Date: 29.10.2008 Dear Sir/Madam, Subject: Civil works - construction of 3 family houses, 1 medical/health village unit, and 1 industrial building in Hadareni Village, Mures County Background informat6ion on the COMMUNITY DEVELOPMENT PROGRAME IN HADARENI VILAGE Following the Decision no. 1/2005 of the European Court of Human Rights amiable solution - in the case of Moldovan and others against Romania, the Romanian Government has initiated a community development programe in Hadareni village, Mures county. The aim of the program is to increase community cohesion between Roma, Hungarians and Romanian citizens of the village by creating local organizational capacity, promoting civic education, initiating and developing dialogue between ethnic and religious groups, enhancing economic development . 1. We hereby solicit your bid for civil works regarding the construction of 3 family houses, 1 medical/health village unit, and 1 industrial building in Hadareni Village, Mures County 2. To enable you to submit a bid, please find enclosed: Annex I. Annex II. Annex III. Annex IV. Annex V. Annex VI. Annex VII. Annex VIII. Instructions to Bidders Bid Data Sheet General Terms and Conditions Special Conditions Schedule of Requirements Technical Specifications and details Bid Submission Form Price schedule
3. Interested Bidders may obtain further information at the following address: Contact Person: Name of Office: Telephone & Fax: E-Mail: Cristina Boldur UNDP Romania, Procurement Unit UN House, 48A Primaverii Blvd., Sector 1, Bucharest 0212017872 / 0212017828 procurement.ro@undp.org
All requests for additional information and clarifications must be submitted in writing either by e-mail (procurement.ro@undp.org) or by fax (0212017828). 4. Bids must be delivered to the above office on or before 19.11.2008, 16:00 hrs. Late bids shall be rejected. 5. Bids will be opened in the presence of Bidders Representatives, who chose to attend at UNDP offices in Bucharest, Romania, on 20 November 2008, 12:00 hrs. 6. This letter is not to be construed in any way as an offer to contract with your firm. Sincerely,
(d) documentary evidence established in accordance with clause 10 of Instructions to Bidders that the civil works and ancillary services to be supplied by the Bidder are eligible civil works and services and conform to the Bidding Documents; Absence of all or part of the above documents in a Bid or submission of a Bid, which is not fully corresponding, to the Bidding Documents requirements may lead to rejection of the aforementioned Bid.
9. Documents Establishing Bidders Eligibility and Qualifications: The Bidder shall furnish evidence of its status as qualified construction work company. The documentary evidence of the Bidders qualifications to perform the contract if its Bid is accepted shall be established to the Purchasers satisfaction: (a) Copies of original documents defining the constitution or legal status, place of registration and principal pace of business of the Bidder (b) that the Bidder is reliable and capable to perform the contract: annual balance sheet of the company (including income statement) certified by the fiscal authorities; the documentary evidence of the Bidders economic and financial capacity (bank statement of the Bidders economic/financial reliability, auditing report, other relevant documentary evidence of economic and financial reliability); (c) company profile (companys profile and a list of the most important contracts ) 10. Documents Establishing Civil works Conformity to Bidding Documents: Construction materials and goods shall conform to Romanian standards, Specifications of the manufacturer, other applicable standards and shall combine high quality and functional reliability. Construction materials and goods shall be supplied to the Purchaser properly packed to avoid damage during transportation and storage. The documentary evidence of conformity to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of: (a) A detailed description of the essential technical and performance characteristics of the equipment; (b) A list giving full particulars, including available sources and current prices of spare parts, special tools, etc, necessary for the proper and continuing functioning of the equipment. 11. Bid Currencies/Bid Prices: All prices shall be quoted in Lei (or US Dollars). The Bidder shall indicate on the appropriate Price Schedule the unit prices (where applicable) and total Bid Price of the civil works it proposes to supply under the contract. 12. Period of Validity of Bids: Bids shall remain valid for 120 days after the date of Bid Submission prescribed by the procuring UN entity pursuant to clause 16 of Instructions to Bidders. A Bid valid for a shorter period may be rejected as non-responsive pursuant to clause 20 of Instructions to Bidders. In exceptional circumstances, the procuring UN entity may solicit the Bidders consent to an extension of the period of validity. The request and the responses thereto shall be made in writing. Bidders granting the request will not be required nor permitted to modify their Bids.
13. Bid Security: (a) The Bidder shall furnish as part of its Bid a Bid Security to the Purchaser in the amount of 3 % of the Offer Value. (b) The Bid Security is to protect the Purchaser against the risk of the Bidders conduct which would warrant the securitys forfeiture, pursuant to Clause 13(g) below. (c) The Bid Security shall be denominated in the currency of the Purchase Order or in a freely convertible currency and shall be in one of the following forms: i. bank guarantee or irrevocable letter of credit, issued by a reputable bank located in the purchasers country or abroad, and in the form provided in these Solicitation Documents, or, ii. cashiers cheque, or certified cheque. (d) Any Bid not secured in accordance with Clauses 13 a) and 13 c) above will be rejected by the Purchaser as nonresponsive pursuant to clause 20 of Instructions to Bidders. (e) Unsuccessful Bidder Bid Security will be discharged or returned as promptly as possible but not later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Purchaser pursuant to clause 12 of instructions to Bidders. 3
(f) The successful Bidders Bid Security will be discharged or returned upon the Bidder signing the Purchase Order, pursuant to clause 26 of Instructions to Bidders, and furnishing the Performance Security, pursuant to clause 27 of Instructions to Bidders. (g) The Bid Security may be forfeited: 1) If a Bidder withdraws its offer during the period of the Bid Validity specified by the Bidder on the Bid Submission Form, or, 2) In the case of a successful Bidder, if the Bidder fails: i. to sign the Purchase Order in accordance with Clause 26 of Instructions to Bidders, or, ii. to furnish Performance Security in accordance with Clause 27 of Instructions to Bidders. D. Submission of Bids 14. Format and Signing of Bid: The Bidder shall prepare two copies of the Bid, clearly marking each Original Bid and Copy of Bid as appropriate. In the event of any discrepancy between them, the original shall govern. The two copies of the Bid shall be typed or written in indelible ink and shall be signed by the Bidder or a person or persons duly authorized to bind the Bidder to the contract. A Bid shall contain no interlineations, erasures, or overwriting except, as necessary to correct errors made by the Bidder, in which case such corrections shall be initialed by the person or persons signing the bid. 15. Sealing and Marking of Bids: 15.1 The Bidder shall seal the original and each copy of the Bid in separate envelopes, duly marking the envelopes as ORIGINAL and COPY. The envelopes shall then be sealed in an outer envelope. 15.2 The inner and outer envelopes shall: (a) be addressed to the Purchaser at the address given in section I of these Solicitation Documents; and (b) make reference to the subject indicated in section I of these Solicitation Documents, and a statement: DO NOT OPEN BEFORE., to be completed with the time and the date specified in section I of these Solicitation Documents for Bid Opening pursuant to clause 16 of Instructions to Bidders. 15.3 The inner and outer envelopes shall also indicate the name and address of the Bidder to enable the Bid to be returned unopened in case it is declared late. 15.4 If the outer envelope is not sealed and marked as required by clause 15.2 of Instructions to Bidders, the Purchaser will assume no responsibility for the Bids misplacement or premature opening.
16. Deadline for Submission of Bids/Late Bids: 16.1 Bids must be delivered to the office on or before the date and time specified in section I of these Solicitation Documents. 16.2 The Purchaser may, at its discretion, extend this deadline for the submission of the bids by amending the Bidding Documents in accordance with clause 6 of Instructions to Bidders, in which case all rights and obligations of the Purchaser and Bidders previously subject to the deadline will thereafter be subject to the deadline as extended. 16 3 Any Bid received by the Purchaser after the Deadline for Submission of Bids will be rejected and returned unopened to the Bidder. 17. Modification and Withdrawal of Bids: The Bidder may withdraw its Bid after submission, provided that written notice of the withdrawal is received by the procuring UN entity prior to the deadline for submission. No Bid may be modified after passing of the Deadline for Submission of Bids. No Bid may be withdrawn in the interval between the Deadline for Submission of Bids and the expiration of the Period of Bid Validity. E. Opening and Evaluation of Bids 18. Opening of Bids:
18.1 The Purchaser will open all Bids in the presence of Bidders Representatives who choose to attend, at the time, on the date, and at the place specified in section I of this Solicitation Document. The Bidders Representatives who are present shall sign a register evidencing their attendance. 18.2 The bidders names, Bid Modifications or withdrawals, bid Prices, discounts, and the presence or absence of requisite Bid Security and such other details as the purchaser, at its discretion, may consider appropriate, will be announced at the opening. No Bid shall be rejected at Bid Opening, except for Late Bids, which shall be returned unopened to the Bidder pursuant to clause 20 of Instructions to Bidders. 18.3 Bids (and modifications sent pursuant to clause 17 of Instructions to Bidders) that are not opened and read out at Bid Opening shall not be considered further for evaluation, irrespective of the circumstances. Withdrawn Bids will be returned unopened to the Bidders. 18.4 The Purchaser will prepare minutes of the Bid Opening. 19. Clarification of Bids: To assist in the examination, evaluation and comparison of Bids the procuring UN entity may at its discretion ask the Bidder for clarification of its Bid. The request for clarification and the response shall be in writing and no change in price or substance of the Bid shall be sought, offered or permitted. 20. Preliminary Examination: 20.1 Prior to the detailed evaluation, the Purchaser will determine the substantial responsiveness of each Bid to the Invitation to Bid (ITB). A substantially responsive Bid is one which conforms to all the terms and conditions of the ITB without material deviations. 20.2 The Purchaser will examine the bids to determine whether they are complete, whether any computational errors have been made, whether the documents have been properly signed, and whether the bids are generally in order. 20.3 Arithmetical errors will be rectified on the following basis: If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected. If the Bidder does not accept the correction of errors, its Bid will be rejected. If there is a discrepancy between words and figures the amount in words will prevail. 20.4 A Bid determined as not substantially responsive will be rejected by the Purchaser and may not subsequently be made responsive by the Bidder by correction of the non-conformity. 21. Conversion to Single Currency: To facilitate evaluation and comparison, the Purchaser will convert all Bid Prices expressed in the amounts in various currencies in which the Bid Prices are payable to US dollars at the official UN exchange rate on the last day for Submission of Bids. 22. Evaluation of Bids: Determination of compliance with the Solicitation Documents is based on the content of the Bid itself without recourse to extrinsic evidence. Evaluation Criteria 1.1 Compliance with requirements of technical assignment. 1.2 Price of the construction works. 1.3 Scheduled time for execution of construction works. 1.4 Compliance with Special and General Conditions specified by these Solicitation Documents. 1.5 Experience and quality of executed similar works confirmed by customers references.
F. Award of Contract 23. Award Criteria: The procuring UN entity will Issue the Purchase Order to the lowest priced technically qualified Bidder. The Purchaser reserves the right to accept or reject any Bid, to annul the solicitation process and reject all Bids at any time prior to award of purchase order, without thereby incurring any liability to the affected Bidder(s) or any obligation to provide information on the grounds for the purchasers action. 5
24. Purchasers Right to Vary Requirements at Time of Award: The Purchaser reserves the right at the time of making the award of contract to increase or decrease by up to 10 % the quantity of civil works specified in the Schedule of Requirements without any change in unit price or other terms and conditions. 25. Notification of Award: Prior to the expiration of the period of Bid Validity, the Purchaser will send the successful Bidder the Purchase Order. The Purchase Order may only be accepted by the Suppliers signing and returning an acknowledgement copy of it or by timely delivery of the civil works in accordance with the terms of this purchase order, as herein specified. Acceptance of this Purchase Order shall effect a contract between the parties under which the rights and obligations of the parties shall be governed solely by the terms and conditions of this purchase order. 26. Signing of the Purchase Order : Within 30 days of receipt of the Purchase Order the successful Bidder shall sign, date and return it to the purchaser. 27. Performance Security: The successful Bidder shall provide the Performance Security on the Performance Security Form provided for in these Solicitation Documents, within 30 days of receipt of the Purchase Order from the purchaser. Failure of the successful Bidder to comply with the requirement of clause 26 or clause 27 of Instructions to Bidders shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security, in which event the Purchaser may make the award to the next lowest evaluated Bidder or call for new Bids.
The following specific data for the civil works to be procured shall complement, supplement, or amend the provisions in the Instruction to Bidders. Whenever there is a conflict, the provisions herein shall prevail over those in the Instructions to Bidders. Relevant clause(s) of Instruction to Bidders Language of the Bid Specific data complementing, supplementing, or amending instructions to Bidders
X English
Bid Price
As per cost estimate. The prices quoted shall include all labor, materials, equipment, supplies, overhead, and other costs to fully furnish and install the works.The price quoted shall be as per Bill of Quantities attached as Annex VI Technical Specifications
X Required. Not required. - Copies of original documents defining the constitution or legal status, place of registration and principal place of business of the Bidder that the Bidder is reliable and capable to perform the contract: annual balance sheet of the company (including income statement) certified by the fiscal authorities; the documentary evidence of the Bidders economic and financial capacity (bank statement of the Bidders economic/financial reliability, auditing report, other relevant documentary evidence of economic and financial reliability); company profile (companys profile and a list of the most important contracts performed in the past 3 years )
X 120 days
Bid Security
X Required. Not required. Bid Security in the amount of 3 % of the Offer Value, as per clause 13 of Instructions to Bidders
X Partial bids permitted. Partial bids not permitted. Partial bid means bid for any full LOT out the 5 indicated lots. X 15 percent, increase or decrease.
Condition waived
2.1.2
2.1.3 2.1.4
3.
TAX EXEMPTION 3.1 Section 7 of the Convention on the Privileges and Immunities of the United Nations provides, inter alia, that the United Nations, including its subsidiary organs, is exempt from all direct taxes, except charges for utilities services, and is exempt from customs duties and charges of a similar nature in respect of articles imported or exported for its official use. In the event any governmental authority refuses to recognize UNDP's exemption from such taxes, duties or charges, the Supplier shall immediately consult with UNDP to determine a mutually acceptable procedure. 3.2 Accordingly, the Supplier authorizes UNDP to deduct from the Supplier's invoice any amount representing such taxes, duties or charges, unless the Supplier has consulted with UNDP before the payment thereof and UNDP has, in each instance, specifically authorized the Supplier to pay such taxes, duties or charges under protest. In that event, the Supplier shall provide UNDP with written evidence that payment of such taxes, duties or charges has been made and appropriately authorized.
4.
RISK OF LOSS Risk of loss, damage to or destruction of the civil works shall be governed in accordance with DDU Incoterms 2000, unless otherwise agreed upon by the Parties on the front side of this Purchase Order.
5.
EXPORT LICENCES Notwithstanding any INCOTERM 2000 used in this Purchase Order, the Supplier shall obtain any export licences required for the civil works.
6.
FITNESS OF CIVIL WORKS/PACKAGING The Supplier warrants that the civil works, including packaging, conform to the specifications for the civil works ordered under this Purchase Order and are fit for the purposes for which such civil works are ordinarily used and for purposes expressly made known to the Supplier by UNDP, and are free from defects in workmanship and materials. The Supplier also warrants that the civil works are contained or packaged adequately to protect the civil works. 8
7.
INSPECTION 1. UNDP shall have a reasonable time after delivery of the civil works to inspect them and to reject and refuse acceptance of civil works not conforming to this Purchase Order; payment for civil works pursuant to this Purchase Order shall not be deemed an acceptance of the civil works. 2. Inspection prior to shipment does not relieve the Supplier from any of its contractual obligations.
8.
INTELLECTUAL PROPERTY INFRINGEMENT The Supplier warrants that the use or supply by UNDP of the civil works sold under this Purchase Order does not infringe any patent, design, trade-name or trade-mark. In addition, the Supplier shall, pursuant to this warranty, indemnify, defend and hold UNDP and the United Nations harmless from any actions or claims brought against UNDP or the United Nations pertaining to the alleged infringement of a patent, design, tradename or trade-mark arising in connection with the civil works sold under this Purchase Order.
9.
RIGHTS OF UNDP In case of failure by the Supplier to fulfil its obligations under the terms and conditions of this Purchase Order, including but not limited to failure to obtain necessary export licences, or to make delivery of all or part of the civil works by the agreed delivery date or dates, UNDP may, after giving the Supplier reasonable notice to perform and without prejudice to any other rights or remedies, exercise one or more of the following rights: a) Procure all or part of the civil works from other sources, in which event UNDP may hold the Supplier responsible for any excess cost occasioned thereby. b) Refuse to accept delivery of all or part of the civil works. c) Cancel this Purchase Order without any liability for termination charges or any other liability of any kind of UNDP.
10.
LATE DELIVERY Without limiting any other rights or obligations of the parties hereunder, if the Supplier will be unable to deliver the civil works by the delivery date(s) stipulated in this Purchase Order, the Supplier shall (i) immediately consult with UNDP to determine the most expeditious means for delivering the civil works and (ii) use an expedited means of delivery, at the Supplier's cost (unless the delay is due to Force Majeure), if reasonably so requested by UNDP.
11.
ASSIGNMENT AND INSOLVENCY 11.1. The Supplier shall not, except after obtaining the written consent of UNDP, assign, transfer, pledge or make other disposition of this Purchase Order, or any part thereof, or any of the Supplier's rights or obligations under this Purchase Order. 11.2. Should the Supplier become insolvent or should control of the Supplier change by virtue of insolvency, UNDP may, without prejudice to any other rights or remedies, immediately terminate this Purchase Order by giving the Supplier written notice of termination.
12.
USE OF UNDP OR UNITED NATIONS NAME OR EMBLEM The Supplier shall not use the name, emblem or official seal of UNDP or the United Nations for any purpose.
13.
PROHIBITION ON ADVERTISING The Supplier shall not advertise or otherwise make public that it is furnishing civil works or services to UNDP without specific permission of UNDP in each instance.
14.
CHILD LABOUR The Supplier represents and warrants that neither it nor any of its affiliates is engaged in any practice inconsistent with the rights set forth in the Convention on the Rights of the Child, including Article 32 thereof, which, inter alia, requires that a child shall be protected from performing any work that is likely to be hazardous 9
or to interfere with the child's education, or to be harmful to the child's health or physical, mental, spiritual, moral or social development. Any breach of this representation and warranty shall entitle UNDP to terminate this Purchase Order immediately upon notice to the Supplier, without any liability for termination charges or any other liability of any kind of UNDP. 15. MINES The Supplier represents and warrants that neither it nor any of its affiliates is actively and directly engaged in patent activities, development, assembly, production, trade or manufacture of mines or in such activities in respect of components primarily utilized in the manufacture of Mines. The term "Mines" means those devices defined in Article 2, Paragraphs 1, 4 and 5 of Protocol II annexed to the Convention on Prohibitions and Restrictions on the Use of Certain Conventional Weapons Which May Be Deemed to Be Excessively Injurious or to Have Indiscriminate Effects of 1980. Any breach of this representation and warranty shall entitle UNDP to terminate this Purchase Order immediately upon notice to the Supplier, without any liability for termination charges or any other liability of any kind of UNDP. 16. 16.1 SETTLEMENT OF DISPUTES Amicable Settlement The Parties shall use their best efforts to settle amicably any dispute, controversy or claim arising out of, or relating to this Purchase Order or the breach, termination or invalidity thereof. Where the Parties wish to seek such an amicable settlement through conciliation, the conciliation shall take place in accordance with the UNCITRAL Conciliation Rules then obtaining, or according to such other procedure as may be agreed between the Parties. 16.2 Arbitration Unless, any such dispute, controversy or claim between the Parties arising out of or relating to this Purchase Order or the breach, termination or invalidity thereof is settled amicably under the preceding paragraph of this Section within sixty (60) days after receipt by one Party of the other Party's request for such amicable settlement, such dispute, controversy or claim shall be referred by either Party to arbitration in accordance with the UNCITRAL Arbitration Rules then obtaining, including its provisions on applicable law. The arbitral tribunal shall have no authority to award punitive damages. The Parties shall be bound by any arbitration award rendered as a result of such arbitration as the final adjudication of any such controversy, claim or dispute. 17. PRIVILEGES AND IMMUNITIES Nothing in or related to these General Terms and Conditions or this Purchase Order shall be deemed a waiver of any of the privileges and immunities of the United Nations, including its subsidiary organs.
10
X Applies
X Applies
If the Supplier fails to supply the specified civil works within the time period(s) stipulated by the purchase order, the Purchaser shall, without prejudice to its other remedies under the contract, deduct from the Purchase Order price, as liquidated damages, a sum equivalent to 0.5 percent of the delivered price of the delayed civil works for each week of delay until actual delivery, up to a maximum deduction of 10 percent of the delayed civil works Purchase Order price. Once the maximum is reached, the Purchaser may consider termination of the Purchase Order Performance security The Performance Security shall amount to 5 % of the contract price; this percentage shall be withheld from the value of each Statement of Works and shall be deposited in the Contractors security account. Fifty percent (50%) of the security shall be returned upon works final reception and completion, and fifty percent (50%) shall be returned at the end of the 12 -month Defects Liability Period calculated from the date of the completion of the works.
X Applies
Annex V.
11
SCHEDULE OF REQUIREMENTS
Lot No. Unit Family House Lacatus Ghiolanca 1 Description of works (specific requirements, general requirements are as per Annex VI) Composed of 3 rooms, sanitary room, kitchen and other annex required spaces (built area 70-80sq.m/building), built only with one level- ground floor, two/four slopes roof; all installations required by the normal standard of housing in the rural area- electrical installations, water pipes from an individual well , ecological tank for sanitation purposes, heating system with stoves. Composed of 3 rooms, sanitary room, kitchen and other annex required spaces (built area 70-80sq.m/building), built only with one level- ground floor, two/four slopes roof; all installations required by the normal standard of housing in the rural area- electrical installations, water pipes from an individual well , ecological tank for sanitation purposes, heating system with stoves. Composed of 3 rooms, sanitary room, kitchen and other annex required spaces (built area 70-80sq.m/building), built only with one level- ground floor, two/four slopes roof; all installations required by the normal standard of housing in the rural area- electrical installations, water pipes from an individual well , ecological tank for sanitation purposes, heating system with stoves. Built only with one level- ground floor; all installations required by the normal standard; ecological tank for sanitation purposes; heating system gas power central unit For two different activities and office spaces for meetings or coordination of activities (350 sq.m- 200 sq.m for construction activities, 100sq.m for textile field activities, 50sq.m offices)
4 5
The schedule of works can be adjusted as agreed by the Parties when signing the Contract.
12
Annex VI.
BILL OF QUANTITIES & SPECIFICATION CRITERIA
LOT NO.1 Family House Lacatus Ghiolanca QUANTITY LIST WITH TECHNOLOGICAL EQUIPMENT, INCLUDING UTILITIES OF THE ESTIMATEOFFER FOR PROCUREMENT
Item
Name
M.U.
Quantity
0 1 2
Water meter Qn=1.5 cubic meters/h Ecological tank for waste water, capacity 10 cubic meters Electric Boiler 10l
TOTAL
pcs pcs
1 1
pcs
1
Thousand lei: USD*):
13
Item
0 1.
1 Technical and Functional Parameters: -Type: multi-jet, and dry dial -Nominal output: 1.5 mc/h -Nominal diameter: 20 mm - Connection sizing: 3/4 -Connection type: coupling -Design pressure Pn 6 bars Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: -Accuracy category: B Guarantee and post-guarantee conditions: -3 years guarantee - 3 days for solving out issues occurred during the guarantee period Other condition of technical character:
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
4.
5.
14
Item
0 1.
2.
1 Technical and Functional Parameters: -Material: polyester -Net volume: 10 cubic meters -Diameter: 1.8 linear meters -Length: 4.15 linear meters -Installing: buried Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; Conditions related to compliance with relevant standards: -SR EN 12566-1 Guarantee and post-guarantee conditions: - 3 years guarantee. Other condition of technical character: Minimum life cycle: 30 years
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
3.
4.
5.
15
TECHNICAL SHEET No . 3 EQUIPMENT: ELECTRIC BOILER Item Technical specifications imposed by the Technical Specifications Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2 Supplier
0 1.
2.
3.
4.
5.
1 Technical and Functional Parameters: Hot water 80 0 C Capacity 10l Sizes: 360x254x360 Maximum pressure: Pn 10 bar Wasteful resistance power: 1.2 kW Power supply: 220 V Performance specs and conditions related to safety in exploitation: -Inside the boilers surface is covered by a special enamel layer; -It is fitted out by a programmable thermostat, magnesium anode, insulation, relief pressure valve, on-off switch. Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Guarantee and post-guarantee conditions: 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period. Other condition of technical character
16
Bill of quantities Estimate - Tender: ELECTRIC INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 EA02A1 [ 2] M 170.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=16/13,4MM 002 EA02A3 [ 2] M 8.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=25,8/21,8 MM 003 EA12A1 M 20.000 METALLIC,FLEXIBILE,PROTECTION,UNTIGHT TUBE, WITH 2 ROWS OF COILS IN QUADRILATERAL-SHAPE(SPD) 13,5-23 MM 003 7356501 M 20.500 METALIC TUBE FLEX.PROT.NONTIGHT TYPE SPD -ROMAN D=13,5 MM
004 EB02A1 M 280.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
288.400
005 EB02A1 M 340.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
350.200
006 EB02B1 M 30.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION 6- 10 MMP
30.900
007 ED01A1 BUC. 4.000 MANUAL SWITCH BURIED UNIPOLAR NORMAL OR WATERPROOF CONSTRUCTION *
17
4.040
008 ED03A1 BUC. 5.000 UNIPOLAR SWITCH BURIED,WOODEN NAILS,IN SERIES,NORM.CONSTR.OF BACHELITA OR WATERPROOF CONSTR. 008 5520366 BUC. CUMPANA SHIFTER ST.250V 10A 5.050
009 ED08A1 BUC. 1.000 PLUG BURIED ASSEM.NORMAL CONSTR. WATERPROOF OR NORMAL PROTECTION CONTACT
010 ED08B1 [ 1] BUC. DOUBLE TWIN PLUG WITH PROTECTION CONTACT RECESSED MOUNTED
9.000
011 ED01D1 BUC. 1.000 MANUAL SWITCH WOODEN NAILS IN UNIPOLAR NORMAL CONSTR. MADE OF BACHELITE OR TIGHT CONSTR. 011 5500677 BUC. 1.010 VISIBLY SET MANUAL SHIFTER 250V 10A
1.000
013 EE04A1 BUC. 2.000 SIMPLE LUMINAIRE (LAMP HOLDER) REGULAR, WITH NAIL AND RING
014 EE05A1 BUC. 3.000 SIMPLE APPLY ,OBL./RIGHT.GLOB ST.OPAL. MONT.CEILING./WALLS ON WOOD DOWEL
3.036
016 EE08A1 BUC. 2.000 CHANDELIER INCANDENSCENCE BULBS WITH 2 ARMS 016 5105312 BUC. 2.006 INCANDENSCENCE BULBS 1 ARM CHANDELIER
017 EE08B1 BUC. 1.000 CHANDELIER INCANDENSCENCE BULBS WITH 3 ARMS 017 5105300 BUC. 1.003 INCANDENSCENCE BULBS 3 ARMS CHANDELIER
018 EE12B1 BUC. 1.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
018 5103611 BUC. 1.003 FLUOR.LUMINAIRE FIA 11-2X36 W EQUIPPED, APPARENT ASSEM.
019 EE12B1 BUC. 2.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
019 5103823 BUC. 2.006 FLUORESCENT LIGHT FIXTURES AB 02-1X18 W VISIBLY SET
020 EE14A1 BUC. 2.000 ASSEM.LAMP INSIDE.CONSTR.OR ON EXTER. ELEMENTS INCANDESCENCE UP TO 1000 W.
020 5101029 BUC. 2.100 INCANDESCENTE LAMP CLEAR E27 TIP S 220V 25W S6115
021 EE14A1 BUC. 11.000 ASSEM.LAMP INSIDE.CONSTR.OR ON EXTER. ELEMENTS INCANDESCENCE UP TO 1000 W.
021 5101251 BUC. 11.550 INCANDES LAMP DOUBLE SPIR.CLEAR E27 AM 220V 60W CS
1.000 19
DIFER.FAULT CURRENT DEVICE + BELL AND SWITCH 022 7305451 BUC. 1.000 PANEL WITH 4 PROTECTION CUT-OUTS PHASE-NULL(1x 6A+2x16A+1x16A WITH DIFFER. PROT.DIVICE Id=30mA) BELL AND SWITCH 023 EF09A1 BUC. 6.000 COUPLING COPPER PIPE AT DEVICES BORNS , MOTORS,ELECTR.COUNTER COND.HAVING SECT. <10SQMM,EXCLUSIVELY
024 EG08B1 M 10.000 COND.EARTH CONNECTION LIGHTING ROD UNDERGROUND EARTH CONN.GALVANIZED STEEL STRIP 40X4MM IN HARD SOIL *
025 W1R06A1 M 3.000 ELECTRODE OF STEEL PIPE OF TWO AND A HALF INCHES FOR EARTH GROUNDING IN NORMAL GROUND 026 W1P08A BUC. 1.000 EARTH CONN.TESTING FOR BUILDING WIRING
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: VARIABLE ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = 20
= I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 20.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1304 ORA 159.000 SELF-LIFTING METALIC SCAFFOLD 2 CASTLES 6MARCH 75KG/M H-31M L=12M 3SHIFTS
003 CI02A1 [10] MP. NATURAL LOCAL STONE PLATING INCL. MESH
20.000
003 2202200 SQ.M. 20.400 BANPOTOC 1 QUALITY G=2CM S LIMESTONE SLAB 6035 004 CG06C1 MP. 6.500 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 005 CH01B1 M 13.500 PLATED SIMPLE CONCRETE TREADS WITH PREFAB.TREADS AND RISERS WITH MARBLE MOSAIC 005 2802892 M 13.905 MANUFACT.MARBLE STAIR CASE NAT.COLOUR 005 2802957 M 13.905 MARBLE MOSAIC RISER NATURAL COLOUR 006 CE14A1 M 5.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 007 CF06A1 MP. 20.000 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM 007 2101203 PLASTER MORTAR M25T M.C. 0.440
008 CG07B1 M 8.000 MOSAIC PLINTHS OR GORGES CAST ON SITE SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 009 CH04A1 M CURRENT WOODEN HANDRAIL 6.000
21
010 CL20B1 KG 52.000 APPARENT METALLIC MANUFACT. ASSEMBLYING: GRATES BANISTERS,TRAP DOOR,CHECKS, GRILL
010 6306274 KG 52.000 SIMPL.DECORATIVE LATTICE WORK FOR STAIRCASES,PROFILED STEEL BALCONY 011 CN11B1 MP. 5.500 DYE WORKS AT BANISTERS,GRID,METALLIC PARAPET WITH ALCHIDICAL ENAMEL 011 6108347 KG 0.385 REDISH BROWN ENAMEL UIC E.735-8 NTR 1703 -80 011 6100943 KG 0.440 ALCHID RED OXID PLASTER ROUGH G 735-3 012 CN09G1 MP. 18.000 PAINTINGS ON WOOD CARPENTERY ,DONE WITH 2 LAYERS ALCHIDIC LAQUER COLORLESS,AT DOORS,WINDOWS ,SHUTTER.RUL. 013 CO02B1 MP. 30.000 CONCRETE PLATES WALK SIDE FOR SAND PAVEMENTS,JOINTS FILLED WITH MASTIC 013 2800488 MP. 30.600 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM 014 IZF10F1 [ 3] MP. 20.000 50MM EXTRUDED POLYSTYRENE LAYER TO EXTERIOR WALLS GLUED BY BITUMINOUS CEMENT 015 RPCO56A1 [ 3] M 18.000 OAK WOOD BANISTERS AT PLATFORMS WITH SIZES OF 30 X 125MM AT 3 ROWS 016 CH01D1 M 9.000 SIMPLE CONCRETE TREADS TITIVATED OR ROLLED WITH CEMENT MORTAR M100-T CAREFULLY FINISHED Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.=
TOTAL
Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT Indirect expenses: Profit: 22
TOTAL
BILL OF QUANTITIES Estimate - Tender: CONSTANT ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 132.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 390.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS 003 MDTC5517 BUC. 2.000 EQUIPMENT TRANSPORT KM 90100043 SELF-LIFTING METALLIC SCAFFOLDING WITH 2 CASTLES 004 CD04E1 M.C. 0.100 MASONRY FROM PRESSED BRICK 240X115X63MM AT BATHROOM TUB CLOSING, CAL.1 005 CD04C1 M.C. 2.000 RESSED BRICK MASONRY 240X115X63MM AT INSULATED CHIMNEY STACKS IN GARRET,QAL.1 005 2101171 M.C. MASONRY MORTAR M 50 S 1030 0.340
006 CD05A1 M.C. 32.000 BRICK MASONRY TYPE GVP AT BUILDINGS H <35M, SHAPE 240X115X 88MM,Q.A 006 2101169 M.C. MASONRY MORTAR M 25 S 1030 6.720
007 CD04H1 M.C. 6.000 MASONRY FROM PRESSED BRICK 240X115X63M M AT BUILDING.H<35M, 12,5CM THICKNESS, Q. A,WITH VOIDS <50 % 007 2101169 M.C. MASONRY MORTAR M 25 S 1030 008 CE15B2 [ 1] M ALUMINIM WINDOW BOARDS 1.080
8.000
WITH SPRINKLER AND PLASTER ROUGH CAST MECHANICALLY PERFORMED,OF 2CM 009 2101202 PLASTER MORTAR M10T M.C. 4.428
010 CF06K1 MP. 123.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 010 2101204 M.C. MORTAR M50T 011 CF06C1 [ 6] MP. OUTER DECORATIVE PLASTER OR SIMILAR 2.829 123.000
012 CF10C1 MP. 316.000 PLASTER POLISHING APPLIED ON FLOATED INTERIOR PLASTERS 013 CG01E1 [ 5] MP. CEMENT SLAB FINISH FOR FLOORS 014 RPCK07D1 MP. RESINOUS WOODEN FLOORING OF 24MM THICK. NAILED ON OAK LATHS OF 50X80MM 70.000
52.000
015 CG06C1 MP. 9.500 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 016 CG06D1 MP. 8.500 MOSAIC FLOOR POURED ON SITE OF 1,5CM THICK.SIMPLE WITHOUT CRIMP ON SURF.>5MP WITH MARBLE MOSAIC 017 CG07B1 M 37.500 MOSAIC PLINTHS OR GORGES CAST ON SITE SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 018 CG28B1 MP. 70.000 5MM DIFFERENCE SUPP.LAYER FOR CEMENT MORTAR FLOOR 018 2101200 M.C. 0.350 PLASTER MORTAR M 100 (LIME PASTE ) S 1030 019 CG26A1 MP. 18.000 POLISHING,INCLUDING MARBLE OR MARBLE MOSAIC GRAVEL WAXING FLOORS
24
021 CN04D1 MP. 44.000 DYE WORKS FOR INTERIOR AND EXTERIOR MANUALLY EXEC.WITH OIL PAINTS IN 2 LAYERS ON SMOOTH PLASTERS 021 6103309 KG 10.648 CREAM PAINT (FP) V.401-1 NTR 90-80
022 CK11G1 [ 3] MP. PVC DOUBLED-GLASSED WINDOWS 023 CK14A1 [ 2] MP. WHITE COLOR PVC DOORS WITH THERMO INSULATING GLASS 4+ 16+4MM
11.000
5.300
024 CK03A1 MP. 9.800 INTERIOR SIMPLE WOOD DOORS ONE LEAF ON LINING 024 2933300 MP. 9.800 ONE LEAF TIMBER DOOR ON LINING FINISHED BY MANUFACTURER 025 CK03C1 MP. 3.300 INTERNAL SIMPLE WOOD DOORS IN 2 LEAFS ON LINING
025 2932150 MP. 3.300 2 LEAFS WOOD DOORS ON LININGS PAINTED AT PRODUCER
026 CK25C1 BUC. 2.000 CARPENTRY ACCESSORY WORKS APPLIED LOCK TO A YALE SYSTEM
026 6310380 BUC. SAFETY LOCK IN YALLE SYSTEM WITH DOOR BOLT
2.000
027 CK08A1 MP. 0.350 EXTRA DIFFERENCE AT LINING FOR DOORS WIDER THAN 19,5 CM.
028 CK09A1 [ 1] M 8.000 20CM WIDE PVC WINDOW BOARDS SET TO THE INTERIOR
029 CM02E1 MP. 4.000 DRAWN WINDOWS SIMPLE MEASURE FREE ON WOOD CARPENTERY 4-8MM THICK.WITH PUTTY AND WANG AT VITRI 029 2500327 MP. 4.360 CLEAR DRAWN GLASS Q.3 4MM. PACKED FREE 25
SIZES S 853
030 CN06B1 [ 3] MP. 316.000 3 LAYER WHITE COLOR WASHABLE PAINTING FOR INTERIOR FOR WALLS
031 RPCK72A1 MP. 52.000 PALUX LAKE PARQUET LAQUERING IN THREE LAYERS
032 IZF10C1 [10] MP. 123.000 THERMINSULATING LAYER FOR WALLS OF EXPANDED POLYSTYRENE FOR FACADE OF 10CM THICK.INCLUDING MORTAR ADHESIVE AND SECURING NAILS 032 2602797 MP. 124.230 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461 033 CO12A1 BUC. 470.000 TERACOTTA ENAMEL STOVES,INCLUDING METALLIC SEALS 033 2436887 BUC. 484.100 COLORED TILES FOR STOVES OF 240X220 1ST Q. S1798
033 7323475 BUC. 4.700 METALLIC SET TERRACOTTA STOVE (EG .GRILL) FROM NES CAST IRON
4.700
034 TRA06A TONA 37.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. = KM Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, 26 TOTAL
NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: CONSTANT ARCHITECTURE GARRET Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 25.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 170.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS
003 CD05E1 M.C. 5.000 BRICK MASONRY GVP TYPE FOR CONSTR.H<35M, FORMAT 365X180X138MM,A Q. 003 2101169 M.C. MASONRY MORTAR M 25 S 1030 0.650
004 CD04C1 M.C. 1.850 RESSED BRICK MASONRY 240X115X63MM AT INSULATED CHIMNEY STACKS IN GARRET,QAL.1 004 2101171 M.C. MASONRY MORTAR M 50 S 1030 005 CE01A1 MP. BURNT CLAY SHAPED TILE COVER 0.315 160.000
005 2302983 BUC. 2560.000 DRAIN TILE WITH 1 BEAK Q1 390X230X11 S515
006 CE13A1 M 39.000 GALVANIZED PLATE DRAIN OF 0,5MM, MADE ON SITE SEMIROUND WITH D=15CM 27
007 CE14A1 M 21.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 008 CE15B2 [ 1] M ALUMINIM WINDOW BOARDS 1.200
009 CE19D1 [ 1] M TOOTHING EAVES FROM ONE SIDE PLANE BOARD AND RABBETED OF 70CM WIDE
55.000
009 2903830 M.C. 0.083 LONG RESIN BOARD SELVEDGED CLASS C THICK =24MM L=3,00M S 942 010 CF06A1 MP. 6.000 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM 010 2101203 PLASTER MORTAR M25T M.C. 0.132
25.000
012 CF06K1 MP. 25.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 012 2101203 PLASTER MORTAR M25T M.C. 0.575
013 CK01A1 MP. 0.500 BUILDINGS WOODEN WINDOWS WITH H= 0- 35M WITH FRAME SURFACE < 1,00MP. 013 2938811 MP. 0.500 EXTERNAL SIMPLE RESIN WINDOWS OAK FRAME <0,50 SQM 014 VB34C1 BUC. 3.000 PROTECTION CAP FOR CIRCULAR SEWERS WITH PERIM. OF 701-1600 MM MADE.ON SITE DET. TYPE 61/0 015 CK09A1 M RESINOUS TIMBER LINTELS 1.000
015 2947800 M 1.000 RESINOUS WINDOW BOARD OF 30MM WIDE UP TO 120MM 016 CM02B1 MP. 0.500 DRAWN GLASSES SIMPLE FREE MEASURE ON WOOD CARPENTERY 2-3MM THICK. WITH PUTTYAND EYES NAILS>0,25MP 016 2500195 MP. 0.565 28
CLEAR DRAWN WINDOW Q.3 3MM. PACKED FREE SIZES S 853 017 CN09B1 MP. 0.250 DYE WORKS ON WOOD CARPENTRY,OIL PAINT IN 3 LAYERS AT DOORS AND WINDOWS 017 6103270 KG RED PAINT V.231-1 NTR 90-80 0.090
018 CN15B1 [ 4] MP. 300.000 PAINTING THE TIMBER BY FIREPROOF SOLUTIONS 019 CN15D1 MP. 75.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 020 CN01A1 MP. TWO LAYERS LIME MILK PAINTINGS (PAINTINGS) 6.000
021 CO15B1 BUC. 5.000 CLEANING WICHET AT DOUBLE CHIMNEY STACKS 022 CO02B1 [ 2] MP. 3.000 CONCRETE PRECAST SLABS 70 X70 X8CM LAID ON THE CLEANING DOOR AREA FOR THE CHIMNEY STACKS 022 2800488 MP. 3.060 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM 023 CO17A1 BUC. 1.000 HATCH TO NON-CIRCULATING TERRACE EXITS 0,8 X0.8M BEECH WOOD INSULATED WITH INSULATING MATERIAL OF 30MIN FIRE RESISTANT 024 CO23A1 MP. 81.000 BEECH BOARD WOOD FLOOR BOARDING OF 20MM THICKNESS 025 IZF10F1 [18] MP. 81.000 INSULATING MINERAL WOOL LAYER G80 TYPE 150MM THICK. COATED,AND ^=0.040 W/MK AND 0 KG/CUBIC METER TO THE FLOORING 026 IZF10C1 [ 5] MP. 25.000 THERMO-INSULATING LAYER FOR FLOOR WITH EXPANDED POLYSTYRENE 026 2602797 MP. 25.250 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461 027 IZF03B2 MP. 25.000 BARRIER AGAINST VAPOURS ON VERTICAL SURFACE WITH 1STR IMPISLIT BIT TYPE /A SAU TSA2000 LIP WITH BITUM TYPE 29
027 2600048 KG 37.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064 027 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126 27.500
028 IZF02A1 MP. 25.000 ROOF VAPOUR DIFFUSION LAYER,TERRACCE WITH GLASS FIBRE KNITTING HORISONTAL SURFACE BITUMEN 028 2600048 KG 12.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
029 IZF01A1 MP. 25.000 SURFACE MILDING APPLY.VAPOURS DIFUSION LAYER WITH CUT BITUMEN IN 2 LAYERS HORIS.AND VERT.SURFACE 029 2600048 KG 3.750 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064 030 IZF04J2 MP. 25.000 BOUNDARY LAYER RELATED TO THE INSULATION WORK EXEC WITH FIBER GLASS FELTING AND NON GLUED BREAKDOWN 030 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126 27.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= TOTAL
Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
List with work quantities Estimate - Tender: RESISTANCE INFRASTRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA04C1 M.C. 18.700 MAN.DIGG.IN LIMIT.SPACES UNDER 1M SUPPOR.AND MAN.EVAC.IN SOIL WITH NAT. MOIST AT DEPTH 0,0-1,5M HARD SOIL 002 TSC02D1 100 MC. 0.290 DIGGING WITH EXCAVATOR ON TYRES 0,21-0, 39 MC SOIL NATURAL MOISTURE OPEN AUT. FILED CATEGORY 2 003 TSC02C1 100 MC. 0.390 EXCAVAT.DIGGING ON TYRES 0,21-0,39 MC NATUR MOIST SOIL LOAD.DEP.SOIL CAT.1
004 TSD01C1 M.C. 35.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 005 TSD05A1 100 MC. 0.350 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 006 TRA06A05 TONA 129.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 007 TSC35B31 100 MC. 0.490 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
008 TSF01B1 MP. 52.000 BANKS SUPPORT BY BEECH BOARDS HORIZ.LAID WIDTH<1.5M, DEPTH 0,02M;0,21-0,6M BETWEEN BOARDS 009 CG32D1 [ 5] M.C. FILLINGS IN LAYERS, EXECUTED BY MECHANICALLY COMPACTED GRAVEL 8.000
010 CA01B1 M.C. 35.300 SIMPLE CONCRETE MOULDING IN FOUNDATIONS (CONTINUOUS,ISOLATED)AND SOCLES WITH VOLUME > 3MC,AND IN RETAINIG WALLS 31
010 2100945 M.C. 35.582 CEMENT CONCRETE B 150(C8/10) STAS 3622 011 CA01D1 M.C. 12.200 SIMPLE CONCRETE MOULDING IN LAYERS OF 320CM THICKNESS AT CONSTRUCTIONS WITH H <35M
011 2100945 M.C. 9.374 CEMENT CONCRETE B 150(C8/10) STAS 3622 011 2100919 M.C. 2.923 CEMENT CONCRETE B50 (C2.8/3.5) STAS 3622 012 CB11A1 MP. 139.000 SHUTTERINGS FOR CONCRETE IN ELEV.FROM PANELS TO STRAIGHT WALL WITH H<3M,WITH PLYWOOD OF 8MM THICK. 013 CC01C1 KG 710.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 014 CZ0301A1 KG 340.000 MANUFAC.REINFOR.SHAPED BARS FOR FOUNDATION ISOL.CONTINUOUS AND PLATES IN.CENT.WORKSHOPS OB 37 D=6-8MM 015 CZ0301D1 KG 370.000 REINFORCED MANUFACTURED SHAPING BARS FOR CONTINOUS ISOLATED FOUNDATION AND PLATE FOUNDATION IN ATEL CENT.PC 52 D=6-8MM 016 TRA06A05 TONA 119.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 017 TRA02A05 TONA 0.710 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM. 018 IZF10F1 [14] MP. 63.300 EXTRUDED POLYSTYRENE INSULATION LAYER OF 100MM WITH = 0.03 W/MK > 35 KG UNDER THE REINFORCED CONCRETE SLAB 019 IZF04J1 [ 1] MP. 81.000 BOUNDARY LAYER EXEC BY POLYETHYLENE FOIL OF 0.2MM 020 CF12A1 [ 1] MP. 19.000 RIGID WATERPROOFING ON M100T WALLS WITH APAPSTOP APPLIED IN 3 LAYERS ON HORIZ SURFACES UNDER WALLS ACC. TO TECHNICAL SPECIFICATIONS Direct expensive from items: 32
WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED:
TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: RESISTANCE SUPER-STRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CA02J1 M.C. 18.000 MOULDING REINFOR.CONCRETE TO CONSTR.WITH H<35M,IN FLOORS(BEAMS,COLUMNS,PLATES) WITH SLAB THICKN.>10CM 001 2100957 M.C. 18.144 33
CEMENT CONCRETE B 200(C12/15) STAS 3622 002 CB13A1 MP. 116.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTRUCTIONS WITH H<20M TO SLABS AND BEAMS,WITH PLYWOOD OF 8MM 003 CB13B1 MP. 25.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 004 CB44A1 BUC. 62.000 SUST.WITH STUDS EXTENS PER3100R FOR ASSEMBLING FLOORS,PRESLAB TURN FLOORS MONOL WITH GR OR GR MONOL PL PREFAB. 005 CB45B1 BUC. 31.000 SUSTAIN. FROM METALIC BEAMS EXTENSIBLE TO CONSTR.WITH H<20M BEAMS SUPPORT.ON METALIC STUDS 006 RPCH38A1 [ 2] BUC. 30.000 ROUND WOODEN PROP SUPPORT D= 12CM AT LINTELS OVER DOOR AND WINDOW OPENINGS 007 CC01C1 KG 1610.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 008 CZ0302A1 KG 275.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=6-
009 CZ0302E1 KG 590.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10010 CZ0302M1 KG 55.000 MANUFCT. REINFORC. FOR PLATES INCLUD. STAIRS TO REGULAR CONST. IN CENTRALIZED WORKSHOPS OB 37 D=6-8MM 011 CZ0302O1 KG 690.000 MANUFCT.REINFORC.FOR PLATES INCLUD. STAIRS TO REGULAR CONST.IN CENTRALIZED WORKSHOPS PC 52 D= 6-8MM 012 CP12A1 BUC. 7.000 ASSEMBL.PREFAB.TO HOUSING WITH STRUCT. MONOL.MIXED AND BRICKWORK.SUST.WITH.VOL. 0,2 MC.AND H<20 M 013 6433209 M.C. 0.300 CONCRETE PRECAST C16/20(B250) II AS32.5 0-16MM 014 6433376 KG 18.000 34
CONCRETE PREFABR.REINFOR. OB 37 D=6-10MM STANDARD 015 6433754 KG 10.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 016 6433754 KG 63.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 017 AUT1301 ORA 5952.000 EXPANDING METAL GIRDER L=3-5M TYPE GE1 3 SHIFTS 018 AUT1325 ORA 11904.000 EXPANDING METAL PROP PE3100 INCLUDING PIPE 051X3,5MM 019 TRA06A TONA 45.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. = KM 020 TRA02A TONA 1.610 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= KM. 021 AUT1140 ORA 30.000 TELESCOPIC JIB CRANE ON TYRES TELEMAC HT 125.5 TF 1 SHIFT 022 MDTC4623 BUC. 6.000 EQUIP.TRANSPORT 10 KM-65121002-TYRE CRANE OF 0,10-0,149 MN(10-14,9TF 023 MDTC5575 BUC. 62.000 EQUIPMENT TRANSPORTATION 10 KM-90100106 EXTENSIBLE METALLIC BEAM WITHL=4-8M TYPE CE-2 024 MDTC5552 BUC. 124.000 EQUIPMENT TRANSPORTATION 10 KM-90100079 METALLIC POP TYPE PE-3100 Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= TOTAL
Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: 35
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
36
List with work quantities Estimate - Tender: REZISTENCE FRAMEWORK Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CE17B1 MP. 125.000 WOODEN FRAMEWORK FOR HEAVY COVERS 002 2900980 M.C. FRAMEWORK SQUARED WOOD 5.500
003 7335349 ORA 38.000 TIMBER MANUFACT. AT CARPENTRY MACHINES 004 CE23A1 MP. 50.000 SAFETY NET REUSED FOR CONSTRUCTION COVERS 005 CN15D1 MP. 35.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 006 6310159 KG 16.000 JOIN.FRAMEWORK ELEM.LIGHT METALIC MANUFACT. 007 RPCR41B1 MP. 140.000 FIREPROOF WOODWORK ON PROTECTED SURFAC. ANT.CONTR.INCE.* 008 CA02M1 M.C. 1.000 REINFOR. CONCRETE MOULDING FOR CONSTR WITH H<35M IN ELEMENTS SHAPED ISOLATED WITH VOLUME>0,5MC 008 2100957 M.C. 1.008 CEMENT CONCRETE B 200(C12/15) STAS 3622 009 CB13B1 MP. 8.500 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 010 CC02C1 KG 150.000 ASSEMBL.REINFOR.FOR CONSTR H<35M FROM BARS IN BEAMS AND COLUMNS D<18MM PLATES D<10MM WITH DIST FROM PLASTIC 011 CZ0302A1 KG 27.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=637
012 CZ0302E1 KG 123.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10013 TRA06A05 TONA 2.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 014 TRA02A05 TONA 0.200 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM.
015 TRA02A10 TONA 2.750 ROAD TRANSPORT OF MATERIALS,SEMIFABS WITH TRUCK ON DIST.= 10 KM.
016 CF12A1 [ 1] MP. 2.750 RIGID WATERPROOFING ON M100T WALLS WITH APAPSTOP APPLIED IN 3 LAYERS ON HORIZ SURFACES UNDER WALLS ACC. TO TECHNICAL SPECIFICATIONS Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
= NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA01G1 M.C. 18.000 MAN. DIGGINGS IN SPREAD SPACES IN SOIL WITH NAT.MOISTURE THROWED IN VEHICLE ATH OF 0,61-2M HARD SOIL 002 TSC35B31 100 MC. 0.180 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
003 TRA01A TONA 33.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= KM
004 TSE06B1 100 MP. 0.900 SOIL PLATF.PREPARING ISOLATING LAYER AND SAND REPARTION OR GRAVEL IN COHESIVE SOIL 005 DA06A1 M.C. 14.000 NAT.AGREGG.LAYER(GRAVEL)ROLLED OVER WITH FILTRING RESISTANCE FUNCTION ISOL.AERING ANTICAP.MANUAL LAYING 006 TRA01A05 TONA 40.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 5 KM DIST.
007 DD02A1 MP. 90.000 PAVMENT MADE OF NORM PAVING 1ST Q. ON SAND SUB BASE
008 TRA01A10 TONA 16.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 10 KM.DIST.
009 DE11A1 M 76.000 SMALL CRIMPS MANUF.CONCRETE 10X15 CM FOR FRAMING SPACES WALK ROAD ,GREEN ALLEY FOUND. CONCRETE10 X 20 C 009 2100933 M.C. 2.000 CEMENT CONCRETE B 100(C6/7.5) STAS 3622 010 TRA06A TONA 5.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. = KM
CONCRETE FROM FOUNDATIONS AND ELEVATIONS 012 TRA01A TONA 120.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= KM
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: SOCIAL ENSURANCE QUOTE - CAS: UNEMPLOYMENT: HEALTH OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
40
QUANTITY LIST WITH TECHNOLOGICAL EQUIPMENT, INCLUDING UTILITIES OF THE ESTIMATEOFFER FOR PROCUREMENT
Item
Name
M.U.
Quantity
0 1 2
Water meter Qn=1.5 cubic meters/h Ecological tank for waste water, capacity 10 cubic meters Electric Boiler 10l
TOTAL
pcs pcs
1 1
pcs
1
Thousand lei: USD*):
Item
0 1.
1 Technical and Functional Parameters: -Type: multi-jet, and dry dial -Nominal output: 1.5 mc/h -Nominal diameter: 20 mm - Connection sizing: 3/4 -Connection type: coupling -Design pressure Pn 6 bars Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: -Accuracy category: B Guarantee and post-guarantee conditions: -3 years guarantee - 3 days for solving out issues occurred during the guarantee period
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
4.
41
5.
TECHNICAL SHEET No. 2 EQUIPMENT: ECOLOGICAL TANK FOR WASTE WATER Item Technical specifications imposed by the Technical Specifications Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2 Supplier
0 1.
2.
1 Technical and Functional Parameters: -Material: polyester -Net volume: 10 cubic meters -Diameter: 1.8 linear meters -Length: 4.15 linear meters -Installing: buried Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; Conditions related to compliance with relevant standards: -SR EN 12566-1 Guarantee and post-guarantee conditions: - 3 years guarantee. Other condition of technical character: Minimum life cycle: 30 years
3.
4.
5.
TECHNICAL SHEET No . 3 EQUIPMENT: ELECTRIC BOILER Item Technical specifications imposed by the Technical Specifications Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2 Supplier
0 1.
2.
3.
1 Technical and Functional Parameters: Hot water 80 0 C Capacity 10l Sizes: 360x254x360 Maximum pressure: Pn 10 bar Wasteful resistance power: 1.2 kW Power supply: 220 V Performance specs and conditions related to safety in exploitation: -Inside the boilers surface is covered by a special enamel layer; -It is fitted out by a programmable thermostat, magnesium anode, insulation, relief pressure valve, on-off switch. Performance specs and conditions related to safety in exploitation:
42
4.
5.
To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Guarantee and post-guarantee conditions: 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period. Other condition of technical character
Bill of quantities Estimate - Tender: ELECTRIC INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 EA02A1 [ 2] M 170.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=16/13,4MM 002 EA02A3 [ 2] M 8.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=25,8/21,8 MM 003 EA12A1 M 20.000 METALLIC,FLEXIBILE,PROTECTION,UNTIGHT TUBE, WITH 2 ROWS OF COILS IN QUADRILATERAL-SHAPE(SPD) 13,5-23 MM 003 7356501 M 20.500 METALIC TUBE FLEX.PROT.NONTIGHT TYPE SPD -ROMAN D=13,5 MM
004 EB02A1 M 280.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
288.400
005 EB02A1 M 340.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
350.200
006 EB02B1 M 30.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION 6- 10 MMP 43
30.900
007 ED01A1 BUC. 4.000 MANUAL SWITCH BURIED UNIPOLAR NORMAL OR WATERPROOF CONSTRUCTION *
4.040
008 ED03A1 BUC. 5.000 UNIPOLAR SWITCH BURIED,WOODEN NAILS,IN SERIES,NORM.CONSTR.OF BACHELITA OR WATERPROOF CONSTR. 008 5520366 BUC. CUMPANA SHIFTER ST.250V 10A 5.050
009 ED08A1 BUC. 1.000 PLUG BURIED ASSEM.NORMAL CONSTR. WATERPROOF OR NORMAL PROTECTION CONTACT
010 ED08B1 [ 1] BUC. DOUBLE TWIN PLUG WITH PROTECTION CONTACT RECESSED MOUNTED
9.000
011 ED01D1 BUC. 1.000 MANUAL SWITCH WOODEN NAILS IN UNIPOLAR NORMAL CONSTR. MADE OF BACHELITE OR TIGHT CONSTR. 011 5500677 BUC. 1.010 VISIBLY SET MANUAL SHIFTER 250V 10A
1.000
013 EE04A1 BUC. 2.000 SIMPLE LUMINAIRE (LAMP HOLDER) REGULAR, WITH NAIL AND RING
014
EE05A1
BUC.
3.000 44
3.036
015 EE08A1 [ 1] BUC. 1.000 CHANDELIER INCANDENSCENCE BULBS WITH 1 ARM 015 5105311 BUC. 1.003 INCANDENSCENCE BULBS 1 ARM CHANDELIER
016 EE08A1 BUC. 2.000 CHANDELIER INCANDENSCENCE BULBS WITH 2 ARMS 016 5105312 BUC. 2.006 INCANDENSCENCE BULBS 1 ARM CHANDELIER
017 EE08B1 BUC. 1.000 CHANDELIER INCANDENSCENCE BULBS WITH 3 ARMS 017 5105300 BUC. 1.003 INCANDENSCENCE BULBS 3 ARMS CHANDELIER
018 EE12B1 BUC. 1.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
018 5103611 BUC. 1.003 FLUOR.LUMINAIRE FIA 11-2X36 W EQUIPPED, APPARENT ASSEM.
019 EE12B1 BUC. 2.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
019 5103823 BUC. 2.006 FLUORESCENT LIGHT FIXTURES AB 02-1X18 W VISIBLY SET 020 EE14A1 BUC. 2.000 ASSEM.LAMP INSIDE.CONSTR.OR ON EXTER. ELEMENTS INCANDESCENCE UP TO 1000 W.
020 5101029 BUC. 2.100 INCANDESCENTE LAMP CLEAR E27 TIP S 220V 25W S6115
021
EE14A1
BUC.
11.000 45
021 5101251 BUC. 11.550 INCANDES LAMP DOUBLE SPIR.CLEAR E27 AM 220V 60W CS
022 EF05D1 [ 1] BUC. PANEL WITH PROTECTION CUT-OUT AND DIFER.FAULT CURRENT DEVICE + BELL AND SWITCH
1.000
022 7305451 BUC. 1.000 PANEL WITH 4 PROTECTION CUT-OUTS PHASE-NULL(1x 6A+2x16A+1x16A WITH DIFFER. PROT.DIVICE Id=30mA) BELL AND SWITCH 023 EF09A1 BUC. 6.000 COUPLING COPPER PIPE AT DEVICES BORNS , MOTORS,ELECTR.COUNTER COND.HAVING SECT. <10SQMM,EXCLUSIVELY
024 EG08B1 M 10.000 COND.EARTH CONNECTION LIGHTING ROD UNDERGROUND EARTH CONN.GALVANIZED STEEL STRIP 40X4MM IN HARD SOIL *
025 W1R06A1 M 3.000 ELECTRODE OF STEEL PIPE OF TWO AND A HALF INCHES FOR EARTH GROUNDING IN NORMAL GROUND 026 W1P08A BUC. 1.000 EARTH CONN.TESTING FOR BUILDING WIRING
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Bill of quantities Estimate - Tender: SANITARY INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 SA04B1 M 18.000 STEEL PIPE LONGIT.WELDED GALVAN.INSTAL. THREAD+COUPLING SET HOUSES+SOC.CULT. CONNECTIONS D= 1/2I 001 3306625 M 18.180 ZINCKED INSTLL. PIPE THREAD+COUPLING M - 15( 1/2) OL 32 1 S 7656
002 SA04C1 M 24.000 STEEL PIPE LONGIT.WELDED FOR ZINCKED INSTAL.WITH THREAD+COUPLING ASSEM.LOC.+ CULT.IN LEGATURI D= 3/4T 002 3306649 M 24.240 ZINCKED INSTLL. PIPE THREAD+COUPLING M - 20( 3/4) OL 32 1 S 7656
003 SA43C1 BUC. 10.000 CLAMP STEEL PIPE FIXING+PVC WATER+GAS SUPPLY,TOOTHING SET,PIPE HAVING D= 1/2 INCHES 004 SA43D1 BUC. 10.000 CLAMP STEEL PIPE FIXING+PVC WATER+GAS SUPPLY,TOOTHING SET,PIPE HAVING D= 3/4 INCHES 005 SA46A1 BUC. 6.000 MANUF.ASSEM.AND CEMENTATION OF PROTECTION PIPE PASSING PIPE THROUGH WALL,PIPE HAVING D=1 INCHES 006 SA46B1 BUC. 4.000 MANUFACT,SET AND ASSEMBLY OF PIPE PROTECTION AT PASSING OF PIPES THROUGH WALL,PIPE HAVING D=1 1/4 INCHES
007 SA46D1 BUC. 2.000 MANUFACT,SET AND ASSEMBLY OF PIPE PROTECTION AT PASSING OF PIPES THROUGH WALL,PIPE HAVING D=2 INCHES
47
011 SB16E1 [ 1] M 14.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D=110 MM
012 SB17A1 [ 1] BUC. 6.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 32MM
012 6712226 BUC. 6.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 32 CODE 62504011
013 SB17C1 [ 1] BUC. 6.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 50MM
013 6712243 BUC. 6.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 50 COD 62504029
014 SB17E1 [ 1] BUC. 10.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D=110 MM
014 6712408 BUC. 6.000 @POLYPROPILENE ELBOW HTD LA 87GR 30MIN DN 110 COD 62504059 014 6712264 BUC. 4.000 @HTD POLYPROPYLENE ELBOW AT 45 DGR DN 110 COD 62504053
015 SB19A1 [ 5] BUC. 2.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=50/40 MM
015 6712811
BUC.
2.000 48
016 SB19C1 [ 2] BUC. 2.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=110/ 50 MM
016 6712848 BUC. 2.000 @HTEA POLIPROP SIMPLE REDUCED BRANCH 45 DGR DN110/50 COD 62510031
017 SB19C1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.SIMPLE UNIFORM BRANCH RUBBER SEAL JOINING D=110 MM 017 6712862 BUC. 2.000 @HTEA POLIPROP SIMPLE EQUAL BRANCH 45 DGR DN 110 COD 62508025
018 SB21C1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.INTERVENTION PART RUBBER SEAL JOINING D=110 MM
019 SB22A1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.REDUCING PIECE RUBBER SEAL JOINING DN 40- 32 MM
020 SB22B1 [ 1] BUC. 2.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL DN 50- 32 MM
021 SB22E1 [ 1] BUC. 1.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL D=110- 50 MM
022 SB44C2 [ 1] BUC. HDPE GULLY TRAP D= 50 MM WITH 1 CONNECTION AND VERTICAL EXIT
2.000
024 SC01D3 [ 2] BUC. FIBRE GLASS BATH TUB FLAT BOTTOM IST Q. WHITE WITH L=1700MM
1.000
025 SC07E1 [ 1] BUC. 2.000 SANIT.PORCELAIN LAVATORY L2 600 ON STAND INCLD.FLOOR TRAP AND DELIVERY VALVE 49
026 SC10A1 BUC. 1.000 DISH WASHER OF ENAMEL COATING CAST IRON WITH SUPPORT SET BY WOODEN DOWELS ON WALL
027 SC13B1 BUC. 2.000 SANITARY PORCELAIN WATER CLOSET WITH SIPHON TRAP P COL2-A TYPE WHITE PORCELAIN C.1 027 2442757 BUC. 2.020 WATER CLOSET COL2-A WHITE PORCELAIN C.1 S 2066 028 SC16D1 [ 1] BUC. 2.000 RESERVOIR FOR WASHING WC BASIN FROM POLYPROPYLENE SET MIDHEIGHT ON BRICK WALL
2.000
030 2451849 BUC. 2.020 PORCELAIN SHELF TYPE E2.60 WHITE Q.1 NI 567
031 SC24A1 BUC. 2.000 BRASS TOWEL SUPPORT MOUNTED ON WALLS TYPE U,WITH 1 ARM, OPENING 450MM
1.000
034 SC29A1 BUC. 2.000 LAUNDRY HANGER OF ENAMELLED CAST IRON , SANITARY PORCELAIN OR PLASTIC MATERIAL TYPE 034 6719536 BUC. 2.000 BATHROOM PEG AMINOPLAST 3 HANGERS NI 2199
NI 545/63
036 SC34A1 BUC. 1.000 BOILER WITH PRESSURE BREAKING VESSEL CAPACITY 100L
037 SD03A1 BUC. 1.000 BATH MIXING BATTERY,WITH FLEXIBLE SHOWER,OF 1/2 INCH TYPE...ASSEM. WITH WOODEN DOWELS ON BRICKWALL 037 4201523 BUC. 1.000 BRASS MIXER BATTERY FLEXIBLE TUBE PEAR SHOWER A 1/2 NI 4309 038 SD06A1 BUC. LAVATORY COCK SYSTEM D=1/2" 2.000
038 4201341 BUC. 2.000 BATH MIXING BATTERY CAST IRON WASH BASIN 1/2" ENAMEL S8732
039 SD06A1 [ 1] BUC. 1.000 LAVATORY COCK SYSTEM FOR WASHER D=1/2"
039 4201444 BUC. 1.000 BATH MIXING BATTERY CAST IRON WASH BASIN ENAMEL 1/2" S8732
040 SD12A1 BUC. 6.000 CORNER ADJUSTMENT FAUCET,OF NICHELLED BRASS,HAVING D=3/8 OR D=1/2 INCHES
040 4201779 BUC. 6.000 NICKEL PLATED GRASS ANGLE CONTROL COCK 1 /2 " S 751/I
042 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
042 7344032 BUC. 2.000 SPHERE TAP FI X FE "MINI" DN 1/2" CODE 40MI4272
1/2"X 3/8"
044 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
044 7344045 BUC. 2.000 @SPHERE FAUCET EVAC+LID+PORTHOSE DN 1/2" CODE 40814762
045 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
045 7344030 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 1/2" CODE 40430425
046 SD13B1 [ 1] BUC. 5.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4''
046 7344059 BUC. 5.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
048 SF01A1 M 42.000 TIGHTENESS TEST AT PRES. OF INST. INTER. OF WATER,IN PIPES STEEL ZN. OR LEAD PRES. INCLUDING REINFORCED 049 SF04A1 [ 1] M WATER PIPES CLEANING AND PUTTING INTO OPERATION 42.000
050 CN13A1 M 42.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL 52
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: WATER AND SEWAGE SERVICES Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA02F1 M.C. 21.000 MAN.DIGGIN.IN LIMIT.SPACES UNDER 1M WITH R.O.W.VERT.UNSUPPORT.IN SOIL AVER.COHEZ. AND VERY COHEZ.DEPTH<1,5M HARD S. 002 TSA12C1 M.C. 4.500 MAN.DIGG.IN EXCAVATIONS 1-1,5M WIDE WITH SUPP.MAN.EVAC.IN SOIL WITH NAT.MOIST AT DEPTH 0,0-1,5M,HARD SOIL 003 TSC02B1 100 MC. DIGGING WITH TYRE EXCAVAT.0,21-0, 39 MC NAT.MOIST.DISCHARGE GROUND CAT.2 0.480
004 TSA18E2 M.C. 4.500 MAN.EXCAV. FOLLOWING MECHANICAL EXCAVATION HOLES.FOUND. ELEM.NAT.MOIST.SOIL WITH SUPPORT DEPTH< 4 M HARD SOIL 005 TSF01A1 MP. 70.000 SUPPORT.BY EDGES WITH BEECH SUPPRT. PLACED HORIZ.EDG.BETWEEN <1,5M,DEEP.0,02M,0,0 -0,2M BETWEEN EDGE 006 TSD01C1 M.C. 52.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 53
007 TSD05A1 100 MC. 0.520 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 008 ACA10A1 [ 2] M 12.000 UNDERGROUND SETTING AT WATER SUPPLY HDPE PIPES JOINED WITH FITTINGS THROUGH COMPRESSION,WITH DN 20-25 MM 008 6701146 M 12.240 @TV HDPE80 312UNI7611.7615 PN10 DN 25X2.3 COD 64000109 009 ACA17A2 BUC. 2.000 POLYETHILEN CONNECTION PIECES JOINED BY COMPRESSION FOR HDPE WATER SUPPLY PIPES 009 6790049 BUC. 2.000 @HDPE FEMALE QUICK JOINING80 DN25X1" COD WAVIN 704026
010 ACA12A1 [ 2] M 14.000 INSTALLING PVC PIPE IN GROUND 100 COMPACT SN 4 FOR EXTERIOR SEWAGE RUBBER TIGTH ELASTOM.RING D=110 MM 011 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
011 7344045 BUC. 1.000 @SPHERE FAUCET EVAC+LID+PORTHOSE DN 1/2" CODE 40814762
012 SD13B1 [ 1] BUC. 2.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4''
012 7344059 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
015 ACD01J1 BUC. 2.000 STAS 2308-81 FRAME AND CAP FOR SEWERS WITH CARRIAGEWAY SUPPORT PIECE III A 54
TYPE 016 ACD09G1 BUC. 1.000 CONCRETE MANHOLES SET SECT. CIRC. PR.TIP 1785-2 DI 1,5 M. H 1,5 WITHOUT UNDERGROUND WATER CARRIAGEWAY 017 ACD04A1 [ 3] BUC. 1.000 MANHOLE STAS 2448-73 WITH INSPECTING CHAMBER HC=1M OF CONCRETE PIPE WITH LIP AND NOSE FOR SEWERS WITH DN 110
0.038
017 2100933 M.C. 1.010 CEMENT CONCRETE B 100 (C6/7,5) STAS 3622
018 ACD07A1 M 1.000 ELEMENTS AT MANHOLES STAS WITH H>2 M INCLUDES: CONCRETE TUBE ACCESS DN 800 L= 1 M WITH FANCET AND OPENING 018 2101183 M.C. MANSONRY MORTAR M 100 S 1030 0.019
019 ACD03A1 M 2.500 STRINGER LADDED OL 50X10 AND STEPS OB D=20MM ACCESS IN SEWERS OF CONCRETE PIPES 020 ACE05A1 [ 1] BUC. 4.000 PVC PIECE FOR PIPING TIGHT PASSAGE THROUGH CONCRETE SEWERS WALLS
020 6311601 BUC. 2.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 32 MM WITH WATERPROOFING
020 6311607 BUC. 2.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 110 MM WITH WATERPROOFING
021 ACE07A1 100 M. 0.120 WATER PIPES WASHING AND DESINFECTION WITH DN 50
022 ACE08A1 M.C. 12.000 DITCH FILLING FOR WATER PIPE SUPPLY AND SEWERAGE WITH: SAND
55
12.000
023 TRA01A05 TONA 24.000 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH DUMP TRUCK DISTANCE= 5 KM
024 TRA01A05P TONA 48.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM
025 TRI1AA03C2 TONA 48.000 MATERIAL LOADING,GROUP A-HEAVY IN DUST, BY THROWING FROM PLATFORMS OR SOIL-CAR CATEG.2
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: VARIABLE ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 56
001 CB48A1 MP. 24.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1304 ORA 168.000 SELF-LIFTING METALIC SCAFFOLD 2 CASTLES 6MARCH 75KG/M H-31M L=12M 3SHIFTS 003 CI02A1 [10] MP. NATURAL LOCAL STONE PLATING INCL. MESH 24.000
003 2202200 SQ.M. 24.766 BANPOTOC 1 QUALITY G=2CM S LIMESTONE SLAB 6035 004 CG06C1 MP. 6.500 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 005 CH01B1 M 11.500 PLATED SIMPLE CONCRETE TREADS WITH PREFAB.TREADS AND RISERS WITH MARBLE MOSAIC 005 2802892 M 11.845 MANUFACT.MARBLE STAIR CASE NAT.COLOUR 005 2802957 M 11.845 MARBLE MOSAIC RISER NATURAL COLOUR 006 CE14A1 M 6.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 007 CF06A1 MP. 24.000 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM 007 2101203 PLASTER MORTAR M25T M.C. 0.528
008 CG07B1 M 8.000 MOSAIC PLINTHS OR GORGES CAST ON SITE SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 009 CH04A1 M CURRENT WOODEN HANDRAIL 6.000
009 2948144 M 6.300 OAK WOOD HANDRAIL PRECAST SECT. 40X80 MM 010 CL20B1 KG 52.000 APPARENT METALLIC MANUFACT. ASSEMBLYING: GRATES BANISTERS,TRAP DOOR,CHECKS, GRILL 010 6306274 KG 52.000 SIMPL.DECORATIVE LATTICE WORK FOR STAIRCASES,PROFILED STEEL BALCONY 57
011 CN11B1 MP. 5.500 DYE WORKS AT BANISTERS,GRID,METALLIC PARAPET WITH ALCHIDICAL ENAMEL 011 6108347 KG 0.385 REDISH BROWN ENAMEL UIC E.735-8 NTR 1703 -80
011 6100943 KG 0.440 ALCHID RED OXID PLASTER ROUGH G 735-3 012 CN09G1 MP. 18.000 PAINTINGS ON WOOD CARPENTERY ,DONE WITH 2 LAYERS ALCHIDIC LAQUER COLORLESS,AT DOORS,WINDOWS ,SHUTTER.RUL. 013 CO02B1 MP. 30.000 CONCRETE PLATES WALK SIDE FOR SAND PAVEMENTS,JOINTS FILLED WITH MASTIC 013 2800488 MP. 30.600 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM
014 IZF10F1 [ 3] MP. 24.000 50MM EXTRUDED POLYSTYRENE LAYER TO EXTERIOR WALLS GLUED BY BITUMINOUS CEMENT
015 RPCO56A1 [ 3] M 18.000 OAK WOOD BANISTERS AT PLATFORMS WITH SIZES OF 30 X 125MM AT 3 ROWS
016 CH01D1 M 9.000 SIMPLE CONCRETE TREADS TITIVATED OR ROLLED WITH CEMENT MORTAR M100-T CAREFULLY FINISHED Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT Indirect expenses: Profit: 58 TOTAL
TOTAL
BILL OF QUANTITIES Estimate - Tender: CONSTANT ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 132.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 390.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS
003 MDTC5517010 BUC. 2.000 EQUIPMENT TRANSPORT 10 KM 90100043 SELF-LIFTING METALLIC SCAFFOLDING WITH 2 CASTLES 004 CD04E1 M.C. 0.100 MASONRY FROM PRESSED BRICK 240X115X63MM AT BATHROOM TUB CLOSING, CAL.1
005 CD04C1 M.C. 2.000 RESSED BRICK MASONRY 240X115X63MM AT INSULATED CHIMNEY STACKS IN GARRET,QAL.1 005 2101171 M.C. MASONRY MORTAR M 50 S 1030 0.340
006 CD05A1 M.C. 32.000 BRICK MASONRY TYPE GVP AT BUILDINGS H <35M, SHAPE 240X115X 88MM,Q.A
6.720 59
007 CD04H1 M.C. 6.000 MASONRY FROM PRESSED BRICK 240X115X63M M AT BUILDING.H<35M, 12,5CM THICKNESS, Q. A,WITH VOIDS <50 % 007 2101169 M.C. MASONRY MORTAR M 25 S 1030 008 CE15B2 [ 1] M ALUMINIM WINDOW BOARDS 1.080
8.000
009 CF01K1 MP. 246.000 FLOATED INT.PLASTERS,AT COLUMNS,WALLS WITH SPRINKLER AND PLASTER ROUGH CAST MECHANICALLY PERFORMED,OF 2CM
M.C.
4.428
010 CF06K1 MP. 123.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 010 2101204 MORTAR M50T M.C. 2.829
123.000
012 CF10C1 MP. 316.000 PLASTER POLISHING APPLIED ON FLOATED INTERIOR PLASTERS 013 CG01E1 [ 5] MP. CEMENT SLAB FINISH FOR FLOORS 70.000
014 RPCK07D1 MP. RESINOUS WOODEN FLOORING OF 24MM THICK. NAILED ON OAK LATHS OF 50X80MM
52.000
015 CG06C1 MP. 9.500 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 016 CG06D1 MP. 8.500 MOSAIC FLOOR POURED ON SITE OF 1,5CM THICK.SIMPLE WITHOUT CRIMP ON SURF.>5MP WITH MARBLE MOSAIC 017 CG07B1 M 37.500 MOSAIC PLINTHS OR GORGES CAST ON SITE 60
SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 018 CG28B1 MP. 70.000 5MM DIFFERENCE SUPP.LAYER FOR CEMENT MORTAR FLOOR 018 2101200 M.C. 0.350 PLASTER MORTAR M 100 (LIME PASTE ) S 1030 019 CG26A1 MP. 18.000 POLISHING,INCLUDING MARBLE OR MARBLE MOSAIC GRAVEL WAXING FLOORS
021 CN04D1 MP. 44.000 DYE WORKS FOR INTERIOR AND EXTERIOR MANUALLY EXEC.WITH OIL PAINTS IN 2 LAYERS ON SMOOTH PLASTERS 021 6103309 KG 10.648 CREAM PAINT (FP) V.401-1 NTR 90-80
11.000
023 CK14A1 [ 2] MP. WHITE COLOR PVC DOORS WITH THERMO INSULATING GLASS 4+ 16+4MM
5.300
024 CK03A1 MP. 9.800 INTERIOR SIMPLE WOOD DOORS ONE LEAF ON LINING
024 2933300 MP. ONE LEAF TIMBER DOOR ON LINING FINISHED BY MANUFACTURER
9.800
025 CK03C1 MP. 3.300 INTERNAL SIMPLE WOOD DOORS IN 2 LEAFS ON LINING
025 2932150 MP. 3.300 2 LEAFS WOOD DOORS ON LININGS PAINTED AT PRODUCER
026 CK25C1 BUC. 2.000 CARPENTRY ACCESSORY WORKS APPLIED LOCK TO A YALE SYSTEM 61
026 6310380 BUC. SAFETY LOCK IN YALLE SYSTEM WITH DOOR BOLT
2.000
027 CK08A1 MP. 0.350 EXTRA DIFFERENCE AT LINING FOR DOORS WIDER THAN 19,5 CM.
028 CK09A1 [ 1] M 8.000 20CM WIDE PVC WINDOW BOARDS SET TO THE INTERIOR
029 CM02E1 MP. 4.000 DRAWN WINDOWS SIMPLE MEASURE FREE ON WOOD CARPENTERY 4-8MM THICK.WITH PUTTY AND WANG AT VITRI 029 2500327 MP. 4.360 CLEAR DRAWN GLASS Q.3 4MM. PACKED FREE SIZES S 853
030 CN06B1 [ 3] MP. 316.000 3 LAYER WHITE COLOR WASHABLE PAINTING FOR INTERIOR FOR WALLS
031 RPCK72A1 MP. 52.000 PALUX LAKE PARQUET LAQUERING IN THREE LAYERS
032 IZF10C1 [10] MP. 123.000 THERMINSULATING LAYER FOR WALLS OF EXPANDED POLYSTYRENE FOR FACADE OF 10CM THICK.INCLUDING MORTAR ADHESIVE AND SECURING NAILS
032 2602797 MP. 124.230 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461
033 2436887 BUC. 484.100 COLORED TILES FOR STOVES OF 240X220 1ST Q. S1798
033 7323475 BUC. 4.700 METALLIC SET TERRACOTTA STOVE (EG .GRILL) 62
4.700
034 TRA06A TONA 37.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: CONSTANT ARCHITECTURE GARRET Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 25.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 170.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS 63
003 CD05E1 M.C. 5.000 BRICK MASONRY GVP TYPE FOR CONSTR.H<35M, FORMAT 365X180X138MM,A Q. 003 2101169 M.C. MASONRY MORTAR M 25 S 1030 0.650
004 CD04C1 M.C. 1.850 RESSED BRICK MASONRY 240X115X63MM AT INSULATED CHIMNEY STACKS IN GARRET,QAL.1 004 2101171 M.C. MASONRY MORTAR M 50 S 1030 005 CE01A1 MP. BURNT CLAY SHAPED TILE COVER 0.315
160.000
005 2302983 BUC. 2560.000 DRAIN TILE WITH 1 BEAK Q1 390X230X11 S515 006 CE13A1 M 39.000 GALVANIZED PLATE DRAIN OF 0,5MM, MADE ON SITE SEMIROUND WITH D=15CM 007 CE14A1 M 21.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 008 CE15B2 [ 1] M ALUMINIM WINDOW BOARDS 009 CE19D1 [ 1] M TOOTHING EAVES FROM ONE SIDE PLANE BOARD AND RABBETED OF 70CM WIDE 1.200
55.000
009 2903830 M.C. 0.083 LONG RESIN BOARD SELVEDGED CLASS C THICK =24MM L=3,00M S 942 010 CF06A1 MP. 6.000 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM
M.C.
0.132
25.000
012 CF06K1 MP. 25.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 012 2101203 PLASTER MORTAR M25T M.C. 0.575
64
013 CK01A1 MP. 0.500 BUILDINGS WOODEN WINDOWS WITH H= 0- 35M WITH FRAME SURFACE < 1,00MP. 013 2938811 MP. 0.500 EXTERNAL SIMPLE RESIN WINDOWS OAK FRAME <0,50 SQM 014 VB34C1 BUC. 3.000 PROTECTION CAP FOR CIRCULAR SEWERS WITH PERIM. OF 701-1600 MM MADE.ON SITE DET. TYPE 61/0 015 CK09A1 M RESINOUS TIMBER LINTELS 1.000
015 2947800 M 1.000 RESINOUS WINDOW BOARD OF 30MM WIDE UP TO 120MM 016 CM02B1 MP. 0.500 DRAWN GLASSES SIMPLE FREE MEASURE ON WOOD CARPENTERY 2-3MM THICK. WITH PUTTYAND EYES NAILS>0,25MP 016 2500195 MP. 0.565 CLEAR DRAWN WINDOW Q.3 3MM. PACKED FREE SIZES S 853 017 CN09B1 MP. 0.250 DYE WORKS ON WOOD CARPENTRY,OIL PAINT IN 3 LAYERS AT DOORS AND WINDOWS 017 6103270 KG RED PAINT V.231-1 NTR 90-80 0.090
018 CN15B1 [ 4] MP. 300.000 PAINTING THE TIMBER BY FIREPROOF SOLUTIONS 019 CN15D1 MP. 75.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 020 CN01A1 MP. TWO LAYERS LIME MILK PAINTINGS (PAINTINGS) 6.000
021 CO15B1 BUC. 5.000 CLEANING WICHET AT DOUBLE CHIMNEY STACKS 022 CO02B1 [ 2] MP. 3.000 CONCRETE PRECAST SLABS 70 X70 X8CM LAID ON THE CLEANING DOOR AREA FOR THE CHIMNEY STACKS 022 2800488 MP. 3.060 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM
65
023 CO17A1 BUC. 1.000 HATCH TO NON-CIRCULATING TERRACE EXITS 0,8 X0.8M BEECH WOOD INSULATED WITH INSULATING MATERIAL OF 30MIN FIRE RESISTANT 024 CO23A1 MP. 81.000 BEECH BOARD WOOD FLOOR BOARDING OF 20MM THICKNESS 025 IZF10F1 [18] MP. 81.000 INSULATING MINERAL WOOL LAYER G80 TYPE 150MM THICK. COATED,AND ^=0.040 W/MK AND 0 KG/CUBIC METER TO THE FLOORING 026 IZF10C1 [ 5] MP. 25.000 THERMO-INSULATING LAYER FOR FLOOR WITH EXPANDED POLYSTYRENE 026 2602797 MP. 25.250 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461
027 IZF03B2 MP. 25.000 BARRIER AGAINST VAPOURS ON VERTICAL SURFACE WITH 1STR IMPISLIT BIT TYPE /A SAU TSA2000 LIP WITH BITUM TYPE
027 2600048 KG 37.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
027 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126
27.500
028 IZF02A1 MP. 25.000 ROOF VAPOUR DIFFUSION LAYER,TERRACCE WITH GLASS FIBRE KNITTING HORISONTAL SURFACE BITUMEN
028 2600048 KG 12.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
029 IZF01A1 MP. 25.000 SURFACE MILDING APPLY.VAPOURS DIFUSION LAYER WITH CUT BITUMEN IN 2 LAYERS HORIS.AND VERT.SURFACE
029 2600048 KG 3.750 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064 030 IZF04J2 MP. 25.000 66
BOUNDARY LAYER RELATED TO THE INSULATION WORK EXEC WITH FIBER GLASS FELTING AND NON GLUED BREAKDOWN
030 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126
27.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: - HEALTH - OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: RESISTANCE SUPER-STRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CA02J1 M.C. 18.000 MOULDING REINFOR.CONCRETE TO CONSTR.WITH H<35M,IN FLOORS(BEAMS,COLUMNS,PLATES) WITH SLAB THICKN.>10CM 001 2100957 M.C. 18.144 CEMENT CONCRETE B 200(C12/15) STAS 3622 002 CB13A1 MP. 116.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTRUCTIONS WITH H<20M TO SLABS AND BEAMS,WITH PLYWOOD OF 8MM 67
003 CB13B1 MP. 25.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 004 CB44A1 BUC. 62.000 SUST.WITH STUDS EXTENS PER3100R FOR ASSEMBLING FLOORS,PRESLAB TURN FLOORS MONOL WITH GR OR GR MONOL PL PREFAB. 005 CB45B1 BUC. 31.000 SUSTAIN. FROM METALIC BEAMS EXTENSIBLE TO CONSTR.WITH H<20M BEAMS SUPPORT.ON METALIC STUDS 006 RPCH38A1 [ 2] BUC. 30.000 ROUND WOODEN PROP SUPPORT D= 12CM AT LINTELS OVER DOOR AND WINDOW OPENINGS 007 CC01C1 KG 1610.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 008 CZ0302A1 KG 275.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=6-
009 CZ0302E1 KG 590.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10010 CZ0302M1 KG 55.000 MANUFCT. REINFORC. FOR PLATES INCLUD. STAIRS TO REGULAR CONST. IN CENTRALIZED WORKSHOPS OB 37 D=6-8MM 011 CZ0302O1 KG 690.000 MANUFCT.REINFORC.FOR PLATES INCLUD. STAIRS TO REGULAR CONST.IN CENTRALIZED WORKSHOPS PC 52 D= 6-8MM 012 CP12A1 BUC. 7.000 ASSEMBL.PREFAB.TO HOUSING WITH STRUCT. MONOL.MIXED AND BRICKWORK.SUST.WITH.VOL. 0,2 MC.AND H<20 M 013 6433209 M.C. 0.300 CONCRETE PRECAST C16/20(B250) II AS32.5 0-16MM 014 6433376 KG 18.000 CONCRETE PREFABR.REINFOR. OB 37 D=6-10MM STANDARD 015 6433754 KG 10.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 68
016 6433754 KG 63.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 017 AUT1301 ORA 5952.000 EXPANDING METAL GIRDER L=3-5M TYPE GE1 3 SHIFTS 018 AUT1325 ORA 11904.000 EXPANDING METAL PROP PE3100 INCLUDING PIPE 051X3,5MM 019 TRA06A TONA 45.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. = KM 020 TRA02A TONA 1.610 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= KM. 021 AUT1140 ORA 30.000 TELESCOPIC JIB CRANE ON TYRES TELEMAC HT 125.5 TF 1 SHIFT 022 MDTC4623 BUC. 6.000 EQUIP.TRANSPORT 10 KM-65121002-TYRE CRANE OF 0,10-0,149 MN(10-14,9TF 023 MDTC5575 BUC. 62.000 EQUIPMENT TRANSPORTATION 10 KM-90100106 EXTENSIBLE METALLIC BEAM WITHL=4-8M TYPE CE-2 024 MDTC5552 BUC. 124.000 EQUIPMENT TRANSPORTATION 10 KM-90100079 METALLIC POP TYPE PE-3100 Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= TOTAL
Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: - HEALTH - OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL 69
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: RESISTANCE INFRASTRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSC18A1 100 MC. 0.140 BULDOZER DIGGING ON TRACTOR 65-80CP INCL.EARTH PUSH. 10M CAT.1 LAND
002 TSA04B1 M.C. 27.500 MAN.DIGGING IN LIMITED SPACES UNDER 1M SUPPORTS AND MAN.EVAC.IN SOIL WITH NAT. HUMIDITY DEPTH.0,0-1,5M MEDIUM SOOL 003 TSC02D1 100 MC. 0.340 DIGGING WITH EXCAVATOR ON TYRES 0,21-0, 39 MC SOIL NATURAL MOISTURE OPEN AUT. FILED CATEGORY 2 004 TSD01C1 M.C. 39.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 005 TSD05A1 100 MC. 0.390 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 006 TRA01A05P TONA 66.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM
007 TSC35B31 100 MC. 0.650 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
008 TSF01B1 MP. 73.000 BANKS SUPPORT BY BEECH BOARDS HORIZ.LAID WIDTH<1.5M, DEPTH 0.02M;0,21-0,6M BETWEEN BOARDS 009 CG32D1 [ 5] M.C. FILLINGS IN LAYERS, EXECUTED BY MECHANICALLY COMPACTED GRAVEL 8.000
70
010 CA01B1 M.C. 48.700 SIMPLE CONCRETE MOULDING IN FOUNDATIONS (CONTINUOUS,ISOLATED)AND SOCLES WITH VOLUME > 3MC,AND IN RETAINIG WALLS 010 2100945 M.C. 49.090 CEMENT CONCRETE B 150(C8/10) STAS 3622
011 CA01D1 M.C. 12.200 SIMPLE CONCRETE MOULDING IN LAYERS OF 320CM THICKNESS AT CONSTRUCTIONS WITH H <35M 011 2100945 M.C. 9.374 CEMENT CONCRETE B 150(C8/10) STAS 3622
012 2100957 M.C. 2.923 CEMENT CONCRETE B 200(C12/15) STAS 3622 013 CB11A1 MP. 186.000 SHUTTERINGS FOR CONCRETE IN ELEV.FROM PANELS TO STRAIGHT WALL WITH H<3M,WITH PLYWOOD OF 8MM THICK. 013 CC01C1 KG 710.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 014 CZ0301A1 KG 340.000 MANUFAC.REINFOR.SHAPED BARS FOR FOUNDATION ISOL.CONTINUOUS AND PLATES IN.CENT.WORKSHOPS OB 37 D=6-8MM 015 CZ0301D1 KG 370.000 REINFORCED MANUFACTURED SHAPING BARS FOR CONTINOUS ISOLATED FOUNDATION AND PLATE FOUNDATION IN ATEL CENT.PC 52 D=6-8MM 016 TRA06A05 TONA 153.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 017 TRA02A05 TONA 0.710 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM.
018 IZF10F1 [14] MP. 63.300 EXTRUDED POLYSTYRENE INSULATION LAYER OF 100MM WITH = 0.03 W/MK > 35 KG UNDER THE REINFORCED CONCRETE SLAB 019 IZF04J1 [ 1] MP. 81.000 BOUNDARY LAYER EXEC BY POLYETHYLENE FOIL OF 0.2MM 71
020 CF12A1 [ 1] MP. 19.000 RIGID WATERPROOFING ON M100T WALLS WITH APAPSTOP APPLIED IN 3 LAYERS ON HORIZ SURFACES UNDER WALLS ACC. TO TECHNICAL SPECIFICATIONS Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT List with work quantities Estimate - Tender: REZISTENCE FRAMEWORK Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CE17B1 MP. 125.000 WOODEN FRAMEWORK FOR HEAVY COVERS 002 2900980 M.C. FRAMEWORK SQUARED WOOD 5.500
003 7335349 ORA 38.000 TIMBER MANUFACT. AT CARPENTRY MACHINES 004 CE23A1 MP. 50.000 SAFETY NET REUSED FOR CONSTRUCTION COVERS 72
005 CN15D1 MP. 35.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 006 6310159 KG 16.000 JOIN.FRAMEWORK ELEM.LIGHT METALIC MANUFACT. 007 RPCR41B1 MP. 140.000 FIREPROOF WOODWORK ON PROTECTED SURFAC. ANT.CONTR.INCE.* 008 CA02M1 M.C. 1.000 REINFOR. CONCRETE MOULDING FOR CONSTR WITH H<35M IN ELEMENTS SHAPED ISOLATED WITH VOLUME>0,5MC 008 2100957 M.C. 1.008 CEMENT CONCRETE B 200(C12/15) STAS 3622 009 CB13B1 MP. 8.500 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 010 CC02C1 KG 150.000 ASSEMBL.REINFOR.FOR CONSTR H<35M FROM BARS IN BEAMS AND COLUMNS D<18MM PLATES D<10MM WITH DIST FROM PLASTIC 011 CZ0302A1 KG 27.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=6012 CZ0302E1 KG 123.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10013 TRA06A05 TONA 2.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 014 TRA02A05 TONA 0.200 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM.
015 TRA02A10 TONA 2.750 ROAD TRANSPORT OF MATERIALS,SEMIFABS WITH TRUCK ON DIST.= 10 KM.
016 CF12A1 [ 1] MP. 2.750 RIGID WATERPROOFING ON M100T WALLS WITH APAPSTOP APPLIED IN 3 LAYERS ON HORIZ SURFACES UNDER WALLS ACC. TO TECHNICAL SPECIFICATIONS 73
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: PAVEMENT Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA01G1 M.C. 12.000 MAN. DIGGINGS IN SPREAD SPACES IN SOIL WITH NAT.MOISTURE THROWED IN VEHICLE ATH OF 0,61-2M HARD SOIL 002 TSC35B31 100 MC. 0.120 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
003 TRA01A05P TONA 22.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM
004 TSE06B1 100 MP. 0.600 SOIL PLATF.PREPARING ISOLATING LAYER AND SAND REPARTION OR GRAVEL IN COHESIVE SOIL 74
005 DA06A1 M.C. 9.000 NAT.AGREGG.LAYER(GRAVEL)ROLLED OVER WITH FILTRING RESISTANCE FUNCTION ISOL.AERING ANTICAP.MANUAL LAYING 006 TRA01A05 TONA 9.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 5 KM DIST.
007 DD02A1 MP. 60.000 PAVMENT MADE OF NORM PAVING 1ST Q. ON SAND SUB BASE
008 TRA01A05 TONA 12.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 5 KM DIST.
009 DE11A1 M 70.000 SMALL CRIMPS MANUF.CONCRETE 10X15 CM FOR FRAMING SPACES WALK ROAD ,GREEN ALLEY FOUND. CONCRETE10 X 20 C
010 TRA06A05 TONA 5.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
LOT NO. 3 Family House Zoltan Florina QUANTITY LIST WITH TECHNOLOGICAL EQUIPMENT, INCLUDING UTILITIES OF THE ESTIMATEOFFER FOR PROCUREMENT
Item
Name
M.U.
Quantity
0 1 2
Water meter Qn=1.5 cubic meters/h Ecological tank for waste water, capacity 10 cubic meters Electric Boiler 10l
TOTAL
pcs pcs
1 1
pcs
1
Thousand lei: USD*):
Item
Supplier
76
0 1.
1 Technical and Functional Parameters: -Type: multi-jet, and dry dial -Nominal output: 1.5 mc/h -Nominal diameter: 20 mm - Connection sizing: 3/4 -Connection type: coupling -Design pressure Pn 6 bars Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: -Accuracy category: B Guarantee and post-guarantee conditions: -3 years guarantee - 3 days for solving out issues occurred during the guarantee period Other condition of technical character:
2.
3.
4.
5.
TECHNICAL SHEET No. 2 EQUIPMENT: ECOLOGICAL TANK FOR WASTE WATER Item Technical specifications imposed by the Technical Specifications Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2 Supplier
0 1.
2.
1 Technical and Functional Parameters: -Material: polyester -Net volume: 10 cubic meters -Diameter: 1.8 linear meters -Length: 4.15 linear meters -Installing: buried Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; Conditions related to compliance with relevant standards: -SR EN 12566-1 Guarantee and post-guarantee conditions: - 3 years guarantee. Other condition of technical character: Minimum life cycle: 30 years
3.
4.
5.
77
TECHNICAL SHEET No . 3 EQUIPMENT: ELECTRIC BOILER Item Technical specifications imposed by the Technical Specifications Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2 Supplier
1 Technical and Functional Parameters: Hot water 80 0 C Capacity 10l Sizes: 360x254x360 Maximum pressure: Pn 10 bar Wasteful resistance power: 1.2 kW Power supply: 220 V 2. Performance specs and conditions related to safety in exploitation: -Inside the boilers surface is covered by a special enamel layer; -It is fitted out by a programmable thermostat, magnesium anode, insulation, relief pressure valve, on-off switch. 3. Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. 4. Guarantee and post-guarantee conditions: 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period. 5. Other condition of technical character Bill of quantities Estimate - Tender: ELECTRIC INSTALLATIONS 1.
Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 EA02A1 [ 2] M 170.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=16/13,4MM 002 EA02A3 [ 2] M 8.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=25,8/21,8 MM 003 EA12A1 M 20.000 METALLIC,FLEXIBILE,PROTECTION,UNTIGHT TUBE, WITH 2 ROWS OF COILS IN QUADRILATERAL-SHAPE(SPD) 13,5-23 MM 003 7356501 M 20.500 78
004 EB02A1 M 280.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
288.400
005 EB02A1 M 340.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
350.200
006 EB02B1 M 30.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION 6- 10 MMP
30.900
007 ED01A1 BUC. 4.000 MANUAL SWITCH BURIED UNIPOLAR NORMAL OR WATERPROOF CONSTRUCTION *
4.040
008 ED03A1 BUC. 5.000 UNIPOLAR SWITCH BURIED,WOODEN NAILS,IN SERIES,NORM.CONSTR.OF BACHELITA OR WATERPROOF CONSTR. 008 5520366 BUC. CUMPANA SHIFTER ST.250V 10A 5.050
009 ED08A1 BUC. 1.000 PLUG BURIED ASSEM.NORMAL CONSTR. WATERPROOF OR NORMAL PROTECTION CONTACT
010 ED08B1 [ 1] BUC. DOUBLE TWIN PLUG WITH PROTECTION CONTACT RECESSED MOUNTED
9.000
79
011 ED01D1 BUC. 1.000 MANUAL SWITCH WOODEN NAILS IN UNIPOLAR NORMAL CONSTR. MADE OF BACHELITE OR TIGHT CONSTR. 011 5500677 BUC. 1.010 VISIBLY SET MANUAL SHIFTER 250V 10A
1.000
013 EE04A1 BUC. 2.000 SIMPLE LUMINAIRE (LAMP HOLDER) REGULAR, WITH NAIL AND RING
014 EE05A1 BUC. 3.000 SIMPLE APPLY ,OBL./RIGHT.GLOB ST.OPAL. MONT.CEILING./WALLS ON WOOD DOWEL
3.036
015 EE08A1 [ 1] BUC. 1.000 CHANDELIER INCANDENSCENCE BULBS WITH 1 ARM 015 5105311 BUC. 1.003 INCANDENSCENCE BULBS 1 ARM CHANDELIER
016 EE08A1 BUC. 2.000 CHANDELIER INCANDENSCENCE BULBS WITH 2 ARMS 016 5105312 BUC. 2.006 INCANDENSCENCE BULBS 1 ARM CHANDELIER
017 EE08B1 BUC. 1.000 CHANDELIER INCANDENSCENCE BULBS WITH 3 ARMS 017 5105300 BUC. 1.003 INCANDENSCENCE BULBS 3 ARMS CHANDELIER
018 EE12B1 BUC. 1.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
018 5103611
BUC.
1.003 80
019 EE12B1 BUC. 2.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
019 5103823 BUC. 2.006 FLUORESCENT LIGHT FIXTURES AB 02-1X18 W VISIBLY SET
020 EE14A1 BUC. 2.000 ASSEM.LAMP INSIDE.CONSTR.OR ON EXTER. ELEMENTS INCANDESCENCE UP TO 1000 W. 020 5101029 BUC. 2.100 INCANDESCENTE LAMP CLEAR E27 TIP S 220V 25W S6115
021 EE14A1 BUC. 11.000 ASSEM.LAMP INSIDE.CONSTR.OR ON EXTER. ELEMENTS INCANDESCENCE UP TO 1000 W.
021 5101251 BUC. 11.550 INCANDES LAMP DOUBLE SPIR.CLEAR E27 AM 220V 60W CS
022 EF05D1 [ 1] BUC. PANEL WITH PROTECTION CUT-OUT AND DIFER.FAULT CURRENT DEVICE + BELL AND SWITCH
1.000
022 7305451 BUC. 1.000 PANEL WITH 4 PROTECTION CUT-OUTS PHASE-NULL(1x 6A+2x16A+1x16A WITH DIFFER. PROT.DIVICE Id=30mA) BELL AND SWITCH 023 EF09A1 BUC. 6.000 COUPLING COPPER PIPE AT DEVICES BORNS , MOTORS,ELECTR.COUNTER COND.HAVING SECT. <10SQMM,EXCLUSIVELY
024 EG08B1 M 10.000 COND.EARTH CONNECTION LIGHTING ROD UNDERGROUND EARTH CONN.GALVANIZED STEEL STRIP 40X4MM IN HARD SOIL *
025 W1R06A1 M 3.000 ELECTRODE OF STEEL PIPE OF TWO AND A HALF INCHES FOR EARTH GROUNDING IN NORMAL GROUND 026 W1P08A BUC. 1.000 81
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: SANITARY INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 SA04B1 M 18.000 STEEL PIPE LONGIT.WELDED GALVAN.INSTAL. THREAD+COUPLING SET HOUSES+SOC.CULT. CONNECTIONS D= 1/2I 001 3306625 M 18.180 ZINCKED INSTLL. PIPE THREAD+COUPLING M - 15( 1/2) OL 32 1 S 7656 002 SA04C1 M 24.000 STEEL PIPE LONGIT.WELDED FOR ZINCKED INSTAL.WITH THREAD+COUPLING ASSEM.LOC.+ CULT.IN LEGATURI D= 3/4T 002 3306649 M 24.240 ZINCKED INSTLL. PIPE THREAD+COUPLING M - 20( 3/4) OL 32 1 S 7656
SUPPLY,TOOTHING SET,PIPE HAVING D= 1/2 INCHES 004 SA43D1 BUC. 10.000 CLAMP STEEL PIPE FIXING+PVC WATER+GAS SUPPLY,TOOTHING SET,PIPE HAVING D= 3/4 INCHES 005 SA46A1 BUC. 6.000 MANUF.ASSEM.AND CEMENTATION OF PROTECTION PIPE PASSING PIPE THROUGH WALL,PIPE HAVING D=1 INCHES 006 SA46B1 BUC. 4.000 MANUFACT,SET AND ASSEMBLY OF PIPE PROTECTION AT PASSING OF PIPES THROUGH WALL,PIPE HAVING D=1 1/4 INCHES 007 SA46D1 BUC. 2.000 MANUFACT,SET AND ASSEMBLY OF PIPE PROTECTION AT PASSING OF PIPES THROUGH WALL,PIPE HAVING D=2 INCHES
011 SB16E1 [ 1] M 14.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D=110 MM
012 SB17A1 [ 1] BUC. 6.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 32MM 012 6712226 BUC. 6.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 32 CODE 62504011
013 SB17C1 [ 1] BUC. 6.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 50MM
013 6712243
BUC.
6.000 83
014 SB17E1 [ 1] BUC. 10.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D=110 MM
014 6712408 BUC. 6.000 @POLYPROPILENE ELBOW HTD LA 87GR 30MIN DN 110 COD 62504059
014 6712264 BUC. 4.000 @HTD POLYPROPYLENE ELBOW AT 45 DGR DN 110 COD 62504053 015 SB19A1 [ 5] BUC. 2.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=50/40 MM
015 6712811 BUC. 2.000 @HTEA POLIPROP REDUCED BRANCK 45GR DN50/ 40 COD 62510007
016 SB19C1 [ 2] BUC. 2.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=110/ 50 MM
016 6712848 BUC. 2.000 @HTEA POLIPROP SIMPLE REDUCED BRANCH 45 DGR DN110/50 COD 62510031
017 SB19C1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.SIMPLE UNIFORM BRANCH RUBBER SEAL JOINING D=110 MM
017 6712862 BUC. 2.000 @HTEA POLIPROP SIMPLE EQUAL BRANCH 45 DGR DN 110 COD 62508025
018 SB21C1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.INTERVENTION PART RUBBER SEAL JOINING D=110 MM
019 SB22A1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.REDUCING PIECE RUBBER SEAL JOINING DN 40- 32 MM
020 SB22B1 [ 1] BUC. 2.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL DN 50- 32 MM 84
021 SB22E1 [ 1] BUC. 1.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL D=110- 50 MM
022 SB44C2 [ 1] BUC. HDPE GULLY TRAP D= 50 MM WITH 1 CONNECTION AND VERTICAL EXIT
2.000
024 SC01D3 [ 2] BUC. FIBRE GLASS BATH TUB FLAT BOTTOM IST Q. WHITE WITH L=1700MM
1.000
025 SC07E1 [ 1] BUC. 2.000 SANIT.PORCELAIN LAVATORY L2 600 ON STAND INCLD.FLOOR TRAP AND DELIVERY VALVE
026 SC10A1 BUC. 1.000 DISH WASHER OF ENAMEL COATING CAST IRON WITH SUPPORT SET BY WOODEN DOWELS ON WALL
027 SC13B1 BUC. 2.000 SANITARY PORCELAIN WATER CLOSET WITH SIPHON TRAP P COL2-A TYPE WHITE PORCELAIN C.1 027 2442757 BUC. 2.020 WATER CLOSET COL2-A WHITE PORCELAIN C.1 S 2066 028 SC16D1 [ 1] BUC. 2.000 RESERVOIR FOR WASHING WC BASIN FROM POLYPROPYLENE SET MIDHEIGHT ON BRICK WALL
029 SC18A5 BUC. 2.000 WC BASIN FRAME,OF POLYPROPYLENE WITH LID 030 SC25A1 BUC. SANITARY PORCELAIN SHELF TYPE 2.000
030 2451849 BUC. 2.020 PORCELAIN SHELF TYPE E2.60 WHITE Q.1 NI 567
1.000
034 SC29A1 BUC. 2.000 LAUNDRY HANGER OF ENAMELLED CAST IRON , SANITARY PORCELAIN OR PLASTIC MATERIAL TYPE 034 6719536 BUC. 2.000 BATHROOM PEG AMINOPLAST 3 HANGERS NI 2199
036 SC34A1 BUC. 1.000 BOILER WITH PRESSURE BREAKING VESSEL CAPACITY 100L
037 SD03A1 BUC. 1.000 BATH MIXING BATTERY,WITH FLEXIBLE SHOWER,OF 1/2 INCH TYPE...ASSEM. WITH WOODEN DOWELS ON BRICKWALL 037 4201523 BUC. 1.000 BRASS MIXER BATTERY FLEXIBLE TUBE PEAR SHOWER A 1/2 NI 4309 038 SD06A1 BUC. LAVATORY COCK SYSTEM D=1/2" 2.000
038 4201341 BUC. 2.000 BATH MIXING BATTERY CAST IRON WASH BASIN 1/2" ENAMEL S8732 039 SD06A1 [ 1] BUC. 1.000 LAVATORY COCK SYSTEM FOR WASHER D=1/2"
039 4201444 BUC. 1.000 BATH MIXING BATTERY CAST IRON WASH BASIN ENAMEL 1/2" S8732
040 4201779 BUC. 6.000 NICKEL PLATED GRASS ANGLE CONTROL COCK 1 /2 " S 751/I
042 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
042 7344032 BUC. 2.000 SPHERE TAP FI X FE "MINI" DN 1/2" CODE 40MI4272
043 SA21B1 [ 1] BUC. 2.000 FLEXIBLE REINFORCED RUBBER CONNECTION 1/2"X 3/8"
044 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
044 7344045 BUC. 2.000 @SPHERE FAUCET EVAC+LID+PORTHOSE DN 1/2" CODE 40814762
045 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
045 7344030 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 1/2" CODE 40430425
046 SD13B1 [ 1] BUC. 5.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4''
046 7344059 BUC. 5.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
87
048 SF01A1 M 42.000 TIGHTENESS TEST AT PRES. OF INST. INTER. OF WATER,IN PIPES STEEL ZN. OR LEAD PRES. INCLUDING REINFORCED 049 SF04A1 [ 1] M WATER PIPES CLEANING AND PUTTING INTO OPERATION 42.000
050 CN13A1 M 42.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: WATER AND SEWAGE SERVICES Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA02F1 M.C. 86.000 MAN.DIGGIN.IN LIMIT.SPACES UNDER 1M WITH R.O.W.VERT.UNSUPPORT.IN SOIL AVER.COHEZ. AND VERY COHEZ.DEPTH<1,5M HARD S. 88
002 TSA12C1 M.C. 9.000 MAN.DIGG.IN EXCAVATIONS 1-1,5M WIDE WITH SUPP.MAN.EVAC.IN SOIL WITH NAT.MOIST AT DEPTH 0,0-1,5M,HARD SOIL 003 TSC02B1 100 MC. DIGGING WITH TYRE EXCAVAT.0,21-0, 39 MC NAT.MOIST.DISCHARGE GROUND CAT.2 0.480
004 TSA18E2 M.C. 4.500 MAN.EXCAV. FOLLOWING MECHANICAL EXCAVATION HOLES.FOUND. ELEM.NAT.MOIST.SOIL WITH SUPPORT DEPTH< 4 M HARD SOIL 005 TSF01A1 MP. 88.000 SUPPORT.BY EDGES WITH BEECH SUPPRT. PLACED HORIZ.EDG.BETWEEN <1,5M,DEEP.0,02M,0,0 -0,2M BETWEEN EDGE 006 TSD01C1 M.C. 90.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 007 TSD05A1 100 MC. 0.900 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 008 ACA10A1 [ 2] M 62.000 UNDERGROUND SETTING AT WATER SUPPLY HDPE PIPES JOINED WITH FITTINGS THROUGH COMPRESSION,WITH DN 20-25 MM 008 6701146 M 63.240 @TV HDPE80 312UNI7611.7615 PN10 DN 25X2.3 COD 64000109 009 ACA17A2 BUC. 2.000 POLYETHILEN CONNECTION PIECES JOINED BY COMPRESSION FOR HDPE WATER SUPPLY PIPES
009 6790049 BUC. 2.000 @FEMALE QUICK JOINING HDPE80 DN25X1" COD WAVIN 704026
011 ACA12A1 [ 2] M 44.000 INSTALLING PVC PIPE IN GROUND 100 COMPACT SN 4 FOR EXTERIOR SEWAGE RUBBER TIGTH ELASTOM.RING D=110 MM 012 ACA17A1 [ 2] BUC. 4.000 PVC CONNECTING PIECE WITH WEIGTH PER 89
PIECE UP TO10 KG INCLUDING 012 6712233 BUC. 4.000 @ PVC-U ELBOW PIPEKGB 45 GR DN 110
013 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
013 7344045 BUC. 1.000 @SPHERE FAUCET EVAC+LID+PORTHOSE DN 1/2" CODE 40814762
014 SD13B1 [ 1] BUC. 2.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4''
014 7344059 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
017 ACD01J1 BUC. 4.000 STAS 2308-81 FRAME AND CAP FOR SEWERS WITH CARRIAGEWAY SUPPORT PIECE III A TYPE 018 ACD09G1 BUC. 1.000 CONCRETE MANHOLES SET SECT. CIRC. PR.TIP 1785-2 DI 1,5 M. H 1,5 WITHOUT UNDERGROUND WATER CARRIAGEWAY 019 ACD04A1 [ 3] BUC. 3.000 MANHOLE STAS 2448-73 WITH INSPECTING CHAMBER HC=1M OF CONCRETE PIPE WITH LIP AND NOSE FOR SEWERS WITH DN 110 019 2101195 M.C. MORTAR M100 T WITH LIME HYDRATING 0.114
019 2100933 M.C. 3.030 CEMENT CONCRETE B 100 (C6/7,5) STAS 3622
020 ACD07A1 M 1.000 ELEMENTS AT MANHOLES STAS WITH H>2 M INCLUDES: CONCRETE TUBE ACCESS DN 800 L= 1 M WITH FANCET AND OPENING 90
0.019
021 ACD03A1 M 2.500 STRINGER LADDED OL 50X10 AND STEPS OB D=20MM ACCESS IN SEWERS OF CONCRETE PIPES
022 ACE05A1 [ 1] BUC. 8.000 PVC PIECE FOR PIPING TIGHT PASSAGE THROUGH CONCRETE SEWERS WALLS
022 6311601 BUC. 2.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 32 MM WITH WATERPROOFING
022 6311607 BUC. 6.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 110 MM WITH WATERPROOFING
023 ACE07A1 100 M. 0.620 WATER PIPES WASHING AND DESINFECTION WITH DN 50
024 ACE08A1 M.C. 34.000 DITCH FILLING FOR WATER PIPE SUPPLY AND SEWERAGE WITH: SAND
62.000
025 TRA01A05 TONA 68.000 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH DUMP TRUCK DISTANCE= 5 KM
026 TRA01A05P TONA 96.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM
027 TRI1AA03C2 TONA 96.000 MATERIAL LOADING,GROUP A-HEAVY IN DUST, BY THROWING FROM PLATFORMS OR SOIL-CAR CATEG.2 Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= TOTAL
91
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: VARIABLE ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 21.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1304 ORA 162.000 SELF-LIFTING METALIC SCAFFOLD 2 CASTLES 6MARCH 75KG/M H-31M L=12M 3SHIFTS 003 CI02A1 [10] MP. NATURAL LOCAL STONE PLATING INCL. MESH 21.000
003 2202200 SQ.M. 21.420 BANPOTOC 1 QUALITY G=2CM S LIMESTONE SLAB 6035 004 CG06C1 MP. 6.500 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 005 CH01B1 M 11.500 PLATED SIMPLE CONCRETE TREADS WITH PREFAB.TREADS AND RISERS WITH MARBLE MOSAIC 92
005 2802892 M 11.845 MANUFACT.MARBLE STAIR CASE NAT.COLOUR 005 2802957 M 11.845 MARBLE MOSAIC RISER NATURAL COLOUR 006 CE14A1 M 6.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 007 CF06A1 MP. 21.000 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM 007 2101203 PLASTER MORTAR M25T M.C. 0.462
008 CG07B1 M 8.000 MOSAIC PLINTHS OR GORGES CAST ON SITE SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 009 CH04A1 M CURRENT WOODEN HANDRAIL 6.000
009 2948144 M 6.300 OAK WOOD HANDRAIL PRECAST SECT. 40X80 MM 010 CL20B1 KG 52.000 APPARENT METALLIC MANUFACT. ASSEMBLYING: GRATES BANISTERS,TRAP DOOR,CHECKS, GRILL 010 6306274 KG 52.000 SIMPL.DECORATIVE LATTICE WORK FOR STAIRCASES,PROFILED STEEL BALCONY 011 CN11B1 MP. 5.500 DYE WORKS AT BANISTERS,GRID,METALLIC PARAPET WITH ALCHIDICAL ENAMEL 011 6108347 KG 0.385 REDISH BROWN ENAMEL UIC E.735-8 NTR 1703 -80 011 6100943 KG 0.440 ALCHID RED OXID PLASTER ROUGH G 735-3 012 CN09G1 MP. 18.000 PAINTINGS ON WOOD CARPENTERY ,DONE WITH 2 LAYERS ALCHIDIC LAQUER COLORLESS,AT DOORS,WINDOWS ,SHUTTER.RUL. 013 CO02B1 MP. 30.000 CONCRETE PLATES WALK SIDE FOR SAND PAVEMENTS,JOINTS FILLED WITH MASTIC 013 2800488 MP. 30.600 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM 014 IZF10F1 [ 3] MP. 21.000 50MM EXTRUDED POLYSTYRENE LAYER TO 93
EXTERIOR WALLS GLUED BY BITUMINOUS CEMENT 015 RPCO56A1 [ 3] M 18.000 OAK WOOD BANISTERS AT PLATFORMS WITH SIZES OF 30 X 125MM AT 3 ROWS
016 CH01D1 M 9.000 SIMPLE CONCRETE TREADS TITIVATED OR ROLLED WITH CEMENT MORTAR M100-T CAREFULLY FINISHED Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: SOCIAL ENSURANCE QUOTE - CAS: UNEMPLOYMENT: HEALTH OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT BILL OF QUANTITIES Estimate - Tender: CONSTANT ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 132.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 390.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS
003 MDTC5517010 BUC. 2.000 EQUIPMENT TRANSPORT 10 KM 90100043 SELF-LIFTING METALLIC SCAFFOLDING WITH 2 94
CASTLES 004 CD04E1 M.C. 0.100 MASONRY FROM PRESSED BRICK 240X115X63MM AT BATHROOM TUB CLOSING, CAL.1
005 CD04C1 M.C. 2.000 RESSED BRICK MASONRY 240X115X63MM AT INSULATED CHIMNEY STACKS IN GARRET,QAL.1
0.340
006 CD05A1 M.C. 32.000 BRICK MASONRY TYPE GVP AT BUILDINGS H <35M, SHAPE 240X115X 88MM,Q.A
6.720
007 CD04H1 M.C. 6.000 MASONRY FROM PRESSED BRICK 240X115X63M M AT BUILDING.H<35M, 12,5CM THICKNESS, Q. A,WITH VOIDS <50 % 007 2101169 M.C. MASONRY MORTAR M 25 S 1030 008 CE15B2 [ 1] M ALUMINIM WINDOW BOARDS 1.080
8.000
009 CF01K1 MP. 246.000 FLOATED INT.PLASTERS,AT COLUMNS,WALLS WITH SPRINKLER AND PLASTER ROUGH CAST MECHANICALLY PERFORMED,OF 2CM
M.C.
4.428
010 CF06K1 MP. 123.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 010 2101204 MORTAR M50T M.C. 2.829
011 CF06C1 [ 6] MP. OUTER DECORATIVE PLASTER OR SIMILAR 012 CF10C1 MP.
123.000
316.000 95
PLASTER POLISHING APPLIED ON FLOATED INTERIOR PLASTERS 013 CG01E1 [ 5] MP. CEMENT SLAB FINISH FOR FLOORS 70.000
014 RPCK07D1 MP. RESINOUS WOODEN FLOORING OF 24MM THICK. NAILED ON OAK LATHS OF 50X80MM
52.000
015 CG06C1 MP. 9.500 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 016 CG06D1 MP. 8.500 MOSAIC FLOOR POURED ON SITE OF 1,5CM THICK.SIMPLE WITHOUT CRIMP ON SURF.>5MP WITH MARBLE MOSAIC 017 CG07B1 M 37.500 MOSAIC PLINTHS OR GORGES CAST ON SITE SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 018 CG28B1 MP. 70.000 5MM DIFFERENCE SUPP.LAYER FOR CEMENT MORTAR FLOOR 018 2101200 M.C. 0.350 PLASTER MORTAR M 100 (LIME PASTE ) S 1030 019 CG26A1 MP. 18.000 POLISHING,INCLUDING MARBLE OR MARBLE MOSAIC GRAVEL WAXING FLOORS
021 CN04D1 MP. 44.000 DYE WORKS FOR INTERIOR AND EXTERIOR MANUALLY EXEC.WITH OIL PAINTS IN 2 LAYERS ON SMOOTH PLASTERS 021 6103309 KG 10.648 CREAM PAINT (FP) V.401-1 NTR 90-80
11.000
023 CK14A1 [ 2] MP. WHITE COLOR PVC DOORS WITH THERMO INSULATING GLASS 4+ 16+4MM
5.300
96
024 CK03A1 MP. 9.800 INTERIOR SIMPLE WOOD DOORS ONE LEAF ON LINING
024 2933300 MP. ONE LEAF TIMBER DOOR ON LINING FINISHED BY MANUFACTURER
9.800
025 CK03C1 MP. 3.300 INTERNAL SIMPLE WOOD DOORS IN 2 LEAFS ON LINING
025 2932150 MP. 3.300 2 LEAFS WOOD DOORS ON LININGS PAINTED AT PRODUCER
026 CK25C1 BUC. 2.000 CARPENTRY ACCESSORY WORKS APPLIED LOCK TO A YALE SYSTEM
026 6310380 BUC. SAFETY LOCK IN YALLE SYSTEM WITH DOOR BOLT
2.000
027 CK08A1 MP. 0.350 EXTRA DIFFERENCE AT LINING FOR DOORS WIDER THAN 19,5 CM.
028 CK09A1 [ 1] M 8.000 20CM WIDE PVC WINDOW BOARDS SET TO THE INTERIOR
029 CM02E1 MP. 4.000 DRAWN WINDOWS SIMPLE MEASURE FREE ON WOOD CARPENTERY 4-8MM THICK.WITH PUTTY AND WANG AT VITRI 029 2500327 MP. 4.360 CLEAR DRAWN GLASS Q.3 4MM. PACKED FREE SIZES S 853 030 CN06B1 [ 3] MP. 316.000 3 LAYER WHITE COLOR WASHABLE PAINTING FOR INTERIOR FOR WALLS
031 RPCK72A1 MP. 52.000 PALUX LAKE PARQUET LAQUERING IN THREE LAYERS
032
IZF10C1
[10] MP.
123.000 97
THERMINSULATING LAYER FOR WALLS OF EXPANDED POLYSTYRENE FOR FACADE OF 10CM THICK.INCLUDING MORTAR ADHESIVE AND SECURING NAILS
032 2602797 MP. 124.230 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461
033 2436887 BUC. 484.100 COLORED TILES FOR STOVES OF 240X220 1ST Q. S1798
033 7323475 BUC. 4.700 METALLIC SET TERRACOTTA STOVE (EG .GRILL) FROM NES CAST IRON
4.700
034 TRA06A TONA 37.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: CONSTANT ARCHITECTURE GARRET Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 25.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 170.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS 003 CD05E1 M.C. 5.000 BRICK MASONRY GVP TYPE FOR CONSTR.H<35M, FORMAT 365X180X138MM,A Q. 003 2101169 M.C. MASONRY MORTAR M 25 S 1030 0.650
004 CD04C1 M.C. 1.850 RESSED BRICK MASONRY 240X115X63MM AT INSULATED CHIMNEY STACKS IN GARRET,QAL.1 004 2101171 M.C. MASONRY MORTAR M 50 S 1030 005 CE01A1 MP. BURNT CLAY SHAPED TILE COVER 0.315
160.000
005 2302983 BUC. 2560.000 DRAIN TILE WITH 1 BEAK Q1 390X230X11 S515 006 CE13A1 M 39.000 GALVANIZED PLATE DRAIN OF 0,5MM, MADE ON SITE SEMIROUND WITH D=15CM 007 CE14A1 M 21.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 008 CE15B2 [ 1] M ALUMINIM WINDOW BOARDS 009 CE19D1 [ 1] M TOOTHING EAVES FROM ONE SIDE PLANE BOARD AND RABBETED OF 70CM WIDE 009 2903830 M.C. 1.200
55.000
0.083 99
LONG RESIN BOARD SELVEDGED CLASS C THICK =24MM L=3,00M S 942 010 CF06A1 MP. 6.000 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM
M.C.
0.132
25.000
012 CF06K1 MP. 25.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 012 2101203 PLASTER MORTAR M25T M.C. 0.575
013 CK01A1 MP. 0.500 BUILDINGS WOODEN WINDOWS WITH H= 0- 35M WITH FRAME SURFACE < 1,00MP. 013 2938811 MP. 0.500 EXTERNAL SIMPLE RESIN WINDOWS OAK FRAME <0,50 SQM 014 VB34C1 BUC. 3.000 PROTECTION CAP FOR CIRCULAR SEWERS WITH PERIM. OF 701-1600 MM MADE.ON SITE DET. TYPE 61/0 015 CK09A1 M RESINOUS TIMBER LINTELS 1.000
015 2947800 M 1.000 RESINOUS WINDOW BOARD OF 30MM WIDE UP TO 120MM 016 CM02B1 MP. 0.500 DRAWN GLASSES SIMPLE FREE MEASURE ON WOOD CARPENTERY 2-3MM THICK. WITH PUTTYAND EYES NAILS>0,25MP 016 2500195 MP. 0.565 CLEAR DRAWN WINDOW Q.3 3MM. PACKED FREE SIZES S 853 017 CN09B1 MP. 0.250 DYE WORKS ON WOOD CARPENTRY,OIL PAINT IN 3 LAYERS AT DOORS AND WINDOWS 017 6103270 KG RED PAINT V.231-1 NTR 90-80 0.090
018 CN15B1 [ 4] MP. 300.000 PAINTING THE TIMBER BY FIREPROOF SOLUTIONS 100
019 CN15D1 MP. 75.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 020 CN01A1 MP. TWO LAYERS LIME MILK PAINTINGS (PAINTINGS) 6.000
021 CO15B1 BUC. 5.000 CLEANING WICHET AT DOUBLE CHIMNEY STACKS 022 CO02B1 [ 2] MP. 3.000 CONCRETE PRECAST SLABS 70 X70 X8CM LAID ON THE CLEANING DOOR AREA FOR THE CHIMNEY STACKS 022 2800488 MP. 3.060 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM
023 CO17A1 BUC. 1.000 HATCH TO NON-CIRCULATING TERRACE EXITS 0,8 X0.8M BEECH WOOD INSULATED WITH INSULATING MATERIAL OF 30MIN FIRE RESISTANT 024 CO23A1 MP. 81.000 BEECH BOARD WOOD FLOOR BOARDING OF 20MM THICKNESS 025 IZF10F1 [18] MP. 81.000 INSULATING MINERAL WOOL LAYER G80 TYPE 150MM THICK. COATED,AND ^=0.040 W/MK AND 0 KG/CUBIC METER TO THE FLOORING 026 IZF10C1 [ 5] MP. 25.000 THERMO-INSULATING LAYER FOR FLOOR WITH EXPANDED POLYSTYRENE 026 2602797 MP. 25.250 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461
027 IZF03B2 MP. 25.000 BARRIER AGAINST VAPOURS ON VERTICAL SURFACE WITH 1STR IMPISLIT BIT TYPE /A SAU TSA2000 LIP WITH BITUM TYPE
027 2600048 KG 37.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
027 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126
27.500
101
028 IZF02A1 MP. 25.000 ROOF VAPOUR DIFFUSION LAYER,TERRACCE WITH GLASS FIBRE KNITTING HORISONTAL SURFACE BITUMEN
028 2600048 KG 12.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
029 IZF01A1 MP. 25.000 SURFACE MILDING APPLY.VAPOURS DIFUSION LAYER WITH CUT BITUMEN IN 2 LAYERS HORIS.AND VERT.SURFACE
029 2600048 KG 3.750 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064 030 IZF04J2 MP. 25.000 BOUNDARY LAYER RELATED TO THE INSULATION WORK EXEC WITH FIBER GLASS FELTING AND NON GLUED BREAKDOWN
030 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126
27.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: - HEALTH - OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities 102
Estimate - Tender: RESISTANCE INFRASTRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSC18A1 100 MC. 0.140 BULDOZER DIGGING ON TRACTOR 65-80CP INCL.EARTH PUSH. 10M CAT.1 LAND
002 TSA04B1 M.C. 27.500 MAN.DIGGING IN LIMITED SPACES UNDER 1M SUPPORTS AND MAN.EVAC.IN SOIL WITH NAT. HUMIDITY DEPTH.0,0-1,5M MEDIUM SOOL 003 TSC02D1 100 MC. 0.340 DIGGING WITH EXCAVATOR ON TYRES 0,21-0, 39 MC SOIL NATURAL MOISTURE OPEN AUT. FILED CATEGORY 2 004 TSD01C1 M.C. 39.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 005 TSD05A1 100 MC. 0.390 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 006 TRA01A05P TONA 66.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM
007 TSC35B31 100 MC. 0.650 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
008 TSF01B1 MP. 73.000 BANKS SUPPORT BY BEECH BOARDS HORIZ.LAID WIDTH<1.5M, DEPTH 0.02M;0,21-0,6M BETWEEN BOARDS 009 CG32D1 [ 5] M.C. FILLINGS IN LAYERS, EXECUTED BY MECHANICALLY COMPACTED GRAVEL 8.000
010 CA01B1 M.C. 48.700 SIMPLE CONCRETE MOULDING IN FOUNDATIONS (CONTINUOUS,ISOLATED)AND SOCLES WITH VOLUME > 3MC,AND IN RETAINIG WALLS 010 2100945 M.C. 49.090 CEMENT CONCRETE B 150(C8/10) STAS 3622 103
011 CA01D1 M.C. 12.200 SIMPLE CONCRETE MOULDING IN LAYERS OF 320CM THICKNESS AT CONSTRUCTIONS WITH H <35M 011 2100945 M.C. 9.374 CEMENT CONCRETE B 150(C8/10) STAS 3622
012 2100957 M.C. 2.923 CEMENT CONCRETE B 200(C12/15) STAS 3622 013 CB11A1 MP. 186.000 SHUTTERINGS FOR CONCRETE IN ELEV.FROM PANELS TO STRAIGHT WALL WITH H<3M,WITH PLYWOOD OF 8MM THICK. 013 CC01C1 KG 710.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 014 CZ0301A1 KG 340.000 MANUFAC.REINFOR.SHAPED BARS FOR FOUNDATION ISOL.CONTINUOUS AND PLATES IN.CENT.WORKSHOPS OB 37 D=6-8MM 015 CZ0301D1 KG 370.000 REINFORCED MANUFACTURED SHAPING BARS FOR CONTINOUS ISOLATED FOUNDATION AND PLATE FOUNDATION IN ATEL CENT.PC 52 D=6-8MM 016 TRA06A05 TONA 153.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 017 TRA02A05 TONA 0.710 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM.
018 IZF10F1 [14] MP. 63.300 EXTRUDED POLYSTYRENE INSULATION LAYER OF 100MM WITH = 0.03 W/MK > 35 KG UNDER THE REINFORCED CONCRETE SLAB 019 IZF04J1 [ 1] MP. 81.000 BOUNDARY LAYER EXEC BY POLYETHYLENE FOIL OF 0.2MM
020 CF12A1 [ 1] MP. 19.000 RIGID WATERPROOFING ON M100T WALLS WITH APAPSTOP APPLIED IN 3 LAYERS ON HORIZ SURFACES UNDER WALLS ACC. TO TECHNICAL SPECIFICATIONS Direct expensive from items: 104
WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED:
TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: RESISTANCE SUPER-STRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CA02J1 M.C. 18.000 MOULDING REINFOR.CONCRETE TO CONSTR.WITH H<35M,IN FLOORS(BEAMS,COLUMNS,PLATES) WITH SLAB THICKN.>10CM 001 2100957 M.C. 18.144 CEMENT CONCRETE B 200(C12/15) STAS 3622 002 CB13A1 MP. 116.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTRUCTIONS WITH H<20M TO SLABS AND BEAMS,WITH PLYWOOD OF 8MM 003 CB13B1 MP. 25.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 105
004 CB44A1 BUC. 62.000 SUST.WITH STUDS EXTENS PER3100R FOR ASSEMBLING FLOORS,PRESLAB TURN FLOORS MONOL WITH GR OR GR MONOL PL PREFAB. 005 CB45B1 BUC. 31.000 SUSTAIN. FROM METALIC BEAMS EXTENSIBLE TO CONSTR.WITH H<20M BEAMS SUPPORT.ON METALIC STUDS 006 RPCH38A1 [ 2] BUC. 30.000 ROUND WOODEN PROP SUPPORT D= 12CM AT LINTELS OVER DOOR AND WINDOW OPENINGS 007 CC01C1 KG 1610.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 008 CZ0302A1 KG 275.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=6-
009 CZ0302E1 KG 590.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10010 CZ0302M1 KG 55.000 MANUFCT. REINFORC. FOR PLATES INCLUD. STAIRS TO REGULAR CONST. IN CENTRALIZED WORKSHOPS OB 37 D=6-8MM 011 CZ0302O1 KG 690.000 MANUFCT.REINFORC.FOR PLATES INCLUD. STAIRS TO REGULAR CONST.IN CENTRALIZED WORKSHOPS PC 52 D= 6-8MM 012 CP12A1 BUC. 7.000 ASSEMBL.PREFAB.TO HOUSING WITH STRUCT. MONOL.MIXED AND BRICKWORK.SUST.WITH.VOL. 0,2 MC.AND H<20 M 013 6433209 M.C. 0.300 CONCRETE PRECAST C16/20(B250) II AS32.5 0-16MM 014 6433376 KG 18.000 CONCRETE PREFABR.REINFOR. OB 37 D=6-10MM STANDARD 015 6433754 KG 10.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 016 6433754 KG 63.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 017 AUT1301 ORA 5952.000 106
EXPANDING METAL GIRDER L=3-5M TYPE GE1 3 SHIFTS 018 AUT1325 ORA 11904.000 EXPANDING METAL PROP PE3100 INCLUDING PIPE 051X3,5MM 019 TRA06A TONA 45.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. = KM 020 TRA02A TONA 1.610 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= KM. 021 AUT1140 ORA 30.000 TELESCOPIC JIB CRANE ON TYRES TELEMAC HT 125.5 TF 1 SHIFT 022 MDTC4623 BUC. 6.000 EQUIP.TRANSPORT 10 KM-65121002-TYRE CRANE OF 0,10-0,149 MN(10-14,9TF 023 MDTC5575 BUC. 62.000 EQUIPMENT TRANSPORTATION 10 KM-90100106 EXTENSIBLE METALLIC BEAM WITHL=4-8M TYPE CE-2 024 MDTC5552 BUC. 124.000 EQUIPMENT TRANSPORTATION 10 KM-90100079 METALLIC POP TYPE PE-3100 Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= TOTAL
Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: - HEALTH - OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
VAT TOTAL with VAT List with work quantities Estimate - Tender: REZISTENCE FRAMEWORK Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CE17B1 MP. 125.000 WOODEN FRAMEWORK FOR HEAVY COVERS 002 2900980 M.C. FRAMEWORK SQUARED WOOD 5.500
003 7335349 ORA 38.000 TIMBER MANUFACT. AT CARPENTRY MACHINES 004 CE23A1 MP. 50.000 SAFETY NET REUSED FOR CONSTRUCTION COVERS 005 CN15D1 MP. 35.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 006 6310159 KG 16.000 JOIN.FRAMEWORK ELEM.LIGHT METALIC MANUFACT. 007 RPCR41B1 MP. 140.000 FIREPROOF WOODWORK ON PROTECTED SURFAC. ANT.CONTR.INCE.* 008 CA02M1 M.C. 1.000 REINFOR. CONCRETE MOULDING FOR CONSTR WITH H<35M IN ELEMENTS SHAPED ISOLATED WITH VOLUME>0,5MC 008 2100957 M.C. 1.008 CEMENT CONCRETE B 200(C12/15) STAS 3622 009 CB13B1 MP. 8.500 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 010 CC02C1 KG 150.000 ASSEMBL.REINFOR.FOR CONSTR H<35M FROM BARS IN BEAMS AND COLUMNS D<18MM PLATES D<10MM WITH DIST FROM PLASTIC 011 CZ0302A1 KG 27.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=6108
012 CZ0302E1 KG 123.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10013 TRA06A05 TONA 2.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 014 TRA02A05 TONA 0.200 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM.
015 TRA02A10 TONA 2.750 ROAD TRANSPORT OF MATERIALS,SEMIFABS WITH TRUCK ON DIST.= 10 KM.
016 CF12A1 [ 1] MP. 2.750 RIGID WATERPROOFING ON M100T WALLS WITH APAPSTOP APPLIED IN 3 LAYERS ON HORIZ SURFACES UNDER WALLS ACC. TO TECHNICAL SPECIFICATIONS Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
= NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA01G1 M.C. 20.000 MAN. DIGGINGS IN SPREAD SPACES IN SOIL WITH NAT.MOISTURE THROWED IN VEHICLE ATH OF 0,61-2M HARD SOIL 002 TSC35B31 100 MC. 0.200 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
003 TRA01A05P TONA 36.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM
004 TSE06B1 100 MP. 0.850 SOIL PLATF.PREPARING ISOLATING LAYER AND SAND REPARTION OR GRAVEL IN COHESIVE SOIL 005 DA06A1 M.C. 13.000 NAT.AGREGG.LAYER(GRAVEL)ROLLED OVER WITH FILTRING RESISTANCE FUNCTION ISOL.AERING ANTICAP.MANUAL LAYING 006 TRA01A10 TONA 38.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 10 KM.DIST. 007 DD02A1 MP. 85.000 PAVMENT MADE OF NORM PAVING 1ST Q. ON SAND SUB BASE
008 TRA01A10 TONA 17.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 10 KM.DIST.
009 DE11A1 M 115.000 SMALL CRIMPS MANUF.CONCRETE 10X15 CM FOR FRAMING SPACES WALK ROAD ,GREEN ALLEY FOUND. CONCRETE10 X 20 C 009 2100933 M.C. 3.000 CEMENT CONCRETE B 100(C6/7.5) STAS 3622
010 TRA06A05 TONA 10.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 011 PB01A1 M.C. 1.000 POURING PLAIN B50 CONCRETE IN COMPLETIONS TO FILLING LEVELLING AND CONCRETE 110
SLOPE EXEC.IN LAYER OF 5-20CM. 011 2100957 M.C. 1.008 CEMENT CONCRETE B 200(C12/15) STAS 3622
012 PC02A1 MP. 6.000 SHUTTERINGS FOR CONCRETE ELEVATION AND RETAINING WALLS FROM PLYWOOD P PANELS PLANE SURFACE 013 ACC08B1 M 5.000 INSTALLING CONCRETE CIRC.PIPE PREC.L=5M DN 500 PREMO
013 6418871 BUC. PREMO FEED PIE D= 500 P= 4 L=5 B600SBP ISLGC T2027
1.010
014 TSG03B1 100 MP. 17.000 MANUAL LAND CLEARING OF AFFORESTATION AREA WITH BUSHES AND SHRUBS WITH DIAM.<10CM. MATER.STORAGE,WITH ROOTING OFF 015 TSG01A1 100 MP. 17.000 LEAFS AND BRANCHES LAND CLEANING OFF, PILING UP AND SUPERVIZED BURNING
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: SOCIAL ENSURANCE QUOTE - CAS: UNEMPLOYMENT: HEALTH OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
111
LOT NO. 4 Health Unit QUANTITY LIST WITH TECHNOLOGICAL EQUIPMENT, INCLUDING UTILITIES OF THE ESTIMATEOFFER FOR PROCUREMENT
Item
Name
M.U.
Quantity
Supplier (name,
address,teleph one, facsimile )
0 1 2 3 4 5 6
1 Mural Tank on gas fuel, thermo power of 30kw Gas Regulating filter Dn Gas Detector and electro-valve
Programmable thermostat
3 1 1 1 1 1 1
Water meter Qn=1.5 cubic meters/h Ecological tank for waste water, capacity 6 m3 TOTAL
0 1.
1 Technical and Functional Parameters: Type: mural with forced flow and sealed burning chamber Thermic agent: hot water 80 600 C Nominal output Pn 3 bars Minimum output 90% Net thermic power: 30 KW Burnt gas Connection 110/60 mm Volume of expansion vessel: 8 liters Hot water flow Dt=25 0 . C 13 l/min Primary connection 3/4 - gas 3/4 - water feed pipe - outlet 1/2 gas consumption 3.4 Ncubic meters/h Fuel nominal output: 20 mbar Performance specs and conditions related to safety in exploitation: The tank shall be fitted out with flame extinguishing protection system, electric current supply cut off, and pressure building up in installation To be granted the I.S.C.I.R. endorsement. The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards:
2.
3.
113
4.
5.
Guarantee and post-guarantee conditions: 3 years guarantee; 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period Other condition of technical character: the electropump shall provide the pressure head of water of 2 mH2 O to tanks nominal load.
Item
0 1.
1 Technical and Functional Parameters: maximum entrance pressure: 200 mbar outlet pressure: 20 mbar connection diameter: 3/4 Performance specs and conditions related to safety in exploitation: - To be granted a Technical Agreement or an homologation document; - The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: Guarantee and post-guarantee conditions: - 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period. Other condition of technical character:
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
4.
5.
Item
0 1.
1 Technical and Functional Parameters: Lower sensitivity limit: 2%CH4 in air Electro-valve nominal diameter: 3/4
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
114
2.
Normal closed electro-valve, with one step Pressure: max 200 bar Male electro-valve connection Power supply: 230 V/50 Hz; Location: in the central heating, and the electro-valve to the exterior Performance specs and conditions related to safety in exploitation: Closing period: < 1 sec. Opening period: < 1 sec. Conditions related to compliance with relevant standards: supplier must be certified according to Standards family ISO 9001 Guarantee and post-guarantee conditions: 3 years guarantee. Other condition of technical character:
3.
4.
5.
Item
0 1.
1 Technical and Functional Parameters: Type: single pole, change over contacts, with on-off switch Power supply: 230V / 50 Hz. Maximum current to thermostat contacts: 6 A Control temperature area: 10 30 0 C Use temperature area: 10 50 0 C Protection degree IP 30 Dt=0.5 K Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement and an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
115
standards: 4. Guarantee and post-guarantee conditions: 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the post-guarantee period. Other condition of technical character:
5.
Item
0 1.
1 Technical and Functional Parameters: -Type: multi-jet, and dry dial -Nominal output: 1,5 mc/h -Nominal diameter: 15 mm - Connection sizing: 1/2 -Connection type: coupling -Design pressure Pn 6 bars Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: -Accuracy category: B Guarantee and post-guarantee conditions: -3 years guarantee - 3 days for solving out issues occurred during the guarantee period Other condition of technical character:
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
4.
5.
Item
Supplier 116
Specifications
0 1.
2.
1 Technical and Functional Parameters: -Material: polyester -Net volume: 6 cubic meters -Diameter: 1.6 linear meters -Length: 3.0 linear meters -Installing: buried Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; Conditions related to compliance with relevant standards: -SR EN 12566-1 Guarantee and post-guarantee conditions: - 3 years guarantee. Other condition of technical character: Minimum life cycle: 30 years
3.
4.
5.
Equipment List TE- panel for 24 modules 1 PCS - automatic switch 4P 32A, with differential prot. device Id=100mA, Icn=6kA, curba C 1 PCS - circuit breaker phase-null 6A, Icn=4,5kA, curba C 3 PCS - circuit breaker phase-null 16A, Icn=4,5kA, curba C 7 PCS - copper clamps 10mmp 5 PCS - copper clamps 2,5mmp 30 PCS - copper conductor 14mmp 3m - tags 11 PCS - warning plate 1 PCS
Bill of quantities Estimate - Tender: HEAT INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 IA07A1 [ 3] BUC. 1.000 INSTALLING MURAL BOILER FOR PREPARING HEAT CARRIER AND HOT WATER, WITH A HEAT OUTPUT OF: 25.1-70 KW 002 IB02A01 [ 3] BUC. INSTALLING FINISHED STEEL SHEET RADIATORS H 600 MM 13.000
117
002 5700860 BUC. STEEL RADIATOR TYPE 11 600/600 MM 002 5700864 BUC. STEEL RADIATOR TYPE 22 600/500 MM 002 5700866 BUC. STEEL RADIATOR TYPE 22 600/700 MM
1.000
5.000
2.000
002 5700868 BUC. 5.000 STEEL RADIATOR TYPE 22 600/1000 MM 003 IC04B1 [ 1] M 34.000 COPPER PIPE MOUNTED BY WELDING IN BRANCHES OF RADIATORS D=15 MM 004 IC25A1 [ 1] M 25.000 COPPER PIPE MOUNTED BY WELDING IN CENTR.HEAT.DISTRIB.D=18 MM 005 IC25A1 [ 2] M 35.000 COPPER PIPE MOUNTED BY WELDING IN CENTR.HEAT.DISTRIB.D=22 MM 006 IC25B1 [ 1] M 16.000 COPPER PIPE MOUNTED BY WELDING IN CENTR.HEAT.DISTRIB.D=28 MM 007 IC34B1 [ 2] BUC. 68.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 2 WELDINGS D=15 MM 007 7300509 BUC. 45.000 @COPPER PIPE ELBOW MM 90 GR DN 15 COD 46900004 007 7300331 BUC. 13.000 @COPPER CURVE FOR GOING OVER PIPE MM DN 15 COD 46850002 007 3331105 BUC. 10.000 @COPPER MALE COUPLING MM DN 15 COD 46270005
008 IC34B1 [ 3] BUC. BRONZE FITTINGS FOR COPPER - STEEL JOINING D=1/2 INCHES
47.000
008 3330697 BUC. 34.000 @BRONZE FE X M PIPE NIPPLE FE X M DN 1/2" X16 COD 46243078
008 3330694 BUC. 13.000 @BRONZE FE X M SCREWED UNION FE X M DN 1/ 2"X15 COD 46341004
009
IC34C1
[ 2] BUC.
22.000 118
COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 2 WELDINGS D=18 MM
009 3330885 BUC. 14.000 @COPPER REDUCTION MT DN 18X15 COD 46243015 010 IC34C1 [ 3] BUC. 10.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 2 WELDINGS D=22 MM
8.000
011 IC34D1 [ 2] BUC. 6.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 2 WELDINGS D=28 MM
4.000
012 IC34D1 [ 4] BUC. BRONZE FITTINGS FOR COPPER - STEEL JOINING D=1 INCH
8.000
012 3330725 BUC. 2.000 @BRONZE FE X M SCREWED UNION FEXM DN 1"X28 COD 46341014
012 3330723 BUC. 6.000 @BRONZE FE X M PIPE NIPPLE FEXM DN 1"X28 COD 46243089 119
013 IC34L1 [ 2] BUC. 4.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 3 WELDINGS D=15 MM 013 3330754 BUC. 4.000 @COPPER TEE PIECE DN 15 COD 46130005 014 IC34M1 [ 2] BUC. 8.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 3 WELDINGS D=18 MM 014 3330778 BUC. @COPPER REDUCING TEE PIECE 8.000 DN 18X15X18
015 IC34M1 [ 3] BUC. 10.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 3 WELDINGS D=22 MM 015 3330797 BUC. @COPPER REDUCING TEE PIECE 10.000 DN 22X18X22
016 IC34N1 [ 2] BUC. 2.000 COPPER FITTINGS FOR JOINING PIPE WELDING PIECES HAVING 3 WELDINGS D=28 MM 016 3330761 BUC. 2.000 @COPPER TEE PIECE DN 28 COD 46130009 016 3330816 BUC. @COPPER REDUCING TEE PIECE 017 IC35C1 [ 1] BUC. TUBE CLIPS DN 14-16 MM 018 IC35D1 [ 1] BUC. TUBE CLIPS DN 18-22 MM 019 IC35E1 [ 1] BUC. TUBE CLIPS DN 26-28 MM 8.000 DN 28X22X28 24.000
62.000
18.000
020 IC40A1 BUC. 12.000 MANUF.ASSEMBLY+CEMENTATION OF PROTECTION PIPE AT PIPES PASSING THROUGH WALLS D=1 INCHES 021 ID01A2 BUC. 26.000 CORNER VENTIL DOUBLED FAUCET ADJUSTM. FOR CENTRAL HEAT.INSTALLATION WITH D: 1/ 2'' 021 4507211 BUC. 13.000 @CORNER FAUCET COPPER PIPE DN 1/2" CODE 4O020413
021 4507213 BUC. 13.000 @CORNER FAUCET COPPER PIPE RETURN ADJUSTMENT DN1/2" COD 4O120414
120
022 ID06A1 [ 1] BUC. 6.000 COUPLING SPHERE FAUCET CENT.HEAT.INSTL. HAVING DN=1/2" 022 7344047 BUC. 6.000 @BALL GAUGE COCK+HOSEBEARING+LEVER MAN DN 1/2" COD 40740485 023 ID06A2 [ 1] BUC. 2.000 COUPLING SPHERE FAUCET FOR CENT.HEAT. INSTL.HAVING DN=3/4"
023 7344059 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
024 ID06A3 [ 1] BUC. 4.000 SPHERE FAUCET WITH COUPLING FOR CENT. HEAT. INSTL.HAVING DN=1"
024 7344085 BUC. 4.000 @BALL VALVE FIXFI+LEVER MANEV DN 1" COD 40450425
025 ID06A3 [ 3] BUC. 1.000 Y TYPE FILTER FOR IMPURITIES OF D: 1 026 ID15A1 [ 1] BUC. 2.000 AUTOMATIC EXHAUSTER CENTR.HEATING INST. DN 1/2"
027 IE01A1 MP. 48.000 TIGHT.TEST AT PRES.CENTR.HEAT.INSTL. TOTAL HEAT.BODIES AREA:UP TO 100 M
028 IE02A1 MP. 48.000 DILAT.-CONTRACT.AND FUNCT.TEST CENTR. HEAT.INSTL.TOTAL HEATING AREA:UP TO 100MP 029 IE07A1 MP. 48.000 DRINCKING WATER WASHING OF INSIDE INSTALLATION OF CENTRAL HEATING WITH SUP. BODY UNTIL 100M 030 CN13A1 M 110.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED
031 RPCU07B1 BUC. 11.000 MASONRY CHANELLING OF 1 BRICK WITH LIME 121
MORTAR AND CEMENT OPENINGS FOR TUBES OF 50-400SQ.CM 032 RPCU20A1 BUC. 11.000 SEALING WITH LIME CEMENT MORTAR OF BRICKWORK VOIDS
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: GAS INSTALLATION Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA02F1 M.C. 9.000 MAN.DIGGIN.IN LIMIT.SPACES UNDER 1M WITH R.O.W.VERT.UNSUPPORT.IN SOIL AVER.COHEZ. AND VERY COHEZ.DEPTH<1,5M HARD S. 002 TSD01C1 M.C. 7.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 003 TSD05A1 100 MC. 0.070 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 122
004 ACE08A1 M.C. 2.000 DITCH FILLING FOR WATER PIPE SUPPLY AND SEWERAGE WITH: SAND
16.000
006 W2G01A01 M 18.000 UNDERGR.CABLE SETTING 1 KV GR.0,050-0, 150 KG/M CU-AL IN DITCH ON SAND LAYER WITHOUT OBST.WITH MAN.PULLING ASSEM. 006 4801660 POWER CABLE S.8778 M 18.360 CYY 0.6/ 1KV 1X 1.5 U
16.320
008 GD14A1 [ 2] BUC. 2.000 HDPE/STEEL REISER TYPE PASSAGE THROUGH PIECE PE 100 DN 32X1"
009 IA41A1 BUC. GAS METER MOUNTED ON METER PLATE EXISTENT AT BRANCHES WITH D: 1''
1.000
010 IA45A1 BUC. 1.000 PLATE FOR GAS METER WITH BRANCH OF: 1'' 011 IC33C1 M 7.000 PIPE OL.INST.WELD.LONG. NG+THREAD+ COUPLING WITHOUT GAS INSTALLATION FITTINGS IN BURNING PLACES +COLUMN+ DISTRIBUSTION COL+DISTRIB.D=3/4 T 011 3305683 M 7.070 BLACK INST.PIPE THREAD+COUPLING M - 20( 3/4) OL 32 1 S 7656 012 IC34C1 BUC. 15.000 SOFT CAST IRON FITTINGS SCREWED COUPLING STEEL PIPES PIECES HAVING 2 SCREWING D=3 /4 INCH 012 4117930 BUC. 10.000 FLEXIBLE CAST IRON ELBOW A1 S474 DN 20 3 /4 012 4123197 BUC. 4.000 123
N8 S478
012 4123563 BUC. 1.000 FLEXIBLE CAST IRON CORCK T9 S487 DN 20 3 /4 013 IC34D1 BUC. 2.000 SOFT CAST IRON FITTINGS FOR SCREWED JOIN.STEEL PIPES PIECES BEING WITH 2 SCREWS FOR D=1 INCHES 013 4113934 BUC. 2.000 FLEXIBLE CAST IRON REDUCTION N4 S 477 25X 20 F1
014 IC35D1 BUC. 3.000 CLAMPS FIXING STEEL PIPES AT HEATING INST.OR GASES ASSEMBLED IN BRICK OR CONCRETE WALL D= 3/4 INCHES 015 IC40B1 BUC. 1.000 MANUF.ASSEMBLY+CEMENTATION OF PROTECTION PIPE AT PIPES PASSING THROUGH WALLS D=1 1/4 INCHES 016 ID20B1 [ 2] BUC. 3.000 BALL GAUGE COCK FOR GAS INSTALLATION WITH DN: 3/4" 016 7344059 BUC. 3.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
1.000
018 GD10A1 BUC. 2.000 AIR HOLE WITH NO CONTROL COVER 1-2 INCHES
019 IE06A1 M 7.000 FINAL VERIFICATION AT PRESSURE OF ASSEMBLY GAS CONDITIONS TAPS D: UP TO 1'' 020 IE06B1 M 16.000 FINAL CHECKING OF PRESSURE OF GAS MOUNTED GAS PIPES, TAPS , D: OVER 1'' 021 CN13A1 M 7.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED 021 6103311 KG 0.119 CREAM-YELLOW COLOUR PAINT V.451-3 NTR 90 124
-80 022 TRA01A TONA 4.000 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH DUMP TRUCK DISTANCE= KM
023 TRA01AP TONA 4.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= KM
023 TRI1AA03C2 TONA 4.000 MATERIAL LOADING,GROUP A-HEAVY IN DUST, BY THROWING FROM PLATFORMS OR SOIL-CAR CATEG.2 024 YB01M [ 1] MII LEI. RECEPTION OF GAS INSTALLATION 1.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: SANITARY INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 SA12B1 [ 3] M 45.000 PEXAL PIPE MONT.IN CONNECTION PIPES OF SANIT.SUNDRIES D= 16 MM TOTAL
TOTAL
125
004 SA04B1 M 10.000 STEEL PIPE LONGIT.WELDED GALVAN.INSTAL. THREAD+COUPLING SET HOUSES+SOC.CULT. CONNECTIONS D= 1/2I 004 3306338 M 10.100 GALVANIZED INST.PIPE THREAD C - 15( 1/2) OL 32 1 S 7656
005 SA06A1 M 36.000 WELDED STEEL PIPE LONGIT.FOR INSTAL. ZINKED WITH THREAD+COUPLING ASSEM.LOC.+ SOC. SOC. CULT.IN DISTRIB. D= 3/4T 005 3306340 M 36.360 PIPE INST.ZINC THREAD M - 20( 3/4) OL 32 1 S 7656
006 SA06B1 M 17.000 STEEL PIPE LONGIT.WELDED FOR ZINCKED INSTAL.WITH THREAD+COUPLING ASSEM.LOC.+ SOC. CULT.IN DISTRIB. D=1 T 006 3306352 M 17.170 GALVANIZED INST.PIPE THREAD M - 25(1 ) OL 32 1 S 7656 007 SA43C1 [ 1] BUC. FIXING PIPE BRACE DN 16 MM 56.000
16.000
12.000
010 SA43C1 BUC. 12.000 CLAMP STEEL PIPE FIXING+PVC WATER+GAS SUPPLY,TOOTHING SET,PIPE HAVING D= 1/2 INCHES 011 SA43D1 BUC. 42.000 CLAMP STEEL PIPE FIXING+PVC WATER+GAS SUPPLY,TOOTHING SET,PIPE HAVING D= 3/4 INCHES 126
012 SA43E1 BUC. 19.000 CLAMP FOR FIXING STEEL+PVC PIPE OF WATER +GAS SUPPLY, ASSEM.BY TOOTHING,PIPE D=1 INCH 013 SA46A1 BUC. 14.000 MANUF.ASSEM.AND CEMENTATION OF PROTECTION PIPE PASSING PIPE THROUGH WALL,PIPE HAVING D=1 INCHES 014 SA46B1 BUC. 5.000 MANUFACT,SET AND ASSEMBLY OF PIPE PROTECTION AT PASSING OF PIPES THROUGH WALL,PIPE HAVING D=1 1/4 INCHES 015 SA46C1 BUC. 2.000 MANUFACT,SET AND ASSEMBLY OF PIPE PROTECTION AT PASSING OF PIPES THROUGH WALL,PIPE HAVING D=1 1/2 INCHES 016 SB16A1 [ 1] M 10.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D= 32 MM 017 SB16C1 [ 1] M 18.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D= 50 MM
019 SB16E1 [ 1] M 11.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D=110 MM
020 SB17A1 [ 1] BUC. 12.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 32MM 020 6712369 BUC. 5.000 @HTB POLYPROPYLENE ELBOW AT 87 DGR 30 MIN DN 32 COD 62504011
020 6712226 BUC. 7.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 32 CODE 62504011 021 SB17C1 [ 1] BUC. 11.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 50MM
021 6712381 BUC. 3.000 @HTD POLYPROPYLENE ELBOW AT 87 DGR 30 MIN DN 50 COD 62504035
127
021 6712243 BUC. 8.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 50 COD 62504029
022 6712252 BUC. 2.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 75 CODE 62504041
023 SB17E1 [ 1] BUC. 13.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D=110 MM
023 6712264 BUC. 13.000 @HTD POLYPROPYLENE ELBOW AT 45 DGR DN 110 COD 62504053
024 SB19A1 [ 5] BUC. 3.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=50/40 MM
024 6712812 BUC. 3.000 @HTEA POLYPROP.EQUAL BRANCH 45GR DN50/50 CODE 62508013
025 SB19A1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.SIMPLE UNIFORM BRANCH RUBBER SEAL JOINING D= 50 MM
025 6712812 BUC. 2.000 @HTEA POLYPROP.EQUAL BRANCH 45GR DN50/50 CODE 62508013 026 SB19B1 [ 2] BUC. 1.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH FOR SEWAGE AND RUBBER SEALING JOINING D= 75/40 MM 026 6712824 BUC. 1.000 @HTEA R.S.SMALL POLYPROP 45GR DN75/ 40 COD 62510013
027 SB19C1 [ 2] BUC. 1.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=110/ 50 MM
027 6712848 BUC. 1.000 @HTEA POLIPROP SIMPLE REDUCED BRANCH 45 DGR DN110/50 COD 62510031 128
028 SB19C1 [ 1] BUC. 5.000 SEWAGE FIREPROOF POLYPROP.SIMPLE UNIFORM BRANCH RUBBER SEAL JOINING D=110 MM
028 6712862 BUC. 5.000 @HTEA POLIPROP SIMPLE EQUAL BRANCH 45 DGR DN 110 COD 62508025
029 SB21A1 [ 1] BUC. 1.000 SEWAGE FIREPROOF POLYPROP.INTERVENTION PART RUBBER SEAL JOINING D= 50 MM
030 SB21C1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.INTERVENTION PART RUBBER SEAL JOINING D=110 MM
031 SB22A1 [ 1] BUC. 4.000 SEWAGE FIREPROOF POLYPROP.REDUCING PIECE RUBBER SEAL JOINING DN 40- 32 MM
032 SB22B1 [ 1] BUC. 1.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL DN 50- 32 MM
033 SB22D1 [ 1] BUC. 1.000 SEWAGE FIREPROOF POLYPROP.REDUCING PIECE RUBBER SEAL JOINING D= 75- 50 MM
034 SB22E1 [ 1] BUC. 1.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL D=110- 50 MM
035 SB22F1 [ 1] BUC. 2.000 SEWAGE FIREPROOF POLYPROP.REDUCING PIECE RUBBER SEAL JOINING D=110- 75 MM
036 SB44C2 [ 1] BUC. HDPE GULLY TRAP D= 50 MM WITH 1 CONNECTION AND VERTICAL EXIT
3.000
037 SB49A1 [ 1] BUC. 1.000 FIREPROOF POLYPROP.FANNING CAP FOR VENTILATION COLUMNS D= 50 MM
038 SB49A2 [ 1] BUC. 2.000 VENTILATION CAP FOR FIREPROOF POLYPROP. AIR COLUMNS D= 75 MM 039 SA43F1 [ 1] BUC. 16.000 129
040 SA43H1 [ 1] BUC. TUBE CLIP DN 50 MM 041 SA43J1 [ 1] BUC. TUBE CLIP DN 75 MM
3.000
2.000
2.000
043 SC07E1 [ 1] BUC. 7.000 SANIT.PORCELAIN LAVATORY L2 600 ON STAND INCLD.FLOOR TRAP AND DELIVERY VALVE 044 SC07A1 [ 1] BUC. 1.000 SANITARY PORCELAIN BASIN FOR DISABLED PERSONS MOUNTED ON FIXED BASIN STAND, INCLD.CEILING SINK WATER TRAP AND DELIVERY VALVE,AND TOWEL SUPPORT 045 SC13A1 BUC. 2.000 SANITARY PORCELAIN WATER CLOSET WITH SIPHON TRAP S COV-A TYPE WHITE PORCELAIN C.1 045 2444690 BUC. 2.020 WATER CLOSET BASIN COV2 WHITE PORCELAIN C. 1 S 2066
046 SC13A1 [ 3] BUC. 1.000 WATER CLOSET BASIN OF SANITARY PORCELAIN WITH INTERIOR S SIPHON,WITH FRONTAL OPENING FOR HANDICAP PERSONS 047 SC16D1 [ 1] BUC. 2.000 RESERVOIR FOR WASHING WC BASIN FROM POLYPROPYLENE SET MIDHEIGHT ON BRICK WALL 048 SC16G1 BUC. 1.000 PORCELAIN DUOBLOCK CLEANING WC BASIN RESERVOIR,ASSEMBL.ON BASIN 049 SC18A5 BUC. 2.000 WC BASIN FRAME,OF POLYPROPYLENE WITH LID
050 SC18A5 [ 1] BUC. 1.000 ERGONOMIC FRAME TO WATER CLOSET FOR HANDICAPPED PERSONS
051 SC24A2 BUC. 7.000 TOWEL SUPPORT MADE OF AM NICKEL SET ON WALLS U TYPE, 1 ARM, OPENING 600MM 130
7.000
052 2451849 BUC. 7.070 PORCELAIN SHELF TYPE E2.60 WHITE Q.1 NI 567 053 SC26A2 BUC. 7.000 SEMICRYST.SANIT.MIRROR POLISH.EDGES SIZES 500X600MM
054 SC26A2 [ 1] BUC. 1.000 POLISHED SEMICRYST.SANITARY MIRROR ADJUSTABLE INCLINE, SIZES 650X650 MM
055 SC27A1 [ 1] BUC. 8.000 LIQUID SOAP DISTRIBUTOR VISIBLY SET ON WALL 056 SC30A1 BUC. 2.000 SANITARY PORCELAIN 1 Q. PAPER HOLDER,HA1 NI 545/63
057 SC30A1 [ 1] BUC. 1.000 SUPPORTING BRACKET WITH PAPER HOLDER SET WITH ANCHORAGE SYSTEM TO THE WALL FOR HANDICAPPED PERSONS 058 SD06A1 BUC. LAVATORY COCK SYSTEM D=1/2" 7.000
058 4201377 BUC. 7.000 BRASS MIXT.WASH HAND BATTERY 1/2" PEARL JET S8732
059 SD06A1 [ 2] BUC. 1.000 LAVATORY COCK SYSTEM WITH MEDICAL GRASP FOR HANDICAPP. D=1/2"
060 SD12A1 BUC. 16.000 CORNER ADJUSTMENT FAUCET,OF NICHELLED BRASS,HAVING D=3/8 OR D=1/2 INCHES 060 4201779 BUC. 16.000 NICKEL PLATED GRASS ANGLE CONTROL COCK 1 /2 " S 751/I
062
SD13A1
[ 1] BUC.
3.000 131
BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 " 062 7344032 BUC. 3.000 SPHERE TAP FI X FE "MINI" DN 1/2" CODE 40MI4272
063 SA21B1 [ 1] BUC. 3.000 FLEXIBLE REINFORCED RUBBER CONNECTION 1/2"X 3/8" 064 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
064 7344047 BUC. 1.000 @BALL GAUGE COCK+HOSEBEARING+LEVER MAN DN 1/2" COD 40740485 065 SD13A1 [ 1] BUC. 2.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
065 7344030 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 1/2" CODE 40430425 066 SD13B1 [ 1] BUC. 3.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4'' 066 7344059 BUC. 3.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425 067 SD13C1 [ 1] BUC. 1.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=1'' 067 7344085 BUC. 1.000 @BALL VALVE FIXFI+LEVER MANEV DN 1" COD 40450425 068 SF01A1 M 131.000 TIGHTENESS TEST AT PRES. OF INST. INTER. OF WATER,IN PIPES STEEL ZN. OR LEAD PRES. INCLUDING REINFORCED 069 SF04A1 M 131.000 CLEANING AND SUBMIT FOR FUNCTION OF PVC WATER PIPES. 070 CN13A1 M 63.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED 070 6103220 KG 1.071 WHITE PAINT (FP) V.101-1 NTR 90-80 132
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT TOTAL
TOTAL
Bill of quantities Estimate - Tender: ELECTRIC INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 EA02A1 [ 2] M 450.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=16/13.4MM 002 EA02B1 [ 2] M 2.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=32/28.1 MM 003 SA18H2 M 4.000 UN-PLASTIF.PVC PIPES TYPE M.ASSEM.AT CONSTR.IND+SOC IN DISTRIB.PIPES LOCATED IN CANALES D=110 004 EA12A1 M 30.000 METALLIC,FLEXIBILE,PROTECTION,UNTIGHT TUBE, WITH 2 ROWS OF COILS IN QUADRILATERAL-SHAPE(SPD) 13,5-23 MM 004 7356501 M 30.750 METALIC TUBE FLEX.PROT.NONTIGHT TYPE SPD 133
-ROMAN D=13,5 MM
005 EB02A1 M 520.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP 005 4826880 M CONDUCTOR FY 1X 1,5 S 6865 535.600
006 EB02A1 M 730.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP 006 4826892 M CONDUCTOR FY 1X 2,5 S 6865 751.900
007 EB02B1 M 20.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION 6- 10 MMP 007 4826921 M CONDUCTOR FY 1X 10 S 6865 20.600
008 EC01B1 M 12.000 ELECTRICAL CABLE LAMP,PLUG SECT.<4MMP MONTAT BACH.PE DIBLURI MAT.PLASTIC 008 7500271 M COPPER FLEXIBLE CABLE MYYM 3x1.5 12.360
009 EC12A1 BUC. 4.000 INTERIOR TERMINAL CONNEC.TO CLAMPS WITH CU.PIPES <2X10MMP 010 ED09A1 [ 2] BUC. TWIN PLUG WITH PROTECTION CONTACT 16A 220V 2.000
010 5536561 BUC. 2.020 TWIN PLUGS 16A 220V EX.EDIICT5 COD 7055A 011 ATB03A [ 1] BUC. 1.000 INSTALLING PROGRAMMABLE THERMOSTAT
012 ATD13A M 6.000 MEASUREMENT,CDA,SIGNALLING CABLE SET ON WALL,GARRET,WITH:UP TO 10 WIRES OF 1,5-2,5 SQMM 012 4812566 M 6.090 CSYY FLEXIBLE CABLE 3 X 1,5 S 8779
013 ATD16A BUC. 2.000 FORMATION OF CABLE END.,LONG UNDER 1 M, INSULATION AND PVC COVER,UNDER 10 WIRES NONARMATURE 134
014 ED01A1 BUC. 2.000 MANUAL SWITCH BURIED UNIPOLAR NORMAL OR WATERPROOF CONSTRUCTION * 014 5500720 BUC. CUMPANA SWITCH ST.250V 10A 2.020
015 ED03A1 BUC. 10.000 UNIPOLAR SWITCH BURIED,WOODEN NAILS,IN SERIES,NORM.CONSTR.OF BACHELITA OR WATERPROOF CONSTR. 015 5520366 BUC. CUMPANA SHIFTER ST.250V 10A 10.100
016 ED08A1 BUC. 2.000 PLUG BURIED ASSEM.NORMAL CONSTR. WATERPROOF OR NORMAL PROTECTION CONTACT 016 5536156 BUC. 2.020 TWIN PLUG PROT.PANEL 250/10A RECESSED
017 ED08B1 [ 1] BUC. DOUBLE TWIN PLUG WITH PROTECTION CONTACT RECESSED MOUNTED
18.000
017 5535994 BUC. 18.180 DOUBLE TWIN PLUG,PROT.CONTACT 250/10A RECESSED 018 EE12B1 BUC. 3.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS 018 5103642 BUC. 3.009 FLUOR.LUMINAIRE FIRA 03-1X36 W DOUBLE REFL.PARAB.EQUIPPED,VISIBLE SET
019 EE12B1 BUC. 8.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
019 5103656 BUC. 8.024 FIRA FLUORESCENT LIGHT FIXTURES 03-2X36 W DOUBLE REFL.PARAB. 020 EE12B1 BUC. 14.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
020 5103671 BUC. 14.042 FIRA 03-4X18 W FLUOR.FIXTURE DOUBLE REFL.PARAB.7 PLATES,ASSEMBLED
021
EE12B1
BUC.
2.000 135
021 5103823 BUC. 2.006 FLUORESCENT LIGHT FIXTURES AB 02-1X18 W VISIBLY SET
022 EE12G1 BUC. 1.000 FIXTURE FOR TUBE FLUORESCENT LAMPS SEALED SET ON PLASTIC MATERIAL DOWELS 022 5103836 BUC. 1.030 FIPAD 04-2X36 W FLUOR.FIXTURE PC DISPER. STARTER,UNASSEMBLED
023 EE14B1 BUC. 2.000 TUBULAR FLUORESCENT LAMP SET INSIDE CONSTR.OR ON EXTER.ELEM.AT NON TIGHT OR TIGHT LUMINAIRES 023 5102336 BUC. TUBULAR FLUORESCENT LAMP 220V-36W 2.140
024 EE11A1 [ 1] BUC. 2.000 TIGHT FIXTURE (PROJECTOR) SET ON SUPPORT 024 5103864 BUC. 2.006 LUXOR PROJECTOR 02-150W SODIUM VAP. SYMETRIC/ASYMETRIC REFL.
025 EE14C1 [ 2] BUC. 2.000 LAMP MONT.INSIDE CONSTR.OR EXTERIOR ELEM.WITH SODIUM VAP.FOR FIXTURES NON SEALED OR SEALED 025 5102368 BUC. @SODIUM VAPOR LAMP 220 V 150W 2.100
027 EF09B1 BUC. 10.000 COPPER PIPE JOINNING AT DEVICE MARKLANDS,MOTORS,POWER PANNELS HAVING SECTION 10 OR 16MMP 027 5203059 BUC. 10.000 BRASS PUNCHING SLIPPER FOR COPPER COND. 5X 3,1 MMP 136
028 EF10A1 BUC. 68.000 ELECTRIC CONNECTION (CONEC.) BETWEEN SAFETY CLAMPS AND DEVICES,OR BETWEEN DEVICES,WITH PIPE L<0,5 M 028 4826919 M CONDUCTOR FY 1X 6 S 6865 23.800
029 EG07B1 M 4.000 DOWN.PIPES STEEL-ZINK BAND 25X4MM, APPARENT ASSEMBLED ON WALLS 030 EG08B1 M 50.000 COND.EARTH CONNECTION LIGHTING ROD UNDERGROUND EARTH CONN.GALVANIZED STEEL STRIP 40X4MM IN HARD SOIL * 031 W1R06A1 M 9.000 ELECTRODE OF STEEL PIPE OF TWO AND A HALF INCHES FOR EARTH GROUNDING IN NORMAL GROUND 032 EG10A1 [ 1] BUC. 1.000 SEPARATION PIECE FOR EARTHING BELT
034 RPCU12C1 BUC. 48.000 WALL CHANELLING IN REINFORCED CONCRETE FLOORING OF 12-13CM THICKNESS AND SECTION 151-300SQCM 035 RPCB13B1 BUC. 48.000 B150 FILLING OF HOLES AREA OF 020SQM IN FLOORINGS OVER 10CM THICKNESS
1.000
8.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND 137
-HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: WATER AND SEWAGE SERVICES Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA02F1 M.C. 40.000 MAN.DIGGIN.IN LIMIT.SPACES UNDER 1M WITH R.O.W.VERT.UNSUPPORT.IN SOIL AVER.COHEZ. AND VERY COHEZ.DEPTH<1,5M HARD S. 002 TSA12C1 M.C. 16.000 MAN.DIGG.IN EXCAVATIONS 1-1,5M WIDE WITH SUPP.MAN.EVAC.IN SOIL WITH NAT.MOIST AT DEPTH 0,0-1,5M,HARD SOIL 003 TSC02B1 100 MC. DIGGING WITH TYRE EXCAVAT.0,21-0, 39 MC NAT.MOIST.DISCHARGE GROUND CAT.2 0.340
004 TSA18E2 M.C. 3.500 MAN.EXCAV. FOLLOWING MECHANICAL EXCAVATION HOLES.FOUND. ELEM.NAT.MOIST.SOIL WITH SUPPORT DEPTH< 4 M HARD SOIL 005 TSF01A1 MP. 60.000 SUPPORT.BY EDGES WITH BEECH SUPPRT. PLACED HORIZ.EDG.BETWEEN <1,5M,DEEP.0,02M,0,0 -0,2M BETWEEN EDGE 006 TSD01C1 M.C. 66.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 007 TSD05A1 100 MC. 0.330 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 138
008 ACA10A2 [ 2] M 20.000 UNDERGROUND SETTING AT WATER SUPPLY HDPE PIPES JOINED WITH FITTINGS THROUGH COMPRESSURE,WITH DN 32 MM 008 7500137 M 21.000 PE WATER PIPE 100 SDR 17 PN 10 Dn=32mm 009 ACA17A2 BUC. 3.000 POLYETHILEN CONNECTION PIECES JOINED BY COMPRESSURE FOR HDPE WATER SUPPLY PIPES 009 7500610 BUC. 1.000 PE ELBOW PIPE 900 COMPRESSION D=32 009 7500155 BUC. FE COMPRESSION CONNECTION 32x3/4 2.000
010 ACA12C1 [ 3] M 13.000 INSTALLING PVC PIPE IN GROUND 100 COMPACT SN 4 FOR EXTERIOR SEWAGE RUBBER TIGTH ELASTOM.RING D=160 MM 011 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
011 7344045 BUC. 1.000 @SPHERE FAUCET EVAC+LID+PORTHOSE DN 1/2" CODE 40814762
012 SD13B1 [ 1] BUC. 2.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4'' 012 7344059 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
1.000
015 ACD01G1 BUC. 3.000 LID AND FRAME STAS 2308-81 FOR SEWERS WITH SUPPORT. PIECE NONCARRIAGEWAY TYPE I 016 ACD09A1 BUC. 1.000 MON.CONCRETE MAHHOLES CIRC.SECT.TYPE 1785-2 DI 1,5 M. H 1,5 NO UNDERGROUND WATER NONCARRIAGEWAY 139
017 ACD04A1 [ 1] BUC. 1.000 MANHOLE STAS 2448-73 WITH INSPECTION CHAMBER HC=1M MADE OF CONCRETE TUBE WITH TAP BOLT AND CHANNEL LIP DN 200 017 2101195 M.C. MORTAR M100 T WITH LIME HYDRATING 0.038
017 2100933 M.C. 1.010 CEMENT CONCRETE B 100 (C6/7,5) STAS 3622
018 ACD07A1 M 1.000 ELEMENTS AT MANHOLES STAS WITH H>2 M INCLUDES: CONCRETE TUBE ACCESS DN 800 L= 1 M WITH FANCET AND OPENING 018 2101183 M.C. MANSONRY MORTAR M 100 S 1030 0.019
019 ACD03A1 M 2.500 STRINGER LADDED OL 50X10 AND STEPS OB D=20MM ACCESS IN SEWERS OF CONCRETE PIPES
020 ACE05A1 [ 1] BUC. 5.000 PVC PIECE FOR PIPING TIGHT PASSAGE THROUGH CONCRETE SEWERS WALLS
020 6311601 BUC. 2.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 32 MM WITH WATERPROOFING
020 6311607 BUC. 2.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 110 MM WITH WATERPROOFING
020 6311608 BUC. 1.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 160 MM WITH WATERPROOFING
021 ACE07A1 100 M. 0.200 WATER PIPES WASHING AND DESINFECTION WITH DN 50
022 ACE08A1 M.C. 10.000 DITCH FILLING FOR WATER PIPE SUPPLY AND SEWERAGE WITH: SAND
20.000
023
TRA01A
TONA
20.000 140
024 TRA01AP TONA 58.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= KM
025 TRI1AA03C2 TONA 58.000 MATERIAL LOADING,GROUP A-HEAVY IN DUST, BY THROWING FROM PLATFORMS OR SOIL-CAR CATEG.2
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: VARIABLE ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 22.500 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 141
002 AUT1304 ORA 165.000 SELF-LIFTING METALIC SCAFFOLD 2 CASTLES 6MARCH 75KG/M H-31M L=12M 3SHIFTS
003 CI02A1 [10] MP. NATURAL LOCAL STONE PLATING INCL. MESH
22.500
003 2202200 SQ.M. 22.940 BANPOTOC 1 QUALITY G=2CM S LIMESTONE SLAB 6035
004 CG06C1 MP. 6.000 MOSAIC FLOOR CAST ON SITE OF 1,5CM THICKNESS SIMPLE WITHOUT CRIMP ON SURFACE <5MP WITH MARBLE MOSAIC 005 CH01B1 M 10.000 PLATED SIMPLE CONCRETE TREADS WITH PREFAB.TREADS AND RISERS WITH MARBLE MOSAIC 005 2802892 M 10.30 MANUFACT.MARBLE STAIR CASE NAT.COLOUR 005 2802957 M 10.300 MARBLE MOSAIC RISER NATURAL COLOUR
006 CE14A1 M 3.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM 007 CF06A1 MP. 22.500 EXTER.REGULAR PLASTER,FLOATED FOR DRYWALLS OR INTERIORS IN GARRET,OF 2 CM
M.C.
0.495
008 CG07B1 M 8.000 MOSAIC PLINTHS OR GORGES CAST ON SITE SITE-HORISONTAL PLINTHS H=10CM AT MARBLE MOSAIC WALLS 009 CH04A1 M CURRENT WOODEN HANDRAIL 19.000
009 2948144 M 19.950 OAK WOOD HANDRAIL PRECAST SECT. 40X80 MM 010 CL20B1 KG 396.000 APPARENT METALLIC MANUFACT. ASSEMBLYING: GRATES BANISTERS,TRAP DOOR,CHECKS, GRILL 010 6306274 KG 396.000 SIMPL.DECORATIVE LATTICE WORK FOR STAIRCASES,PROFILED STEEL BALCONY 011 CN11B1 MP. 18.000 142
DYE WORKS AT BANISTERS,GRID,METALLIC PARAPET WITH ALCHIDICAL ENAMEL 011 6108347 KG 1.260 REDISH BROWN ENAMEL UIC E.735-8 NTR 1703 -80 011 6100943 KG 1.440 ALCHID RED OXID PLASTER ROUGH G 735-3 012 CN09G1 MP. 57.000 PAINTINGS ON WOOD CARPENTERY ,DONE WITH 2 LAYERS ALCHIDIC LAQUER COLORLESS,AT DOORS,WINDOWS ,SHUTTER.RUL. 013 CO02B1 MP. 26.000 CONCRETE PLATES WALK SIDE FOR SAND PAVEMENTS,JOINTS FILLED WITH MASTIC 013 2800488 MP. 30.600 CONCRETE MANUFACT. FLAGSTONE 70X70X8CM 014 IZF10F1 [ 3] MP. 26.520 50MM EXTRUDED POLYSTYRENE LAYER TO EXTERIOR WALLS GLUED BY BITUMINOUS CEMENT
015 RPCO56A1 [ 3] M 57.000 OAK WOOD BANISTERS AT PLATFORMS WITH SIZES OF 30 X 125MM AT 3 ROWS Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
143
Bill of quantities Estimate - Tender: CONSTANT ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 155.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 435.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 5TF H=31M L=29M 3 SHIFTS
003 MDTC5517010 BUC. 2.000 EQUIPMENT TRANSPORT 10 KM 90100043 SELFLIFTING METALLIC SCAFFOLDIING WITH 2 CASTLES 004 CD05A1 M.C. 49.000 BRICK MASONRY TYPE GVP AT BUILDINGS H <35M, SHAPE 240X115X 88MM,Q.A
10.290
005 CD04H1 M.C. 6.500 MASONRY FROM PRESSED BRICK 240X115X63M M AT BUILDING.H<35M, 12,5CM THICKNESS, Q. A,WITH VOIDS <50 % 005 2101169 M.C. MASONRY MORTAR M 25 S 1030 1.170
13.000
007 CF01K1 MP. 375.000 FLOATED INT.PLASTERS,AT COLUMNS,WALLS WITH SPRINKLER AND PLASTER ROUGH CAST MECHANICALLY PERFORMED,OF 2CM 007 2101202 PLASTER MORTAR M10T M.C. 6.750
008 CF06K1 MP. 155.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 144
M.C.
3.565
155.000
010 CF10C1 MP. 496.000 PLASTER POLISHING APPLIED ON FLOATED INTERIOR PLASTERS
121.000
012 CG03B1 [ 5] MP. 52.000 PLASTIC MATERIAL FLOORING WITH PVC CARPET FOR INTERNSE TRAFFIC WITH PVC SILL
53.300
013 CG11A1 [ 2] MP. 31.000 CERAMIC TILE SLAB FLOORING ANCHORED BY ADHESIVE PASTE
013 2422628 MP. 31.930 BROWN SMOOTH GLAZED SANDSTONE PLATES S 250X 60X12 C1 VRAC
014 RPCK42A1 M CERAMICS TILE PLINTHS OF MAX. 15CM HIGH,HORZONTAL FOR WALLS*
57.000
014 2434891 M 58.139 UN SMOOTH SANDSTONE JOINNINGS ELEM. GREEN S 150X100X 8 C1 S5939
015 CG28B1 MP. 121.000 5MM DIFFERENCE SUPP.LAYER FOR CEMENT MORTAR FLOOR
015 2101200 M.C. 0.605 PLASTER MORTAR M 100 (LIME PASTE ) S 1030
016 CI06E1 MP. 80.000 WHITE TILE PLATING ADHESIVE PASTE FIXED
145
016 2401777 MP. 83.999 DECOR WHITE TILE MONOC M.DR 150X150X5,5 Q. 1 S233
18.000
018 CK14A1 [ 2] MP. 31.000 WHITE COLOR PVC DOORS WITH THERMO INSULATING GLASS 4+ 16+4MM 019 CK25C1 BUC. 10.000 CARPENTRY ACCESSORY WORKS APPLIED LOCK TO A YALE SYSTEM
019 6310380 BUC. SAFETY LOCK IN YALLE SYSTEM WITH DOOR BOLT
10.000
020 CK09A1 [ 1] M 13.000 20CM WIDE PVC WINDOW BOARDS SET TO THE INTERIOR
021 CM02E1 MP. 8.000 DRAWN WINDOWS SIMPLE MEASURE FREE ON WOOD CARPENTERY 4-8MM THICK.WITH PUTTY AND WANG AT VITRI 021 2500327 MP. 8.720 CLEAR DRAWN GLASS Q.3 4MM. PACKED FREE SIZES S 853
022 CL20B1 [ 3] KG 1.000 VISIBLE METALLIC PLATEWORKS: STAINLESS HANDRAIL TO SANITARY GROUPS FOR HANDICAP PERSONS 023 CN06B1 [ 3] MP. 496.000 3 LAYER WHITE COLOR WASHABLE PAINTING FOR INTERIOR FOR WALLS
024 IZF10C1 [10] MP. 155.000 THERMINSULATING LAYER FOR WALLS OF EXPANDED POLYSTYRENE FOR FACADE OF 10CM THICK.INCLUDING MORTAR ADHESIVE AND SECURING NAILS 024 2602797 MP. 156.550 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461
025 CK14A1 [ 7] MP. 0.640 METALLIC HATCH GARRET ACCESS 30MIN FIRE RESISTANT 146
1.000
9.000
027 TRA06A05 TONA 49.500 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: CONSTANT ARCHITECTURE GARRET Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 37.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1302 ORA 195.000 METAL AUTO-LIFTING SCAFFOLD 3 CAST. 3. 147
003 CD05E1 M.C. 8.000 BRICK MASONRY GVP TYPE FOR CONSTR.H<35M, FORMAT 365X180X138MM,A Q.
1.040
210.000
004 2302983 BUC. 3360.000 DRAIN TILE WITH 1 BEAK Q1 390X230X11 S515 005 CE13A1 [ 5] M 55.000 STEEL GUTTERS PROTECTED BY PLASTIFOL OF 0.5MM, SEMI-ROUND OF D= 15CM 006 CE14A1 [ 3] M 15.000 STEEL RAIN PIPES PROTECTED BY PLASTIFOL OF 0.5MM ROUND WITH D=15.4CM
007 CE19D1 [ 1] M TOOTHING EAVES FROM ONE SIDE PLANE BOARD AND RABBETED OF 70CM WIDE
52.000
007 2903830 M.C. 0.080 LONG RESIN BOARD SELVEDGED CLASS C THICK =24MM L=3,00M S 942
37.000
009 CF06K1 MP. 37.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 009 2101203 M.C. 0.851 PLASTER MORTAR M25T 010 CN15B1 [ 4] MP. 400.000 PAINTING THE TIMBER BY FIREPROOF SOLUTIONS
011 CN15D1 MP. 100.000 PAINTING OF WOOD WORK WITH SPECIAL SOLUTIONS,WITH ANTISEPTIC PAINTS, WATERPROOF ON IMPREGNATE WOOD 012 CO23A1 MP. 135.000 148
013 IZF10F1 [18] MP. 135.000 INSULATING MINERAL WOOL LAYER G80 TYPE 150MM THICK. COATED,AND ^=0.040 W/MK AND 0 KG/CUBIC METER TO THE FLOORING 014 IZF10C1 [ 5] MP. 37.000 THERMO-INSULATING LAYER FOR FLOOR WITH EXPANDED POLYSTYRENE
014 2602797 MP. 37.370 PEX C EXPANDED POLYSTYRENE SLAB OF 2000X500X 100MM S7461 015 IZF03B2 MP. 135.000 BARRIER AGAINST VAPOURS ON VERTICAL SURFACE WITH 1STR IMPISLIT BIT TYPE /A SAU TSA2000 LIP WITH BITUM TYPE 015 2600048 KG 202.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
015 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126
148.500
016 IZF02A1 MP. 135.000 ROOF VAPOUR DIFFUSION LAYER,TERRACCE WITH GLASS FIBRE KNITTING HORISONTAL SURFACE BITUMEN 016 2600048 KG 67.500 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064 017 IZF01A1 MP. 135.000 SURFACE MILDING APPLY.VAPOURS DIFUSION LAYER WITH CUT BITUMEN IN 2 LAYERS HORIS.AND VERT.SURFACE 017 2600048 KG 20.250 MAT.+ WORK D.P.C. BITUMEN TYPE H 80/90 S7064
018 IZF04J2 MP. 135.000 BOUNDARY LAYER RELATED TO THE INSULATION WORK EXEC WITH FIBER GLASS FELTING AND NON GLUED BREAKDOWN 018 2602060 MP. BIT.2F.NIS. TSA FIBER GLASS 2000 100CM S 10126 145.799
149
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: RESISTANCE SUPER-STRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CA02J1 M.C. 24.700 MOULDING REINFOR.CONCRETE TO CONSTR.WITH H<35M,IN FLOORS(BEAMS,COLUMNS,PLATES) WITH SLAB THICKN.>10CM 001 2100957 M.C. 24.898 CEMENT CONCRETE B 200(C12/15) STAS 3622 002 CB13A1 MP. 158.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTRUCTIONS WITH H<20M TO SLABS AND BEAMS,WITH PLYWOOD OF 8MM 003 CB13B1 MP. 158.000 SHUTTERINGS MADE OF REUSED PANELS FOR CONSTR.WITH H<20M,AT COLUMNS AND FRAMES, WITH PLYWOOD OF 8MM 004 CB44A1 BUC. 72.000 SUST.WITH STUDS EXTENS PER3100R FOR ASSEMBLING FLOORS,PRESLAB TURN FLOORS MONOL WITH GR OR GR MONOL PL PREFAB. 005 CB45B1 BUC. 40.000 150
SUSTAIN. FROM METALIC BEAMS EXTENSIBLE TO CONSTR.WITH H<20M BEAMS SUPPORT.ON METALIC STUDS 006 RPCH38A1 [ 2] BUC. 41.000 ROUND WOODEN PROP SUPPORT D= 12 CM AT LINTELS OVER DOOR AND WINDOW OPENINGS 007 CC01C1 KG 1555.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 008 CZ0302A1 KG 335.000 MANUFAC. REINFORC. FOR WALLS BEAMS COLUMNS DIAPHRAGMS TO REGULAR CONST IN CENTRALIZED WORKSHOPS OB 37 D=6009 CZ0302E1 KG 795.000 MADE REINFORCED FOR WALLS BEAMS PILLARS MIDRIFF AT BUILDG. REGULAR IN WORKSHOP CENTRALIZED PC 52 D=10010 CZ0302M1 KG 120.000 MANUFCT. REINFORC. FOR PLATES INCLUD. STAIRS TO REGULAR CONST. IN CENTRALIZED WORKSHOPS OB 37 D=6-8MM 011 CZ0302O1 KG 840.000 MANUFCT.REINFORC.FOR PLATES INCLUD. STAIRS TO REGULAR CONST.IN CENTRALIZED WORKSHOPS PC 52 D= 6-8MM 012 CP12A1 BUC. 10.000 ASSEMBL.PREFAB.TO HOUSING WITH STRUCT. MONOL.MIXED AND BRICKWORK.SUST.WITH.VOL. 0,2 MC.AND H<20 M 013 6433209 M.C. 0.400 CONCRETE PRECAST C16/20(B250) II AS32.5 0-16MM 014 6433376 KG 27.000 CONCRETE PREFABR.REINFOR. OB 37 D=6-10MM STANDARD 015 6433754 KG 14.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 016 6433754 KG 90.000 REINFOR.IN CONCRETE PREFABR. PC52 O6-10 MM STANDARD 017 AUT1301 ORA 7680.000 EXPANDING METAL GIRDER L=3-5M TYPE GE1 3 SHIFTS 018 AUT1325 ORA 13824.000 EXPANDING METAL PROP PE3100 INCLUDING PIPE 051X3,5MM 151
019 TRA06A TONA 62.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. = KM 020 TRA02A TONA 1.600 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= KM. 021 AUT1140 ORA 30.000 TELESCOPIC JIB CRANE ON TYRES TELEMAC HT 125.5 TF 1 SHIFT 022 MDTC46230 BUC. EQUIP.TRANSPORT KM-65121002-TYRE CRANE OF 0,10-0,149 MN(10-14,9TF 6.000
023 MDTC5575 BUC. 80.000 EQUIPMENT TRANSPORTATION KM-90100106 EXTENSIBLE METALLIC BEAM WITHL=4-8M TYPE CE-2 024 MDTC5552 BUC. EQUIPMENT TRANSPORTATION METALLIC POP TYPE PE-3100 144.000 KM-90100079
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: PAVEMENTS AND P ARKING Work category: ================================================================= 152
= NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA01G1 M.C. 40.000 MAN. DIGGINGS IN SPREAD SPACES IN SOIL WITH NAT.MOISTURE THROWED IN VEHICLE ATH OF 0,61-2M HARD SOIL 002 TSC35B31 100 MC. 0.400 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M
003 TSD01A1 M.C. SHOVEL SPREADING OF MELLOW EARTH UNIFORM LAYER 10-30CM.THICK BY CLODS CRUSHING,SOFT GROUND
40.000
004 TSD05A1 100 MC. 0.400 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 005 TSE06B1 100 MP. 4.000 SOIL PLATF.PREPARING ISOLATING LAYER AND SAND REPARTION OR GRAVEL IN COHESIVE SOIL 006 DA06A1 M.C. 60.000 NAT.AGREGG.LAYER(GRAVEL)ROLLED OVER WITH FILTRING RESISTANCE FUNCTION ISOL.AERING ANTICAP.MANUAL LAYING 007 TRA01A05 TONA 168.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 5 KM DIST.
008 DD02A1 MP. 400.000 PAVMENT MADE OF NORM PAVING 1ST Q. ON SAND SUB BASE 009 TRA01A10 TONA 140.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 10 KM.DIST. 010 DE11A1 M 230.000 SMALL CRIMPS MANUF.CONCRETE 10X15 CM FOR FRAMING SPACES WALK ROAD ,GREEN ALLEY FOUND. CONCRETE10 X 20 C 010 2100933 M.C. 4.600 CEMENT CONCRETE B 100(C6/7.5) STAS 3622
011 TRA06A05 TONA 14.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 153
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
LOT NO. 5 Industrial Building QUANTITY LIST WITH TECHNOLOGICAL EQUIPMENT, INCLUDING UTILITIES OF THE ESTIMATE-OFFER FOR PROCUREMENT
Item
Name
M.U.
Quantity
Supplier (name,
address,telephone,
0 1 2 3 4 5 6
1 Mural Tank on gas fuel, thermo power of 30kw Gas Regulating filter Dn Gas Detector and electro-valve
Programmable thermostat
3 2 2 1 2 1 1
(col.3 x 4) 5
facsimile )
Water meter Qn=2.5 cubic meters/h Ecological tank for waste water, capacity 20 m3 TOTAL
TECHNICAL SHEET No. 1 EQUIPMENT: TANK FOR HOT WATER Item Technical specifications imposed by the Technical Specifications Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2 Supplier
0 1.
1 Technical and Functional Parameters: Type: mural with forced flow and sealed burning chamber Thermic agent: hot water 80 600 C Nominal output Pn 3 bars Minimum output 90% Net thermic power: 30 KW Burnt gas Connection 110/60 mm Volume of expansion vessel: 8 liters Hot water flow Dt=25 0 . C 13 l/min Primary connection 3/4 - gas 3/4 - water feed pipe - outlet 1/2 gas consumption 3.4 Ncubic meters/h Fuel nominal output: 20 mbar Performance specs and conditions related to safety in exploitation: The tank shall be fitted out with flame extinguishing protection system, electric current supply cut off, and pressure building up in
2.
155
3.
installation To be granted the I.S.C.I.R. endorsement. The Technical Book shall be presented in Romanian wording.
Conditions related to compliance with relevant standards: Guarantee and post-guarantee conditions: 3 years guarantee; 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period Other condition of technical character: the electropump shall provide the pressure head of water of 2 mH2 O to tanks nominal load.
4.
5.
Item
0 1.
1 Technical and Functional Parameters: maximum entrance pressure: 200 mbar outlet pressure: 20 mbar connection diameter: 3/4 Performance specs and conditions related to safety in exploitation: - To be granted a Technical Agreement or an homologation document; - The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: Guarantee and post-guarantee conditions: - 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the postguarantee period. Other condition of technical character:
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
4.
5.
156
Item
0 1.
2.
1 Technical and Functional Parameters: Lower sensitivity limit: 2%CH4 in air Electro-valve nominal diameter: 1 Normal closed electro-valve, with one step Pressure: max 200 bar Male electro-valve connection Power supply: 230 V/50 Hz; Location: in the central heating, and the electro-valve to the exterior Performance specs and conditions related to safety in exploitation: Closing period: < 1 sec. Opening period: < 1 sec. Conditions related to compliance with relevant standards: supplier must be certified according to Standards family ISO 9001 Guarantee and post-guarantee conditions: 3 years guarantee. Other condition of technical character:
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
3.
4.
5.
Item
0 1.
1 Technical and Functional Parameters: Type: single pole, change over contacts, with on-off switch Power supply: 230V / 50 Hz. Maximum current to thermostat contacts: 6 A Control temperature area: 10 30 0 C Use temperature area: 10 50 0 C Protection degree IP 30 Dt=0.5 K Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement and an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
157
standards: 4. Guarantee and post-guarantee conditions: 3 days for solving out issues occurred during the guarantee period; 10 days for providing spare parts in the post-guarantee period. Other condition of technical character:
5.
Item
0 1.
1 Technical and Functional Parameters: -Type: multi-jet, and dry dial -Nominal output: 2.5 cubic meters/h -Nominal diameter: 20 mm - Connection sizing: 3/4 -Connection type: coupling -Design pressure Pn 6 bars Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; The Technical Book shall be presented in Romanian wording. Conditions related to compliance with relevant standards: -Accuracy category: B Guarantee and post-guarantee conditions: -3 years guarantee - 3 days for solving out issues occurred during the guarantee period Other condition of technical character:
Comparison between the technical proposal and the specifications imposed by the Technical Specifications 2
Supplier
2.
3.
4.
5.
Item
Supplier 158
Specifications
0 1.
2.
1 Technical and Functional Parameters: -Material: polyester -Net volume: 20 cubic meters -Diameter: 2.5 linear meters -Length: 4.15 linear meters -Installing: buried Performance specs and conditions related to safety in exploitation: To be granted a Technical Agreement or an homologation document; Conditions related to compliance with relevant standards: - SR EN 12566-1 Guarantee and post-guarantee conditions: - 3 years guarantee. Other condition of technical character: Minimum life cycle: 30 years
3.
4.
5.
- enclosed panel 48 modules - automatic switch 4P 63A, with differential prot. device Id=100mA, Icn=9kA, curve C - circuit breaker phase-null 6A, Icn=4,5kA, curve C - circuit breaker phase-null 16A, Icn=4,5kA, curve C - circuit breaker 4P 10A, Icn=4,5kA, curba C - circuit breaker 4P 25A, Icn=6kA, curba C - copper clamps 25mmp - copper clamps 6mmp - copper clamps 2,5mmp - copper conductor 14mmp - tags - warning plate
1 PCS 1 PCS 4 PCS 10 PCS 3 PCS 1 PCS 5 PCS 5 PCS 55 PCS 8m 18 PCS 1 PCS
Bill of quantities Estimate - Tender: HEAT INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 159
001 IA07A1 [ 3] BUC. 2.000 INSTALLING MURAL BOILER FOR PREPARING HEAT CARRIER AND HOT WATER, WITH A HEAT OUTPUT OF: 25.1-70 KW 002 ATB03A [ 1] BUC. 2.000 INSTALLING PROGRAMMABLE THERMOSTAT
28.000
003 5700864 BUC. STEEL RADIATOR TYPE22 600/500 MM 003 5700865 BUC. STEEL RADIATOR TYPE22 600/600 MM
4.000
1.000
2.000
2.000
2.000
6.000
004 IC08B1 M 94.000 OL PIPE INST.WELD.LONG.NG+THREAD+ COUPLING HEAT.C.HOUSING+SOC.INS.CONNEC. HEAT.BODY+AERING D=1/2 I 004 3305671 M 94.000 BLACK INST.PIPE THREAD+COUPLING M - 15( 1/2) OL 32 1 S 7656
005 IC08C1 M 9.000 OL PIPE INST.WELD.LONG.NG+THREAD+ COUPLING HEAT.C.HOUSING+SOC.INS.CONNEC. HEAT. BODY+ AERING D=3/4 T 005 3305683 M 9.000 BLACK INST.PIPE THREAD+COUPLING M - 20( 3/4) OL 32 1 S 7656 160
006 IC10B1 M 65.000 OL PIPE INST.WELD.LONG.NG+THREAD+ COUPLING HEAT.C.HOUSING+SOC.INS.IN DISTRIBUTION D= 3/4 INCHES 006 3305683 M 65.975 BLACK INST.PIPE THREAD+COUPLING M - 20( 3/4) OL 32 1 S 7656
007 IC10C1 M 85.000 OL PIPE INST.WELD.LONG.NG+THREAD+ COUPLING HEAT.C.HOUSING+SOC.INS.IN DISTRIBUTION D= 1 INCHES 007 3305695 M 86.275 BLACK INST. PIPE FL+MF M - 25(1 ) OL 321 S 7656
008 IC10D1 M 36.000 OL PIPE INST.WELD.LONG.NG+THREAD+ COUPLING HEAT.C.HOUSING+SOC.INS.IN DISTRIBUTION D= 1 1/4 INCHES 008 3305700 M 36.540 BLACK INST.PIPE THREAD+COUPLING M - 32(1 1/4) OL 32 1 S 7656
009 IC10E1 M 19.000 OL PIPE INST.WELD.LONG.NG+THREAD+ COUPLING HEAT.C.HOUSING+SOC.INS.IN DISTRIBUTION D= 1 1/2 INCHES 009 3305712 M 19.285 BLACK THREADED+COUPLINGS PIPE M - 40(1 1 /2) OL 32 1 S 7656
010 IC35C1 BUC. 88.000 CLAMPS FIXING STEEL PIPES AT HEATING INST.OR GASES ASSEMBLED IN BRICK OR CONCRETE WALL D= 1/2 INCHES 011 IC35D1 BUC. 24.000 CLAMPS FIXING STEEL PIPES AT HEATING INST.OR GASES ASSEMBLED IN BRICK OR CONCRETE WALL D= 3/4 INCHES 012 IC35E1 BUC. 26.000 FIXING STEEL PIPES AT WARMING INSTALLATION OR GASE ASSEM.IN BRICK WALL OR CONCRETE D=1 INCHES 013 IC35F1 BUC. 10.000 CLAMPS FIXING STEEL PIPES AT HEATING INST.OR GASES ASSEMBLED IN BRICK OR CONCRETE WALL D=1 1/4 INCHES 161
014 IC35G1 BUC. 6.000 FIXING CLAMPS FOR STEEL PIPES HEATING INST.OR GAS SET IN BRICKWORK OR CONCRETE D=1 1/2 INCHES 015 IC37A1 [ 1] KG 20.000 PIPE SUPPORTS,DIFFERENT TUBES, COLECTORDISTRIB DEVICES, RECIPIENTS DIV.UP TO 2KG.INCL./PIECE 016 IC40A1 BUC. 16.000 MANUF.ASSEMBLY+CEMENTATION OF PROTECTION PIPE AT PIPES PASSING THROUGH WALLS D=1 INCHES 017 IC40B1 BUC. 18.000 MANUF.ASSEMBLY+CEMENTATION OF PROTECTION PIPE AT PIPES PASSING THROUGH WALLS D=1 1/4 INCHES
018 IC40D1 BUC. 4.000 PROTECTION PIPE MANUFACTURE ASSEMBLY+ CEMENTED AT PASSING OF PIPES TROUGH WALLS D=2 INCHES 019 IC40F1 BUC. 2.000 PROTECTION PIPE MANUFACTURE ASSEMBLY+ CEMENTED AT PASSING OF PIPES TROUGH WALLS D=3 INCHES 020 ID01A2 BUC. 56.000 CORNER VENTIL DOUBLED FAUCET ADJUSTM.FOR CENTRAL HEAT.INSTALLATION WITH D: 1/2'' 020 4507207 BUC. 28.000 @CORNER FAUCET ROUND DN 1/2" CODE 4O020407
020 4507209 BUC. 28.000 CORNER FAUCETV ADJUSTMENT BECK DN 1/2" CODE 4O120408
021 ID06A1 [ 1] BUC. 6.000 COUPLING SPHERE FAUCET CENT.HEAT.INSTL. HAVING DN=1/2"
021 7344049 BUC. 6.000 @BALL GAUGE COCK+HOSEBEARING+LEVER MANEV DN 1/2" COD 40761487
022 ID06A1 [ 1] BUC. 4.000 COUPLING SPHERE FAUCET CENT.HEAT.INSTL. HAVING DN=1/2"
023 ID06A2 [ 1] BUC. 4.000 COUPLING SPHERE FAUCET FOR CENT.HEAT. INSTL.HAVING DN=3/4"
023 7344059 BUC. 4.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
024 ID06B2 [ 1] BUC. 2.000 COUPLING SPHERE FAUCET FOR CENT.HEAT. INSTL.HAVING DN=1 1/2" 024 7344119 BUC. 2.000 @SPHERE FAUCET MALE+LEVER MANEV DN 1"1/4 COD 46460425
026 ID06B2 [ 3] BUC. 1.000 Y TYPE INCLINED FILTER FOR IMPURITIES WITH D: 1 1/2''
027 IC54B1 BUC. 4.000 SOFT CAST IRON BLACK THREAD INTEREXTERIOR U2 UNION D =3/4 INCHES
028 IC54C1 [ 1] BUC. 2.000 U2 BLACK UNION PLASTIC CAST IRON MALE FEMALE D =1 1/2 INCHES
029 IE01C1 MP. 226.000 TIGHTNESS PRESSURE TEST CENTRAL HEATING, TOTAL HEAT AREA OF BUILDING IS:201 SQM. TO 500 030 IE02C1 MP. 226.000 DILAT.-CONTRACT.AND FUNCT.TEST CENTR. HEAT.INSTL.TOTAL HEATING AREA IS:201 MP. LA 500 031 IE07C1 MP. 226.000 TAP WATER CLEANING OF THE INTERIOR INSTALLATION OF CENTRAL HEATING WITH SUPP. DEVICE 201-500 MP. 032 CN13A1 M 168.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED 163
033 CN13C1 MP. 16.000 PAINTINGS AT INSTALLATION DONE WITH OIL PAINTS ON PIPES WITH EXTERNAL D >34MM INCL. 033 6103220 KG 2.400 WHITE PAINT (FP) V.101-1 NTR 90-80
034 IZJ07B1 MP. 2.000 ROUGH CASTING OF PIPES AND DEVICES,WITH PLASTER ROUGH CAST LEAD IN TWO LAYERS
035 IZH22A1 [ 2] MP. 4.000 PIPE INSULATION WITH MINERAL WOOL SHELLS AND ALUMINIUM FOLIATING OF 40 MM. THICKNESS 035 2609490 M 9.270 @MINERAL COTTON SHELLS VILLAS DN48 G=40 CASER SHEET AL
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: GAS INSTALLATION Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = 164
= N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA02F1 M.C. 25.000 MAN.DIGGIN.IN LIMIT.SPACES UNDER 1M WITH R.O.W.VERT.UNSUPPORT.IN SOIL AVER.COHEZ. AND VERY COHEZ.DEPTH<1,5M HARD S. 002 TSC02B1 100 MC. DIGGING WITH TYRE EXCAVAT.0,21-0, 39 MC NAT.MOIST.DISCHARGE GROUND CAT.2 0.850
003 TSD01C1 M.C. 83.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 004 TSD05A1 100 MC. 0.830 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 005 ACE08A1 M.C. 27.000 DITCH FILLING FOR WATER PIPE SUPPLY AND SEWERAGE WITH: SAND
170.000
007 W2G01A01 M 174.000 UNDERGR.CABLE SETTING 1 KV GR.0,050-0, 150 KG/M CU-AL IN DITCH ON SAND LAYER WITHOUT OBST.WITH MAN.PULLING ASSEM. 007 4801660 POWER CABLE S.8778 M 177.478 CYY 0,6/ 1KV 1X 1,5 U
009 GD14B1 [ 1] BUC. 2.000 HDPE/STEEL REISER TYPE PASSAGE THROUGH PIECE PE 100 DN 63X2"
010 IA41B1 BUC. 1.000 GAS METER SET ON EXISTING METER PLATE 1 1/4''CONNECTIONS 165
012 IC30A1 M 1.500 OL.INST.PIPE LONG.WELDED BLACK SMOOTH GAS INST.HOUSING+SOC.CULT.BUILDINGS WELDING IN DISTRIBUTION D= 3/4 INCHES 012 3304835 M 1.523 NON THREADED BLACK PIPE M - 20( 3/4) OL 32 1 S 7656
013 IC30B1 M 8.000 OL.INST.PIPE LONG.WELDED BLACK SMOOTH GAS INST.HOUSING+SOC.CULT.BUILDINGS WELDING IN DISTRIBUTION D= 1 INCH 013 3304847 M 8.120 NON THREADED BLACK PIPE M - 25(1) OL 32 1 S 7656
014 IC34C1 BUC. 3.000 SOFT CAST IRON FITTINGS SCREWED COUPLING STEEL PIPES PIECES HAVING 2 SCREWING D=3 /4 INCH 014 4117930 BUC. 1.000 FLEXIBLE CAST IRON ELBOW A1 S474 DN 20 3 /4 014 4123197 BUC. 2.000 FLEXIBLE CAST IRON NIPPLE PIPE N8 S478 DN 20 3/4 DS 015 IC34D1 BUC. 12.000 SOFT CAST IRON FITTINGS FOR SCREWED JOIN.STEEL PIPES PIECES BEING WITH 2 SCREWS FOR D=1 INCHES 015 4117966 BUC. 8.000 FLEXIBLE CAST IRON ELBOW PIPE A1 S474 DN 25 1
015 4123240 BUC. 2.000 FLEXIBLE CAST IRON NIPPLE PIPE N8 S478 DN 25 1 DS 015 4113934 BUC. 2.000 FLEXIBLE CAST IRON REDUCTION N4 S 477 25X 20 F1
016 IC34G1 BUC. 2.000 IRON CAST FITTINGS PLIANT FOR COUPLING SCREWED STEEL PIPES THE PIECES BEING WITH 2 SCREW ON FOR D=2 INCHES 016 4114160 BUC. 2.000 166
N4 S 477
017 IC34N1 BUC. 1.000 SOFT CAST IRON FITTINGS SCREWED GALVANIZED PIPES HIDRANTS COLUMNS, 3 SCREWS D=1 INCHES 017 4115463 BUC. IRON CAST TEE B1 S476 DN= 25 1 1.000
018 IC35D1 BUC. 1.000 CLAMPS FIXING STEEL PIPES AT HEATING INST.OR GASES ASSEMBLED IN BRICK OR CONCRETE WALL D= 3/4 INCHES 019 IC35E1 BUC. 4.000 FIXING STEEL PIPES AT WARMING INSTALLATION OR GASE ASSEM.IN BRICK WALL OR CONCRETE D=1 INCHES 020 IC40C1 BUC. 1.000 MAKING ASSEMBL+CONCRETING PROTECTION PIPES AT PASSING OF PIPES TROUGH WALLS D =1 1/2 INCHES 021 ID20B1 [ 2] BUC. 2.000 BALL GAUGE COCK FOR GAS INSTALLATION WITH DN: 3/4"
021 7344059 BUC. 2.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
022 ID20C1 [ 1] BUC. 2.000 BALL GAUGE COCK FOR GAS INSTALLATION AVAND DN 1 ''
022 7344085 BUC. 2.000 @BALL VALVE FIXFI+LEVER MANEV DN 1" COD 40450425
1.000
024 GD10A1 BUC. 2.000 AIR HOLE WITH NO CONTROL COVER 1-2 INCHES
025 IE06A1 M 9.500 FINAL VERIFICATION AT PRESSURE OF ASSEMBLY GAS CONDITIONS TAPS D: UP TO 1'' 167
026 IE06B1 M 170.000 FINAL CHECKING OF PRESSURE OF GAS MOUNTED GAS PIPES, TAPS , D: OVER1'' 027 IE06B1 M 16.000 FINAL CHECKING OF PRESSURE OF GAS MOUNTED GAS PIPES, TAPS , D: OVER1''
028 CN13A1 M 9.500 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED 028 6103311 KG 0.162 CREAM-YELLOW COLOUR PAINT V.451-3 NTR 90 -80
029 TRA01A TONA 54.000 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH DUMP TRUCK DISTANCE= KM
030 TRA01AP TONA 49.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= KM
031 TRI1AA03C2 TONA 49.000 MATERIAL LOADING,GROUP A-HEAVY IN DUST, BY THROWING FROM PLATFORMS OR SOIL-CAR CATEG.2 032 YB01M [ 1] MII LEI. RECEPTION OF GAS INSTALLATION 1.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Bill of quantities Estimate - Tender: SANITARY INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 SA12B1 [ 3] M 44.000 PEXAL PIPE MONT.IN CONNECTION PIPES OF SANIT.SUNDRIES D= 16 MM
004 SA06B1 M 45.000 STEEL PIPE LONGIT.WELDED FOR ZINCKED INSTAL.WITH THREAD+COUPLING ASSEM.LOC.+ SOC. CULT.IN DISTRIB. D=1 T 004 3306352 M 45.450 GALVANIZED INST.PIPE THREAD M - 25(1 ) OL 32 1 S 7656
55.000
15.000
007 SA43E1 [ 1] BUC. 7.000 FIXING PIPE BRACE DN 26 MM 008 SA43E1 BUC. 30.000 CLAMP FOR FIXING STEEL+PVC PIPE OF WATER +GAS SUPPLY, ASSEM.BY TOOTHING,PIPE D=1 INCH 009 SB16A1 [ 1] M 7.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D= 32 MM 169
010 SB16C1 [ 1] M 12.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D= 50 MM 011 SB16D1 [ 1] M 12.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D= 75 MM
012 SB16E1 [ 1] M 16.000 SEWAGE FIREPROOF POLYPROP.PIPE RUBBER SEAL JOINING D=110 MM
013 SB17A1 [ 1] BUC. 12.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 32MM 013 6712369 BUC. 6.000 @HTB POLYPROPYLENE ELBOW AT 87 DGR 30 MIN DN 32 COD 62504011
013 6712226 BUC. 6.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 32 CODE 62504011
014 SB17C1 [ 1] BUC. 13.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D= 50MM
014 6712381 BUC. 2.000 @HTD POLYPROPYLENE ELBOW AT 87 DGR 30 MIN DN 50 COD 62504035
014 6712243 BUC. 11.000 @HTB POLYPROPYLENE ELBOW AT 45 DGR DN 50 COD 62504029
015 SB17E1 [ 1] BUC. 20.000 SEWAGE FIREPROOF POLYPROP.ELBOW RUBBER SEAL JOINING D=110 MM
015 6712264 BUC. 20.000 @HTD POLYPROPYLENE ELBOW AT 45 DGR DN 110 COD 62504053
016 SB19A1 [ 1] BUC. 1.000 SEWAGE FIREPROOF POLYPROP.SIMPLE UNIFORM BRANCH RUBBER SEAL JOINING D= 50 MM
016 6712812 BUC. 1.000 @HTEA POLYPROP.EQUAL BRANCH 45GR DN50/50 CODE 62508013 170
017 SB19C1 [ 2] BUC. 2.000 FIREPROOF POLYPROP. SIMPLE LOW BRANCH RUBBER SEAL JOINING D=110/ 50 MM
017 6712848 BUC. 2.000 @HTEA POLIPROP SIMPLE REDUCED BRANCH 45 DGR DN110/50 COD 62510031
018 SB19C1 [ 1] BUC. 8.000 SEWAGE FIREPROOF POLYPROP.SIMPLE UNIFORM BRANCH RUBBER SEAL JOINING D=110 MM
018 6712862 BUC. 8.000 @HTEA POLIPROP SIMPLE EQUAL BRANCH 45 DGR DN 110 COD 62508025
019 SB21C1 [ 1] BUC. 3.000 SEWAGE FIREPROOF POLYPROP.INTERVENTION PART RUBBER SEAL JOINING D=110 MM
020 SB22E1 [ 1] BUC. 2.000 FIREPROOF POLYPROP.REDUCING COUPLING FOR SEWERAGE RUBBER SEAL D=110- 50 MM
021 SB22F1 [ 1] BUC. 3.000 SEWAGE FIREPROOF POLYPROP.REDUCING PIECE RUBBER SEAL JOINING D=110- 75 MM
023 SB44D2 [ 1] BUC. HDPE GULLY TRAP D= 50 MM WITH 2 CONNECTIONS AND VERTICAL EXIT
2.000
024 SA43H1 [ 1] BUC. TUBE CLIP DN 50 MM 025 SA43J1 [ 1] BUC. TUBE CLIP DN 75 MM
5.000
9.000
3.000
027 SC07A1 [ 2] BUC. 4.000 SANITARY PORCELAIN LAVATORY, SET ON CONSOLES ANCHORED BY WOODEN DOWELS ON 171
BRICKWALL,INCL.SINK WATER TRAP AND VALVE 027 2442288 BUC. 4.040 PORCELAIN BASIN WITHOUT REST L 2-600MM WHITE C.1 S 1540 027 4203557 BUC. 8.000 ENAMELLED DOUBLE ARM CONSOLE 420MM QAL.1 S 3343 028 SC07E1 [ 1] BUC. 2.000 SANIT.PORCELAIN LAVATORY L2 600 ON STAND INCLD.FLOOR TRAP AND DELIVERY VALVE
029 SC13A1 BUC. 6.000 SANITARY PORCELAIN WATER CLOSET WITH SIPHON TRAP S COV-A TYPE WHITE PORCELAIN C.1 029 2444690 BUC. 6.060 WATER CLOSET BASIN COV2 WHITE PORCELAIN C. 1 S 2066
030 SC16D1 [ 1] BUC. 6.000 RESERVOIR FOR WASHING WC BASIN FROM POLYPROPYLENE SET MIDHEIGHT ON BRICK WALL 031 SC18A5 BUC. 6.000 WC BASIN FRAME,OF POLYPROPYLENE WITH LID
032 SC22A1 [ 1] BUC. 1.000 SANITARY PORCELAIN URINAL WITH DELAY ACTION VALVE, MOUNTED ON BRICK WALL
032 4201747 BUC. 1.000 URINAL WITH DELAY ACTION VALVE VISIBLY SET
033 SC24A2 BUC. 2.000 TOWEL SUPPORT MADE OF AM NICKEL SET ON WALLS U TYPE, 1 ARM, OPENING 600MM
6.000
034 2451849 BUC. 6.060 PORCELAIN SHELF TYPE E2.60 WHITE Q.1 NI 567
172
036 SC27A1 [ 1] BUC. 6.000 LIQUID SOAP DISTRIBUTOR VISIBLY SET ON WALL
038 SD05A1 [ 1] BUC. 4.000 DELAY ACTION VALVE COLD WATER FOR BASIN, WITH DN 1/2"
2.000
039 4201377 BUC. 2.000 BRASS MIXT.WASH HAND BATTERY 1/2" PEARL JET S8732
040 SD12A1 BUC. 8.000 CORNER ADJUSTMENT FAUCET,OF NICHELLED BRASS,HAVING D=3/8 OR D=1/2 INCHES 040 4201779 BUC. 8.000 NICKEL PLATED GRASS ANGLE CONTROL COCK 1 /2 " S 751/I
042 SD13A1 [ 1] BUC. 6.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
042 7344032 BUC. 6.000 SPHERE TAP FI X FE "MINI" DN 1/2" CODE 40MI4272
043 SA21B1 [ 1] BUC. 6.000 FLEXIBLE REINFORCED RUBBER CONNECTION 1/2"X 3/8"
044 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
044 7344047 BUC. 1.000 @BALL GAUGE COCK+HOSEBEARING+LEVER MAN DN 1/2" COD 40740485 173
045 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
045 7344030 BUC. 1.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 1/2" CODE 40430425
046 SD13B1 [ 1] BUC. 3.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=3/4''
046 7344059 BUC. 3.000 @SHERE FAUCET FEMALEXFEMALE+LEVER MANEV DN 3/4" CODE 40440425
047 SD13C1 [ 1] BUC. 2.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=1''
047 7344085 BUC. 2.000 @BALL VALVE FIXFI+LEVER MANEV DN 1" COD 40450425
048 SF01A1 M 107.000 TIGHTENESS TEST AT PRES. OF INST. INTER. OF WATER,IN PIPES STEEL ZN. OR LEAD PRES. INCLUDING REINFORCED 049 SF04A1 M 107.000 CLEANING AND SUBMIT FOR FUNCTION OF PVC WATER PIPES.
050 CN13A1 M 45.000 INSTALLATIONS REGULAR PAINTINGS WITH OIL PAINT ON PIPES EXT.D<34MM INCLUDED
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, 174
NOMINALIZED:
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
Bill of quantities Estimate - Tender: WATER AND SEWAGE SERVICES Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA02F1 M.C. 236.000 MAN.DIGGIN.IN LIMIT.SPACES UNDER 1M WITH R.O.W.VERT.UNSUPPORT.IN SOIL AVER.COHEZ. AND VERY COHEZ.DEPTH<1,5M HARD S. 002 TSA12C1 M.C. 24.000 MAN.DIGG.IN EXCAVATIONS 1-1,5M WIDE WITH SUPP.MAN.EVAC.IN SOIL WITH NAT.MOIST AT DEPTH 0,0-1,5M,HARD SOIL 003 TSC02B1 100 MC. DIGGING WITH TYRE EXCAVAT.0,21-0, 39 MC NAT.MOIST.DISCHARGE GROUND CAT.2 0.820
004 TSA18E2 M.C. 6.000 MAN.EXCAV. FOLLOWING MECHANICAL EXCAVATION HOLES.FOUND. ELEM.NAT.MOIST.SOIL WITH SUPPORT DEPTH< 4 M HARD SOIL 005 TSF01A1 MP. 105.000 SUPPORT.BY EDGES WITH BEECH SUPPRT. PLACED HORIZ.EDG.BETWEEN <1,5M,DEEP.0,02M,0,0 -0,2M BETWEEN EDGE 006 TSD01C1 M.C. 242.000 LOOSE SOIL SHOVEL SPREADING,UNIFORM LAYER 10-30CM.THICK WITH BREAKBLE CLODS HARD SOIL 007 TSD05A1 100 MC. 2.420 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 008 ACA10A3 [ 2] M 173.000 175
UNDERGROUND SETTING AT WATER SUPPLY HDPE PIPES JOINED WITH FITTINGS THROUGH COMPRESSURE,WITH DN 40 MM 008 7500552 M 176.460 PE WATER PIPE 100 SDR 17 PN 10 Dn=40mm
009 ACA17A2 BUC. 3.000 POLYETHILEN CONNECTION PIECES JOINED BY COMPRESSURE FOR HDPE WATER SUPPLY PIPES
010 ACA12C1 [ 3] M 51.000 INSTALLING PVC PIPE IN GROUND 100 COMPACT SN 4 FOR EXTERIOR SEWAGE RUBBER TIGTH ELASTOM.RING D=160 MM
011 SD13A1 [ 1] BUC. 1.000 BALL VALVE WITH COUPLINGS,FOR STEEL PIPES OF D= 1/2 "
011 7344045 BUC. 1.000 @SPHERE FAUCET EVAC+LID+PORTHOSE DN 1/2" CODE 40814762
012 SD13C1 [ 1] BUC. 2.000 SPHERE FAUCET WITH COUPLING,FOR STEEL PIPES D=1''
012 7344085 BUC. 2.000 @BALL VALVE FIXFI+LEVER MANEV DN 1" COD 40450425
1.000 DN
1.000
015 ACD01J1 BUC. 4.000 STAS 2308-81 FRAME AND CAP FOR SEWERS WITH CARRIAGEWAY SUPPORT PIECE III A TYPE 176
016 ACD09G1 BUC. 1.000 CONCRETE MANHOLES SET SECT. CIRC. PR.TIP 1785-2 DI 1,5 M. H 1,5 WITHOUT UNDERGROUND WATER CARRIAGEWAY 017 ACD04A1 BUC. 2.000 MANHOLE STAS 2448-73 WORK SPACE HC=2M CONCRETE TUBE WITH PLUG AND OPENING WITH DN 200 017 2101195 M.C. MORTAR M100 T WITH LIME HYDRATING 0.076
017 2100933 M.C. 2.020 CEMENT CONCRETE B 100 (C6/7,5) STAS 3622
017 2804216 BUC. 1.010 SIMPLE CONCRETE CIRCULAR TUBE WITHOUT FOOTING COUPLING DRY JOINING 1000X1000 S816
018 ACD07A1 M 1.000 ELEMENTS AT MANHOLES STAS WITH H>2 M INCLUDES: CONCRETE TUBE ACCESS DN 800 L= 1 M WITH FANCET AND OPENING 018 2101183 M.C. MANSONRY MORTAR M 100 S 1030 0.019
019 ACD03A1 M 3.000 STRINGER LADDED OL 50X10 AND STEPS OB D=20MM ACCESS IN SEWERS OF CONCRETE PIPES 020 ACE05A1 [ 1] BUC. 8.000 PVC PIECE FOR PIPING TIGHT PASSAGE THROUGH CONCRETE SEWERS WALLS
020 6311602 BUC. 2.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 40 MM WITH WATERPROOFING
020 6311607 BUC. 3.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 110 MM WITH WATERPROOFING
020 6311608 BUC. 3.000 @PASSAGE THROUGH PIECE INCLUDED IN PVC 160 MM WITH WATERPROOFING
021 ACE07A1 100 M. 17.300 WATER PIPES WASHING AND DESINFECTION WITH DN 50 177
022 ACE08A1 M.C. 56.000 DITCH FILLING FOR WATER PIPE SUPPLY AND SEWERAGE WITH: SAND
173.000
023 TRA01A TONA 112.000 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH DUMP TRUCK DISTANCE= KM
024 TRA01AP TONA 180.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= KM
025 TRI1AA03C2 TONA 180.000 MATERIAL LOADING,GROUP A-HEAVY IN DUST, BY THROWING FROM PLATFORMS OR SOIL-CAR CATEG.2 Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
178
Bill of quantities Estimate - Tender: ELECTRIC INSTALLATIONS Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 EA02A1 [ 2] M 80.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=16/13,4MM
002 EA02B2 [ 2] M 3.000 PROTECTION INSULATION TUBE,IPEY SEALED RECESSED WITH D=40/35,4MM
120.000
005 EA16C1 BUC. 32.000 DEVIATION DOSE FOR CABLES OR INSTALLATIO N PIPES -NBU PG 16 005 7318987 BUC. 32.000 DEVIATION DOSE FOR CABLES OR INSTALLATIO N PIPES TYPE:NBU PG16
006 EB02A1 M 240.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
247.200
007 EB02A1 M 120.000 INSULATION COPPER PIPE INSIDE PROTECTION TUBES,PIPE HAVING SECTION < 4 MMP
007 4826892
123.600 179
008 EC01B1 M 280.000 ELECTRICAL CABLE LAMP,PLUG SECT.<4MMP MONTAT BACH.PE DIBLURI MAT.PLASTIC
008 4801830 M 288.400 POWER CABLE CYY 0,6/ 1KV 2X 1,5U S.8778
009 EC01B1 M 120.000 ELECTRICAL CABLE LAMP,PLUG SECT.<4MMP MONTAT BACH.PE DIBLURI MAT.PLASTIC
009 4801892 M 123.600 POWER CABLE CYY 0,6/ 1KV 3X 1,5U S.8778
010 EC01B1 M 360.000 ELECTRICAL CABLE LAMP,PLUG SECT.<4MMP MONTAT BACH.PE DIBLURI MAT.PLASTIC
010 4801907 M 370.800 POWER CABLE CYY 0,6/ 1KV 3X 2,5U S.8778
011 EC03A1 M 50.000 POWER CABLE SET WITH SCAFS ON CONSOLES FIXED WITH METALLIC NAILS COND.<10 SQMM.
012 EC03A1 M 15.000 POWER CABLE SET WITH SCAFS ON CONSOLES FIXED WITH METALLIC NAILS COND.< 10 SQMM. 012 4802079 POWER CABLE 8778 M 15.450 CYY 0,6/ 1KV 5X 6 U S.
013 EC03C1 M 5.000 POWER CABLE MONTAT CU SCOABE PE CONSOLE FIX.CU DIBLURI METAL COND.25 SAU 35 MMP. 013 4802108 M 5.100 CYY POWER CABLE 0,6/ 1KV 5X 25 U S.8778
014 EC12A1 BUC. 236.000 INTERIOR TERMINAL CONNEC.TO CLAMPS WITH CU.PIPES <2X10MMP 180
015 EC12C1 BUC. 6.000 INSIDE FINAL HEAD CONNECT.AT LANDMARKWIT H PIPE.WITH <4X10MMP
016 EC12D1 [ 2] BUC. 2.000 TERMINAL INTERIOR HEAD AT THROUGH JOINTS OF COPPER PIPES 5X25SQMM
017 ED01A1 BUC. 4.000 MANUAL SWITCH BURIED UNIPOLAR NORMAL OR WATERPROOF CONSTRUCTION * 017 5500720 BUC. CUMPANA SWITCH ST.250V 10A 4.040
018 ED03A1 BUC. 8.000 UNIPOLAR SWITCH BURIED,WOODEN NAILS,IN SERIES,NORM.CONSTR.OF BACHELITA OR WATERPROOF CONSTR.
8.080
019 ED03F1 BUC. 6.000 UNIPOLAR PLUG APPARENT ,WOOD DOWEL,IN SERIES,CONSTR.NORM.FROM BACHELITA OR TIGHT CONSTR. 019 5500689 BUC. 6.060 VISIBLY SET MANUAL SWITCH 250V 10A
020 ED08B1 [ 1] BUC. DOUBLE TWIN PLUG WITH PROTECTION CONTACT RECESSED MOUNTED
12.000
021 ED08E1 BUC. 38.000 VISIBLE SET PLUG ON WOODEN NAILS NORMAL CONSTRUCTION OR CAPSULATED CONSTRUCTION
021 5535996 BUC. 38.380 DOUBLE MOUNTED BIPOLAR SOCKET,PROT. CONTACT 250/10A
181
BUC.
24.000
023 EE12B1 BUC. 2.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
023 5103605 BUC. 2.006 FIA FLUORESCENT LIGHT FIXTURES 11-1X36W VISIBLY SET
024 EE12B1 BUC. 10.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS 024 5103763 BUC. 10.030 FIAG FLUORESCENT FIXTURE 11-2X36 W FITTED,VISIBLY MOUNTED
025 EE12B1 BUC. 3.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
025 5103707 BUC. 3.009 FIRI FLUORESCENT FIXTURE 03-2X18 W REFL.DOUBLE PARAB.FITTED,RECESSED
026 EE12B1 BUC. 6.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
026 5103723 BUC. 6.018 FIRI FLUORESCENT FIXTURE 03-4X18 W REFL.DOUBLE PARAB.7 PLATES, RECESSED
027 EE12B1 BUC. 4.000 UNTIGHT HOLLOW FLUORESCENT FIXTURES SET ON PLASTICS DOWELS
027 5103823 BUC. 4.012 FLUORESCENT LIGHT FIXTURES AB 02-1X18 W VISIBLY SET
028 EE12G1 BUC. 6.000 FIXTURE FOR TUBE FLUORESCENT LAMPS SEALED SET ON PLASTIC MATERIAL DOWELS 028 5103835 BUC. 6.180 FIPAD FLUORESCENT FIXTURE 04-2X18 W DISPER. PC,STARTER,NOT FITTED 182
029 EE14B1 BUC. 12.000 TUBULAR FLUORESCENT LAMP SET INSIDE CONSTR.OR ON EXTER.ELEM.AT NON TIGHT OR TIGHT LUMINAIRES
030 EE10C1 BUC. 8.000 SPECIAL FIXTURE, DIFS. MOUNTED ON MET.NAILS FOR MERCURY VAPOUR LAMPS
030 5104746 BUC. VAPOUR FIXTURE HG.IHV 1X250W WATERPROOF FOR INTER.LIGHTING
8.024
031 EE14C1 BUC. 8.000 MERCURRY VAPOURS LAMP ASSEM.INSIDE CONSTRUCTION OR AT EXTERNAL ELEMENTS FOR TIGHT OR NON TIGHT LUMINAIRES
031 5102384 BUC. 8.400 FL.MERCURY VAPOUR LAMP OF HIGH PRESSURE LVF E40/45 220V 250W S7832
033 EF09A1 BUC. 55.000 COUPLING COPPER PIPE AT DEVICES BORNS , MOTORS,ELECTR.COUNTER COND.HAVING SECT. <10MMP,EXCLUSIV 034 EF09C1 BUC. 10.000 COPPER PIPE BRANCHING AT TERMINALS, MOTORS,ELECTR.PANEL PIPE HAVING SECT.25 OR 35MMP 034 5203097 BUC. 10.000 BRASS CUT SHOE COPPER PIPE 6X 5,4 MMP
035 EF10A1 BUC. 140.000 ELECTRIC CONNECTION (CONEC.) BETWEEN SAFETY CLAMPS AND DEVICES,OR BETWEEN DEVICES,WITH PIPE L<0,5 M 035 4826919 M CONDUCTOR FY 1X 6 S 6865 49.000 183
036 EB09A1 [ 1] BUC. 6.000 COPPER FLEX.PIECE FOR ADDITIONAL B.E.P. EARTH GROUNDING
1.800
12.000
038 EG07B1 M 12.000 DOWN.PIPES STEEL-ZINK BAND 25X4MM, APPARENT ASSEMBLED ON WALLS
039 EG08C1 M 50.000 EARTH COND.LIGHTING ROD PROT.EARTH CONN. UNDERGROUND ASSEM.OL GALVANIZED STRIP 40X4MM ASSEM.IN VERY HARD SOIL 040 W1R06A1 M 9.000 ELECTRODE OF STEEL PIPE OF TWO AND A HALF INCHES FOR EARTH GROUNDING IN NORMAL GROUND
1.000
043 EG11B1 [ 1] BUC. 6.000 BEP CONNECTING PIECE TO INSTALLATION PIPES 044 W1R11A [ 1] BUC. 6.000 FLEX.PIECE JOINING BY GALVANIZED SCREWS TO B.E.P.
045 EG11B1 [ 2] BUC. 1.000 GAS SPARK VALVE TAP FOR NAT GAS INST. CONN.TO BEP
184
047 EH05B1 BUC. 2.000 PANEL TESTING MADE OF CAPSULATED BOXES IN NUMBER OF MAX.10
25.000
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Other direct expenses: -SOCIAL ENSURANCE QUOTE - CAS: -UNEMPLOYMENT: -RISK FUND -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
BILL OF QUANTITIES Estimate - Tender: ARCHITECTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CB48A1 MP. 412.000 ASSEMBLY AND DISMANLING OF MECH.LIFTED SCAFFOLDING 2 CASTLES L=12M FOR FACADE FINISHING 002 AUT1304 ORA 960.000 SELF-LIFTING METALIC SCAFFOLD 2 CASTLES 6MARCH 75KG/M H-31M L=12M 3SHIFTS
003 MDTC5517005 BUC. 2.000 EQUIPMENT TRANSPORTAT 5 KM 90100043 SELF LIFTING METALLIC SCAFFOLDING WITH 2 CASTELS 004 CD05A1 M.C. 4.500 185
0.945
005 CD24A1 MP. 150.000 PLAIN PARTITIONING WALLS CW 75/100 WITH METALLIC STRUCTURE (RIGIPS)
006 CK17C1 [ 1] MP. PVC PARTIONING MADE OF FIXED PANELS AND DOOR SHEETS
25.000
007 CE05C1 [ 1] MP. 415.000 ROOF COVERING OF THERMO-INSULATING PANELS OF 8 CM (NAVY BLUE)
008 CD14A1 [ 1] MP. 375.000 FACADE METALLIC PANELS SANDWICH TYPE WITH POLYURETHANE FOAM THERMO-INSULATION OF 8 CM(NAVY BLUE)
009 CE13A1 M 104.000 GALVANIZED PLATE DRAIN OF 0,5MM, MADE ON SITE SEMIROUND WITH D=15CM
010 CE14A1 M 18.000 GALVANIZED PLATE RAIN PIPE OF 0,5MM MADE ON SITE SEMIROUND WITH D= 15,4CM
011 2101200 M.C. 0.120 PLASTER MORTAR M 100 (LIME PASTE) S 1030
312.000
014 CN06B1 [ 6] MP. 2 LAYER WASHABLE PAINTING FOR INTERIOR, WHITE COLOR
312.000
186
015 CF01K1 MP. 30.000 FLOATED INT.PLASTERS,AT COLUMNS,WALLS WITH SPRINKLER AND PLASTER ROUGH CAST MECHANICALLY PERFORMED,OF 2CM 015 2101202 PLASTER MORTAR M10T M.C. 0.540
016 CF06K1 MP. 83.000 FLOATED EXTERNAL PLASTER ON BRICK AND BLOCKS WALLS WITH CRUND.MECH.LAYER VIZ. MANUALLY MORTAR M25-T THICK.2,5 CM 016 2101203 PLASTER MORTAR M25T M.C. 1.909
017 CF09A1 [ 4] MP. 83.000 SPECIAL THIN PLASTER FOR SOCLE AT INTERIOR AND EXTERIOR WITH MOSAIC PUTZ 018 CF03A1 MP. 16.500 INTERNAL FLOATED PLASTER,AT CEILINGS PLANE,AVERAGE THICKNESS OF 2CM
M.C.
0.330
019 2101200 M.C. 5.775 PLASTER MORTAR M 100 (LIME PASTE) S 1030
020 CG01F1 MP. 377.000 CEMENT FINISH SLAB SUPPORT OF LEVELLING PLASTER UNDER FLOORING OF 3CM THICKNESS
021 CG11A1 MP. 70.000 PLATED FLOORS FROM CERAMICS SQUARED OR RECTANGULAR OF SAME COLOUR PLACED SIMETRICALLY 021 2425280 MP. NON GLAZED SMOOTH TILING GRI F 100X100X 8 C1 S5939 72.100
115.000 187
022 2434891 M 117.299 UN SMOOTH SANDSTONE JOINNINGS ELEM. GREEN S 150X100X 8 C1 S5939
023 CG02B1 [ 2] MP. 25.000 LAMINATED PARQUET FLOOR FOR INTENSE TRAFFIC
024 CI06E1 MP. 80.000 WHITE TILE PLATING ADHESIVE PASTE FIXED
024 2401777 MP. 83.999 DECOR WHITE TILE MONOC M.DR 150X150X5,5 Q. 1 S233
025 CK11G1 [ 2] MP. 32.800 P.V.C. WINDOWS WITH 5 ROOMS , SEALING, WHITE DOUBLE-GLASSED WINDOW OF 24 MM 026 CK14A1 [ 1] MP. SPECIAL METALLIC DOORS 1.900
1.000
027 CK14A1 [ 2] MP. 12.000 WHITE COLOR PVC DOORS WITH THERMO INSULATING GLASS 4+ 16+4MM
[ 6] MP.
2.300
029 CK14A1 [29] MP. PVC DOORS WITH PLAN WINDOW WITH SURFACE < 5 SQUARE METERS
19.500
030 CK14A1 [11] MP. 18.000 ALUMINIUM ROLLING DOORS (GATES) WITH THERMO-INSULATION
031 CK11G1 MP. 1.200 ALUMINIUM WINDOWS FOR CONSTRUCTIONS WITH H<10M AND WINDOW FRAME OF < 3SQM
1.200 188
189
032 CM04B1 MP. 1.100 CLEAR DRAWN WINDOW GLASSES FIXED SIZES METALLIC JOINERY 2-3MM THICK RED LEAD PUTTY AND METALLIC RODS >0,2 032 2500327 MP. 1.155 CLEAR DRAWN GLASS Q.3 4MM. PACKED FREE SIZES S 853
034 CI02A1 [13] MP. 31.000 SPECIAL FINISHING FOR FACADE WITH ALUMINIUM ALUCOBOND PLATES
035 CO01A1 MP. 170.000 PAVEMENT OF SIMPLE CONCRETE POURED ON SITE 035 2100933 M.C. 13.770 CEMENT CONCRETE B 100(C6/7.5) STAS 3622
036 CO03A1 M 111.000 PAVEMENT KERBS SET ON M100-T MORTAR OF 5CM THIC.ON CONCRETE FOUNDATION,WITH CEMENT 036 2202202 M PAVEMENT KERBS 12 X25X50CM 111.555
036 2101200 M.C. 1.221 PLASTER MORTAR M 100 (LIME PASTE) S 1030 037 CL20C1 [18] KG INSTALLING VISIBLE PLATEWORKS: GRATE FOR WIPPING THE FEET 30.000
037 6306016 KG 30.000 METALLIC GRID FOR SWEEPING FEET OF PROFILED STEEL
038 TRA06A05 TONA 34.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 190
Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: SOCIAL ENSURANCE QUOTE - CAS: UNEMPLOYMENT: HEALTH OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: TOTAL
Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: RESISTANCE INFRASTRUCTURE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA01B1 M.C. 108.000 MAN.EXCAVATIONS IN LARGE SPACES IN SOIL WITH NAT. MOISTURE SET IN STORAGE ROOM OR VEHIC.H<0,6M MEDIUM SOIL* 002 TSA14B1 M.C. 3.820 MAN.EXCAV.IN HOLES OF 1.5-6M WIDE WITH SUPPORT MAN. EVAC.IN SOIL WITH NAT.MOIST. 0.0-2M DEEP,INTERMEDIATE SOIL 003 TSA04B1 M.C. 19.000 MAN.DIGGING IN LIMITED SPACES UNDER 1M SUPPORTS AND MAN.EVAC.IN SOIL WITH NAT. HUMIDITY DEPTH.0,0-1,5M MEDIUM SOOL 004 TSD02D1 100 MC. 1.840 LOOSE SOIL SPREADING RESULTED FROM 1ST OR 2ND C. SOIL WITH BULD. 65-80HP IN LAYER WITH THICKNESS OF 51-100 005 TSD01B1 M.C. 27.000 191
SHOVEL SPREADING OF THE LOOSE LAND,LEVEL LAYER 10-30CM.THICK WITH CRUSHED CLODS AVERAGE SOIL 006 TSD05A1 100 MC. 0.270 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 007 TRB01C12 TONA 14.600 MATERIALS TRANSPORT WITH WHEELEBARROW TYRES LOAD THROW UNLOAD OVERTURN GROUP13 DISTANCE 20M 008 TRA01A05P TONA 18.200 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM 009 CG32D1 [ 5] M.C. FILLINGS IN LAYERS, EXECUTED BY MECHANICALLY COMPACTED GRAVEL 45.000
010 CA01B1 M.C. 44.000 SIMPLE CONCRETE MOULDING IN FOUNDATIONS (CONTINUOUS,ISOLATED)AND SOCLES WITH VOLUME > 3MC,AND IN RETAINIG WALLS 010 2100945 M.C. 44.352 CEMENT CONCRETE B 150(C8/10) STAS 3622
011 CA01D1 [ 8] M.C. 5.000 PLAIN CONCRETE C6/7.5 IN LAYERS OF 320CM THICK. TO EQUALIZING
012 CB01A1 MP. 115.000 SHUTTERING IN BUSHING GLASS BOTTOM , EQUIPMENT BOTTOM,FROM REUSED PANELS,FROM RESINE SLATS SC AND SUBSC INCL SPIJIN 013 CB11A1 MP. 132.000 SHUTTERINGS FOR CONCRETE IN ELEV.FROM PANELS TO STRAIGHT WALL WITH H<3M,WITH PLYWOOD OF 8MM THICK. 014 CA02A1 M.C. 25.000 REINFORCED CONCRETE MOULDING IN INSULATED FOUNDATIONS VOLUME <3MC
014 2100969 M.C. 25.200 CEMENT CONCRETE C16/20(B 250) STAS 3622
192
015 CA02C1 M.C. 15.000 POURING REINFORCED CONCRETE IN CONTIN. FOUNDATIONS ,PLATE FOUNDATIONS AND WALLS UNDER 0 ELEVATION OF BUILD.WITH THICK. <30CM 015 2100969 M.C. 15.120 CEMENT CONCRETE C16/20(B 250) STAS 3622
016 CC01C1 KG 3830.000 CONCRETE STEEL REINFORCEMENTS ASSEMBLING IN CONTINUOUS FOUNDATIONS,SLABS OF PLATES,WITH DIST FROM PLASTICS 017 CZ0301A1 KG 855.000 MANUFAC.REINFOR.SHAPED BARS FOR FOUNDATION ISOL.CONTINUOUS AND PLATES IN.CENT.WORKSHOPS OB 37 D=6-8MM 018 CZ0301D1 KG 2975.000 REINFORCED MANUFACTURED SHAPING BARS FOR CONTINOUS ISOLATED FOUNDATION AND PLATE FOUNDATION IN ATEL CENT.PC 52 D=6-8MM 019 TRA06A05 TONA 176.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM 020 TRA02A05 TONA 5.000 ROAD MATERIALS SEMIPRECAST TRANSPORT WITH TRUCK ON DISTANCE= 5 KM.
021 CA01D1 M.C. 30.000 SIMPLE CONCRETE MOULDING IN LAYERS OF 320CM THICKNESS AT CONSTRUCTIONS WITH H <35M 021 2100969 M.C. 30.240 CEMENT CONCRETE C16/20(B 250) STAS 3622
022 IZF04J1 [ 1] MP. 336.000 BOUNDARY LAYER EXEC BY POLYETHYLENE FOIL OF0.2MM
023 CC02F1 KG 1020.000 REINFORCED ASSEMBLED AT CONSTR.H<35M FROM NETS WITH G=1-3KG/MPIN MIDRIFF WALLS WITH PLASTIC DISTAN 024 CZ0302XD1 KG 1020.000 MANUFACTURING OF WELDED MESH IN CENTRALIZED WORKSHOPS OF CONCRETE STEEL 37 WITH BARS OF D=4-5MM 025 IZF10F1 [14] MP. 336.000 EXTRUDED POLYSTYRENE INSULATION LAYER OF 100MM WITH = 0.03 W/MK > 35 KG 193
UNDER THE REINFORCED CONCRETE SLAB Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT Bill of quantities Estimate - Tender: CONSTANT RESISTANCE Work category: ================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 CL01A1 TONA 5.470 STEEL PILLARS SETTING FOR INDUSTRIAL HALL COMPLET.SET HAVING<1T INCL.
002 CL04A1 TONA 4.500 STEEL FULL BEAM SETTING COMPL.SETTING UNDER 1T
003 CL16A1 TONA 4.021 SETTING OF METALLIC TEMPLETS OF 0.1-0.2T ON CONCRETE FRAMEWORK TO CONSTR WITH H <35M 004 TRA04A10 TONA ROAD TRANSPORT PRECAST MATER.BY AUTO CARRIER WITH TRAILER UNDER 20T ON DIS.10 KM.* 13.500
194
006 CP26A1 [ 1] M.C. 0.650 PUTTING IN OPERATION OF MORTAR M100 FOR SITTING METALLIC PILLARS
007 CC02C1 KG 35.000 ASSEMBL.REINFOR.FOR CONSTR H<35M FROM BARS IN BEAMS AND COLUMNS D<18MM PLATES D<10MM WITH DIST FROM PLASTIC 008 CZ0302XE1 KG 35.000 MANUFACTURING OF WELDED MESH IN CENTRALIZED WORKSHOPS OF CONCRETE STEEL 37 WITH BARS OF D=6-8MM 009 TRA06A05 TONA 4.300 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
================================================================= = NO.SYMBOL ITEM QUANTITY MEASURE UNIT PU MAT VAL MAT = = N A M E PU MAN VAL MAN = = I T E M PU UTI VAL UTI = = PU TRA VAL TRA = = SPOR MAT MAN UTI WEIGHT/ADD. TOTAL WEIGHT T O T A L = ================================================================= 001 TSA01G1 M.C. 60.000 MAN. DIGGINGS IN SPREAD SPACES IN SOIL WITH NAT.MOISTURE THROWED IN VEHICLE ATH OF 0,61-2M HARD SOIL 002 TSC04G1 100 MC. 4.000 MECH.DIGGING WITH EXC.OF 0,71-1,25CM IN SOIL WITH NATURAL MOISTURE VEHIC.UNLOAD. SOIL CAT.3 003 TSC18B1 100 MC. 2.000 DIGG.WITH BULLDOZ.ON TRACT.65-80PH INCLD.SOIL PUSHING AT 10 M SOIL CAT.2 004 TSC35B31 100 MC. 2.000 AUTOLOADER ON TYRES WITH BUCKET 2,6-3,9 CM LAND CATEG 2 AT DIST. 11-20 M 005 TRA01A05P TONA 1080.000 ROAD TRANSPORT OF SOIL OR DEBRIS WITH TIP LORRY DIST.= 5 KM 006 TSD01D1 M.C. 60.000 SHOVEL SPREADING OF LOOSE SOIL,LEVEL LAYER 10-30CM.THICK.CLODS CRUSHING VERY HARD SOIL 007 TSD05A1 100 MC. 0.600 COMPACTION WITH MEC.RAMMER OF 150-200KG OF FILLG.IN LAYER OF 20-30CM EXCLUSIVELY WET LAYER FROM NONCOHEZ. SOIL 008 TSE06B1 100 MP. 22.000 SOIL PLATF.PREPARING ISOLATING LAYER AND SAND REPARTION OR GRAVEL IN COHESIVE SOIL 009 DA06A1 M.C. 660.000 NAT.AGREGG.LAYER(GRAVEL)ROLLED OVER WITH FILTRING RESISTANCE FUNCTION ISOL.AERING ANTICAP.MANUAL LAYING 010 TRA01A10 TONA 1475.000 MATERIAL,SEMIPREFAB ROAD TRANSPORT BY TIP LORRY ON A 10 KM.DIST.
011 DC05C1 MP. 2200.000 CEMENT CONCRETE ROAD SURFACING EXEC IN ONE BASE OF 20 CM THICKNESS
012 DZ30F1 M.C. 444.000 CEMENT CONCRETE FOR ROAD PLATFORM AIRPORT RUNWAY TRADE 400 WITH GRAVEL AND SAND CONCRETE 196
013 DC04B1 M 500.000 CUTTING BY DIAMOND DISK MACHINE OF SHRINKAGE AND EXPANSION JOINTS BETON ROAD WEAR 014 DC03A1 BUC. 240.000 CONCRETE STEEL ANCHORAGE WITH LENGTH BAR 1 M WITH MOUTH PENANCOR CEMENT CONCRETE SURFACING VIBRATED TO CONSTRUCTION LONG JOINTS 015 TRA06A05 TONA 1065.000 CONCRETE- MORTAR ROAD TRANSPORTATION WITH CONCRETE MIXER MOTOR-TRUCK OF 5,5MC DIST. =5 KM Direct expensive from items: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT From which: Afferent amount of thermic equipm. = Afferent amount of electric equipm.= Details transports: - Items TRA Other direct expenses: - SOCIAL ENSURANCE QUOTE - CAS: - UNEMPLOYMENT: -HEALTH -OTHER EXPENSIVE ACCORDING TO THE LAW STIPULATION, NOMINALIZED: Total direct expenses: WEIGHT MATERIALS WORK LABOUR EQUIPMENT TRANSPORT TOTAL TOTAL
Indirect expenses: Profit: TOTAL GENERAL ESTIMATE: VAT TOTAL with VAT
197
Dear Sir / Madam, Having examined the Bidding Documents, the receipt of which is hereby duly acknowledged, we, the undersigned, offer to supply and deliver [description of civil works] in conformity with the said bidding documents for the sum of [total bid amount in words and figures] as may be ascertained in accordance with the Price Schedule attached herewith and made part of this Bid. We undertake, if our Bid is accepted, to deliver the civil works in accordance with the delivery schedule specified in the Schedule of Requirements. We agree to abide by this Bid for a period of [number] days from the date fixed for opening of Bids in the Invitation to Bid, and it shall remain binding upon us and may be accepted at any time before the expiration of that period. We understand that you are not bound to accept any Bid you may receive.
......................... Signature
198
1. The Price Schedule must provide a detailed cost breakdown for each item. 2. Technical descriptions for each proposed item must provide sufficient detail to allow the Purchaser to determine compliance of Bid with specifications as per Schedule of Requirements and Technical Specifications of this ITB. 3. In addition to the hard copy, if possible please provide also the information on diskette (IBM compatible). 4. 5. 6. 7. Work schedule (Annex). Warranty for performed works. Timeframe for rectification of defects. Payment schedule.
Signature of Bidder ..
Fin ancial su mmary table of work category --- --------- -------------------- -------Est imate-ten der of object: LACAT US FAMILY HOUSE ------- -------------------- --------- ------ ----------------------------- --------- ------ ----------------------------- --------- ------ -| No. | | Amount | from which: | | Cr. | W o r k c a t e g o r y | (VAT exclusive)----- --------- ------ ----------------------------- --------- ------ -| | | | | cont ractor | associate | sub contracto r | | | | - RON | chi ef | | | | | | |(asso ciation c hief) | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | 0 | 1 | 2 | 3 | 4 | 5 | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | I. | Buildings and speci al constr uction s,aff. | | | | | | | installations to co nstructio ns and | | | | | | | facility networks i nside bui lding | | | | | | | | | | | | | 1 | VARIABLE ARCHITECTU RE | | | | | | | | | | | | | 2 | CONSTANT ARCHITECTU RE | | | | | | | | | | | | | 3 | ARHITECTURE ATTIC | | | | | | | | | | | | | 4 | RESISTANCE INFRASTR UCTURE | | | | | | | | | | | | | 5 | RESISTANCE SUPERSTR UCTURE | | | | | | | | | | | | | 6 | RESISTANCE FRAMEWOR K | | | | | | | | | | | | | 7 | ELECTRIC INSTALLATI ONS | | | | | | | | | | | | | 8 | SANITARY INSTALLATI ONS | | | | | | | | | | | | | 9 | HEATING INSTALLATIO NS | | | | | | | | | | | | | 10 | GAS INSTALLATIONS | | | | | | | | | | | | | 11 | WATER AND SEWAGE SE RVICES | | | | | | | | | | | | | 12 | PAVEMENT | | | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL I | | | | | |-----|- ----------------------------- ------ -------|- -------------|------ --------- ------ |------------- --------|------ --------- ------ | | II. | Supply | | | | | | | - Technological equipments w ith as sembling| | | | | | | - Transport equipments | | | | | | | - Utilities,including indepe ndent equipmen| | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL II | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Total amount ( excl usive VAT ) - RON - | | | | | | | Euro | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Value added tax - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL (VAT inclusi ve ) - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -|
199
Financia l summary table of w ork categ ory --- --------- -------------------- -------Est imate-ten der of object: MOLDO VAN FAMIL Y HOUS E ------- -------------------- --------- ------ ----------------------------- --------- ------ ----------------------------- --------- ------ -| No. | | Amount | from which: | | Cr. | W o r k c a t e g o r y | (VAT exclusive)----- --------- ------ ----------------------------- --------- ------ -| | | | | cont ractor | associate | sub contracto r | | | | - RON | chi ef | | | | | | |(asso ciation c hief) | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | 0 | 1 | 2 | 3 | 4 | 5 | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | I. | Buildings and speci al constr uction s,aff. | | | | | | | installations to co nstructio ns and | | | | | | | facility networks i nside bui lding | | | | | | | | | | | | | 1 | VARIABLE ARCHITECTU RE | | | | | | | | | | | | | 2 | CONSTANT ARCHITECTU RE | | | | | | | | | | | | | 3 | ARHITECTURE ATTIC | | | | | | | | | | | | | 4 | RESISTANCE INFRASTR UCTURE | | | | | | | | | | | | | 5 | RESISTANCE SUPERSTR UCTURE | | | | | | | | | | | | | 6 | RESISTANCE FRAMEWOR K | | | | | | | | | | | | | 7 | ELECTRIC INSTALLATI ONS | | | | | | | | | | | | | 8 | SANITARY INSTALLATI ONS | | | | | | | | | | | | | 9 | HEATING INSTALLATIO NS | | | | | | | | | | | | | 10 | GAS INSTALLATIONS | | | | | | | | | | | | | 11 | WATER AND SEWAGE SE RVICES | | | | | | | | | | | | | 12 | PAVEMENT | | | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL I | | | | | |-----|- ----------------------------- ------ -------|- -------------|------ --------- ------ |------------- --------|------ --------- ------ | | II. | Supply | | | | | | | - Technological equipments w ith as sembling| | | | | | | - Transport equipments | | | | | | | - Utilities,including indepe ndent equipmen| | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL II | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Total amount ( excl usive VAT ) - RON - | | | | | | | Euro | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Value added tax - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL (VAT inclusi ve ) - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -|
200
Financia l summary table of w ork categ ory --- --------- -------------------- -------Est imate-ten der of object: ZOLTA N FAMILY HOUSE ------- -------------------- --------- ------ ----------------------------- --------- ------ ----------------------------- --------- ------ -| No. | | Amount | from which: | | Cr. | W o r k c a t e g o r y | (VAT exclusive)----- --------- ------ ----------------------------- --------- ------ -| | | | | cont ractor | associate | sub contracto r | | | | - RON | chi ef | | | | | | |(asso ciation c hief) | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | 0 | 1 | 2 | 3 | 4 | 5 | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | I. | Buildings and speci al constr uction s,aff. | | | | | | | installations to co nstructio ns and | | | | | | | facility networks i nside bui lding | | | | | | | | | | | | | 1 | VARIABLE ARCHITECTU RE | | | | | | | | | | | | | 2 | CONSTANT ARCHITECTU RE | | | | | | | | | | | | | 3 | ARHITECTURE ATTIC | | | | | | | | | | | | | 4 | RESISTANCE INFRASTR UCTURE | | | | | | | | | | | | | 5 | RESISTANCE SUPERSTR UCTURE | | | | | | | | | | | | | 6 | RESISTANCE FRAMEWOR K | | | | | | | | | | | | | 7 | ELECTRIC INSTALLATI ONS | | | | | | | | | | | | | 8 | SANITARY INSTALLATI ONS | | | | | | | | | | | | | 9 | HEATING INSTALLATIO NS | | | | | | | | | | | | | 10 | GAS INSTALLATIONS | | | | | | | | | | | | | 11 | WATER AND SEWAGE SE RVICES | | | | | | | | | | | | | 12 | PAVEMENT | | | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL I | | | | | |-----|- ----------------------------- ------ -------|- -------------|------ --------- ------ |------------- --------|------ --------- ------ | | II. | Supply | | | | | | | - Technological equipments w ith as sembling| | | | | | | - Transport equipments | | | | | | | - Utilities,including indepe ndent equipmen| | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL II | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Total amount ( excl usive VAT ) - RON - | | | | | | | Euro | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Value added tax - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL (VAT inclusi ve ) - RON | | | | |
|-----|-------------------------------------------|--------------|---------------------|---------------------|---------------------|
201
Financia l summary table of w ork categ ory --- --------- -------------------- -------Est imate-ten der of object: HEALT H UNIT ------- -------------------- --------- ------ ----------------------------- --------- ------ ----------------------------- --------- ------ -| No. | | Amount | from which: | | Cr. | W o r k c a t e g o r y | (VAT exclusive)----- --------- ------ ----------------------------- --------- ------ -| | | | | cont ractor | associate | sub contracto r | | | | - RON | chi ef | | | | | | |(asso ciation c hief) | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | 0 | 1 | 2 | 3 | 4 | 5 | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | I. | Buildings and speci al constr uction s,aff. | | | | | | | installations to co nstructio ns and | | | | | | | facility networks i nside bui lding | | | | | | | | | | | | | 1 | VARIABLE ARCHITECTU RE | | | | | | | | | | | | | 2 | CONSTANT ARCHITECTU RE | | | | | | | | | | | | | 3 | ARHITECTURE ATTIC | | | | | | | | | | | | | 4 | RESISTANCE INFRASTR UCTURE | | | | | | | | | | | | | 5 | RESISTANCE SUPERSTR UCTURE | | | | | | | | | | | | | 6 | RESISTANCE FRAMEWOR K | | | | | | | | | | | | | 7 | ELECTRIC INSTALLATI ONS | | | | | | | | | | | | | 8 | SANITARY INSTALLATI ONS | | | | | | | | | | | | | 9 | HEATING INSTALLATIO NS | | | | | | | | | | | | | 10 | GAS INSTALLATIONS | | | | | | | | | | | | | 11 | WATER AND SEWAGE SE RVICES | | | | | | | | | | | | | 12 | PAVEMENT AND PARKIN G | | | | | | | | | | | | |-----| ----------------------------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL I | | | | | |-----|- ----------------------------- ------ -------|- -------------|------ --------- ------ |------------- --------|------ --------- ------ | | II. | Supply | | | | | | | - Technological equipments w ith as sembling| | | | | | | - Transport equipments | | | | | | | - Utilities,including indepe ndent equipmen| | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL II | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Total amount ( excl usive VAT ) - RON - | | | | | | | Euro | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Value added tax - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL (VAT inclusi ve ) - RON | | | | |
|-----|-------------------------------------------|--------------|---------------------|---------------------|---------------------|
202
Financia l summary table of w ork categ ory --- --------- -------------------- -------Est imate-ten der of object: INDUS TRIAL BUI LDIND ------- -------------------- --------- ------ ----------------------------- --------- ------ ----------------------------- --------- ------ -| No. | | Amount | from which: | | Cr. | W o r k c a t e g o r y | (VAT exclusive)----- --------- ------ ----------------------------- --------- ------ -| | | | | cont ractor | associate | sub contracto r | | | | - RON | chi ef | | | | | | |(asso ciation c hief) | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | 0 | 1 | 2 | 3 | 4 | 5 | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | I. | Buildings and speci al constr uction s,aff. | | | | | | | installations to co nstructio ns and | | | | | | | facility networks i nside bui lding | | | | | | | | | | | | | 1 | ARCHITECTURE | | | | | | | | | | | | | 2 | RESISTANCE INFRASTR UCTURE | | | | | | | | | | | | | 3 | RESISTANCE SUPERSTR UCTURE | | | | | | | | | | | | | 4 | ELECTRIC INSTALLATI ONS | | | | | | | | | | | | | 5 | SANITARY INSTALLATI ONS | | | | | | | | | | | | | 6 | HEATING INSTALLATIO NS | | | | | | | | | | | | | 7 | GAS INSTALLATIONS | | | | | | | | | | | | | 8 | WATER AND SEWAGE SE RVICES | | | | | | | | | | | | | 9 | PLATFORM | | | | | | | | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL I | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | II. | Supply | | | | | | | - Technological equipments w ith as sembling| | | | | | | - Transport equipments | | | | | | | - Utilities,including indepe ndent equipmen| | | | | |-----|- ----------------------------- ------ -------|- -------------|------ --------- ------ |------------- --------|------ --------- ------ | | | TOTAL II | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | Total amount ( excl usive VAT ) - RON - | | | | | | | Euro | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|---------------------|----- --------------- -| | | Value added tax - RON | | | | | |-----| -------------------- --------- ------ --------| --------------|----- --------- ------ -|------- --------------|----- --------------- -| | | TOTAL (VAT inclusi ve ) - RON | | | | |
|-----|-------------------------------------------|--------------|---------------------|---------------------|---------------------|
Financial summary table of objects ----------------------------------
|--------|------------------------------------------------------------|-----------------------|-----------------------------------------------------------------------| | No.Cr. | O b j e c t g r o u p | Amount | from which| from which: | | | O b j e c t n a m e | ( VAT | C + M |-----------------------------------------------------------------------| | | | exclusive)| | contractor | associate | subcontractor | | | | - RON - | | leader | | | | | | | | of the association | | | | | | | |-----------------------------------------------------------------------| | | | | | Total | C+M | Total | C+M | Total | C+M | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------| | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------| | 1. | Basic Investment (work) | | | | | | | | | | | | | | | | | | | | | 1.001| 1 LACATUS FAMILY HOUSE | | | | | | | | | | | | | | | | | | | | | 1.002| 2 MOLDOVAN FAMILY HOUSE | | | | | | | | | | | | | | | | | | | | | 1.003| 3 ZOLTAN FAMILY HOUSE | | | | | | | | | | | | | | | | | | | | | 1.004| 4 HEALTH UNIT | | | | | | | | | | | | | | | | | | | | | 1.005| 5 INDUSTRIAL BUILDING | | | | | | | | | | | | | | | | | | | | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------| | | | | | | | | | | | | 2 | Site organization 1.00% | | | | | | | | | | | | | | | | | | | | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------| | | | | | | | | | | | | | Total Amount ( VAT exclusive ) - RON | | | | | | | | | | | Euro | | | | | | | | | | | | | | | | | | | | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------| | | | | | | | | | | | | | Value added tax - RON | | | | | | | | | | | | | | | | | | | | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------| | | TOTAL (VAT inclusive) - RON | | | | | | | | | | | | | | | | | | | | |--------|------------------------------------------------------------|-----------------------|-----------|-----------|-----------|-----------|-----------|-----------|
203