Professional Documents
Culture Documents
Appendix 3
Label
7.2 Remarks 1
Detailed check list attached to this document. Complies with Specification. Approved.
8. Laboratory QC No. 9. Date of approval by QC 10. Total quantity approved PO quantity: Pieces PO completed. 1,000,000
LT3/08/13
14 March 2013 1,000,000 Pieces (20 Packets x 5 Rolls x 10,000 Pieces) DO quantity for this delivery: 1,000,000 Pieces Remaining balance after this delivery: NIL
Remarks 2: QC Approved labels provided to Packaging Section Head. Inform the Packaging Section Head as follows: To provide Approved labels to the Storekeeper and instruct him to cancel the goods from Quarantine status. To affix Approved labels on each packet and transfer the goods to Approved Storage Area for packaging materials.
Edition: 6
Appendix 3
Label
Checked by (Signature): Name : Ng Xue Li Designation Chemist Department Department Date : Thursday, March 14, 2013
Approved by (Signature): Name : : : : Date : William Chandra Quality Control Technician Quality Control Assistant Quality Control Department Quality Control Department : Thursday, March 14, 2013
Designation
Quantity (Pieces) 1
Received by (Signature)
20
PS Head Storekeeper
1,000,00 0
PS Head Storekeeper
* Number of Approved labels printed: 21. Identical copy of Approved label is attached to this
Edition: 6