VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.65 18.367 16 100 Nil 100 29.3 84.7 44.5 0.98770 99 0.248 99 0.12551
2C 8.45 8.187 3,480 21,888 18.042 17.784 37.059 233 21,655 30.0 86.0 44.6 0.98703 21,374 53.436 21,321 0.12544
3C 14.47 14.207 1,460 9,185 Nil 9,185 29.3 84.7 44.6 0.98768 9,072 22.680 9,049 0.12544
4C 17.98 17.714 71 445 Nil 445 29.2 84.6 44.6 0.98773 439 1.098 438 0.12544
5C 17.93 17.658 102 641 Nil 641 29.0 84.2 44.6 0.98793 633 1.584 632 0.12544
6C 15.83 15.572 917 5,766 Nil 5,766 29.0 84.2 44.6 0.98793 5,697 14.24 5,682 0.12544
7C 3.80 3.544 5,780 36,353 Nil 36,353 29.6 85.3 44.5 0.98740 35,895 89.737 35,805 0.12551
8C 10.30 10.038 2,803 17,630 18.347 18.089 19 122 17,508 29.1 84.4 44.6 0.98783 17,295 43.237 17,252 0.12544
SL.P 16.05 15.761 79 495 16.141 15.851 75.827 477 18 29.0 84.2 44.6 0.98793 18 0.045 18 0.12544
SL.S 16.67 16.366 57 359 Nil 359 28.8 83.8 44.6 0.98813 354 0.886 354 0.12544
TOTAL
TOTAL 14,764 92,863 132 832 92,031 90,877 90,650
REMARKS: 899 25 874 848 846

PRODUCTION LOADING IN TO 2C

Gross Volume :(T.O.V.) 92,863 Oil Volume @ 60 F :(N.S.V.) 90,650 DRAFT FWD 7.20 m AFT
Less Free Water : 832 Less OBQ/ROB :
Oil Volume :(G.O.V.) 92,031 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 90,877 Long tons/Metric tons :
Long Tons/Metric Tons : 11,402 11,585 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 6-Mar-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

12.430 0.12752 12.629


2,681 0.12745 2724.164
1,138.010 0.12745 1156.245
55.106 0.12745 55.989
79.463 0.12745 80.736
714.584 0.12745 726.034
4,505.165 0.12752 4577.314
2,169.482 0.12745 2204.245
2.256 0.12745 2.292
44.462 0.12745 45.174

11,402 11,585

9.20 m TRIM 2.00 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 6-Mar-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bah

Crude Storage Lifting

24 Hours Total (bbls) 899 Last Lifting 19-D

BS and W % 0.25 Lifting Vol (bbls) 141,

Storage Gross (bbls) Next Lifting


92,031

Storage Net / G.S.V (Nbbls) 90,877 Next Lifting Vol (bbls)

Storage Net / N.S.V (Nbbls) 90,650

Days to Tank Tops 249 Vessel ETA

Total Crude This Month (Nbbls) 90,877

Water Offtake

Water Received 24hrs (bbls) 25 Offtake 24 Hours (bbls)

Total Water in Cargo (bbls) 832 Note :

Total P/W Received (bbls) 86,787

Water Drawn off (bbls) 0 Loading/Incoming Temp 42.0

Specific Gravity 0 Storage tanks's temperature 30.0

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 225,862 ### 78,338 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,296

Closing (m3) 225,862 77,042 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Maintenance Nav. Bridge deck
3. Check and maintenance LSA / FFA equipment
4. Maintenance RO No.1
5. Installed of floating alarm system for engine room bilges
Tool box meeting 06.30
6. Cleaned and painted of engine room dirty place
7. Chipping, brushing, coating top plate LO cooler main en
8. Cleaned evaporator AC accommodation
9. Repaired spindle valve and renewed gland packing stea

1. Review deck, engine and galley dept. activity


2. Check and maintenance LSA / FFA equipment
3. Maintenance Nav. Bridge deck
Supervisory Meeting 16.30

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
S.T.O.P. Audit program

Observation Card Report : 21


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

TO COT 2C

21296 / 90289
e Vessel

Comment

equipment

engine room bilges


m dirty place
e LO cooler main engine
ation
d gland packing steam valve

t. activity
equipment

Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C

Mooring/Unmooring :
NIL

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


05.30: 1 Person Mafhindo, 1 Person Spektra, 23 Persons Pkp by. KST.51 ( Out )
07.30: 1 Person Santos Rep by. KST.51 ( Out )
10.15: 1 Person Santos Rep, 1 Person Oryx by. KST.51 ( In )
15.00: 1 Person Santos Rep by. KST.51 ( Out )
17.00: 1 Person Spektra, 2 Persons Pkp by. AHT. Tegap Jaya ( In )
17.05: 1 Person Oryx by. AHT. Tegap Jaya ( Out )
22.00: 1 Person Mafhindo, 21 Persons Pkp by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assisted transfer santos rep and contractor personel
2. Maintenance Nav. Bridge deck
3. Checked and maintenance LSA / FFA equipment

ENGINE :
1. Maintenance RO No.1
2. Installed of floating alarm system for engine room bilges
3. Cleaned and painted of engine room dirty place
4. Chipping, brushing, coating top plate LO cooler main engine
5. Cleaned evaporator AC accommodation
6. Repaired spindle valve and renewed gland packing of steam valve at main steam valve
7. Fabricated fresh water pipe line from fresh water tank portside to fresh water pump

2. PERMIT TO WORK PW MW HW CSE IP VAL


460 1760 379 174 7 1045
2.1 J HA 460 1760 379 174 5 1045
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,296 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 12 0 0 29
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
27 28
MAN HOURS ( POB X 12 HRS )
Previous man hours 226188 Days W/O LTI 1194 Since 28-Nov-13
Man hours today 252
Total man hours 226440
Safe man hours 226440
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


06-Mar-17 @2400 HRS

TOTAL
3825
3823
TRANS ROB
0 225,862
0 77,042
ROB `
85
174
ROB
200
POB
46

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1722 2 1724
2921 21 2942
3 0 3
0 0 0
154 0 154

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Mar-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 84,952 0 0 1,310 0 0.0 24.0 1.0 83,642 Crane used
02 83,642 0 0 1,310 0 1.0 0.0 24.0 82,332 Crane used
03 82,332 0 0 1,338 0 3.0 0.0 24.0 80,994 Crane used

04 80,994 0 0 1,360 0 1.0 0.0 24.0 79,634 Warm up aux.boiler

05 79,634 0 0 1,296 0 0.0 0.0 24.0 78,338


06 78,338 0 0 1,296 0 0.0 0.0 24.0 77,042
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Mar-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 225,862 0 0 0 0 225,862
02 225,862 0 0 0 0 225,862
03 225,862 0 0 0 0 225,862
04 225,862 0 0 0 0 225,862
05 225,862 0 0 0 0 225,862
06 225,862 0 0 0 0 225,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12
2 13 12 13
3 11 14 14
4 12 14 13
5 12 13 14
6 14 13 14
7 13 12
8 12 13
9 13 14
10 13 14
11 14 12
12 12 12
13 13 13
14 11 13
15 13 12
16 14 13
17 12 14
18 13 14
19 11 12
20 12 12
21 12 13
22 13 14
23 12 14
24 14 13
25 12 13
26 12 14
27 14 12
28 14 12
29 13
30 14
31 13

TOTAL 393 365 80 0 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8
2 7 8 8
3 7 8 8
4 8 8 7
5 8 7 8
6 7 8 8
7 8 8
8 8 8
9 8 8
10 7 8
11 8 7
12 7 8
13 7 8
14 8 8
15 8 8
16 8 7
17 8 8
18 7 8
19 7 8
20 8 8
21 8 7
22 8 8
23 7 8
24 8 8
25 8 8
26 7 8
27 7 7
28 8 8
29 8
30 8
31 8

TOTAL 237 218 47 0 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975
2 4,951 4,968 4,971
3 4,971 4,971 4,973
4 4,954 4,970 4,972
5 4,980 4,975 4,973
6 4,969 4,969 4,974
7 4,972 4,974
8 4,957 4,972
9 4,960 4,977
10 4,987 4,978
11 4,991 4,975
12 4,984 4,971
13 4,966 4,977
14 4,958 4,975
15 4,963 4,973
16 4,974 4,969
17 4,988 4,972
18 4,964 4,974
19 4,978 4,976
20 4,971 4,971
21 4,973 4,974
22 4,970 4,975
23 4,966 4,972
24 4,960 4,977
25 4,969 4,970
26 4,972 4,969
27 4,974 4,973
28 4,975 4,970
29 4,970
30 4,973
31 4,978

TOTAL 154,082 139,237 29,838 0 0 0 0 0 0 0 0 0

Averag
e/Day 4,970 4,973 963 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55
2 70 120 40
3 135 110 95
4 80 90 30
5 120 120 95
6 125 90 145
7 130 95
8 60 110
9 40 115
10 110 110
11 100 100
12 105 110
13 100 100
14 55 110
15 85 70
16 90 110
17 90 85
18 95 95
19 55 95
20 75 80
21 90 155
22 80 165
23 80 165
24 80 165
25 95 150
26 150 165
27 110 140
28 150 40
29 125
30 140
31 90

TOTAL 2,990 3,195 460 0 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Mar 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Mar-2017 23 0 24 47
2-Mar-2017 22 0 24 46
3-Mar-2017 21 1 25 47
4-Mar-2017 21 0 25 46
5-Mar-2017 21 1 25 47
6-Mar-2017 21 0 25 46

TOTAL 129 2 148 279


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 6/Mar/17
Action/Comme Positive /
Reported by Rank Location Description Total
nt Negative

Crew mess Advice to gelley crew received additional food


1 BOY RICHARD TOGAS Master room stuff
Done Positive 1

Nav. Bridge
2 ANDI AHMAD UNIT 2/O deck
Supervise maintenance Nav. Bridge deck Done Positive 1

3 IHSANUDIN 3/O On deck Checked and maintenance LSA and FFA Done Positive 1

4 MARTHEN KAMMA C/E AC room Cleaned evaporator AC accommodation Done Positive 1

5 ACO AKBAR 2/E Engine room Maintenance RO No.1 Done Positive 1

Engine room
6 RATNO SITUMORANG 3/E workshop
Repaired outlet pipe handwash Done Positive 1

Repaired spindle valve and renewed gland


7 LILIK WAHYUWANTO 4/E Engine room
packing of steam valve at main steam valve
Done Positive 1

Installed of floating alarm system for engine


8 SURYADINATA E/E Engine room
room bilges
Done Positive 1

Nav. Bridge
9 A AFANDI Bosun deck
Maintenance Nav. Bridge deck Done Positive 1
Nav. Bridge Assisted boatswain maintenance Nav. Bridge
10 MIFTAKHUL ARKHAM AB deck deck
Done Positive 1

Nav. Bridge Assisted boatswain maintenance Nav. Bridge


11 M SAFARI AB deck deck
Done Positive 1

Nav. Bridge Assisted boatswain maintenance Nav. Bridge


12 MOHAMMAD ANSORI AB deck deck
Done Positive 1

Nav. Bridge Assisted boatswain maintenance Nav. Bridge


13 ANTONY OS deck deck
Done Positive 1

14 SYAEFUL IMAM FTR Engine room Fabricated of fresh water pipe line Done Positive 1

15 NUR ALI MTM Engine room Assist 2/E maintenance RO No.1 Done Positive 1

Chipping, brushing, coating checker plate


16 ADOR MTM Engine room
beside of aux.boiler area
Done Positive 1

Chipping, brushing, coating LO cooler main


17 CHULWAN NURFALLAH WIPER Engine room
engine area
Done Positive 1
Checked and arranged additional food stuff new
18 MASRUDI C/Cook Provision store
arrival
Done Positive 1

Assist C/Cook checked and arranged additional


19 ROHIM 2ND/Cook Provision store food stuff new arrival Done Positive 1

20 RANGGUN JAWI STWD B deck House keeping Done Positive 1

21 HARIANTO SULE TANAN STWD C deck House keeping Done Positive 1

TOTAL 21