VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

CU.M.

17.845

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.61
9.30
16.73
16.93
17.91
17.47
16.87
16.98
18.24
7.28

18.312
9.008
16.439
16.640
17.621
17.180
16.580
16.693
17.929
6.969

27
3,183
559
483
116
271
504
430
9
357

168
20,019
3,518
3,037
728
1,704
3,172
2,703
59
2,248

Nil
18.135
Nil
Nil
Nil
NIL
NIL
NIL
18.510
12.060

5,939

37,354
911

SL.S

18.204
11.749

OIL VOL

Volume

V.C.F.

G.O.V.

TEMP

VOL.(BBLS)

BBLS

17.443

0
110

0.6
204.58

0
0
0
4
1,287

168
19,909
3,518
3,037
728
1,704
3,172
2,703
55
961

31.0
32.5
31.2
31.0
30.6
31.7
30.9
30.7
29.8
30.8

87.8
90.5
88.2
87.8
87.1
89.1
87.6
87.3
85.6
87.4

1,401
70

35,953
841

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98610
0.98465
0.98588
0.98603
0.98643
0.98543
0.98620
0.98633
0.98720
0.98628

G.S.V.

G.S.V.

N.S.V.

165
19,603
3,468
2,995
718
1,679
3,128
2,666
54
948

0.248
39.206
5.202
5.989
1.076
3.36
6.256
3.999
0.135
2.370

165
19,564
3,463
2,989
717
1,676
3,122
2,662
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

223

35,424
828

35,356
827

24.00PM CHANGE OVER TANK PRODUCTION IN TO COT 6C


PRODUCTION LOADING IN TO 2C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

37,354
1,401
35,953
35,424
4,444
4,515
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

35,424

DRAFT FWD

7.30 m

Capt. Saiful Bahri

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
1-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

20.771
2,459.032
435.010
375.649
90.021
210.604
392.596
334.430
6.783
118.901

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

4,444

8.30 m

21.103
2498.434
441.981
381.668
91.464
213.979
398.883
339.789
6.891
120.806
4,515

TRIM
LIST

Capt. Ihwan Asrul

1.00 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

1-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Saiful Bah

Lifting

24 Hours Total (bbls)

911

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

35,953

Storage Net / G.S.V (Nbbls)

35,424

Storage Net / N.S.V (Nbbls)

35,356

Days to Tank Tops

326

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

35,424

Water

Offtake

Water Received 24hrs (bbls)

70

Total Water in Cargo (bbls)

1,401

Total P/W Received (bbls)

83,375

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

41.0

Specific Gravity

Storage tanks's temperature

32.5

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 2C


24.00 PM CHANGE OVER TANK PRODUCTION I

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

235,612

### 75,622

###

1,296

235,612

74,326

Service Vessel
MDO
0
0

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Comment
1. Review previous day activity
2. EHS and Security re induction to all crew
3. Review the workplace inspection / SPKK
4. Man Over Board Drill

Tool box meeting

Supervisory Meeting

06.30

16.30

1. Review deck, engine and galley dept. activity


2. Check And Maintenance LSA & FFA
3. Maintenance on deck
4. House keeping
5. Closing finding work place inspection

Incidents

Type
NIL

Drills
Type
Man Over Board Drill

S.T.O.P. Audit program


Observation Card Report : 22
The details see SPKK sheet *)
###

Reference

Comments

Time

Comment

07.30 - 08.30

Followed all crew FSO SPJ

Capt. Saiful Bahri

19-Dec-16
141,460
-

deg C
deg C

TO COT 2C
ANK PRODUCTION IN TO COT 6C

19610 / 35402

e Vessel

Comment

crew
PKK

t. activity

Comment

all crew FSO SPJ

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
: PRODUCTION LOADING INTO COT 2C
24.00 PM CHANGE OVER TANK PRODUCTION IN TO COT 6C

Mooring/Unmooring :

Bunkering/Debunkering :
07.00 : NMS Adventure Cast Off

Personnel & Material Transfer :


01.30 : 1 Person Nalco, 4 Persons SPJ By KST.51 ( In )
07.10 : 1 Person Santos Rep, 1 Person Nalco & 3 Persons SKK Migas By NMS Adventure 1 ( Out )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred Santos Rep, Nalco, SPJ & SKK Migas Personnels
2. Weekly safety meeting and safety sharing
3. EHS and Security re induction to all crew
4. Workplace inspection and SPKK Reviewed
5. Man Over Board Drill
6. House Keeping

ENGINE :
1. Weekly safety meeting and safety sharing
2. EHS and Security re induction to all crew
3. Workplace inspection and SPKK Reviewed
4. Man Over Board Drill

2.

PERMIT TO WORK

2.1
J HA
3. BUNKERS(M3)

PW

MW

HW

CSE

IP

VAL

432

1650
1650

374

167

897

374

167

897

M.F.O
M.D.O

CONS
0
1,296

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
0

0
16

OSD
200

REC
0
IN

CONS
0
OUT

432

4. FRESH WATER (MT)


BLR
DOM
5. DISPERSANT, FOAM, CHEMICALS (LTRS)
REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )

Previous man hours


Man hours today
Total man hours

210000
264
210264

Days W/O LTI

1130

Since

210264
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

01-Jan-17

@2400 HRS

TOTAL
3527
3525

TRANS
0
0
ROB

45
119
ROB
200
POB

22

ROB
235,612
74,326
`

28-Nov-13

Previous

Today

Total

0
0
0
0
1593
2576
3
0
41

0
0
0
0
2
22
0
0
0

0
0
0
0
1595
2598
3
0
41

Man Over board Drill


NIL
NIL
NIL
Man Over board Drill

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Opening
Balance
( Ltr )
75,622

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

5.0

19.0

0.0

74,326

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

1,296

Remarks

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Opening
Balance
( Ltr )
235,612

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

235,612

Receive

Transfer Consumption Adjusment

Remarks

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

12

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN

JUL AUG SEP OCT NOV DEC

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

4,964

TOTAL

4,964

160

Averag
e/Day

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

80

TOTAL

80

Jul Aug Sep Oct Nov Dec

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017

22

22

TOTAL

22

22

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
1/Jan/17
Reported by

1 IHWAN ASRUL

Rank

Location

Description
Emergency Drill, Safety Sharing and Safety

Master Meeting Room Meeting

Action/Commen
t

Positive /
Negative

Total

Man Over Board Drill

Positive

Accommodation
Inspection

Positive

Positive

Positive

2 IYYANG

C/O

Meeting room Explained Weekly Work Inspection

3 ANDI A UNIT

2/O

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

4 INDRA

3/O

Meeting room

Prepared Safety drill, safety sharing and safety


meeting

5 JULY MANGIRI

C/E

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

6 ACO AKBAR

2/E

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

7 IRVAN TAHIR

3/E

Crew Mess
Room

Positive

8 HENDRA PRATAMA

4/E

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

9 NIKO

E/E

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

10 AANG

Bosun

Deck B

11 ACHMAD NURUL HUDA

AB

Crew Mess
Room

12 UDIYANTO

AB

Meeting room

13 BAYU SEGARA

AB

14 DEDI

EHS Reinduction To All Crew

Man Over Board Drill

Done

Deck B Area Clean & Tidy

Good

Positive

EHS Reinduction To All Crew

Done

Positive

Attanded Safety drill, safety sharing and safety


meeting

Positive

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

OS

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

15 SAIFUL IMAM

FTR

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

16 ELIK BUDIANTO

FTR

Meeting room

Attanded Safety drill, safety sharing and safety


meeting

Positive

17 SUAIB

MTM

Engine Room House Keeping In Engine Room Store

Positive

18 NUR ALI

MTM

Engine Room House Keeping In Engine Room Store

Positive

Attanded Safety drill, safety sharing and safety


C/Cook Meeting room meeting

Positive

Attanded Safety drill, safety sharing and safety


meeting

Positive

19 MASRUDI
20 ROCHIM

COOK

Meeting room

21 RANGGUN JAWI

STWD

Deck B

House Keeping In Deck B Area

Done

Positive

22 BOBI MANGOTO

STWD

Galley

Cleaned Wasteful In Galley

Done

Positive

TOTAL 22