Preliminary Findings
to demonstrate ability to pay sources & amounts of funding timelines for funding availability
Route 11
Extension
Can tolling generate enough revenue to pay a meaningful portion of the cost?
Tolling Study
Consultant: expertise & experience in tolling studies Analysis based on: extensive data collection traffic modeling special survey of drivers special toll assessment methods Planning-Level Results: reasonable estimates of revenue investment-grade analysis is typically next step if planning study indicates good revenue potential Driver Survey Sites
Financing:
Bond full amount (for comparative purposes)
Annual debt payment = $121 Million
Toll rates
What is traveler willing to pay? What rate yields best revenue?
Route 2
Locations beyond 8.5 mile project o Existing Route 11 o Route 2 (alternative to Route 11) o Interchange of Rt 11, I-95, I-395
Understanding full range of revenue options & yields leads to better informed decisions
Fitchville Rd. Haughton Rd. Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354
Bozrah St.
Wawecus St.
Alternative 1
Variations Tested:
Chesterfield Rd. Turner Rd.
395
Flanders Rd.
collection methods:
o electronic with cash option o electronic only** All Electronic Tolls (AET)
toll
95
395
alternatives presented
Findings
Revenues:
$5.9 million annually (gross) Low revenue yield relative to Route 11 cost
Traffic:
Toll on Rt 11 extension discourages drivers from using Rt 11 extension 60-70% of drivers remain on Route 85
Tolling removes less traffic from Route 85. about 9,000 cars return to Rt 85
395 Hartford Tpke.
354
85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.
95
11
Lake Hayward Rd. 161
11 82
95
10
Bozrah St.
Wawecus St.
Alternative 2
toll
395
toll
Flanders Rd.
Hartford Tpke.
95
395
95
Findings
Revenues:
$8.5 million annually (gross)
Low revenue yield relative to Route 11 cost
Traffic:
Problem: toll adds traffic to Route 85 (north of Rt 82)
12
354
95
Parum Rd. Dr Foote Rd.
85
85
11
Grassy Hill Rd. 161
11
82
95
Conclusion: Alt 2 is not a viable option given low revenues & local traffic impacts
Norwich Ave.
Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354
Bozrah St.
Wawecus St.
toll
Alternative 3
toll
395
toll
Flanders Rd.
Hartford Tpke.
95
395
95
Findings
Revenues:
$28.0 million annually (gross)
Traffic:
Problem: tolling diverts traffic from Route 2 to other roads
15
Route 2
27,200
33,100
15,300
Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd. Chestnut Hill Rd.
2
354
Haughton Rd.
Fitchville Rd.
32
32 11
16
Norwich Ave.
Parum Rd. Dr Foote Rd. Lake Hayward Rd. Chestnut Hill Rd.
2
354 Scott Hill Rd. Bozrah St.
Fitchville Rd.
32
11
32
New London Rd.
Route 82:
4-5 miles south
395
Fitchville Rd. Haughton Rd. Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354
Bozrah St.
Wawecus St.
Alternative 4
395
toll
Flanders Rd.
Hartford Tpke.
95
395
toll
95
Findings
Revenues:
$46 - $78 million annually (gross)
o o $46 million = $1.00 toll at interchange (plus $0.20/mile on Route 11 extension) $78 million = $2.00 toll at interchange (plus $0.20/mile on Route 11 extension)
Note: Federal law currently prohibits adding tolls to an Interstate highway unless it is part of a
special pilot program. However, federal transportation act must be reauthorized in less than 2 years and restrictions might be changed.
Traffic:
Route 85: Results similar to Alt 1 (tolls on Rt 11 extension only). Placing a toll on Route 11 fails to remove the desired amount of traffic from Route 85. I-95 & I-395: Diversion from I-95 & I-395 (at $1.00 toll) is about 9% but further analysis required. 19
Route 85
Route 11 Corridor total
15,000 0 15,000
354
85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.
95
11
Lake Hayward Rd. 161 Flanders Rd.
11
82
Toll on Rt 11 = $0.20/mile
Toll at interchange
95
= $1.00
20
I-95 I-395
79,700 27,400
72,100 25,000
Corridor total
107,100
97,100
10,000 (9%)
Turner Rd. East Haddam Rd.
354
Chesterfield Rd.
85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.
95
11
Lake Hayward Rd. 161 Flanders Rd.
11
82
Toll on Rt 11 = $0.20/mile
Toll at interchange
95
= $1.00
21
354
Chesterfield Rd.
85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.
95
11
Lake Hayward Rd. Witch Meadow Rd. 161 Flanders Rd.
11 82
Toll on Rt 11 = $0.20/mile
Toll at interchange
95
= $1.00
22
Fitchville Rd. Haughton Rd. Norwich Ave. Parum Rd. Dr Foote Rd. Lake Hayward Rd.
354
Bozrah St.
Wawecus St.
Alternative 5
Interchange only
East Haddam Rd.
395
Flanders Rd.
Hartford Tpke.
95
395
toll
95
Findings
Revenues
$38 - $69 million annual gross (versus $46-$78M for Alt 4)
o o $38 million = $1.00 toll $69 million = $2.00 toll
Traffic:
Route 85: no impact from tolls I-95 & I-395: Diversion from I-95 & I-395 (at $1.00 toll) is about 15% but further analysis required. 24
I-95
I-395 Corridor total
79,700
27,400 107,100
68,200
23,000 91,200
11,500 (14%)
4,400 (16%) 15,900 (15%)
tolling interchange diverts about 15% of traffic from I-95 & I-395
395
Turner Rd. Hartford Tpke.
354
Chesterfield Rd.
85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.
95
11
Lake Hayward Rd. Witch Meadow Rd. 161 Flanders Rd.
11 82
Toll at interchange
95
= $1.00
25
354
Chesterfield Rd.
85
Parum Rd. Dr Foote Rd. Grassy Hill Rd.
95
11
Lake Hayward Rd.
Witch Meadow Rd. 161 Flanders Rd.
11 82
Toll at interchange
95
= $1.00
26
Financial Summary:
1 - Rt 11 Extension Only 2 - Rt 11: Extension + Existing 3 - Rt 11 (all) + Rt 2 4A - Rt 11 Ext.+ Interchange ($1.00) 4B - Rt 11 Ext. + Interchange ($2.00) 5A Interchange Only ($1.00) 5B Interchange Only ($2.00)
millions: $0
$8.5
$5.9 $8.5
$19.5 Route 11 Route 2 I-95 I-395
$28.0
$10.4
$6.0
$29.9
$46.3
$18.5
$6.1
$54.0
$78.6
$121 (1)
$28.3
$9.5
$37.8
$18.0
$51.0
$69.0
$80 $100 $120
$20
$40
$60
(1)
$1.7 billion bond issue. Based on total 2020 estimated project cost & additional 30% for bond sales & capitalization of interest cost. Assumes 30-year bond term, 24-year earning period, & 5% interest rate.
Conclusions
1. Alternative 5 only potentially viable tolling option
If tolling is to be part of financial plan, Alt 5 (or some variation) is most viable
Next Steps
Continue with full Route 11 scope of work (all 3 tracks):
1. Environmental analysis 2. Design plans 3. Financial plan Financial plan:
Traditional funding sources
o o Federal & state Timelines for availability of funds
Phasing options
29