Introduction
Cooling towers are commonly used to remove excess heat that is generated & represent a relatively inexpensive and dependable means of removing low-grade heat from cooling water. Cooling towers make use of evaporation whereby some of the water is evaporated into a moving air stream and subsequently discharged into the atmosphere in the form of vapours.
Tower Problems
Scale deposit Fouling due to presence of silt ,dirt ,sand etc. Microbiological growth due to presence of microoganisms , Algae, fungi Corrosion of steel parts
Operation Considerations
Water make-up To compensate the water loss due to : 1. Evaporation , 2. Drift (water entrained in discharge vapor), estimated to be About 0.2% of water supply 3. Blow down (water released to discard solids).
Design Parameter Total design capacity Height of top of tower above sill -do- at throat -do- at top Dry Bulb Temp. Design wet bulb Temp Cold Water outlet Temp Hot water Inlet Temp PVC Fill
CT- Stage I 33000cum / Hr. 120 m 36.93 m 42.67 m 35.1 28.5 32.5 42.5
Size 1600x600x300 in two layers; munters type C-10-19 double folded edge on one side and with black UV Stabilization , 0.25 mm thick and having a flute size of 19mm 2.8 m
CT Stage II 36500 m3/hr 104.625 m 49.856 51.856 35.05 28.25 33 41.1 1220x1830 of varying depths of 915mm,1120mm &1525 mm of Paharpur M67 make
10
Basin Depth
2.0-2.30 m