You are on page 1of 31

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.67 18.372 15 94 Nil 0 94 30.9 87.6 44.5 0.98625 93 0.033 93 0.12551


2C 14.95 14.653 1,140 7,171 Nil 0 7,171 31.5 88.7 44.5 0.98570 7,068 3.534 7,065 0.12551
3C 3.01 2.719 6,086 38,281 Nil 38,281 34.2 93.6 44.5 0.98325 37,640 37.640 37,602 0.12551
4C 4.50 4.204 5,543 34,865 Nil 34,865 34.0 93.2 44.5 0.98345 34,288 34.288 34,253 0.12551
5C 17.69 17.396 200 1,258 Nil 1,258 32.4 90.3 44.5 0.98490 1,239 0.434 1,239 0.12551
6C 16.41 16.121 693 4,361 18.110 17.821 32.301 203 4,158 32.0 89.6 44.5 0.98525 4,096 2.05 4,094 0.12551
7C 2.01 1.719 6,398 40,245 Nil 0 40,245 31.8 89.2 44.5 0.98545 39,659 39.659 39,619 0.12551
8C 3.78 3.491 5,175 32,548 18.370 18.083 20.917 132 32,416 32.1 89.8 44.5 0.98515 31,935 31.935 31,903 0.12551
SL.P 8.77 8.464 313 1,970 9.990 9.684 273.970 1,723 247 33.5 92.3 44.5 0.98390 243 0.364 242 0.12551
SL.S 14.09 13.779 140 879 17.860 17.549 19.213 121 758 32.6 90.7 44.5 0.98470 747 1.120 746 0.12551
TOTAL
TOTAL 25,704 161,670 346 2,179 159,492 157,007 156,856
REMARKS: 932 59 873 860 846

PRODUCTION LOADING INTO COT 6C


DE BOTTOMING PW 2 C IN TO SLOP P/S
INTERNAL TRANSFER COT 2 C IN TO TANK NOMINATION

Gross Volume :(T.O.V.) 161,670 Oil Volume @ 60 F :(T.C.V.) 157,007 DRAFT FWD 9.00 m AFT
Less Free Water : 2,179 Less OBQ/ROB :
Oil Volume :(G.O.V.) 159,492 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 157,007 Long tons/Metric tons :
Long Tons/Metric Tons : 19,706 20,022 Vessel Experience Factor :
API 60 F : 44.5 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.05 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 9-Dec-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

11.687 0.12752 11.874


887.131 0.12752 901.338
4,724.145 0.12752 4799.801
4,303.450 0.12752 4372.368
155.510 0.12752 158.000
514.138 0.12752 522.372
4,977.598 0.12752 5057.313
4,008.121 0.12752 4072.309
30.448 0.12752 30.935
93.712 0.12752 95.213

19,706 20,022

10.00 m TRIM 1.00 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 9-Dec-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah

Crude Storage Lifting

24 Hours Total (bbls) 932 Last Lifting 29-O

BS and W % 0.05 Lifting Vol (bbls) 60,5

Storage Gross (bbls) Next Lifting


159,492

Storage Net / G.S.V (Nbbls) 157,007 Next Lifting Vol (bbls)

Storage Net / N.S.V (Nbbls) 156,856

Days to Tank Tops 172 Vessel ETA

Total Crude This Month (Nbbls) 157,007

Water Offtake

Water Received 24hrs (bbls) 59 Offtake 24 Hours (bbls)

Total Water in Cargo (bbls) 2,179

Total P/W Received (bbls) 81,660

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 32.0

PFW PH 0
Note: PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10 DE BOTTOMING PW 2 C IN TO SLOP P/S
INTERNAL TRANSFER COT 2 C IN TO TANK NOMI
OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 270,112 ### 21,047 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 3,500 1,822

Closing (m3) 266,612 19,225 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Reviewed previous day activity


2. Internal Cargo Transfer
3. Release export hose to hose floating buoy
4. Maintenance RO No.2
5. Maintenance Auxiliary Engine No.2
6. Cleaning Body Screw Air Compressor

Tool box meeting 06.30

1. Review deck, engine and galley dept. activity


2. Continue Internal Cargo Transfer for offtake nomination
3. Deck and engine dept. daily activity
Supervisory Meeting 16.30 4. Test safety device
5. Schedule collecting garbage in to container
6. House keeping all departments

Incidents
Type Reference Comments
NIL

Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 19


The details see SPKK sheet *)
###
Capt. Saiful Bahri

29-Oct-16

60,545

deg C

deg C

O COT 6C
O SLOP P/S
C IN TO TANK NOMINATION

3255 / 156214
e Vessel

Comment

g buoy

or

t. activity
offtake nomination preparation

ntainer
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C
07.40: Line Up
09.00: Start Cargo Pump No.2 ( FOR INTERNAL TRANSFER COT )
10.00: Start Heating Cargo
10.35: Start Ballast Pump
17.00: Stop Cargo Pump No.2
17.20: Stop Heating Cargo
16.00: Stop Ballast pump

Mooring/Unmooring :

Bunkering/Debunkering :

Personnel & Material Transfer :


05.30 : 6 Pesons SPJ, 6 Persons Gearindo & 9 Persons PKP by. KST. 51 ( Out )
11.30 : 1 Cradle Paint SPJ
- 1 Cargo Net Food Stuff SPJ
- 3 Oil Drums Adventurer by KST ( In )
12.40 : 1 Box Oil Sample by Adventure 1 ( Out )
14.00 : 5 Persons SPJ by Adventure 1 ( In )
13.55 : transferred 3 oil drums to adventurer ( out )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred SPJ & Contractor Personnel
2. Internal Cargo Transfer COT
3. Heating cargo tank
4. Checked Ballast Tank Condition
5. Transferred Materials
6. Released export hose to hose floating buoy via KST. 51
7. House Keeping

ENGINE :
1. Internal Cargo Transfer
2. Maintenance RO No.2
3. Maintenance Auxiliary Engine No.2
4. Cleaned Body Screw Air Compressor
5. Running up A/E No.1 and 3 for :
07.00 - 16.00: - Internal Cargo Transfer
- Release Export Hose To KST. 51
- Transferred Materials by KST. 51 ( In )
2. PERMIT TO WORK PW MW HW CSE IP VAL
425 1578 372 164 7 877
2.1 J HA 425 1578 372 164 5 877
3. BUNKERS(M3) CONS RCVD
M.F.O 3,500 0
M.D.O 1,822 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 13 0 0 0
DOM 10 0 0 12
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
19 18
MAN HOURS ( POB X 12 HRS )
Previous man hours 203628 Days W/O LTI 1107 Since 28-Nov-13
Man hours today 276
Total man hours 203904
Safe man hours 203904
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


09-Dec-16 @2400 HRS

`
TOTAL
3423
3421
TRANS ROB
0 266,612
0 19,225
ROB `
72
214
ROB
200
POB
36

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1548 2 1550
2088 19 2107
3 0 3
0 0 0
1389 5 1394

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 31,555 0 0 1,338 0 3.0 12.0 9.0 30,217
02 30,217 0 0 1,324 0 16.0 0.0 8.0 28,893
03 28,893 0 0 1,296 0 19.0 0.0 3.0 27,597
04 27,597 0 0 1,310 0 24.0 1.0 0.0 26,287
05 26,287 0 0 1,296 0 24.0 0.0 0.0 24,991
06 24,991 0 0 1,296 0 24.0 0.0 0.0 23,695
07 23,695 0 0 1,324 0 18.0 0.0 6.0 22,371
08 22,371 0 0 1,324 0 2.0 0.0 24.0 21,047
09 21,047 0 0 1,822 0 9.0 0.0 24.0 19,225 Internal Cargo Transferred

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 270,112 0 0 0 0 270,112
02 270,112 0 0 0 0 270,112
03 270,112 0 0 0 0 270,112
04 270,112 0 0 0 0 270,112
05 270,112 0 0 0 0 270,112
06 270,112 0 0 0 0 270,112
07 270,112 0 0 0 0 270,112
08 270,112 0 0 0 0 270,112
09 270,112 0 0 3,500 266,612
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12 12 11 10 14 11 12 13 11 11 14
2 10 10 12 13 10 12 12 11 12 13 11 12
3 14 14 13 11 12 13 11 13 11 12 12 12
4 13 13 12 14 11 11 13 12 14 11 11 13
5 12 11 11 12 13 13 12 11 11 12 12 12
6 11 13 13 12 13 11 11 12 13 12 11 13
7 14 14 13 10 14 12 11 10 14 13 12 11
8 13 12 12 10 14 12 12 10 12 11 11 12
9 10 13 14 11 13 13 12 12 13 12 12 12
10 11 14 14 14 13 11 11 13 11 12 13
11 11 14 14 13 12 12 13 14 13 11 10
12 14 12 13 13 14 12 12 11 14 13 14
13 10 13 14 11 11 11 11 11 13 12 12
14 10 14 13 11 11 12 12 12 11 12 12
15 12 13 14 12 13 13 13 13 12 11 13
16 13 14 12 12 13 14 13 12 12 11 13
17 10 11 14 11 14 14 11 14 11 13 11
18 11 13 14 14 14 11 13 11 14 12 11
19 12 12 12 13 12 11 12 13 12 11 13
20 14 11 13 13 11 12 13 14 11 12 10
21 10 13 12 12 14 11 12 12 14 11 10
22 12 12 13 12 12 11 12 11 12 12 12
23 11 12 14 14 12 13 10 13 14 11 12
24 12 14 12 11 10 11 10 12 11 13 13
25 14 13 11 12 11 14 11 14 13 12 13
26 13 14 13 12 13 12 11 13 12 13 12
27 12 12 10 11 14 12 12 14 12 13 14
28 14 11 12 11 13 11 12 12 11 13 13
29 12 14 11 13 11 12 11 13 11 12 12
30 14 14 12 13 12 12 14 12 11 14
31 13 12 12 11 12 12

TOTAL 373 368 393 361 383 363 363 381 369 370 360 111
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8 8 7 7 8 8 8 7 7 7 8
2 8 7 8 7 7 8 8 8 7 7 7 8
3 8 8 8 8 8 7 8 7 8 8 8 7
4 7 8 8 8 8 8 7 8 7 8 7 8
5 8 8 7 8 8 8 8 8 7 8 7 8
6 8 8 8 7 7 8 7 8 8 7 8 8
7 7 8 8 7 8 7 8 7 8 8 7 7
8 8 7 8 8 8 8 8 7 8 7 7 8
9 8 8 8 7 8 8 8 7 8 8 8 7
10 8 8 8 8 7 7 7 5 7 8 8
11 8 8 8 8 8 8 8 6 8 8 7
12 8 8 8 8 8 8 8 8 7 7 8
13 7 8 7 7 8 8 8 7 8 8 8
14 8 8 8 8 7 8 8 8 7 8 8
15 7 8 8 8 8 8 8 7 8 7 7
16 7 8 8 8 8 8 7 8 8 7 8
17 8 7 8 7 8 8 8 7 8 8 8
18 8 8 8 8 8 7 8 8 7 8 7
19 8 8 8 8 7 8 8 8 8 7 7
20 8 8 7 7 8 8 8 7 8 8 7
21 7 7 8 7 8 8 8 7 8 8 7
22 8 8 8 8 7 8 7 8 7 8 8
23 8 8 8 8 8 8 7 7 8 7 8
24 8 8 8 7 7 7 7 8 8 8 8
25 8 8 8 7 8 8 8 7 8 8 7
26 8 8 7 8 8 8 7 7 7 8 8
27 7 8 7 8 8 8 8 8 7 8 8
28 8 7 7 8 8 7 8 8 7 8 8
29 8 8 8 7 7 8 7 8 7 8 7
30 8 8 7 8 8 8 7 8 7 8
31 8 8 8 8 8 7

TOTAL 240 227 242 227 239 234 239 230 227 237 226 69
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977 4,963 4,977 4,942 4,980 4,969 4,951 4,979 4,943 4,977 4,978
2 4,938 4,956 4,971 4,945 4,981 4,975 4,974 4,941 4,951 4,982 4,976 4,981
3 4,973 4,962 4,969 4,952 4,975 4,982 4,970 4,962 4,983 4,976 4,978 4,964
4 4,961 4,971 4,967 4,961 4,965 4,968 4,977 4,961 4,962 4,966 4,975 4,959
5 4,946 4,968 4,970 4,988 4,931 4,972 4,969 4,975 4,945 4,962 4,972 4,980
6 4,927 4,955 4,972 4,959 4,929 4,975 4,965 4,972 4,971 4,965 4,973 4,956
7 4,938 4,962 4,968 4,935 4,942 4,973 4,968 4,952 4,939 4,972 4,971 4,967
8 4,981 4,966 4,977 4,964 4,983 4,969 4,971 4,938 4,983 4,975 4,970 4,979
9 4,972 4,959 4,975 4,972 4,957 4,968 4,970 4,944 4,962 4,969 4,971 4,981
10 4,963 4,957 4,968 4,951 4,975 4,977 4,968 4,981 4,955 4,975 4,952
11 4,959 4,963 4,973 4,974 4,981 4,975 4,972 4,965 4,982 4,970 4,967
12 4,945 4,968 4,975 4,967 4,939 4,969 4,971 4,976 4,952 4,965 4,978
13 4,937 4,961 4,972 4,931 4,968 4,971 4,974 4,960 4,984 4,971 4,945
14 4,962 4,966 4,969 4,925 4,975 4,975 4,969 4,969 4,929 4,973 4,981
15 4,976 4,971 4,970 4,982 4,952 4,970 4,972 4,975 4,955 4,977 4,962
16 4,948 4,967 4,968 4,943 4,981 4,982 4,970 4,959 4,972 4,970 4,936
17 4,952 4,959 4,966 4,954 4,949 4,968 4,971 4,978 4,968 4,975 4,972
18 4,928 4,967 4,971 4,958 4,975 4,969 4,977 4,965 4,946 4,978 4,954
19 4,942 4,960 4,977 4,951 4,935 4,973 4,968 4,956 4,982 4,972 4,942
20 4,965 4,965 4,975 4,985 4,991 4,970 4,975 4,972 4,971 4,975 4,948
21 4,928 4,963 4,970 4,976 4,972 4,975 4,970 4,982 4,982 4,979 4,951
22 4,951 4,961 4,969 4,972 4,958 4,977 4,952 4,959 4,973 4,976 4,957
23 4,972 4,966 4,973 4,961 4,978 4,971 4,945 4,964 4,959 4,969 4,963
24 4,938 4,972 4,974 4,972 4,984 4,977 4,962 4,987 4,982 4,974 4,952
25 4,944 4,968 4,982 4,931 4,975 4,974 4,980 4,949 4,962 4,978 4,962
26 4,958 4,962 4,958 4,983 4,963 4,970 4,971 4,969 4,981 4,972 4,970
27 4,967 4,951 4,981 4,925 4,961 4,968 4,981 4,935 4,949 4,979 4,982
28 4,935 4,966 4,963 4,971 4,964 4,971 4,975 4,981 4,964 4,977 4,963
29 4,951 4,958 4,972 4,964 4,960 4,968 4,965 4,959 4,977 4,982 4,959
30 4,962 4,957 4,937 4,972 4,972 4,951 4,982 4,948 4,973 4,948
31 4,958 4,981 4,969 4,967 4,979 4,978

TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 153,898 148,948 154,148 148,907 44,745
Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 4,964 4,965 4,973 4,803 1,443
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 130 65 25 140 95 50 45 30 75 95 85 100
2 30 80 90 105 60 45 50 55 95 125 120 70
3 130 125 105 140 70 50 70 90 95 90 115 100
4 40 120 35 115 55 85 80 60 125 40 90 150
5 75 125 95 135 80 65 135 50 45 65 80 155
6 40 70 120 120 120 55 70 60 60 110 130 135
7 125 100 95 125 120 115 85 85 105 90 95 125
8 100 75 115 140 125 110 110 70 130 100 60 145
9 110 85 90 70 105 115 105 80 115 100 110 60
10 135 85 105 135 85 120 100 120 120 55 115
11 120 65 75 120 105 115 75 75 90 50 180
12 80 105 90 155 115 120 55 80 115 45 140
13 50 110 110 60 105 80 45 75 105 140 95
14 125 90 75 100 95 95 40 65 115 155 90
15 120 60 85 70 40 145 45 45 60 105 140
16 95 95 75 60 75 75 45 90 80 105 110
17 115 80 85 80 80 40 55 140 115 65 60
18 100 95 100 110 65 60 50 130 110 70 105
19 105 100 55 120 20 125 55 140 90 145 155
20 145 95 125 125 75 135 105 105 125 140 100
21 95 85 105 120 115 145 110 130 120 85 75
22 120 100 135 115 70 85 90 65 115 100 95
23 110 70 120 100 105 75 90 80 120 135 120
24 80 50 130 95 100 80 75 125 130 125 150
25 105 25 120 60 60 115 45 110 45 95 105
26 115 70 130 115 100 55 50 120 85 105 155
27 100 70 155 115 85 40 85 125 70 90 105
28 110 75 125 110 95 45 85 130 55 130 105
29 105 95 145 65 90 55 85 100 65 80 130
30 145 135 80 75 45 30 115 125 140 140
31 100 150 70 50 80 105

TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215 2,825 2,900 3,080
DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Dec 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Dec-2016 24 1 16 41
2-Dec-2016 24 1 19 44
3-Dec-2016 24 1 21 46
4-Dec-2016 24 0 21 45
5-Dec-2016 24 0 16 40
6-Dec-2016 24 1 17 42
7-Dec-2016 24 1 15 40
8-Dec-2016 24 0 13 37
9-Dec-2016 23 0 13 36

TOTAL 215 5 151 371


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 9/Dec/16
Action/Commen Positive /
Reported by Rank Location Description Total
t Negative

Advised to all crews about Renewal Certificate Especially to sign off


1 BOY R.TOGAS Master Meeting Room Proficiency and competency crew
Positive 1

Released Export Hose To Floating Buoy via


2 IYYANG C/O Main Deck
KST.51
Positive 1

3 ANDI A UNIT 2/O Main Deck Assist C/O Check all Ballast Tank Condition Done Positive 1

Line up Valve In Pump


4 INDRA 3/O Pump Room Assist C/O Line Up Internal Cargo Transfer
Room
Positive 1

Operated Internal Cargo Transfer In Engine


5 JULY MANGIRI C/E Engine Room
Room
Positive 1

Electro Motor RO No.1 not in normal working Order to Electrician


6 ACO AKBAR 2/E RO Room
condition checked
Negative 1
Maintenance Auxiliary Engine No.2 for Offtake
7 RATNO SITUMORANG 3/E Engine Room
preparation
Positive 1
Operated Auxiliary Boiler For Internal Cargo
8 HENDRA PRATAMA 4/E Engine Room
Transfer and Cargo heating
Positive 1

9 NIKO E/E RO Room Overhauled RO No.1 Electro Motor Running smoothly Positive 1

10 AANG Bosun

11 ACHMAD NURUL HUDA AB Main Deck Assist C/O Internal Cargo Transfer Positive 1

Assist C/O Lifted Materials From KST. 51 To SPJ


12 UDIYANTO AB Main Deck
( In )
Positive 1

Assist C/O Line Up Internal Cargo Transfer In


13 M. SAFARI AB Pump Room
Pump Room
Positive 1

Standby Check Ullage


14 ANTONY OS Main Deck Assist C/O Internal Cargo Transfer
In COT
Positive 1

Assist Electrician Overhaul Electro Motor RO


15 SAIFUL IMAM FTR RO Room
No.1
Repair Done Positive 1

16 ELIK BUDIANTO FTR

Assist 3/E Operation Auxiliary Boiler For Internal


17 SAHONO MTM Engine Room
Cargo Transfer
Positive 1

18 SUAIB MTM

Assist C/E Operation Internal Cargo Transfer In


19 NUR ALI MTM Engine Room
Engine Room
Positive 1

20 MASRUDI C/Cook Galley Daily Cleaned In Galley Positive 1

21 ROCHIM COOK Galley House keeping in Galley room Done Positive 1

Accommodati
22 RANGGUN JAWI STWD on
House Keeping In Accommodation Passage Clean & Tidy Positive 1

23 BOBI MANGOTO STWD

TOTAL 19