Professional Documents
Culture Documents
INDOTECH
METAL
NUSANTARA
ISSUED
STATUS
Prototype
Date
DEPARTMENT
Trial
Approve
Date
CONTROL NO
Mass Production
Approve
Date
ENGINEERING PROCESS
APPROVED
CHECKED
PREPARED
LEGALLY
DEPARTMENT
QUALITY ASSURANCE
APPROVED
CHECKED
RECEIVED
Approve
PFD-PRS ENG-01-036
MODEL
K07A
PART NAME
PART NO
PAD PLATE A
002-C22-415
INCLUDE DATA STRUCTURE
FLOW PROSES
NO
Material Received
1
N
Inspection IQC
PART NO
002-C22-415
PART NAME
SUPPLIER
LOCAL
IMPORT
PAD PLATE A
SAPH 440 T=3.2 mm
SUPPLIER NAME
POSCO
NO
PART NAME
1 PAD PLATE A
PART NO.
DRAW NO.
MODEL
K07A
002-C22-415
QUANTITY OFCHECK
FLOW PROCESS
PERSILANGAN TEMPAT
LORI
QUALITY OF CHECK
DIFFRENT LINE
STORAGE
DELIVERY
CONTROL
Department Legally
Department Make
NO
Revised
First Make
APPRD
MAKE
DEPT MAKED
LEGALLY
DAPERMENT
PAGE : 1 / 1