Professional Documents
Culture Documents
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.75
9.30
16.73
17.53
18.24
15.91
16.87
15.85
18.24
7.28
18.452
9.008
16.439
17.241
17.951
15.621
16.580
15.563
17.929
6.969
0
3,183
559
248
0
897
504
808
9
357
0
20,019
3,518
1,557
0
5,640
3,172
5,080
59
2,248
Nil
18.135
Nil
Nil
Nil
18.072
NIL
NIL
18.510
12.060
6,565
41,291
1,062
SL.S
OIL VOL
Volume
V.C.F.
G.O.V.
TEMP
OIL VOLUME
W.C.F
@ 60F
TABLE 11
CU.M.
VOL.(BBLS)
BBLS
17.845
17.443
0
110
17.783
46.166
18.204
11.749
0.6
204.58
290
0
0
4
1,287
0
19,909
3,518
1,557
0
5,350
3,172
5,080
55
961
31.0
32.5
31.2
31.0
30.6
34.0
30.9
30.7
29.8
30.8
87.8
90.5
88.2
87.8
87.1
93.2
87.6
87.3
85.6
87.4
1,691
69
39,601
994
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98343
0.98625
0.98638
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
0
19,606
3,468
1,535
0
5,261
3,128
5,010
54
948
0.000
39.212
5.202
3.071
0.000
10.52
6.256
7.516
0.135
2.370
0
19,567
3,463
1,532
0
5,251
3,122
5,003
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
269
39,011
976
38,937
975
PRODUCTION LOADING IN TO 6C
41,291
1,691
39,601
39,011
4,894
4,972
44.6
39,011
DRAFT FWD
7.30 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
5-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
2,459.356
435.032
192.592
0.000
659.977
392.616
628.512
6.783
118.907
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
4,894
8.30 m
0.000
2498.764
442.003
195.678
0.000
670.552
398.903
638.583
6.892
120.813
4,972
TRIM
LIST
1.00 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
1,062
Last Lifting
BS and W %
0.20
39,601
39,011
38,937
272
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
39,011
Water
Offtake
69
1,691
83,665
Loading/Incoming Temp
42.0
Specific Gravity
34.0
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
231,612
### 69,470
###
1,338
231,612
68,132
Service Vessel
MDO
0
0
Meetings
Type
Time
Supervisory Meeting
06.30
16.30
Comment
1. Review previous day activity
2. Maintenance LSA & FFA
3. Install Bolt Tank Cleaning Line On Deck
4. Transfer Sea Good materials
5. Maintenance Stripping Pump
6. Closing finding work place inspection
7. Maintenance RO No.2
8. Continue General Overhaul Auxiliary Engine No.2
Incidents
Type
NIL
Drills
Type
Reference
Time
Comments
Comment
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
5202 / 38954
e Vessel
Comment
eck
y Engine No.2
t. activity
Comment
Mooring/Unmooring :
Bunkering/Debunkering :
ENGINE :
1. Continued General Overhaul Auxiliary Engine No.2
2. Maintenance RO No.2
- Renewed Sand Filter 3 Micro
3. Running up A/E 1 & 3:
14.30 - 16.00 - Transferred Sea Good Materials In And Out
2.
PERMIT TO WORK
2.1
J HA
3. BUNKERS(M3)
PW
MW
HW
CSE
IP
VAL
434
1661
1661
374
168
903
374
168
903
M.F.O
M.D.O
CONS
0
1,338
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
24
OSD
200
REC
0
CONS
0
434
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours
211056
264
211320
1134
IN
OUT
Since
211320
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
05-Jan-17
@2400 HRS
TOTAL
3547
3545
TRANS
0
0
ROB
45
130
ROB
200
ROB
231,612
68,132
`
POB
22
28-Nov-13
Previous
Today
Total
0
0
0
0
1601
1664
3
0
41
0
0
0
0
2
22
0
0
0
0
0
0
0
1603
1686
3
0
41
NIL
NIL
NIL
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
04
71,278
1,808
8.0
0.0
24.0
69,470
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
60
Jul
13
11
12
12
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
38
Jul
7
7
8
8
TOTAL 24,820
Averag
e/Day
801
80
70
135
80
120
485
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
22
22
22
22
22
0
0
0
0
0
0
0
0
0
0
22
22
22
22
22
TOTAL
110
110
REMARKS
1 IHWAN ASRUL
Rank
Location
Description
Advice To Galley Team To Prepared For
Action/Commen
t
Positive /
Negative
Total
Positive
Well Done
Positive
Positive
Well Done
Positive
General Overhaul
Positive
Positive
2 IYYANG
C/O
3 ANDI A UNIT
2/O
Main Deck
4 INDRA
3/O
Main Deck
5 JULY MANGIRI
C/E
Engine Room
6 ACO AKBAR
2/E
RO Room
7 IRVAN TAHIR
3/E
Engine Room
General Overhaul
Positive
8 HENDRA PRATAMA
4/E
Engine Room
General Overhaul
Positive
9 NIKO
E/E
Engine Room
General Overhaul
Positive
10 AANG
Bosun
Maintenance Stripping
Pump
Positive
Positive
Positive
Positive
Closed
Negativ
Done
Positive
General Overhaul
Positive
Done
Positive
General Overhaul
Positive
Well Done
Positive
Done
Positive
Done
Positive
Done
Positive
AB
Pump Room
12 UDIYANTO
AB
Main Deck
13 BAYU SEGARA
AB
Pump Room
14 DEDI
OS
15 SAIFUL IMAM
FTR
RO Room
16 ELIK BUDIANTO
FTR
Engine Room
17 SUAIB
MTM
RO Room
18 NUR ALI
MTM
Engine Room
19 MASRUDI
C/Cook
Galley
20 ROCHIM
COOK
Store
Provision
21 RANGGUN JAWI
STWD
Galley
22 BOBI MANGOTO
STWD
Crew Mess
Room
Done
TOTAL 22