Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.

740 Padra to Vadodara Section of Vadodara


Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I)
Appendix B-I (A) of Schedule-B: Typical Cross-sections
As per Concession Agreement As per Site Execution
S. No. Remarks
Chainage Length TCS Type S. No. Design Chainage Length TCS Type
(Km) (Km)
1 355+000 355+050 0.050 2 1 355+000 355+025 0.025 2

2 355+050 355+700 0.650 1 2 355+025 355+680 0.655 1

3 355+700 355+825 0.125 3 3 355+680 355+805 0.125 3

4 355+825 360+340 4.515 1 4 355+805 360+330 4.525 1

5 360+340 361+800 1.460 4/Structure 5 360+330 361+790 1.460 4/Structure

6 361+800 363+515 1.715 1 6 361+790 363+480 1.690 1

7 363+515 364+150 0.635 4/Structure 7 363+480 364+100 0.620 4/Structure

8 364+150 365+000 0.850 1 8 364+100 364+990 0.890 1

9 365+000 365+250 0.250 2 9 364+990 365+270 0.280 2

10 365+250 367+690 2.440 1 10 365+270 367+670 2.400 1

11 367+690 368+300 0.610 4/Structure 11 367+670 368+290 0.620 4/Structure

12 368+300 374+100 5.800 1 12 368+290 374+150 5.860 1

13 374+100 374+350 0.250 2 13 374+150 374+350 0.200 2

14 374+350 375+550 1.200 1 14 374+350 375+630 1.280 1

15 375+550 375+750 0.200 3


15 375+630 376+760 1.130 Toll
16 375+750 376+780 1.030 Toll

17 376+780 378+740 1.960 1 16 376+760 378+740 1.980 1


Total 23.740 Total 23.740
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai
Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I)
Appendix B-I (B) of Schedule-B: Typical Cross-sections (LOOP/RAMP)
As per Concession Agreement As per Site
Lane
Interchange No
Lane Con- TCS Ramp Con-
& Chainage Ramp No. Description Description TCS TYPE
figuration TYPE No. figuratio
(on VME in Km)
n

I12EML From Mumbai (VME) To Ahmedabad (NH-8) 3 TCS 8 I12EML From Mumbai (VME) To Ahmedabad (NH-8) 3 TCS 8

I12EMR From Mumbai (VME) To Vadodara (NH-8) 2 TCS 7 I12EMR From Mumbai (VME) To Vadodara (NH-8) 2 TCS 7
Int. 12 (374+355)
From Ahmedabad From Ahmedabad
I12HLM 3 TCS 8 I12HLM 3 TCS 8
(NH-8) To Mumbai (VME) (NH-8) To Mumbai (VME)

From Vadodara (NH-8) to From Vadodara (NH-8) to


I12HRM 2 TCS 7 I12HRM 2 TCS 7
Mumbai (VME) Mumbai (VME)

I13EML From Mumbai (VME) To Ahmedabad (AVE) 3 TCS 8 I13EML From Mumbai (VME) To Ahmedabad (AVE) 3 TCS 8

I13EMR From Mumbai (VME) To Vadodara (AVE) 3 TCS 8 I13EMR From Mumbai (VME) To Vadodara (AVE) 3 TCS 8
Int. 13 (378+740)
I13HLM From Ahmedabad(AVE) To Mumbai (VME) 3 TCS 8 I13HLM From Ahmedabad(AVE) To Mumbai (VME) 3 TCS 8

I13HRM From Vadodara (AVE) To Mumbai (VME) 2 TCS 7 I13HRM From Vadodara (AVE) To Mumbai (VME) 2 TCS 7
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Ex
under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I)
Appendix B-III (A) of Schedule-B: DETAILS OF CONNECTING ROADS
As per Concession Agreement As per Site
Stretches(Km) Length Width Stretches(Km) Length Width
Sl. No.
From To (in Km) (in Meter) From To (in Km) (in Meter)
A. Connecting Roads - Main Expressway
Left side Connecting Road (Main Expressway)

1 355700 355825 0.125 5.50 355700 355825 0.125 5.50

2 375550 375750 0.200 5.50 375550 375750 0.200 5.50


Right side Connecting Road (Main Expressway)
1 355000 355050 0.050 5.50 355000 355050 0.050 5.50
2 365000 365250 0.250 5.50 365000 365250 0.250 5.50
3 374100 374350 0.250 5.50 374100 374350 0.250 5.50
B. Connecting Roads - Interchange location
Left side Connecting Road - Interchange Area (Main Expressway)

1 0 700 0.700 5.50 0 700 0.700 5.50


Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in
the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I)

Appendix B-IV of Schedule-B: Details of Proposed ROW


As per Concession Agreement As per Site
Sl. Stretches Length ROW Width Stretches Length ROW Width
Remarks Sl. No. Remarks
No. From (Km) To (Km) (in Km) (in m) From (Km) To (Km) (in Km) (in m)
Main Expressway Main Expressway

1 355+000 355+600 1.200 100 -- 1 355+000 355+600 1.200 100 --

2 355+600 356+900 1.300 120 -- 2 355+600 356+900 1.300 120 --

3 356+900 373+670 16.770 100 -- 3 356+900 373+670 16.770 100 --

As per
4 373+670 374+930 1.260 As per Design Interchange Area 4 373+670 374+930 1.260 Interchange Area
Design

5 374+930 375+560 0.630 100 -- 5 374+930 375+560 0.630 100 --

As per
6 375+560 376+870 1.310 As per Design Toll Plaza Area 6 375+560 376+870 1.310 Toll Plaza Area
Design

7 376+870 378+000 1.130 100 -- 7 376+870 378+000 1.130 100 --

As per
8 378+000 378+740 0.740 As per Design Interchange Area 8 378+000 378+740 0.740 Interchange Area
Design
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase
IA-Package-I)

Appendix B-V MAJOR INTERSECTIONS (INTERCHANGES)


As per Concession Agreement As per Site
Sl. No. Location Connecting Type of Location Connecting Type of Status of Works Remarks
(km) Road Interchange Type Design (km) Road Interchange Type Design
Main Expressway

Ramp-1 From Express way to


Embankment completed for
Ahmedabad Via NH 48 ( Exit Ramp)
hinderance free area (Length - 1108 Rmt.)

VUP completed, Canopy erected and Ramp-2 From Vadodara to Mumbai


Partial Partial Earthwork for hinderance free area in Via Expressway (NE-4) ( Entry Ramp)
1 374+355 NH 8 Type Design as given in Layout 04 374+332 NH-48 as per Design progress (Length-790 Rmt)
Cloverleaf Cloverleaf

PQC & Earthwork completed in Loop-1 From Express way to Vadodara


hinderance free area, canopy erection Via NH 48 ( Exit Ramp)(Length-1466
completed Rmt)
PQC & Earthwork completed in Loop-2 From Ahmedabaf to Mumbai
hinderance free area, canopy erection Via Expressway (NE-4) ( Entry Ramp)
completed (Length-870 Rmt)
Ramp-1 From Express way to
Subgrade top completed. GSB in
Ahmedabad Via NE-1 ( Exit Ramp)
progress (Length - 880 Rmt.)
2 378+740 NE 1 Trumpet Type Design as given in Layout 05 378+740 NE 1 Directional Ramp as per Design
Ramp-2 From Vadodara (NE-1) to
Subgrade top completed. GSB in
Mumbai Via Expressway (NE-4)
progress ( Entry Ramp)(Length-1040 Rmt)
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP
Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I)
(A) Stretches for provision of Reinforced Earth Wall
As per Concession Agreement As per Site
Chainage (Km) Total Length Chainage (Km) Total Length Status of
Sl. No. Remarks Sl. No. Remarks
From To (m) From To (m) Works
1 360+340 360+413 2x 73=146 Both Sides 1 360+334 360+406 2x72=144 Completed Both Sides
2 361+615 361+800 2x 185=370 Both Sides 2 361+609 361+792 2x183=366 Completed Both Sides
3 363+515 363+765 2x250=500 Both Sides 3 363+489 363+704 215 Completed LHS
4 363+489 363+765 276 Completed RHS
4 363+935 364+150 2x 215=430 Both Sides 5 363+892 364+106 2x214=428 Completed Both Sides
5 367+690 367+982 2x294=584 Both Sides 6 367+678 367+928 250 Completed LHS
7 367+678 368+009 331 Completed RHS
6 368+047 368+300 2x253=506 Both Sides 8 367+995 368+290 295 Completed LHS
9 368+081 368+290 209 Completed RHS

Page 6 of 10
(B) Stretches for provision of Retaining Wall As per Site
Chainage (Km) Chainage (Km) Total Length Status of
Sl. No. Length (m) Remarks Sl. No. Remarks
From To From To (m) Works
1 371+700 371+825 125 Left side 1 371570 371670 100 Completed Left Side
2 371850 371875 25 Completed Left Side
(C) Stretches for Provision of Toe Wall As per Site
Chainage (Km) Chainage (Km) Total Length Status of
Sl. No. Length(m) Remarks Sl. No. Remarks
From To From To (m) Works
1 355+000 355+050 50 Right Side 1 355000 355030 30 Completed Left Side
2 365+000 365+290 290 Right Side 2 359390 359410 20 Completed Right Side
3 370+455 370+525 70 Right Side 3 360310 360330 20 Completed Left Side
4 371+170 371+295 125 Left Side 4 364980 365150 170 Completed Right Side
5 371+295 371+350 55 Right Side 5 366550 366590 40 Completed Right Side
6 371+855 372+000 145 Left Side 6 367020 367060 40 Completed Right Side
7 371+900 372+030 130 Right Side 7 368480 368500 20 Completed Left Side
8 372+060 372+225 165 Right Side 8 369480 369520 40 Completed Left Side
9 372+795 373+065 270 Left Side 9 369590 369620 30 Completed Right Side
10 372+900 373+045 145 Right Side 10 369660 369710 50 Completed Left Side
11 373+115 373+260 145 Left Side 11 369840 369860 20 Completed Right Side
12 373+325 373+495 170 Left Side 12 369880 369900 20 Completed Right Side
13 373+700 373+865 165 Right Side 13 369894 369960 66 Completed Left Side
Total Length in Lm 1925 14 370110 370130 20 Completed Left Side
15 370170 370210 40 Completed Left Side
16 370370 370400 30 Completed Right Side
17 370440 370510 70 Completed Right Side
18 370480 370500 20 Completed Left Side
19 370590 370610 20 Completed Right Side
20 371160 371210 50 Completed Left Side
21 371220 371230 10 Completed Right Side
22 371230 371270 40 Completed Left Side
23 371243 371263 20 Completed Right Side
24 371280 371320 40 Completed Right Side
25 371400 371410 10 Completed Right Side
26 371410 371431 21 Completed Left Side
27 371414 371420 6 Completed Right Side
28 371435 371470 35 Completed Left Side
29 371500 371520 20 Completed Left Side
30 371875 371955 80 Completed Left Side
31 371900 371980 80 Completed Right Side
32 372045 372070 25 Completed Left Side
33 372063 372280 217 Completed Right Side
34 372760 372920 160 Completed Left Side
35 372933.5 373030 96.5 Completed Left Side
36 372990 373010 20 Completed Right Side
37 373140 373200 60 Completed Left Side
38 373350 373399 49 Completed Left Side
39 373430 373488 58 Completed Right Side
40 376530 376580 50 Completed Left Side
41 376880 376890 10 Completed Right Side
42 377080 377150 70 Completed Right Side
43 377170 377454 284 Completed Right Side
44 377460 377496 36 Completed Right Side
45 377620 377640 20 Completed Left Side
46 377644 377650 6 Completed Left Side
47 377660 377670 10 Completed Right Side
48 377674 377700 26 Completed Right Side
Total Length in Lm 2376

Page 7 of 10
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in
Annuity Mode (Phase IA-Package-I)

(A) Stretches for special protection in ravine area

As per Concession Agreement As per Site

Chainage (Km) Stretches


Length Length
Sl. No. Sl. No. Completed
(in Km) (in m)
From To From (Km) To (Km)

1 365+400 378+700 13300 1 365+400 378+740 10871 8521


Construction of Eight lane Vadodara Kim Expressway from km
355.00 to km 378.740 Padra to Vadodara Section of Vadodara
Mumbai Expressway in the State of Gujarat under NHDP Phase-VI
on Hybrid Annuity Mode (Phase IA-Package-I)

(A) Stretches for protection in ravine area


Chainage
Side Length (M)
From To
365400 365702 LHS 302
365707 365903 LHS 196
366016 366517 LHS 501
366522 366857 LHS 335
366862 366968 LHS 106
367025 367190 LHS 165
367249 367565 LHS 316
367616 367678 LHS 62
368290 368493 LHS 203
368496 368559 LHS 63
368566 368899 LHS 333
368906 368979 LHS 73
368982 369129 LHS 147
369180 369468 LHS 288
369471 369881 LHS 410
369884 369977 LHS 93
370047 370350 LHS 303
370660 371057 LHS 397
371060 371224 LHS 164
371231 371418 LHS 187
372170 372213 LHS 43
372216 372371 LHS 155
372378 372658 LHS 280
372661 372921 LHS 260
372924 373080 LHS 156
373190 373360 LHS 170
374640 375149 LHS 509
375152 375277 LHS 125
375280 375534 LHS 254
375593 375643 LHS 50
375648 376048 LHS 400
376051 376531 LHS 480
376536 376710 LHS 174
377000 377177 LHS 177
377182 377382 LHS 200
377387 377458 LHS 71
377522 377545 LHS 23
377550 377643 LHS 93
377646 377860 LHS 214
377990 378120 LHS 130

365400 365702 RHS 302


365707 365903 RHS 196
366016 366517 RHS 501
366522 366857 RHS 335
366862 366968 RHS 106
367034 367171 RHS 137
367230 367565 RHS 335
367616 367678 RHS 62
368290 368493 RHS 203
368496 368559 RHS 63
368566 368899 RHS 333
368906 368979 RHS 73
368982 369080 RHS 98
369120 369468 RHS 348
369471 369881 RHS 410
369884 369977 RHS 93
370031 370400 RHS 369
370660 371057 RHS 397
371060 371224 RHS 164
372200 372213 RHS 13
372216 372371 RHS 155
372378 372658 RHS 280
372661 372921 RHS 260
372924 373080 RHS 156
373190 373370 RHS 180
374640 375149 RHS 509
375152 375277 RHS 125
375280 375546 RHS 266
375605 375643 RHS 38
375648 376048 RHS 400
376051 376531 RHS 480
376536 376710 RHS 174
377000 377177 RHS 177
377182 377382 RHS 200
377387 377496 RHS 109
377550 377643 RHS 93
377646 377810 RHS 164
377990 378120 RHS 130
Total completed 8521