Location Unit Work Client CONTRACTOR Sub-Contractor Category : A = Approval, : KSA : PROPYLENE OXIDE : Drawing Index for Propylene Oxide Project : M/s SADARA : M/S Tekfen. : M/s NASS. I = Information, R = Review

DRAWING INDEX FOR PROPYLENE OXIDE PROJECT FOR TEKF

TEKFEN Code : 1 = Rejecte 5 = Info Only.

3 = Minor Comm

Th

Sl. No.

Drawing No.

Drawing Title

Category I/R/A

PECL-C-927-CL-2001

STRUCTURAL DESIGN CALCULATIONS FOR LIFTING LUG OF CONVECTION MODULES & HEADER BOXES

PECL-C-927-CL-2002

STRUCTURAL DESIGN CALCULATIONS OF STRUCTURAL SUPPORTS FOR EXTERNAL PIPING

PECL-C-927-CL-9001

REFRACTORY DESIGN CALCULATION

PECL-C-927-MR-9001

PURCHASE SPECIFICATION FOR REFRACTORY ITEMS

PECL-C-927-MR-4001

PURCHASE SPECIFICATION FOR SPRING SUPPORTS

PECL-C-927-MR-1001

MATERIAL REQUISITION FOR INCOLOY PIPES

PECL-C-927-MR-1001

MATERIAL REQUISITION FOR INCOLOY PIPES

PECL-C-927-MR-1031

MATERIAL REQUISITION FOR INCOLOY WROUGHT FITTINGS

PECL-C-927-MR-1002

MATERIAL REQUISITION FOR STAINLESS STEEL PIPES

CONTRACTING COMPANY

DD,MANAMA BAHRAIN

ROJECT FOR TEKFEN CONSTRUCTION COMPANY ,KSA

Date Doc No. Rev. No. Job No. Prepared by

: : NASS-J-601B-0001 :0 : J#601B : JA

KFEN Code : 1 = Rejected, 2= Comments as Noted 3 = Minor Comments Acceptable, 4= No Comments 5 = Info Only. The Drgs. Under 'I' category will be approved under code'R' from Tekfen.

Status Planned
Actual

Rev. 0 11/4/2012

Rev. 1

Rev.2

Rev. 3

Remarks

Approval TEKFEN Code Planned


Actual

Approval TEKFEN Code Planned


Actual

31/01/2012

Approval TEKFEN Code Planned


Actual

Approval TEKFEN Code Planned


Actual

17/01/2012

Approval TEKFEN Code Planned 10/12/2011

Actual

Approval TEKFEN Code Planned


Actual

10/12/2011

Approval TEKFEN Code Planned


Actual

10/12/2011

Approval TEKFEN Code