VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C Nil 0 Nil 0 0 0
2C 16.32 16.072 627 3,941 18.064 17.806 30 189 3,752 32.4 90.3 44.6 0.98488 3,695 9.238 3,686 0.12544
3C 1.00 0.758 6,639 41,759 Nil 41,759 31.2 88.2 44.6 0.98593 41,172 102.929 41,069 0.12544
4C 17.24 16.993 343 2,160 Nil 2,160 31.4 88.5 44.6 0.98578 2,129 5.323 2,124 0.12544
5C Nil 0 Nil 0 0 0
6C 16.55 16.304 619 3,893 18.220 17.965 0 0 3,893 31.9 89.4 44.6 0.98533 3,836 9.59 3,826 0.12544
7C 1.00 0.759 6,651 41,835 Nil 41,835 30.2 86.4 44.5 0.98685 41,284 103.211 41,181 0.12551
8C 1.00 0.762 5,936 37,338 Nil 37,338 30.7 87.3 44.6 0.98638 36,829 92.073 36,737 0.12544
SL.P 5.50 5.221 417 2,625 5.535 5.256 416 2,618 7 32.0 89.6 44.6 0.98523 7 0.017 7 0.12544
SL.S 17.50 17.208 30 189 17.505 17.211 30 189 1 32.0 89.6 44.6 0.98523 1 0.001 1 0.12544
TOTAL
TOTAL 21,263 133,740 476 2,996 130,744 128,953 128,631
REMARKS: 884 46 838 825 823

PRODUCTION LOADING IN TO 2C

Gross Volume :(T.O.V.) 133,740 Oil Volume @ 60 F :(N.S.V.) 128,631 DRAFT FWD 8.00 m AFT
Less Free Water : 2,996 Less OBQ/ROB :
Oil Volume :(G.O.V.) 130,744 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 128,953 Long tons/Metric tons :
Long Tons/Metric Tons : 16,179 16,438 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 22-Apr-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

0 0
464 0.12745 470.961
5,165 0.12745 5247.330
267 0.12745 271.346
0 0
481 0.12745 488.899
5,182 0.12752 5264.587
4,620 0.12745 4693.857
0.875 0.12745 0.889
0.075 0.12745 0.076

16,179 16,438

10.70 m TRIM 2.70 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 22-Apr-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri

Crude Storage Lifting

24 Hours Total (bbls) 884 Last Lifting 19-Dec

BS and W % 0.25 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


130,744 -

Storage Net / G.S.V (Nbbls) 128,953 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 128,631

Days to Tank Tops 214 Vessel ETA -

Total Crude This Month (Nbbls) 128,953

Water Offtake

Water Received 24hrs (bbls) 46 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 2,996 Note :

Total P/W Received (bbls) 10,368

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 32.4

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 186.77 ### 54.31 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1.30

Closing (m3) 186.77 53.01 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Reviewed previous day works


2. Gas free in COT 1C & 5C in progress
3. Weekly test LSA, FFA and Nav/GMDSS equipment
4. Weekly test LSA, FFA and Nav/GMDSS equipment
5. Collecting garbage into garbage container at lay down
Tool box meeting 06.30
6. Workplace inspection
7. Maintenance RO No.1
8. Maintenance COPT no.2
9. Maintenance screw compressor

1. Review deck, engine and galley dept. activity


2. Gas free in COT 1C & 5C in progress
3. EHS and Security reinduction to all crew
Supervisory Meeting 16.30 4. Review the workplace inspection / SPKK
5. Ship drill / safety learn

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

NTO COT 2C
&5C

3711 / 128535
e Vessel

Comment

ss
DSS equipment
DSS equipment
ntainer at lay down

pt. activity
ss
crew
SPKK

Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C
17.00 - 17.30 lt : Checked O2 Content and LEL in COT 1C
Free Gas COT 1 C & 5C In Progress

Mooring/Unmooring :

Bunkering/Debunkering :

Personnel & Material Transfer :

1.2 Planned/Unplanned Maintenance


DECK :
1. Continued free gas by portable fan in COT 1C & 5C
2. Continued marking label at wing bridge STBD side
3. Weekly tested LSA, FFA and Nav/GMDSS equipment
4. Weekly tested safety device and emergency machinery
5. Collecting garbage into garbage container at lay down
6. Final coating compass deck area
7. Work place Inspection
8. House keeping
ENGINE :
1. Assembled electro motor for screw air compressor
2. Renewed sea water booster pump RO No.1
3. House keeping in engine room
4. Collected engine room garbage in to garbage container at lay down
5. Continued maintenance cargo oil pump No.2

2. PERMIT TO WORK PW MW HW CSE IP VAL


482 1923 385 181 8 1105
2.1 J HA 4782 1923 385 181 6 1105
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1.30 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 0 20
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
0 0
MAN HOURS ( POB X 12 HRS )
Previous man hours 239088 Days W/O LTI 1241 Since 28-Nov-13
Man hours today 276
Total man hours 239364
Safe man hours 239364
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


22-Apr-17 @2400 HRS

TOTAL
4084
8382
TRANS ROB
0 186.77
0 53.01
ROB `
81
293
ROB
200
POB
23
28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1819 2 1821
3995 23 4018
3 0 3
0 0 0
201 0 201

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( KL ) ( KL ) ( KL ) ( KL ) ( KL ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 43.77 0 0 1.30 0 0.0 0.0 24.0 42.47
02 42.47 0 0 1.30 0 0.0 0.0 24.0 41.17
DO Consumption for Boiler
03 41.17 0 0 1.61 0 8.0 0.0 16.0 39.56 (Burning n Before stop 0.2
KL )

04 39.56 0 0 1.37 0 5.5 0.0 18.5 38.19 Free gas COT 5C


05 38.19 0 0 1.30 0 0.0 24.0 0.0 36.89
06 36.89 0 0 1.31 0 1.0 23.0 0.0 35.58 Transferred materials
07 35.58 0 0 1.32 0 0.0 22.0 2.0 34.26 Transferred materials
Opened & closed garbage
34.26 0 0 1.31 0 0.0 23.0 1.0 32.95 container
08
09 32.95 0 0 1.31 0 0.0 23.0 1.0 31.64 Transferred materials
DO Consumption for Boiler
10 31.64 0 0 1.61 0 0.0 16.0 8.0 30.03 (Burning n Before stop 0.2
KL )

DO Consumption for Boiler


11 30.03 0 0 1.62 0 9.0 0.0 15.0 28.41 (Burning n Before stop 0.2
KL )

12 28.41 0 0 1.31 0 0.0 1.0 23.0 27.10 Transferred materials


13 27.10 40 0 1.31 0 0.0 1.0 23.0 65.79 Transferred materials
14 65.79 0 0 1.31 0 1.0 0.0 23.0 64.48 Transferred materials
Opened & closed
15 64.48 0 0 1.31 0 1.0 0.0 23.0 63.17 garbage container
16 63.17 0 0 1.30 0 0.0 0.0 24.0 61.87
17 61.87 0 0 1.30 0 0.0 0.0 24.0 60.57
DO Consumption for Boiler
18 60.57 0 0 1.82 0 9.0 0.0 15.0 58.75 (Burning n Before stop 0.4
KL )

DO Consumption for Boiler


19 58.75 0 0 1.81 0 8.0 0.0 16.0 56.94 (Burning n Before stop 0.4
KL )

20 56.94 0 0 1.31 0 0.0 14.0 10.0 55.63 Transferred materials


21 55.63 0 0 1.32 0 0.0 22.0 2.0 54.31 Transferred materials

22 54.31 0 0 1.30 0 0.0 24.0 0.0 53.01


23
24
25
26
27
28
29
30
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11 196.77 0 0 4.00 0 192.77 Internal cargo transferred
12 192.77 0 0 0 0 192.77
13 192.77 0 0 0 0 192.77
14 192.77 0 0 0 0 192.77
15 192.77 0 0 0 0 192.77
16 192.77 0 0 0 0 192.77
17 192.77 0 0 0 0 192.77
18 192.77 0 0 3.00 0 189.77 Internal cargo transferred
19 189.77 0 0 3.00 0 186.77 Heating cargo oil
20 186.77 0 0 0 0 186.77
21 186.77 0 0 0 0 186.77
22 186.77 0 0 0 0 186.77
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12 13
2 13 12 13 14
3 11 14 14 13
4 12 14 13 14
5 12 13 14 12
6 14 13 14 13
7 13 12 13 14
8 12 13 12 13
9 13 14 13 12
10 13 14 13 12
11 14 12 14 13
12 12 12 13 14
13 13 13 13 12
14 11 13 12 14
15 13 12 12 13
16 14 13 13 12
17 12 14 13 14
18 13 14 12 11
19 11 12 13 14
20 12 12 14 13
21 12 13 12 11
22 13 14 12 13
23 12 14 13
24 14 13 14
25 12 13 14
26 12 14 13
27 14 12 14
28 14 12 13
29 13 14
30 14 13
31 13 13

TOTAL 393 365 405 284 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8 8
2 7 8 8 7
3 7 8 8 7
4 8 8 7 8
5 8 7 8 8
6 7 8 8 7
7 8 8 7 8
8 8 8 7 7
9 8 8 8 7
10 7 8 8 8
11 8 7 8 7
12 7 8 7 8
13 7 8 8 7
14 8 8 8 7
15 8 8 7 8
16 8 7 8 7
17 8 8 7 8
18 7 8 8 7
19 7 8 8 7
20 8 8 7 8
21 8 7 8 7
22 8 8 7 7
23 7 8 8
24 8 8 8
25 8 8 8
26 7 8 7
27 7 7 8
28 8 8 8
29 8 7
30 8 7
31 8 7

TOTAL 237 218 236 163 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975 4,983
2 4,951 4,968 4,971 4,991
3 4,971 4,971 4,973 4,982
4 4,954 4,970 4,972 4,965
5 4,980 4,975 4,973 4,970
6 4,969 4,969 4,974 4,952
7 4,972 4,974 4,973 4,977
8 4,957 4,972 4,930 4,984
9 4,960 4,977 4,945 4,948
10 4,987 4,978 4,961 4,984
11 4,991 4,975 4,952 4,957
12 4,984 4,971 4,960 4,964
13 4,966 4,977 4,981 4,973
14 4,958 4,975 4,972 4,982
15 4,963 4,973 4,981 4,954
16 4,974 4,969 4,941 4,987
17 4,988 4,972 4,959 4,963
18 4,964 4,974 4,981 4,987
19 4,978 4,976 4,985 4,969
20 4,971 4,971 4,994 4,973
21 4,973 4,974 4,963 4,981
22 4,970 4,975 4,952 4,990
23 4,966 4,972 4,958
24 4,960 4,977 4,949
25 4,969 4,970 4,961
26 4,972 4,969 4,983
27 4,974 4,973 4,978
28 4,975 4,970 4,966
29 4,970 4,960
30 4,973 4,959
31 4,978 4,958

TOTAL 154,082 139,237 153,940 109,416 0 0 0 0 0 0 0 0

Average/
Day 4,970 4,973 4,966 3,647 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55 160
2 70 120 40 155
3 135 110 95 135
4 80 90 30 140
5 120 120 95 125
6 125 90 145 110
7 130 95 135 90
8 60 110 145 95
9 40 115 145 95
10 110 110 140 80
11 100 100 150 135
12 105 110 130 125
13 100 100 50 140
14 55 110 65 135
15 85 70 140 80
16 90 110 60 70
17 90 85 80 75
18 95 95 70 125
19 55 95 70 75
20 75 80 125 65
21 90 155 115 75
22 80 165 145 100
23 80 165 120
24 80 165 140
25 95 150 130
26 150 165 135
27 110 140 90
28 150 40 65
29 125 40
30 140 100
31 90 160

TOTAL 2,990 3,195 3,205 2,385 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Apr 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Apr-2017 24 1 21 46
2-Apr-2017 24 1 21 46
3-Apr-2017 24 1 21 46
4-Apr-2017 24 0 21 45
5-Apr-2017 24 1 13 38
6-Apr-2017 24 0 13 37
7-Apr-2017 23 0 15 38
8-Apr-2017 23 1 16 40
9-Apr-2017 23 1 16 40
10-Apr-2017 23 0 16 39
11-Apr-2017 23 0 16 39
12-Apr-2017 23 0 16 39
13-Apr-2017 23 0 16 39
14-Apr-2017 23 1 13 37
15-Apr-2017 23 0 13 36
16-Apr-2017 23 0 13 36
17-Apr-2017 23 0 13 36
18-Apr-2017 23 1 13 37
19-Apr-2017 23 0 0 23
20-Apr-2017 23 0 0 23
21-Apr-2017 23 0 0 23
22-Apr-2017 23 0 0 23

TOTAL 512 8 286 806


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 22/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess Advice about weekly routine test emergency
1 IHWAN ASRUL Master room and safety equipment
Done Positive 1

2 IYYANG C/O Main deck Workplace inspection at cargo tank area Done Positive 1

3 ANDI AHMAD UNIT 2/O Bridge Weekly tested Nav/GMDSS equipment Done Positive 1

4 INDRA 3/O Main deck Weekly tested emergency and safety device Done Positive 1

5 JULY MANGIRI C/E STBD Quarter Assembled electro motor screw compressor Done Positive 1

6 ACO AKBAR 2/E RO Room Renewed sea water booster pump RO No.1 Done Positive 1

7 RATNO SITUMORANG 3/E Engine Room Maintenance cargo oil pump tank No.2 Done Positive 1

8 HENDRA PRATAMA 4/E Life boat Weekly tested running engine life boat Done Positive 1

Assisted C/E assembled electro motor screw


9 NIKO ARIYO E/E STBD Quarter
compressor
Done Positive 1

10 AANG Bosun Compass deck Final coating compass deck area Done Positive 1

Assisted boatswain final coating compass deck


11 UDIYANTO AB Compass deck
area
Done Positive 1

12 BAYU SEGARA AB Main deck Collected garbage in to garbage container Done Positive 1

Assisted boatswain final coating compass deck


13 MOHAMMAD ANSORI AB Compass deck
area
Done Positive 1

Collected garbage in to garbage container by


14 DEDI BIN WARNA OS Main deck
category
Done Positive 1

Assisted 3/E maintenance cargo oil pump tank


15 ELIK BUDIANTO FTR Engine Room
No.2
Done Positive 1

16 KAREL PIETERSZ MTM RO Room Assisted 2/E maintenance RO No.1 Done Positive 1

Assisted 3/E maintenance cargo oil pump tank


17 SUAIB MTM Engine Room
No.2
Done Positive 1

18 UMAR SAID MTM RO Room Assisted 2/E maintenance RO No.1 Done Positive 1

Assisted 3/E maintenance cargo oil pump tank


19 SUMARDI WIPER Engine Room
No.2
Done Positive 1

20 HASAN C/Cook Galley House keeping area galley Done Positive 1

21 MASRUDI 2ND/Cook Provision store Rechecking received provision Done Positive 1

Collected galley garbage in to garbage


22 HARIANTO SULE TANAN STWD Main deck
container at lay down
Done Positive 1
Collected galley garbage in to garbage
23 BOBBY MANGONTO STWD Main deck
container at lay down
Done Positive 1

TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING

6 BUTTERWORTHING COT 1C ( COP NO. 2 )


1ST STAGE ( 4 MTRS ) 17/Mar/17
2ND STAGE ( 8 MTRS ) 17/Mar/17
1ST STAGE ( 12 MTRS ) 17/Mar/17
1ST STAGE ( 16 MTRS ) 17/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 1C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING TOTAL 40 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING BY SAMPLING HOLE BY OIL GAUGING TAPE : 2 CM ( SLUDGE ) ONLY AT BELLMOUTH AREA
7 GAS FREE BY USING I.G.S FIX FAN 18/Mar/17
20/Mar/17
TOTAL TANK CLEANING AND GAS FREE : 61 HRS
8 GAS FREE BY USING 2 SETS PNEUMATIC AIR 21/Mar/17
DRIVEN FAN 22/Mar/17
23/Mar/17
24/Mar/17
25/Mar/17
26/Mar/17
COT ATM RESULTS : O²/ 21.00% - LEL/NIL - CO/NIL - HC/NIL
FREE GAS BY PORTABLE FAN : 5 Days
TANK CLEANING AND GAS FREE COMPLETED FOR COT 1 C : 8 Days
REMARKS :
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

12
10

10

40

OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

7 BUTTERWORTHING COT 5C ( COP NO. 2 )


1ST STAGE ( 12 MTRS ) 25/Mar/17
1ST STAGE ( 16 MTRS ) 25/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING CLEANING TOTAL 46 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING SAMPLING HOLD BY OIL GAOUGING TAPE : 5 CM SLUDGE AREA BELLMOUTH
7 FREE GAS BY USING I.G.S FIX FAN 25/Mar/17
27/Mar/17

TOTAL TANK CLEANING AND GAS FREE : 59 HRS


27/Mar/17 18.00 pm O2 Content : 18 %, LEL : 29 %, CO : %, H2S : 5 %

ESTIMATE COMPLETED 31 MARCH 2017


8 FREE GAS BY USING I.G.S FIX FAN 28/Mar/17
17.00 pm O2 Content : 18 %, LEL : 12 %, CO : %, H2S : %
29/Mar/17
17.00 pm O2 Content : 18,5 %, LEL : 6 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 30/Mar/17
DRIVEN FAN 17.20 pm O2 Content : 20, %, LEL : 3 %, CO : 0 %, H2S : 0 %
Will be done again Cleaning for Cargo tank 5 C
Tank cleaning COT 5 C 3/Apr/17
FREE GAS BY USING I.G.S FIX FAN 4/Apr/17
15,00 pm O2 Content : 20, 9 %, LEL : 20 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 5/Apr/17
DRIVEN FAN 11,30 pm O2 Content : 20 %, LEL : 11 %, CO : 0 %, H2S : 0 %
6/Apr/17
11,30 pm O2 Content : 20 %, LEL : 10 %, CO : 0 %, H2S : 0 %
7/Apr/17
11,40 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
8/Apr/17
11,45 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
9/Apr/17 TANK CLEANING AND GAS FREE COMPLETED

NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

10
10

10

46

UTH
5
8

59

8
4
%
21

0
8
5
%
21

15

15

15

112