You are on page 1of 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.75
9.30
16.73
17.53
18.24
12.87
16.87
15.85
18.23
7.28

18.452
9.008
16.439
17.241
17.951
12.578
16.580
15.563
17.929
6.969

0
3,183
559
248
0
2,135
504
808
9
357

0
20,019
3,518
1,557
0
13,427
3,172
5,080
59
2,248

Nil
18.133
Nil
Nil
Nil
17.812
NIL
NIL
18.508
12.059

7,803

49,079
1,001

SL.S

OIL VOL

Volume

V.C.F.

G.O.V.

TEMP

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

CU.M.

VOL.(BBLS)

BBLS

17.845

17.443

0
110

17.525

140.069

18.204
11.749

0.6
204.58

881
0
0
4
1,287

0
19,909
3,518
1,557
0
12,546
3,172
5,080
55
961

31.0
32.5
31.2
31.0
30.6
32.9
30.9
30.7
29.8
30.8

87.8
90.5
88.2
87.8
87.1
91.2
87.6
87.3
85.6
87.4

2,282
75

46,797
926

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98443
0.98625
0.98638
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
19,606
3,468
1,535
0
12,351
3,128
5,010
54
948

0.000
39.212
5.202
3.071
0.000
24.70
6.256
7.516
0.135
2.370

0
19,567
3,463
1,532
0
12,326
3,122
5,003
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

363

46,101
910

46,012
908

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

49,079
2,282
46,797
46,101
5,783
5,876
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

46,101

DRAFT FWD

7.30 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
13-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
2,459.356
435.032
192.592
0.000
1,549.325
392.616
628.512
6.783
118.907

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

5,783

8.40 m

0.000
2498.764
442.003
195.678
0.000
1574.150
398.903
638.583
6.892
120.813
5,876

TRIM
LIST

Capt. Ihwan Asrul

1.10 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

13-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Juanda Pard

Lifting

24 Hours Total (bbls)

1,001

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

46,797

Storage Net / G.S.V (Nbbls)

46,101

Storage Net / N.S.V (Nbbls)

46,012

Days to Tank Tops

284

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

46,101

Water

Offtake

Water Received 24hrs (bbls)

75

Total Water in Cargo (bbls)

2,282

Total P/W Received (bbls)

84,256

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

32.9

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

231,612

Service Vessel
MDO

### 58,864

###

1,324

231,612

57,540

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment
1. Review previous day activity
2. Continued marking label for safety equipment
3. Continue maintenance main deck , etc at Slop S
4. Corrective action for SPKK and workplace inspection
5. Lifting and transfer materials
6. Check & running test auxiliary engine no.2
7. Maintenance RO No.2
8. Painting new plate in engine room
9. Remove LED lamp in engine room
10. Maintenance auxiliary boiler

1. Review deck, engine and galley dept. activity


2. Weekly test LSA/FFA and GMDSS equipment
3. Weekly test safety device and emergency machinery
4. Collecting garbage into garbage container at laydown
5. Workplace inspection

Incidents
Type

Reference

Comments

NIL

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 21
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

12089 / 45841

e Vessel

Comment

quipment
etc at Slop S
kplace inspection

e no.2

t. activity
equipment
gency machinery
tainer at laydown

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
07.45 : SMS Vision Port Side Alongside
09.15 : SMS Vision Cast Off
19.45 : AHT. Tegap jaya port side alongside
23.15 : AHT. Tegap jaya cast off

Bunkering/Debunkering :
07.50 : Commenced Transferred Fresh Water To SMS Vision
09.10 : Completed Transferred Fresh Water 15T To SMS Vision
19.50 : Commenced Transferred Fresh Water To AHT. Tegap jaya
23.00 : Completed Transferred Fresh Water 30T to AHT. Tegap jaya

Personnel & Material Transfer :


05.20 : 19 persons PKP & 1 person SPJ By KST. 51 ( Out )
11.45 : 1 Person SPJ by KST. 51 ( in )
12.00 : 2 Cradle provision, 70 empty gallon & 1 cargo net by KST. 51 ( In )
17.10 : 20 Persons PKP, & 1 Person Mafhindo By KST. 51 ( In )
20.30 : 1 Person santos rep by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos Rep , SPJ, Mafhindo & PKP Personnel's
2. Continued marked label port Lifeboat
3. Continued chipping, brushing and 1st coating main deck, etc at Slop S
4. Shifted materials in lay down
5. Lifted materials / food stuff

ENGINE :
1. Checked & running tested auxiliary engine no.2
2. Maintenance cylinder head auxiliary engine for spare
3. maintenance auxilary boiler
- Cleaned main fuel oil burner
- Cleaned diesel oil pilot burner
- Cleaned high electricity igniter
4. Painted new checker plate bottom side under main engine air inter cooler
5. Painted sea water common inlet pipe generator engine cooling line
6. Removed LED lamp in engine room
7. maintenance RO no.2
- Replacement 10m fine filter RO no.2
8. Running up A/E 1 & 3:
10.00 - 12.00 - Shifted & Lifted Materials Provision by KST. 51 ( In )

2.

PERMIT TO WORK

PW

MW

HW

CSE

IP

VAL

439

2.1
J HA
3. BUNKERS(M3)

439

1683
1683

4. FRESH WATER (MT)


BLR
DOM

374

169

374

169

924

M.F.O
M.D.O

CONS
0
1,324

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
45

0
20

OSD
200

REC
0
IN

CONS
0
OUT

23

20

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

213144
252
213396

Days W/O LTI

1142

Since

213396
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

924

28-Nov-13

13-Jan-17

TOTAL

@2400 HRS

3596
3594

TRANS
0
0
ROB

ROB
231,612
57,540
`

45
136
ROB
200
POB

43
28-Nov-13

Previous

Today

Total

0
0
0
0
1617
1838
3
0
57

0
0
0
0
2
21
0
0
0

0
0
0
0
1619
1859
3
0
57

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

58,864

1,324

14.0

0.0

12.0

57,540

Transferred Materials

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

164

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

98

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966

TOTAL 64,606
Averag
e/Day

JUL AUG SEP OCT NOV DEC

2,084

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100

1,255

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21

0
0
0
0
0
1
0
0
0
0
0
0
1

0
0
0
0
0
6
6
6
10
10
19
19
21

22
22
22
22
22
29
28
28
32
32
40
40
43

TOTAL

283

97

382

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
13/Jan/17
Reported by

Action/Commen
t

Positive /
Negative

Total

Done

Positive

Secured whip check

Negative

Induction to new visitor on board

Done

Positive

Marked label life boat done

Done

Positive

running well

Positive

Well Done

Positive

Done

Positive

Done

Positive

Positive

shifted materials pipe

Positive

Rank

Location

Master

Crew Mess
Room

Advice For Preparing Receiving Provision

2 DENNY DAVID PAULUS

C/O

Main Deck

Air hose not secured with safety whip checks

3 CENG UMAR

2/O

Induction
room

4 INDRA

3/O

Boat Deck

5 JULY MANGIRI

C/E

6 AGUNG RISTIANTO

2/E

RO Room

7 IRVAN TAHIR

3/E

Engine Room

8 HENDRA PRATAMA

4/E

Engine Room Maintenance auxiliary bolier

9 SURYADINATA

E/E

Engine Room Removed LED lamp in engine room

1 IHWAN ASRUL

10 AANG

Description

Engine Room Running tested auxiliary engine No.2


Maintenance RO No.2
Maintenance cylinder head auxiliary engine for
spare

Bosun

Lay down

shifted materials as crane operator

11 ACHMAD NURUL HUDA

AB

Main Deck

Chipping brushing main deck slop STBD area

Good

Positive

12 UDIYANTO

AB

Main Deck

Assisted Boatswain chipping brushing on deck


area Slop STBD

Well Done

Positive

13 BAYU SEGARA

AB

Main Deck

Continued 2nd Coating main Deck Slop STBD


Area

Done

Positive

14 DEDI

OS

Main Deck

Gangway air hose not secured with safety whip


checks

Secured whip check

Negative

15 ELIK BUDIANTO

FTR

RO Room

Painted sea water common inlet pipe generator


engine cooling line

Good

Positive

16 SUAIB

MTM

Engine Room

assisted 3/E Maintenance cylinder head auxiliary


engine for spare

Done

Positive

Done

Positive

Well Done

Positive

17 CHULWAN NURFALLAH WIPER

Engine Room assisted 4/E Maintenance auxiliary bolier

18 MASRUDI

C/Cook

Provision
Store

19 ROCHIM

COOK

Main Deck

Assisted C/Cook in provision store

Good

Positive

20 BOBY MANGONTO

STWD

Provision
Store

Assisted C/Cook in provision store

Well Done

Positive

21 HARIANTO SULE TANAN STWD

Provision
Store

Assisted C/Cook in provision store

Well Done

Positive

Arrange the received food stuff in store

TOTAL 21