I12EML From Mumbai (VME) To Ahmedabad (NH-8) 3 TCS 8 I12EML From Mumbai (VME) To Ahmedabad (NH-8) 3 TCS 8
I12EMR From Mumbai (VME) To Vadodara (NH-8) 2 TCS 7 I12EMR From Mumbai (VME) To Vadodara (NH-8) 2 TCS 7
Int. 12 (374+355)
From Ahmedabad From Ahmedabad
I12HLM 3 TCS 8 I12HLM 3 TCS 8
(NH-8) To Mumbai (VME) (NH-8) To Mumbai (VME)
I13EML From Mumbai (VME) To Ahmedabad (AVE) 3 TCS 8 I13EML From Mumbai (VME) To Ahmedabad (AVE) 3 TCS 8
I13EMR From Mumbai (VME) To Vadodara (AVE) 3 TCS 8 I13EMR From Mumbai (VME) To Vadodara (AVE) 3 TCS 8
Int. 13 (378+740)
I13HLM From Ahmedabad(AVE) To Mumbai (VME) 3 TCS 8 I13HLM From Ahmedabad(AVE) To Mumbai (VME) 3 TCS 8
I13HRM From Vadodara (AVE) To Mumbai (VME) 2 TCS 7 I13HRM From Vadodara (AVE) To Mumbai (VME) 2 TCS 7
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Ex
under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I)
Appendix B-III (A) of Schedule-B: DETAILS OF CONNECTING ROADS
As per Concession Agreement As per Site
Stretches(Km) Length Width Stretches(Km) Length Width
Sl. No.
From To (in Km) (in Meter) From To (in Km) (in Meter)
A. Connecting Roads - Main Expressway
Left side Connecting Road (Main Expressway)
As per
4 373+670 374+930 1.260 As per Design Interchange Area 4 373+670 374+930 1.260 Interchange Area
Design
As per
6 375+560 376+870 1.310 As per Design Toll Plaza Area 6 375+560 376+870 1.310 Toll Plaza Area
Design
As per
8 378+000 378+740 0.740 As per Design Interchange Area 8 378+000 378+740 0.740 Interchange Area
Design
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase
IA-Package-I)
Page 6 of 10
(B) Stretches for provision of Retaining Wall As per Site
Chainage (Km) Chainage (Km) Total Length Status of
Sl. No. Length (m) Remarks Sl. No. Remarks
From To From To (m) Works
1 371+700 371+825 125 Left side 1 371570 371670 100 Completed Left Side
2 371850 371875 25 Completed Left Side
(C) Stretches for Provision of Toe Wall As per Site
Chainage (Km) Chainage (Km) Total Length Status of
Sl. No. Length(m) Remarks Sl. No. Remarks
From To From To (m) Works
1 355+000 355+050 50 Right Side 1 355000 355030 30 Completed Left Side
2 365+000 365+290 290 Right Side 2 359390 359410 20 Completed Right Side
3 370+455 370+525 70 Right Side 3 360310 360330 20 Completed Left Side
4 371+170 371+295 125 Left Side 4 364980 365150 170 Completed Right Side
5 371+295 371+350 55 Right Side 5 366550 366590 40 Completed Right Side
6 371+855 372+000 145 Left Side 6 367020 367060 40 Completed Right Side
7 371+900 372+030 130 Right Side 7 368480 368500 20 Completed Left Side
8 372+060 372+225 165 Right Side 8 369480 369520 40 Completed Left Side
9 372+795 373+065 270 Left Side 9 369590 369620 30 Completed Right Side
10 372+900 373+045 145 Right Side 10 369660 369710 50 Completed Left Side
11 373+115 373+260 145 Left Side 11 369840 369860 20 Completed Right Side
12 373+325 373+495 170 Left Side 12 369880 369900 20 Completed Right Side
13 373+700 373+865 165 Right Side 13 369894 369960 66 Completed Left Side
Total Length in Lm 1925 14 370110 370130 20 Completed Left Side
15 370170 370210 40 Completed Left Side
16 370370 370400 30 Completed Right Side
17 370440 370510 70 Completed Right Side
18 370480 370500 20 Completed Left Side
19 370590 370610 20 Completed Right Side
20 371160 371210 50 Completed Left Side
21 371220 371230 10 Completed Right Side
22 371230 371270 40 Completed Left Side
23 371243 371263 20 Completed Right Side
24 371280 371320 40 Completed Right Side
25 371400 371410 10 Completed Right Side
26 371410 371431 21 Completed Left Side
27 371414 371420 6 Completed Right Side
28 371435 371470 35 Completed Left Side
29 371500 371520 20 Completed Left Side
30 371875 371955 80 Completed Left Side
31 371900 371980 80 Completed Right Side
32 372045 372070 25 Completed Left Side
33 372063 372280 217 Completed Right Side
34 372760 372920 160 Completed Left Side
35 372933.5 373030 96.5 Completed Left Side
36 372990 373010 20 Completed Right Side
37 373140 373200 60 Completed Left Side
38 373350 373399 49 Completed Left Side
39 373430 373488 58 Completed Right Side
40 376530 376580 50 Completed Left Side
41 376880 376890 10 Completed Right Side
42 377080 377150 70 Completed Right Side
43 377170 377454 284 Completed Right Side
44 377460 377496 36 Completed Right Side
45 377620 377640 20 Completed Left Side
46 377644 377650 6 Completed Left Side
47 377660 377670 10 Completed Right Side
48 377674 377700 26 Completed Right Side
Total Length in Lm 2376
Page 7 of 10
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in
Annuity Mode (Phase IA-Package-I)