Professional Documents
Culture Documents
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 15.33 15.055 995 6,256 17.975 17.697 63.90 402 5,854 31.9 89.4 44.6 0.98533 5,768 14.420 5,754 0.12544
3C 1.52 1.244 6,512 40,957 Nil 40,957 30.5 86.9 44.6 0.98658 40,407 101.017 40,306 0.12544
4C 17.95 17.673 85 537 Nil 537 32.6 90.7 44.6 0.98468 528 1.321 527 0.12544
5C Nil 0 Nil 0 0 0
6C 17.20 16.924 370 2,329 18.225 17.953 0.00 0 2,329 32.0 89.6 44.6 0.98523 2,294 5.74 2,289 0.12544
7C 3.31 3.035 5,982 37,628 18.157 17.881 13.92 88 37,541 30.6 87.1 44.5 0.98650 37,034 92.585 36,942 0.12551
8C 3.25 2.977 5,345 33,617 18.270 17.998 44 277 33,340 30.6 87.1 44.6 0.98648 32,890 82.224 32,807 0.12544
SL.P 7.56 7.262 352 2,213 9.111 8.813 302 1,899 314 32.0 89.6 44.6 0.98523 309 0.773 308 0.12544
SL.S 7.43 7.124 352 2,217 12.000 11.695 206 1,298 919 32.0 89.6 44.6 0.98523 905 2.264 903 0.12544
TOTAL
TOTAL 19,993 125,753 630 3,963 121,790 120,136 119,836
REMARKS: 881 52 829 817 815
PRODUCTION LOADING IN TO 2C
DECANTING PW : 1500 BBLS
DE BOTTOMING PW 6 C IN TO SLOP
INTERNAL TRANSFER COT
Gross Volume :(T.O.V.) 125,753 Oil Volume @ 60 F :(N.S.V.) 119,836 DRAFT FWD 8.60 m AFT
Less Free Water : 3,963 Less OBQ/ROB :
Oil Volume :(G.O.V.) 121,790 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 120,136 Long tons/Metric tons :
Long Tons/Metric Tons : 15,072 15,314 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 11-Apr-17
0 0
724 0.12745 735.143
5,068.647 0.12745 5149.865
66.277 0.12745 67.339
0 0
287.790 0.12745 292.402
4,648.157 0.12752 4722.596
4,125.663 0.12745 4191.771
38.771 0.12745 39.393
113.577 0.12745 115.397
15,072 15,314
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
PRODUCTION LOADING IN TO 2C
OIW Peak (mg/I) 0 DECANTING PW : 1500 BBLS
DE BOTTOMING PW 6 C IN TO SLOP
INTERNAL TRANSFER COT
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 2C
&5C
N TO 2C
N TO SLOP
6837 / 119785
e Vessel
Comment
ss
A
pt. activity
ss
A
ballast
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
16.30 : NMS Adventure 1 STBD alongside
18.30 : NMS Adventure 1 cast off
Bunkering/Debunkering :
16.36 : Commenced transfer FW to NMS Adventure 1
18.30 : Completed transfer FW 15T to NMS Adventure 1
ENGINE :
1. Overhauled turbo charger auxiliary engine for spare
2. Firing up auxiliary boiler for heating cargo oil
3. Checked and repaired safety device auxiliary engine no.1
4. Firing up auxiliary boiler ,COPT no.1 & WBTP for internal cargo transferred
5. Installed LED projector lamp at IGS blower fan area
6. Running up A/E No. 1 & 3 :
08.00 - 17.00 : - Internal cargo transferred
9. EHS AUDIT/INSPECTION
`
TOTAL
4021
4019
TRANS ROB
0 192.77
0 28.41
ROB `
81
254
ROB
200
POB
39
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11 196.77 0 0 4.00 0 192.77 Internal cargo transferred
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 1,823 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
Crew Mess
1 BOY RICHARD TOGAS Master Room
Discussed about internal cargo transfer Done Positive 1
2 IYYANG C/O CCR All in charged internal cargo transfer Done Positive 1
8 LILIK WAHYUWANTO 4/E Engine room Preparing boiler for internal cargo transferred Done Positive 1
9 NIKO ARIYO E/E IGS Installed LED projector for IGS fan area Done Positive 1
11 UDIYANTO AB Main deck Assisted C/O internal cargo transferred Done Positive 1
13 MOHAMMAD ANSORI AB Main deck Assisted C/O checked all ballast tank Done Positive 1
15 ELIK BUDIANTO FTR Workshop House keeping in workshop room Done Positive 1
16 NUR ALI MTM RO room Cleaned fine filter RO for spare Done Positive 1
20 HASAN C/Cook Provision store house keeping at area provision store Done Positive 1
TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
15
112