Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.

740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid
Annuity Mode (Phase IA-Package-I) Format – S/1
Progress Check list of Misc. Works on New Major Bridges
Drainage RCC Crash Barrier Pitching Apron and Toe Walls Approach Slabs
Sr. No Chainage Side Restoration of Weep On Approach Side Hand Rails Utility Duct Bridge Wearing Expn. Joints Load Testing Rebound USPV Testing
Waterway Holes Spouts and Numbering Courses Hammer Testing
Down Pipes On Deck Mumbai Delhi Mumbai Delhi
Mumbai Delhi

360+220 LHS N/A C N N N N N/A N N N/A N/A N N N N/A N/A C C

360+220 RHS N/A C N N N N N/A N N N/A N/A N N N N/A N/A C C

362+350 LHS C N/A C C C C N/A C N N/A N/A C C C C C N N

362+350 RHS C N/A C C C C N/A C N N/A N/A C C C C C N N

365+976 LHS C N/A N C C C N/A C N N N C C C N C C C

365+976 RHS C N/A N C C C N/A C N N N C C C N C C C

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity
Mode (Phase IA-Package-I) Format – S/2
Progress Check list of Misc. Works on New Minor Bridges
Drainage RCC Crash Barrier Pitching Apron and Toe Walls Approach Slabs Rebound
Sl No Chainage Side Restoration of Weep Holes Spouts and On Approach Side Hand Rails Utility Bridge Wearing Expn. Joints Load Testing Hammer USPV Testing
Waterway Down Pipes On Deck Duct Numbering Mumbai Delhi Mumbai Delhi Courses Testing
Mumbai Delhi
359+810 LHS N/A N/A N C N C N/A C N N/A N/A C C N N N C C
1
359+810 RHS N/A N/A N C N N N/A C N N/A N/A N N N N N C C

364+650 LHS N/A N/A N C C N N/A C N N/A N/A C C C N N N N


2
364+650 RHS N/A N/A N C C C N/A C N N/A N/A C C C C N N N

367+220 LHS N/A C N C C C N/A C N N N C C C N/A N/A N N


3
367+220 RHS N/A C N C C C N/A C N N N C C C N/A N/A N N

370+580 LHS C C N/A C N/A N/A N/A C N C C C C N/A N/A N/A N N


4
370+580 RHS C C N/A C N/A N/A N/A C N C C C C N/A N/A N/A N N

372+028 LHS C N/A N N N/A N/A N/A N N N N N N N N N N N


5
372+028 RHS C N/A N N N/A N/A N/A N N N N N N N N N N N

373+905 LHS N/A N/A N N N N N/A N N N/A N/A N N N N N N N


6
373+905 RHS N/A N/A N N N N N/A N N N/A N/A N N N N N N N

376+867 LHS C N/A N C N/A N/A N/A C N N/A N/A C C N N N N N


7
376+867 RHS C N/A N C N/A N/A N/A C N N N N N N N N N N

377+920 LHS N C N/A N N/A N/A N/A N N N N N N N/A N/A N/A N N


8
377+920 RHS N C N/A N N/A N/A N/A N N N N N N N/A N/A N/A N N

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-
Package-I) Format – S/3

Progress Check list of Misc. Works on the Old but Widened Major and Minor Bridges
Drainage RCC Crash Barrier Approach Slabs Joint Filler between Cr. Br. Old Bridge Report on
Restoration of Bridge Pitching Apron Wearing
Sl No Chainage Side Waterway Weep Holes Spouts and On Approach Side Hand Rails Painting Utility Duct Numbering and Toe Walls Courses Expn. Joints Load Testing Structural Adequacy (as
Down Pipes On Deck Porbandar Dwarka Porbandar Dwarka per IRC:35)
Porbandar Dwarka

4 N/A
5

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity
Mode (Phase IA-Package-I) Format – S/4
Progress Check list of Misc. Works on VUPs and PUPs
Drainage RCC Crash Barrier Approach Slabs Expn. Joints Rebound
Bridge Wearing Crossroad Underside
Sl No Chainage Side Weep Holes Spouts and On Approach Side Hand Rails Utility Duct Numbering Courses Load Testing Hammer USPV Testing Works Lighting
Down Pipes On Deck Mumbai Delhi Mumbai Delhi Testing
Mumbai Delhi

(A) VUPs and LVUPs


355+820 LHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
1
355+820 RHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
358+975 LHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
2
358+975 RHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
363+273 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
3
363+273 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
369+130 LHS C N/A C C N N/A C N C C C N/A N/A N/A N N N N
4
369+130 RHS C N/A C C N N/A C N C C C N/A N/A N/A N N N N
370+024 LHS C N/A C N C N/A N N C C C N/A N/A N/A N N N N
5
370+024 RHS C N/A C N C N/A C N C C C N/A N/A N/A N N N N
375+588 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
6
375+588 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
377+374 LHS C N/A N N N N/A N N C C C N/A N/A N/A N N N N
7
377+374 RHS C N/A N N N N/A N N C C C N/A N/A N/A N N N N

(B) PUPs
357+326 LHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
1
357+326 RHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
357+975 LHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
2
357+975 RHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
358+348 LHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
3
358+348 RHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
359+397 LHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
4
359+397 RHS C N/A C C C N/A C N C C C N/A N/A N/A C C N N
359+868 LHS C N/A N N N N/A N N C C C N/A N/A N/A C C N N
5
359+868 RHS C N/A N N N N/A N N C C C N/A N/A N/A C C N N
362+160 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
6
362+160 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
362+682 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
7
362+682 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
362+274 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
8
362+274 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
365+165 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
9
365+165 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
367+015 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
10
367+015 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
367+590 LHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N
11
367+590 RHS C N/A C C C N/A C N C C C N/A N/A N/A N N N N

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat
under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I) Format – S/5
Progress Check List of Slab Culverts

Structure Works with 300thk Pitching on 150thk Vertical 20thk Mastic Filter Parapet Wall
Restoration of Filter & Toe Wall 10mm Expn.
Sl No Chainage Side Return and Retaining Waterway Weep holes Parapet Walls Board between Old and Painting Numbering Gap on Top
Walls New SC
Mumbai Delhi

N/A

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State
of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I) Format – S/6
Progress Check List of Box Culverts

Return Wall 300thk Quadrant Pitching 150 Thk Rigid Flat Stone 750thk Dry Stone
Sl No Chainage Side Box Laying Restoration of Weep hole over 150thk Filter Curtain Wall Embedded in 300 Thk Flexible Outer
Waterway M 15 Conc. Apron
Mumbai Delhi Mumbai Delhi
355+670 LHS C C C C C N/A N/A N/A N/A N/A
1
355+670 RHS C C C C C N/A N/A N/A N/A N/A
355+905 LHS C C C C C N/A N/A N/A C C
2
355+905 RHS C C C C C N/A N/A N/A C C
356+400 LHS C C C C C N/A N/A N/A N/A N/A
3
356+400 RHS C C C C C N/A N/A N/A N/A N/A
357+350 LHS C C C C C N/A N/A N/A C C
4
357+350 RHS C C C C C N/A N/A N/A C C
358+148 LHS C C C C C N/A N/A C C C
5
358+148 RHS C C C C C N/A N/A C C C
358+358 LHS C C C C C N/A N/A N/A C C
6
358+358 RHS C C C C C N/A N/A N/A C C
359+475 LHS C C C C C N/A N/A N/A C C
7
359+475 RHS C C C C C N/A N/A N/A C C
362+562 LHS C C C C C N/A N/A N/A N/A N/A
8
362+562 RHS C C C C C N/A N/A N/A N/A N/A
363+292 LHS C C C C C N/A N/A N/A N/A N/A
9
363+292 RHS C C C C C N/A N/A N/A N/A N/A
365+100 LHS C C C C C N/A N/A N/A N/A N/A
10
365+100 RHS C C C C C N/A N/A N/A N/A N/A
365+654 LHS C C C C C N/A N/A C C C
11
365+654 RHS C C C C C N/A N/A C C C
366+545 LHS C C C C C N/A N/A C C C
12
366+545 RHS C C C C C N/A N/A C C C
366+890 LHS C C C C C N/A N/A C C C
13
366+890 RHS C C C C C N/A N/A C C C
368+476 LHS C C C C C N/A N/A C C C
14
368+476 RHS C C C C C N/A N/A C C C
368+615 LHS C C C C C N/A N/A C C C
15
368+615 RHS C C C C C N/A N/A C C C
368+861 LHS C C C C C N/A N/A C C C
16
368+861 RHS C C C C C N/A N/A C C C
369+009 LHS C N C C C N N C N N
17
369+009 RHS C N C C C N N C N N
369+586 LHS C C C C C N/A N/A C C C
18
369+586 RHS C C C C C N/A N/A C C C
369+876 LHS C C C C C N/A N/A C C C
19
369+876 RHS C C C C C N/A N/A C C C
370+014 LHS
20 Considered under RIS
370+014 RHS
371+008 LHS C C C C C N/A N/A C N/A C
21
371+008 RHS C C C C C N/A N/A C N/A C
371+258 LHS C C C C C N/A N/A C C C
22
371+258 RHS C C C C C N/A N/A C C C
371+389 LHS C N C C C N N N N N
23
371+389 RHS C N C C C N N N N N
372+203 LHS C C C C C N/A N/A C N/A C
24
372+203 RHS C C C C C N/A N/A C N/A C
372+355 LHS C C C C C N/A N/A C N/A C
25
372+355 RHS C C C C C N/A N/A C N/A C
372+680 LHS C C C C C N/A N/A C C C
26
372+680 RHS C C C C C N/A N/A C C C
372+950 LHS C N C C C N/A N/A N N N
27
372+950 RHS C C C C C N/A N/A C C C
373+450 LHS C N C C C N/A N/A N N N
28

Page 1 of 9
300thk Quadrant Pitching 150 Thk Rigid Flat Stone 750thk Dry Stone
Restoration of Return Wall over 150thk Filter
Sl No Chainage Side Box Laying Waterway Weep hole Curtain Wall Embedded in 300 Thk Flexible Outer
Mumbai Delhi Mumbai Delhi M 15 Conc. Apron
28
373+450 RHS C N C C C N/A N/A N N N
374+628 LHS C C C C C N/A N/A C N/A C
29
374+628 RHS C C C C C N/A N/A C C C
Ramp 2 (0+460) LHS C N C C C N/A N/A N N/A N
30
Ramp 2 (0+460) RHS C N C C C N/A N/A C N N
Loop 2 (0+640) LHS C N C C C N/A N/A C N/A N
31
Loop 2 (0+640) RHS C N C N N N/A N/A C N N
Loop 1 (0+200) LHS C N C C C N/A N/A C N/A N
32
Loop 1 (0+200) RHS C N C C C N/A N/A N N N
Loop 1 (0+710) LHS C N C N N N/A N/A N N/A N
33
Loop 1 (0+710) RHS C N C N N N/A N/A N N N
375+171 LHS C N C C C N/A N/A C N N
34
375+171 RHS C N C C C N/A N/A C N N
375+279 LHS C C C C C N/A N/A C C C
35
375+279 RHS C C C C C N/A N/A C C C
375+689 LHS C C C C C N/A N/A N/A N/A N/A
36
375+689 RHS C C C C C N/A N/A N/A N/A N/A
376+050 LHS C C C C C N/A N/A N N/A C
37
376+050 RHS C C C C C N/A N/A C C C
376+534 LHS C N C C C N/A N/A N N/A N
38
376+534 RHS C C C C C N/A N/A C C C
377+065 LHS C N C C C N/A N/A C N/A N
39
377+065 RHS C N C C C N/A N/A C C N
377+385 LHS C C C C C N/A N/A N/A N/A N/A
40
377+385 RHS C C C C C N/A N/A N/A N/A N/A
377+525 LHS C N C C C N/A N/A N N/A N
41
377+525 RHS C N C C C N/A N/A C N N
377+659 LHS C N C C C N/A N/A N N N
42
377+659 RHS C N C C C N/A N/A N N N
377+825 LHS C C C C C N/A N/A C N/A C
43
377+825 RHS C N C C C N/A N/A C N N
378+275 LHS C C C C C N/A N/A C N/A C
44
378+275 RHS C C C C C N/A N/A C C C
Ramp 1 (0+470) LHS C N C C C N/A N/A N N/A N
45
Ramp 1 (0+470) RHS C N C N N N/A N/A N N N
Ramp 2 (0+670) LHS C N C N N N/A N/A N N/A N
46
Ramp 2 (0+670) RHS C N C N N N/A N/A N N N
Loop 2 (0+640) LHS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
47
Loop 2 (0+640) RHS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 2 of 9
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara
Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Mode (Phase IA-Package-I) Format – S/7
Progress Check List of Hume Pipe Culverts (HPCs)
300thk Revetment on 150thk
Sl No Chainage Side Bedding Pipe Laying Jointing Head Wall Parapet Restoration of 300thk Apron Filter
Waterway
Mumbai Delhi
355+229 LHS C C C C N/A N/A N/A N/A N/A
1
355+229 RHS C C C C N/A N/A N/A N/A N/A
355+470 LHS C C C C N/A N/A N/A N/A N/A
2
355+470 RHS C C C C N/A N/A N/A N/A N/A
356+740 LHS C C C C N/A N/A N/A N/A N/A
3
356+740 RHS C C C C N/A N/A N/A N/A N/A
357+640 LHS C C C C N/A N/A N/A N/A N/A
4
357+640 RHS C C C C N/A N/A N/A N/A N/A
358+770 LHS C C C C N/A N/A N/A N/A N/A
5
358+770 RHS C C C C N/A N/A N/A N/A N/A
359+179 LHS C C C C N/A N/A N/A N/A N/A
6
359+179 RHS C C C C N/A N/A N/A N/A N/A
360+368 LHS C C C C N/A N/A N/A N/A N/A
7
360+368 RHS C C C C N/A N/A N/A N/A N/A
361+869 LHS C C C C N/A N/A N/A N/A N/A
8
361+869 RHS C C C C N/A N/A N/A N/A N/A
363+059 LHS C C C C N/A N/A N/A N/A N/A
9
363+059 RHS C C C N N/A N/A N/A N/A N/A
363+519 LHS C C C C N/A N/A N/A N/A N/A
10
363+519 RHS C C C C N/A N/A N/A N/A N/A
364+469 LHS C C C C N/A N/A N/A N/A N/A
11
364+469 RHS C C C C N/A N/A N/A N/A N/A
364+869 LHS C C C N N/A N/A N/A N/A N/A
12
364+869 RHS C C C N N/A N/A N/A N/A N/A
366+370 LHS C C C N N/A N/A N/A N/A N/A
13
366+370 RHS C C C N N/A N/A N/A N/A N/A
367+380 LHS C C C N N/A N/A N/A N/A N/A
14
367+380 RHS C C C N N/A N/A N/A N/A N/A
367+870 LHS C C C C N/A N/A N/A N/A N/A
15
367+870 RHS C C C C N/A N/A N/A N/A N/A
368+319 LHS C C C N N/A N/A N/A N/A N/A
16
368+319 RHS C C C N N/A N/A N/A N/A N/A
378+120 LHS C C C N N/A N/A N/A N/A N/A
17
378+120 RHS C C C N N/A N/A N/A N/A N/A
378+420 LHS C C C N N/A N/A N/A N/A N/A
18
378+420 RHS C C C N N/A N/A N/A N/A N/A
(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1
Construction of Eight lane Vadodara Kim Expressway from km 355.00 to km 378.740 Padra to Vadodara Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase-VI on Hybrid Annuity Format – S/4
Mode (Phase IA-Package-I)
Progress Check list of Misc. Works on Flyover
Drainage RCC Crash Barrier Approach Slabs Expn. Joints Rebound
Sl No Chainage Side Weep Holes Spouts and On Approach Side Hand Rails Utility Duct Wearing Load Testing Hammer USPV Testing
Down Pipes On Deck Mumbai Delhi Courses Mumbai Delhi Testing
Mumbai Delhi

Flyover
356+188 LHS N/A N C N N N/A C N C N N N N N N
1
356+188 RHS N/A N C N N N/A C N C N N N N N N
356+564 LHS N/A N C C N N/A C C C N N N N N N
2
356+564 RHS N/A N C C N N/A C C C N N N N N N
363+850 LHS N/A N C C C N/A C C C C C C C N N
3
363+850 RHS N/A N C C C N/A C C C C C C C N N
368+014 LHS N/A N C C C N/A C C C C N N N N N
4
368+014 RHS N/A N C C C N/A C C C C N N N N N
371+720 LHS N/A N N N N N/A N N N N N N N N N
5
371+720 RHS N/A N N N N N/A N N N N N N N N N
374+355 LHS N/A N C N N N/A C C C N N N N N N
6
374+355 RHS N/A N C N N N/A C C C N N N N N N
378+211 LHS N/A N C N N N/A C N N N N N N N N
7
378+211 RHS N/A N C N N N/A C N N N N N N N N
378+740 LHS N/A N C N N/A N/A C N N/A N N N N N N
8
378+740 RHS N/A N C N N/A N/A C N N/A N N N N N N

(C – Complete, N – Not Complete, NA – Not Applicable)

Concessionaire Independent Engineer


Representative Representative

Page 1 of 9