 255.00

Productivity Per Day

52

NO

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 27 / 31

Build-Up Rates Road Furnitures - Guardrails

Workmen Cost Per No

RM

255.00

52

= RM

##

Row cost Per No

= RM

##

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 28 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Item d, page 30

Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I)

Nose Yellow

= RM

##

ADD:

P& O

15%

RM

##

Rate Per NO. Take

RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 29 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work. Item e, page 30

A) MATERIAL

I)

Cartridge

= RM

##

ADD:

P& O

15%

= RM

##

Rate Per NO. Take

= RM RM

## ##

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 30 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections Supply and replace new beam panel. Item g, page 30

A) MATERIAL

I)

Cartridge

= RM

##

ADD:

P& O

15%

= RM

##

Rate Per NO.

= RM Take RM

## ##

Maintenance Of Guardrail And Crush Cushion