A REPORTS 1 Basis of design 2 Pipeline design report 3 Pipeline and riser installation procedure
4 Scope of work for construction 5 Construction schedule 6 Material take-off B CALCULATIONS 1 Pipeline and risers installation analysis
PT-456-IW-OP-01.CA Tnh a vo Report Tnh a vo Report PT-456-IW-OP-01.00 PT-456-IW-OP-02.00 PT-456-IW-OP-03.00 PT-456-IW-OP-04.00 PT-456-IW-OP-05.00 PT-456-IW-OP-06.00 PT-456-IW-OP-07.00 PT-456-IW-OP-08.00
2 Pipeline expansion calculation 3 Riser Stress analysis C DRAWINGS 1 Pipeline layout 2 Pipeline alignment sheets Pipeline installation by DLB Con Son Riser installation at BK16 4 by DLB Con Son Riser installation at BK14 5 by DLB Con Son 3 6 BK16 riser detail design 7 BK14 riser detail design 8 BK16 riser tie-in
COPYRIGHT BY JOINT VENTURE VIETSOVPETRO. THIS DOCUMENT IS THE PROPERTY OF THE COMPANY. THIS DOCUMENT SHALL NOT BE COPIED IN HOLE OF PART OR THE CONTENTS MADE KNOWN OR IN ANY OTHER WAY BE MADE USE OF WITHOUT WRITTEN PERMISSION OF THE COMP.
0
Sheets
Design
P.Y. Nha
Checked Baykisheva L Ch.depart. N.V. Hung Pr. manag L.V.Cung Approved N.V.Tinh
F-CN-01 Rev.1 : 23-10-2003
WD
167780861.doc
Baykisheva
03.12
Rev Sheet Surname Signature Date . F-CN-01 Rev.1 : 23-10-2003 167780861.doc3 Format A4
PT-456-IW VD
Rev. Shee 2 2