You are on page 1of 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.75
9.30
16.73
17.53
18.24
15.91
16.87
15.85
18.24
7.28

18.452
9.008
16.439
17.241
17.951
15.621
16.580
15.563
17.929
6.969

0
3,183
559
248
0
897
504
808
9
357

0
20,019
3,518
1,557
0
5,640
3,172
5,080
59
2,248

Nil
18.135
Nil
Nil
Nil
18.072
NIL
NIL
18.510
12.060

6,565

41,291
1,062

SL.S

OIL VOL

Volume

V.C.F.

G.O.V.

TEMP

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

CU.M.

VOL.(BBLS)

BBLS

17.845

17.443

0
110

17.783

46.166

18.204
11.749

0.6
204.58

290
0
0
4
1,287

0
19,909
3,518
1,557
0
5,350
3,172
5,080
55
961

31.0
32.5
31.2
31.0
30.6
34.0
30.9
30.7
29.8
30.8

87.8
90.5
88.2
87.8
87.1
93.2
87.6
87.3
85.6
87.4

1,691
69

39,601
994

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98343
0.98625
0.98638
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
19,606
3,468
1,535
0
5,261
3,128
5,010
54
948

0.000
39.212
5.202
3.071
0.000
10.52
6.256
7.516
0.135
2.370

0
19,567
3,463
1,532
0
5,251
3,122
5,003
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

269

39,011
976

38,937
975

PRODUCTION LOADING IN TO 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

41,291
1,691
39,601
39,011
4,894
4,972
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

39,011

DRAFT FWD

7.30 m

Capt. Saiful Bahri

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
5-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
2,459.356
435.032
192.592
0.000
659.977
392.616
628.512
6.783
118.907

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

4,894

8.30 m

0.000
2498.764
442.003
195.678
0.000
670.552
398.903
638.583
6.892
120.813
4,972

TRIM
LIST

Capt. Ihwan Asrul

1.00 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

5-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Saiful Bah

Lifting

24 Hours Total (bbls)

1,062

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

39,601

Storage Net / G.S.V (Nbbls)

39,011

Storage Net / N.S.V (Nbbls)

38,937

Days to Tank Tops

272

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

39,011

Water

Offtake

Water Received 24hrs (bbls)

69

Total Water in Cargo (bbls)

1,691

Total P/W Received (bbls)

83,665

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

34.0

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

231,612

### 69,470

###

1,338

231,612

68,132

Service Vessel
MDO
0
0

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment
1. Review previous day activity
2. Maintenance LSA & FFA
3. Install Bolt Tank Cleaning Line On Deck
4. Transfer Sea Good materials
5. Maintenance Stripping Pump
6. Closing finding work place inspection
7. Maintenance RO No.2
8. Continue General Overhaul Auxiliary Engine No.2

1. Review deck, engine and galley dept. activity


2. Marking Label On Deck
3. Maintenance on deck
4. Transfer materials Spare part
5. Closing finding work place inspection
6. Crew change
7. House Keeping

Incidents

Type
NIL

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 22
The details see SPKK sheet *)
###

Reference

Time

Comments

Comment

Capt. Saiful Bahri

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

5202 / 38954

e Vessel

Comment

eck

y Engine No.2

t. activity

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :

Bunkering/Debunkering :

Personnel & Material Transfer :


10.55 : 2 Persons Oryx By AHT. Tegap jaya ( In )
14.30 : Sea Good Materials By KST. 51 ( In )
15.10 : 2 Persons Oryx By KST. 51
16.00 : Sea Good Condensat Waste Tank By Tegap Jaya ( Out )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Oryx Personnel's
2. Maintenance LSA & FFA
3. Installed Bolt Tank Cleaning Line On Deck
4. Maintenance Stripping Pump
5. Transferred Sea Good materials
6. Closing finding work place inspection
7. House Keeping

ENGINE :
1. Continued General Overhaul Auxiliary Engine No.2
2. Maintenance RO No.2
- Renewed Sand Filter 3 Micro
3. Running up A/E 1 & 3:
14.30 - 16.00 - Transferred Sea Good Materials In And Out

2.

PERMIT TO WORK

2.1
J HA
3. BUNKERS(M3)

PW

MW

HW

CSE

IP

VAL

434

1661
1661

374

168

903

374

168

903

M.F.O
M.D.O

CONS
0
1,338

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
0

0
24

OSD
200

REC
0

CONS
0

434

4. FRESH WATER (MT)


BLR
DOM
5. DISPERSANT, FOAM, CHEMICALS (LTRS)
REASON FOR USE

6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

211056
264
211320

Days W/O LTI

1134

IN

OUT

Since

211320
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

05-Jan-17

@2400 HRS

TOTAL
3547
3545

TRANS
0
0
ROB

45
130
ROB
200

ROB
231,612
68,132
`

POB

22
28-Nov-13

Previous

Today

Total

0
0
0
0
1601
1664
3
0
41

0
0
0
0
2
22
0
0
0

0
0
0
0
1603
1686
3
0
41

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

60

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

38

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980

TOTAL 24,820
Averag
e/Day

JUL AUG SEP OCT NOV DEC

801

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120

485

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017

22
22
22
22
22

0
0
0
0
0

0
0
0
0
0

22
22
22
22
22

TOTAL

110

110

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
5/Jan/17
Reported by

1 IHWAN ASRUL

Rank

Location

Description
Advice To Galley Team To Prepared For

Master Meeting Room Additional Provision On Friday

Action/Commen
t

Positive /
Negative

Total

Check & Prepare For


Receiving

Positive

Well Done

Positive

Positive

Well Done

Positive

General Overhaul

Positive

Positive

2 IYYANG

C/O

3 ANDI A UNIT

2/O

Main Deck

Assisted Boatswain Transferred Materials On


Deck

4 INDRA

3/O

Main Deck

Marked Label On Deck

5 JULY MANGIRI

C/E

Engine Room

6 ACO AKBAR

2/E

RO Room

7 IRVAN TAHIR

3/E

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

8 HENDRA PRATAMA

4/E

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

9 NIKO

E/E

Engine Room

Assisted C/E General Overhaul Auxiliary Engine


No.2

General Overhaul

Positive

10 AANG

Bosun

Maintenance Stripping
Pump

Positive

Assisted Boatswain Renewed Gland Packing For Maintenance Stripping


Stripping Pump
Pump

Positive

Installed Bolt Tank Cleaning Line On Deck

Positive

Positive

Closed

Negativ

Done

Positive

General Overhaul

Positive

Done

Positive

General Overhaul

Positive

Well Done

Positive

Check provision for next requestion

Done

Positive

Flushing Wastefel With Hot Water

Done

Positive

Cleaned Crew Mess Room After All Crew Lunch

Done

Positive

Pump Room Maintenance Stripping Pump In Pump Room

Continued General Overhaul Auxiliary Engine


No.2
Maintenance RO No.2

Pump Room Renewed Gland Packing For Stripping Pump

11 ACHMAD NURUL HUDA

AB

Pump Room

12 UDIYANTO

AB

Main Deck

13 BAYU SEGARA

AB

Pump Room

14 DEDI

OS

Pump Room Stripping pump running is not normal

15 SAIFUL IMAM

FTR

RO Room

16 ELIK BUDIANTO

FTR

Engine Room

17 SUAIB

MTM

RO Room

18 NUR ALI

MTM

Engine Room

19 MASRUDI

C/Cook

Galley

20 ROCHIM

COOK

Store
Provision

21 RANGGUN JAWI

STWD

Galley

22 BOBI MANGOTO

STWD

Crew Mess
Room

Done

Assisted Boatswain Renewed Gland Packing For Maintenance Stripping


Stripping Pump
Pump

Assisted 2/E Maintenance RO No.2


Assisted C/E General Overhaul Auxiliary Engine
No.2
Assisted 2/E Maintenance RO No.2
Assisted C/E General Overhaul Auxiliary Engine
No.2
House keeping cooking equipment after use

TOTAL 22

You might also like