Route 11 Traffic & Toll Revenue Study

Preliminary Findings

Tom Maziarz, CT DOT presentation to Greenway Commission


SECCOG, June 19, 2013

Toll Revenue Study


Part of Financial Plan Financial plan requirement

Route 11
(existing)

to demonstrate ability to pay sources & amounts of funding timelines for funding availability

Toll Revenue Study

Route 11
Extension

Can tolling generate enough revenue to pay a meaningful portion of the cost?

Scope of Tolling Study:


wide range of tolling options broad geographic scope

Tolling Study
Consultant: expertise & experience in tolling studies Analysis based on: extensive data collection traffic modeling special survey of drivers special toll assessment methods Planning-Level Results: reasonable estimates of revenue investment-grade analysis is typically next step if planning study indicates good revenue potential Driver Survey Sites

Cost & Financing Assumptions:


Cost:
$1.4 Billion to construct

Financing:
Bond full amount (for comparative purposes)
Annual debt payment = $121 Million

Variety of tolling options evaluated


Toll collection methods:
Cash & electronic Electronic only

Toll rates
What is traveler willing to pay? What rate yields best revenue?

Back-office & administrative functions


How do you manage day-to-day collection, processing, & administration of system?

For planning purposes we used:


Lowest cost collection & back-office options
o all-electronic collection o private contractor services

Best rate for revenue


o about $0.20 per mile higher rate will trigger: more toll avoidance & lower revenue common rate on many new facilities o $1.00 or $2.00 flat rate at interchange

Route 2

What was geographic scope?


Toll collection locations:
Route 11 extension
Route 11 (existing)

Locations beyond 8.5 mile project o Existing Route 11 o Route 2 (alternative to Route 11) o Interchange of Rt 11, I-95, I-395

Why we explored broad geographic scope


Need to consider alternate routes & diversions
Route 11 extension Interchange

Understanding full range of revenue options & yields leads to better informed decisions

Toll Location Alternatives


1. Route 11: extension only
toll the 8-mile Route 11 extension only.

2. Route 11: extension + existing


toll all 16 miles of Route 11 (existing plus extension).

3. Route 11 (all) & Route 2


toll all 16 miles of Route 11 plus 13 miles of Route 2.

4. Routes 11 extension & I-95 interchange


toll Route 11 extension plus I-95/I-395 interchange.

5. I-95 interchange only


toll I-95/I-395/Route 11 interchange only
7

Fitchville Rd. Haughton Rd. Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354

Otrobando Ave. 395

Chestnut Hill Rd.

Scott Hill Rd.

Bozrah St.

Wawecus St.

Toll Location Alternatives:

Alternative 1

Route 11: Extension Only


East Haddam Rd.

Witch Meadow Rd.

Variations Tested:
Chesterfield Rd. Turner Rd.

toll rates: (per mile)


o o o o
Hartford Tpke.

Grassy Hill Rd.


161

395

$0.20 ** $0.15 $0.10 $0.05

Flanders Rd.

collection methods:
o electronic with cash option o electronic only** All Electronic Tolls (AET)

toll
95

395

** $0.20 & AET assumed for all


95

alternatives presented

Alternative 1 Route 11 Extension Only

Findings
Revenues:
$5.9 million annually (gross) Low revenue yield relative to Route 11 cost

Traffic:
Toll on Rt 11 extension discourages drivers from using Rt 11 extension 60-70% of drivers remain on Route 85

Alternative 1 Route 11 Extension Only


2011 current traffic Route 85 Route 11 Corridor total 15,000 0 15,000 2020 Build no toll 2,900 18,700 21,600 2020 Build with toll 11,900 7,700 19,600
Turner Rd. East Haddam Rd.

Tolling removes less traffic from Route 85. about 9,000 cars return to Rt 85
395 Hartford Tpke.

354

85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.

95

11
Lake Hayward Rd. 161

11 82

Mainline Toll Zone / Gantry

95

Conclusion: Not viable alternative


Does not remove sufficient traffic from Route 85 Very low revenue potential

10

Fitchville Rd. Haughton Rd.


Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354

Otrobando Ave. 395

Chestnut Hill Rd.

Scott Hill Rd.

Bozrah St.

Wawecus St.

Toll Location Alternatives:

Alternative 2

Route 11: Extension + Existing


East Haddam Rd.

Witch Meadow Rd.

same as Alt 1, but adds a toll to existing Rt 11

toll

Chesterfield Rd. Turner Rd. Grassy Hill Rd.


161

395

toll

Flanders Rd.

Hartford Tpke.

95

395

95

Alternative 2 Route 11: Extension plus Existing

Findings
Revenues:
$8.5 million annually (gross)
Low revenue yield relative to Route 11 cost

Traffic:
Problem: toll adds traffic to Route 85 (north of Rt 82)

12

Alternative 2 Route 11: extension plus existing


2011 current traffic Route 85 Route 11 Corridor total 2,400 9,700 12,100 2020 Build no toll 1,600 15,300 16,900 2020 Build with toll 8,600 5,300 13,900
395 Turner Rd. Hartford Tpke.

Tolling existing Rt 11 adds traffic to Route 85


(1,600 to 8,600)

354

95
Parum Rd. Dr Foote Rd.

85

85
11
Grassy Hill Rd. 161

11

Mainline Toll Zone / Gantry

82

95

Conclusion: Alt 2 is not a viable option given low revenues & local traffic impacts

Fitchville Rd. Haughton Rd.

Otrobando Ave. 395

Norwich Ave.
Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354

Chestnut Hill Rd.

Scott Hill Rd.

Bozrah St.

Wawecus St.

toll

Toll Location Alternatives:

Alternative 3

Route 11 (all) + Route 2


Witch Meadow Rd. East Haddam Rd.

same as Alt 2, but adds a toll to Route 2


Chesterfield Rd. Turner Rd.

toll

Grassy Hill Rd.


161

395

toll

Flanders Rd.

Hartford Tpke.

95

395

95

Alternative 3 Route 11 (all) plus Route 2

Findings
Revenues:
$28.0 million annually (gross)

moderate revenue yield relative to Route 11 cost

Traffic:
Problem: tolling diverts traffic from Route 2 to other roads

15

Alternative 3 - Toll Route 11 plus Route 2


2011 current traffic 2020 Build no toll 2020 Build with toll

Route 2

27,200

33,100

15,300

tolling Rt 2 diverts 18,100 drivers to other roads


(Rt 2 drops from 33,100 to 15,300)

Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd. Chestnut Hill Rd.

2
354

Haughton Rd.

Fitchville Rd.

32

32 11

New London Rd.

Scott Hill Rd.


Bozrah St. 395

Mainline Toll Zone / Gantry

16

Volume Diversion routes Diverted Norwich Av -Fitchville Rd 6,700

Where do the 18,100 cars go?

Route 82 Route 32 Other Local Roads I-395

4,500 3,600 2,000 1,300 18,100

Norwich Ave.
Parum Rd. Dr Foote Rd. Lake Hayward Rd. Chestnut Hill Rd.

2
354 Scott Hill Rd. Bozrah St.

Fitchville Rd.
32

11

32
New London Rd.

Route 82:
4-5 miles south

395

Conclusion: Despite revenue potential, Alt. 3 is not viable option.


17

Fitchville Rd. Haughton Rd. Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354

Otrobando Ave. 395

Chestnut Hill Rd.

Scott Hill Rd.

Bozrah St.

Wawecus St.

Toll Location Alternatives:

Alternative 4

Route 11 extension + Interchange


East Haddam Rd.

Witch Meadow Rd.

same as Alt 1, but adds toll to 95/395/11 interchange

Chesterfield Rd. Turner Rd. Grassy Hill Rd.


161

395

toll

Flanders Rd.

Hartford Tpke.

95

395

toll

95

Alternative 4 Route 11 Extension plus Interchange

Findings
Revenues:
$46 - $78 million annually (gross)
o o $46 million = $1.00 toll at interchange (plus $0.20/mile on Route 11 extension) $78 million = $2.00 toll at interchange (plus $0.20/mile on Route 11 extension)

High revenue yield relative to Route 11 cost

Note: Federal law currently prohibits adding tolls to an Interstate highway unless it is part of a
special pilot program. However, federal transportation act must be reauthorized in less than 2 years and restrictions might be changed.

Traffic:
Route 85: Results similar to Alt 1 (tolls on Rt 11 extension only). Placing a toll on Route 11 fails to remove the desired amount of traffic from Route 85. I-95 & I-395: Diversion from I-95 & I-395 (at $1.00 toll) is about 9% but further analysis required. 19

Alternative 4 Route 11 Extension plus Interchange


Route 85 & Route 11 volumes
2011 current traffic 2020 Build no toll 2020 Build with toll
Tolling Rt 11removes less traffic from Route 85. about 10,000 cars return to Route 85
395 Turner Rd. Hartford Tpke.

Route 85
Route 11 Corridor total

15,000 0 15,000

1,300 22,900 24,200

11,500 9,200 20,700


East Haddam Rd. Chesterfield Rd.

354

85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.

95

11
Lake Hayward Rd. 161 Flanders Rd.

11
82

Mainline Toll Zone / Gantry Ramp Toll Zone / Gantry

Toll on Rt 11 = $0.20/mile

Toll at interchange

95

= $1.00

20

Alternative 4 Route 11 Extension plus Interchange


I-95 & I-395 traffic volumes
2020 Build no toll 2020 Build with toll traffic diverted by toll

tolling interchange diverts about 9% of traffic from

I-95 & I-395

I-95 I-395

79,700 27,400

72,100 25,000

7,600 (10%) 2,400 (9%)

Corridor total

107,100

97,100

10,000 (9%)
Turner Rd. East Haddam Rd.

395 Hartford Tpke.

354

Chesterfield Rd.

85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.

95

11
Lake Hayward Rd. 161 Flanders Rd.

11
82

Mainline Toll Zone / Gantry Ramp Toll Zone / Gantry

Toll on Rt 11 = $0.20/mile

Toll at interchange

95

= $1.00

21

Alternative 4 Route 11 Extension plus Interchange

Conclusion: Not viable alternative


Good revenue potential But it does not remove sufficient traffic from Route 85
395
Turner Rd. Hartford Tpke.

354

East Haddam Rd.

Chesterfield Rd.

85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.

95

11
Lake Hayward Rd. Witch Meadow Rd. 161 Flanders Rd.

11 82

Toll on Rt 11 = $0.20/mile

Toll at interchange

95

= $1.00

Mainline Toll Zone / Gantry Ramp Toll Zone / Gantry

22

Fitchville Rd. Haughton Rd. Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354

Otrobando Ave. 395

Chestnut Hill Rd.

Scott Hill Rd.

Bozrah St.

Wawecus St.

Toll Location Alternatives:

Alternative 5

Interchange only
East Haddam Rd.

Witch Meadow Rd.

Add a toll to 95/395/11 interchange only

Chesterfield Rd. Turner Rd. Grassy Hill Rd.


161

395

Flanders Rd.

Hartford Tpke.

95

395

toll

95

Alternative 5 Interchange only

Findings
Revenues
$38 - $69 million annual gross (versus $46-$78M for Alt 4)
o o $38 million = $1.00 toll $69 million = $2.00 toll

high revenue yield relative to Route 11 cost

Note: Federal law currently prohibits adding tolls to an Interstate highway


unless it is part of a special pilot program. However, federal transportation act must be reauthorized in less than 2 years and restrictions might be changed.

Traffic:
Route 85: no impact from tolls I-95 & I-395: Diversion from I-95 & I-395 (at $1.00 toll) is about 15% but further analysis required. 24

Alternative 5 Interchange only


2020 Build no toll 2020 Build with toll traffic diverted by toll

I-95
I-395 Corridor total

79,700
27,400 107,100

68,200
23,000 91,200

11,500 (14%)
4,400 (16%) 15,900 (15%)

tolling interchange diverts about 15% of traffic from I-95 & I-395

395
Turner Rd. Hartford Tpke.

354

East Haddam Rd.

Chesterfield Rd.

85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.

95

11
Lake Hayward Rd. Witch Meadow Rd. 161 Flanders Rd.

11 82

Mainline Toll Zone / Gantry Ramp Toll Zone / Gantry

Toll at interchange

95

= $1.00

25

Alternative 5 Interchange only


Conclusion: Warrants further study.
Good revenue potential

Traffic impacts need further study.


o to identify which roads are impacted o to determine if we can to reduce diversions
Turner Rd. 395 Hartford Tpke.

354

East Haddam Rd.

Chesterfield Rd.

85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.

95

11
Lake Hayward Rd.
Witch Meadow Rd. 161 Flanders Rd.

11 82

Mainline Toll Zone / Gantry Ramp Toll Zone / Gantry

Toll at interchange

95

= $1.00

26

Financial Summary:

Preliminary Estimates of Gross Toll Revenues


(assumes all electronic tolling at $0.20/mile)

1 - Rt 11 Extension Only 2 - Rt 11: Extension + Existing 3 - Rt 11 (all) + Rt 2 4A - Rt 11 Ext.+ Interchange ($1.00) 4B - Rt 11 Ext. + Interchange ($2.00) 5A Interchange Only ($1.00) 5B Interchange Only ($2.00)
millions: $0
$8.5

$5.9 $8.5
$19.5 Route 11 Route 2 I-95 I-395

$28.0
$10.4

$6.0

$29.9

$46.3
$18.5

Annual Debt Service

$6.1

$54.0

$78.6

$121 (1)

$28.3

$9.5

$37.8
$18.0

$51.0

$69.0
$80 $100 $120

$20

$40

$60

(1)

$1.7 billion bond issue. Based on total 2020 estimated project cost & additional 30% for bond sales & capitalization of interest cost. Assumes 30-year bond term, 24-year earning period, & 5% interest rate.

Conclusions
1. Alternative 5 only potentially viable tolling option
If tolling is to be part of financial plan, Alt 5 (or some variation) is most viable

2. Alternative 5 needs further analysis


Traffic impacts: requires detailed assessment
o Where traffic is diverted to & why?
Are these long distance trips that will shift to Rt 9, Rt 44, Rt 6, ? Are these shorter trips that will shift to local roads?

o Can these diversions be avoided or managed?


Adjust toll rates & policies Highway exit & entrance location & design

Revenue estimate: update & revise revenue estimate as well


28

Next Steps
Continue with full Route 11 scope of work (all 3 tracks):
1. Environmental analysis 2. Design plans 3. Financial plan Financial plan:
Traditional funding sources
o o Federal & state Timelines for availability of funds

Additional tolling analysis for Alt 5 (or version of this)


o o o Detailed diversion analysis Revised revenue analysis Public engagement

Phasing options
29