Switch Implementation

1) Pre-stage a) Clear cfgdisable, cfgclear, cfgsave for New Switch b) Check and upload correct switch Firmware version c) Check Domains, cfgshow parameter, licensing, MoinitorSystem parameter, d) Review Master Matrix, 12000 interop parameter. e) Verify cable lengths and number of cables. f) Label cables g) Network Drops? h) Mount additional rack if necessary

2)

Prepare Environment a) Down drives in Netbackup device manager should switch use it b) Review Disk Software Pathing on production systems: <To be Determined> Perform Switch Swap a) List the Order of Switches: < To Be Determined> i. SwitchDisable target switch ii. Poweroff Target Switch iii. Remove Target Switch iv. Move/Replace with 3800, and power up v. Switchdisable 2800/3800 vi. cfgshow (needs to be empty) vii. if necessary configDownload ["host","user","file"[,"passwd"]] viii. switchname "name" ix. ifModeSet "fei0" x. DOMAIN CHECK xi. Cable up xii. Switchenable xiii. PATHING SOFTWARE CHECK FOR PROD SYSTEMS