1. Objective
2. Basic Conditions
3. Operations Procedures
4. Corrective Action
5. Support Information
6. Sample forms and explanation
Objective :
Achieve 100% delivery and receive
Establish transparency in operations leading
to long-term trust
Improve conditions & performance based on
guidelines
Basic Conditions:
Following conditions are fixed
1) Delivery Cycle between supplier plant & GIL plant
e.g. 1-1: Delivery 1 time / day
1-2: Delivery 2 times / day
2-1: Delivery 1 time / 2days (alternate day)
2) Departure time at supplier plant
3) Arrival Time (=Window timing) at GIL plant
Note: Window timing has allowance depend on the
situation of distance and traffic
4) Unit Size: Standard number of parts in each Bin /
Container
5) Type of Bin / Container
Remarks
Prepare shipping
request
Return empty-boxes
Collect empty-boxes
GIL Chakan
Delivery
Request
Confirmed
Request
Invoice
Delivery
Request
Prep.
FGS
Ship
Receiving Board
Time
(60min)
1000
1100
1200
Returnable
Delivery
Collect
Request
RMS
Receive
Return
If delay is there,
enter number of
units delay with
respect to request
DELAY
Corrective Action:
In the case of deviations and/or incidents, corrective
action, with analysis, shall be taken by Supplier & GIL:
1. Unit size: different quantity in a container is applied,
2. Different type bin/container is used,
3. Excess quantity than delivery request is transported,
4. Frequent deviations of departure time and/or arrival
time, and
Planned quantity of
material consumption
for the month
2) Departure time
3) Arrival time
4) Unit size
Attached List
5) Types of container
This sheet is specific for each supplier and joint sign-off for operations parameters
on this sheet will be obtained
___________________
(GIL Signature)
___________________
(Supplier Name)
___________________
(Gabriel India Ltd.)
___________________
(Name of Signatory)
___________________
(Name of Signatory)