COST BREAK DOWN FORM

PROJECT NO. PROJECT NAME.:Welding & Inspection split tees for hot tapping
Prepared By Checked By Approved By 25/07/2012

Item A

Description

Q'ty

Unit

Unit P

Amount

Engineering Cost
WPS/PQR/WQT Welding Record and Inspection Report 1 1 Lot Lot 35,000 12,500 35,000 12,500

Construction Cost
Mobilization Fitup&Weld Split tees - 12" onto 24" - 10" onto 20" - 16" onto 18" - 4" onto 10" - 4" onto 12" - 6" onto 20" - 8" onto 12" NDE -RT 100% Buttweld(Fitting) -PT Fillet /BW Split tee Equipment/tool -Weld generator/Haib/etc. 1 Lot Sub Total for Labour Cost 75,000 75,000 440,922 440,922.40 20% 7% 88,184.48 37,037.48 566,144.36 1 1 Lot Lot 20,000 8,500 20,000 8,500 2 1 3 1 1 1 1 Sets Sets Sets Sets Sets Sets Sets 31,819 26,634 28,521 12,810 14,822 24,034 17,422 63,638 26,634 85,562 12,810 14,822 24,034 17,422 1 Lot 45,000 45,000

Sub Total Cost OPT Vat Total Cost ( Baht ) NOTE : 1.This price excluding scafloding work 2.This price base on working day time(mon-sat) for holiday factor 1.2 multiply Item B.cost

COST BREAK DOWN FORM


PROJECT NO. PROJECT NAME.:Welding & Inspection Reinforced set on branch for hot tapping
Prepared By

Item A

Description

Q'ty

Engineering Cost
WPS/PQR/WQT Welding Record and Inspection Report 1 1

Construction Cost
Mobilization Fitup&Weld Split tees - 12" onto 24" - 10" onto 20" - 16" onto 18" - 4" onto 10" - 4" onto 12" - 6" onto 20" - 8" onto 12" NDE -RT 100% Buttweld(Fitting) -PT Fillet /BW Split tee Equipment/tool -Weld generator/Haib/etc. 1 Sub Total for Labour Cost Sub Total Cost OPT Vat Total Cost ( Baht ) NOTE : 1.This price excluding scafloding work 2.This price base on working day time(mon-sat) for holiday factor 1.2 multiply Item B.cost 20% 7% 1 1 2 1 3 1 1 1 1 1

DOWN FORM

r hot tapping
Checked By Approved By 25/07/2012

Unit

Unit P

Amount

Lot Lot

35,000 12,500

35,000 12,500

Lot

45,000

45,000

Sets Sets Sets Sets Sets Sets Sets

39,619 33,134 41,521 15,410 17,422 27,934 22,622

79,238 33,134 124,562 15,410 17,422 27,934 22,622

Lot Lot

20,000 25,000

20,000 25,000

Lot

85,000

85,000 542,822 542,822.40 108,564.48 45,597.08 696,983.96