Professional Documents
Culture Documents
Page
Rev. A B Prp. JH/SM JH/SM
4
Chk. PG PG
of
Apr. MK MK
5
Date 12-Nov-13 27-Nov-13
Equipment No. Service Name Type of Tank No. Required. Nominal Capacity Net Working Capacity Inside Diameter Tank Height Bottom Slope/ Type Gallon Gallon mm / inch mm / inch
Dimension
339 229 965.20 / 38 69 1752.59 /
Operating Condition
Operating Pressure Operating Temp. High Liquid Level Low Liquid Level Normal Normal psig deg F mm / inch mm / inch ATM AMBIENT 1484.60 / 300.00 / 58.5 11.8
Design Information
Potable Water 0.997 @ psig deg F
B
86
deg F
0.03
/ /
1.06
Insulation
Hot No
Other Requirements
Tank Inside Cleaning before Box Up P.W.H.T. for Operation Condition Yes Yes No No
42 Notes : 43 44 B 45 46 47 48 49 53 54 55 56
1. Potable water system shall be designed for day workers and visiting personnel, 250 liters/day/person (66 USgallon/day/person). The person in-charge for Grissik GMS inspection is assumed 3 personnel per visit. Therefore, minimum requirement for potable water is 200 USgallon/day (0.03 m3/hr). Holding time is estimated for 24 hour (1 day) for minimum requirement.