Professional Documents
Culture Documents
DIV
PT.SAMUDERA PE
PERIODE 26
I. OMZET
II. COST OPERATION
III. GROSS PROFIT
OPEX
IV. FIXED COST
Gaji Karyawan
Atk, Rtk, Phone,Listrik,Air,dll
Operasional kantor
Jumlah Fixed Cost
V. VARIABLE COST
Sparepart
Biaya Rekondisi
Investasi
Pengurusan Surat (Kir,STNK)
SPD/Intertain dan Fee
Retribusi 10 UNIT Trailer Juli & Agustus
Jumlah Variable Cost
TOTAL OPEX
VI. NET PROFIT BEFORE INSTALLEMENT
VII. INSTALLEMENT(ANSURAN UNIT)
PT. SAMUDERA
DIV
PT.SAMUDER
PERIODE 26
I. OMZET
II. COST OPERATION
III. GROSS PROFIT
OPEX
IV. FIXED COST
Gaji Karyawan
Atk, Rtk, Phone,Listrik,Air,dll
Operasional kantor
Jumlah Fixed Cost
V. VARIABLE COST
Sparepart
Biaya Rekondisi
Investasi
PT. SAMUDERA
LAPORAN
DIVISI TRUCKING
PT.SAMUDERA PERDANA SELARAS + PT. KPN
PERIODE 26 JULI-25 AGUSTUS 2012
E INSTALLEMENT
INSTALLEMENT
Rp
995,591,513
Rp
581,905,325
Rp
413,686,188
Rp
Rp
49,605,000
8,977,700
Rp
694,300
Rp
59,277,000
Rp
Rp
Rp
Rp
Rp
Rp
Rp
197,912,200
6,995,000
2,701,000
6,093,000
1,505,000
5,000,000
220,206,200
Rp
Rp
279,483,200
134,202,988
Rp
503,199,800
Rp
(368,996,812)
Rp
110,038,399
Rp
(479,035,211)
Prepered By :
PT. SAMUDERA PERDANA SELARAS
AGUNG INDRAWAN, SE
Div. Trucking
LAPORAN
DIVISI TRUCKING
PT.SAMUDERA PERDANA SELARAS
PERIODE 26 JULI-25 AGUSTUS 2012
Rp
830,171,831
Rp
500,609,325
Rp
329,562,506
Rp
Rp
49,605,000
8,977,700
Rp
694,300
Rp
59,277,000
Rp
Rp
Rp
162,342,750
6,995,000
2,701,000
E INSTALLEMENT
INSTALLEMENT
Rp
Rp
Rp
Rp
6,093,000
1,505,000
3,000,000
182,636,750
Rp
Rp
241,913,750
87,648,756
Rp
365,241,800
Rp
(277,593,044)
Rp
110,038,399
Rp
(387,631,443)
Prepered By :
PT. SAMUDERA PERDANA SELARAS
AGUNG INDRAWAN, SE
Div. Trucking
PN
GAJI KARYAWAN
41,880,000
GAJI
UM+PLS 5 KRYWN OP
3,725,000
GAJI SECURITY
4,000,000
49,605,000
362,500
RTK
PENGIRIMAN SRT, BANK
DANSEWA KANTOR
TUBAN
TAL
337,500
5,361,700
2,916,000
8,977,700
BNSN+SERVIS MTR
KRYWN TUBAN
694,300
694,300
INVESTASI
PEMBUATAN RUANG
TAMU+MEMPERBAIKI
SPD/ INTERTAIN DAN FEE
FEE/ ENTERTAIN
2,701,000
1,505,000
1,505,000
GAJI KARYAWAN
41,880,000
GAJI
UM+PLS 5 KRYWN OP
3,725,000
GAJI SECURITY
4,000,000
49,605,000
362,500
RTK
PENGIRIMAN SRT, BANK
DANSEWA KANTOR
TUBAN
TAL
337,500
5,361,700
2,916,000
8,977,700
BNSN+SERVIS MTR
KRYWN TUBAN
694,300
694,300
INVESTASI
PEMBUATAN RUANG
TAMU+MEMPERBAIKI
SPD/ INTERTAIN DAN FEE
FEE/ ENTERTAIN
2,701,000
1,505,000
1,505,000
REKAPITULAS
PERIODE 26
NO
NOPOL
INCOME
A 01 / Trailer
H 1994 VW
A 02 / Trailer
H 1801 CY
23,098,290
A 03 / Trailer
H 1976 BY
A 04 / Trailer
H 1645 JE
11,200,000
A 05 / Trailer
H 1302 KE
13,500,000
A 06 / Trailer
H 1622 JE
9,800,000
A 07 / Trailer
H 1871 GH
14,300,000
A 08 / Trailer
H 1844 BW
9,950,000
A 09 / Trailer
H 1759 DW
13,300,000
10
A 10 / Trailer
H 1761 DW
5,700,000
11
A 11 / Trailer
H 1506 PG
9,650,000
JUMLAH
110,498,290
12
B 01 / Tronton
H 1937 BW
11,866,500
13
B 05 / Tronton
H 1911 DY
13,389,400
14
B 10 / Tronton
K 1863 BA
15
B 12 / Tronton
H 1767 CW
19,713,852
16
B 14 / Tronton
H 1766 CW
20,288,700
17
B 15 / Tronton
H 1897 EY
24,897,838
18
B 16 / Tronton
H 1898 EY
27,007,348
19
B 17 / Tronton
H 1985 EY
16,354,480
20
B 18 / Tronton
H 1824 FY
24,525,600
21
B 19 / Tronton
H 1825 FY
21,372,348
22
B 20 / Tronton
H 1936 FY
18,838,051
23
B 21 / Tronton
H 1937 FY
29,356,250
24
B 22 / Tronton
H 1958 GY
26,235,000
25
B 23 / Tronton
H 1760 AW
26,122,348
26
B 24 / Tronton
H 1761 AW
14,655,000
27
B 25 / Tronton
H 1832 DW
18,085,562
28
B 26 / Tronton
H 1910 DW
26,077,750
29
C 01 / Engkel
H 1995 GY
9,018,000
30
6,500,000
31
32
6,195,750
33
E 01 / DT
B 9909 TYT
35,211,340
34
E 02 / DT
B 9912 TYT
25,093,550
35
E 03 / DT
B 9914 TYT
30,783,210
36
E 04 / DT
H 1757 AQ
14,788,300
37
E 05 / DT
H 1759 AQ
29,949,411
38
E 06 / DT
H 1761 AQ
35,082,420
39
E 07 / DT
H 1763 AQ
36,253,650
40
E 08 / DT
H 1765 AQ
26,059,045
41
E 09 / DT
H 1767 AQ
6,492,000
42
F 01 / WB
H 1831 DW
8,344,880
43
F 02 / WB
H 1842 DW
21,197,040
44
F 03 / WB
H 1956 DW
22,930,000
JUMLAH
652,684,623
JUMLAH ALL
763,182,913
REKAPIT
PERIODE 26
NO
NOPOL
INCOME
A 01 / Trailer
H 1994 VW
A 02 / Trailer
H 1801 CY
23,098,290
A 03 / Trailer
H 1976 BY
A 04 / Trailer
H 1645 JE
11,200,000
A 07 / Trailer
H 1871 GH
14,300,000
A 08 / Trailer
H 1844 BW
9,950,000
A 11 / Trailer
H 1506 PG
9,650,000
JUMLAH
68,198,290
B 01 / Tronton
H 1937 BW
11,866,500
B 05 / Tronton
H 1911 DY
13,389,400
10
B 10 / Tronton
K 1863 BA
11
B 12 / Tronton
H 1767 CW
19,713,852
12
B 15 / Tronton
H 1897 EY
24,897,838
13
B 16 / Tronton
H 1898 EY
27,007,348
14
B 17 / Tronton
H 1985 EY
16,354,480
15
B 18 / Tronton
H 1824 FY
24,525,600
16
B 19 / Tronton
H 1825 FY
21,372,348
17
B 20 / Tronton
H 1936 FY
18,838,051
18
B 21 / Tronton
H 1937 FY
29,356,250
19
B 22 / Tronton
H 1958 GY
26,235,000
20
B 23 / Tronton
H 1760 AW
26,122,348
21
B 24 / Tronton
H 1761 AW
14,655,000
22
C 01 / Engkel
H 1995 GY
9,018,000
30
6,500,000
31
25
E 01 / DT
B 9909 TYT
35,211,340
26
E 02 / DT
B 9912 TYT
25,093,550
27
E 03 / DT
B 9914 TYT
30,783,210
28
E 04 / DT
H 1757 AQ
14,788,300
29
E 05 / DT
H 1759 AQ
29,949,411
30
E 06 / DT
H 1761 AQ
35,082,420
31
E 07 / DT
H 1763 AQ
36,253,650
32
E 08 / DT
H 1765 AQ
26,059,045
33
E 09 / DT
H 1767 AQ
6,492,000
JUMLAH
529,564,941
JUMLAH ALL
597,763,231
OUT
PERBAIKAN
UNIT
R / L KOTOR
0
15,330,300
12,205,000
10,893,290
1,922,150
1,587,200
5,515,000
5,685,000
4,439,800
6,730,000
6,770,000
2,892,350
4,870,000
4,930,000
2,947,450
6,545,000
7,755,000
1,979,400
4,815,000
5,135,000
1,761,500
7,530,000
5,770,000
3,949,300
3,270,000
2,430,000
5,318,050
4,815,000
4,835,000
7,164,500
56,295,000
54,203,290
49,292,000
6,290,000
5,576,500
1,212,600
7,212,000
6,177,400
6,056,650
2,906,750
9,900,000
9,813,852
2,060,000
8,876,000
11,412,700
4,755,750
12,270,000
12,627,838
7,587,350
13,270,000
13,737,348
3,865,100
8,420,000
7,934,480
1,485,000
11,275,000
13,250,600
10,321,500
10,620,000
10,752,348
10,875,700
REKONDISI
KIER/STNK
/TILANG
4,000,000
1,000,000
5,000,000
9,905,000
8,933,051
1,733,850
14,215,000
15,141,250
11,689,950
11,521,000
14,714,000
5,941,250
12,345,000
13,777,348
1,595,000
6,820,000
7,835,000
9,195,000
8,965,000
9,120,562
1,936,200
11,300,000
14,777,750
9,293,450
5,365,000
3,653,000
5,332,500
4,460,000
2,040,000
4,310,000
1,885,750
17,750,000
17,461,340
5,073,000
75,000
12,430,000
12,663,550
11,499,300
75,000
15,815,000
14,968,210
3,702,050
75,000
6,730,000
8,058,300
3,753,450
15,490,000
14,459,411
3,273,650
18,160,000
16,922,420
2,556,250
17,660,000
18,593,650
3,194,050
11,820,000
14,239,045
6,149,600
75,000
2,910,000
3,582,000
7,098,350
2,693,000
4,495,000
3,849,880
1,485,000
10,125,000
11,072,040
1,506,900
10,825,000
12,105,000
1,485,000
321,549,000
331,135,623
148,620,200
6,093,000
377,844,000
385,338,913
197,912,200
6,995,000
6,093,000
357,000
2,743,000
1,995,000
OUT
PERBAIKAN
UNIT
R / L KOTOR
0
15,330,300
12,205,000
10,893,290
1,922,150
1,587,200
5,515,000
5,685,000
4,439,800
6,545,000
7,755,000
1,979,400
4,815,000
5,135,000
1,761,500
4,815,000
4,835,000
7,164,500
33,895,000
34,303,290
34,184,850
6,290,000
5,576,500
1,212,600
7,212,000
6,177,400
6,056,650
2,906,750
9,900,000
9,813,852
2,060,000
12,270,000
12,627,838
7,587,350
13,270,000
13,737,348
3,865,100
8,420,000
7,934,480
1,485,000
11,275,000
13,250,600
10,321,500
10,620,000
10,752,348
10,875,700
9,905,000
8,933,051
1,733,850
14,215,000
15,141,250
11,689,950
11,521,000
14,714,000
5,941,250
12,345,000
13,777,348
1,595,000
6,820,000
7,835,000
9,195,000
5,365,000
3,653,000
5,332,500
4,460,000
2,040,000
KIER/STNK
REKONDISI
/TILANG
4,000,000
1,000,000
5,000,000
357,000
17,750,000
17,461,340
5,073,000
75,000
12,430,000
12,663,550
11,499,300
75,000
15,815,000
14,968,210
3,702,050
75,000
6,730,000
8,058,300
3,753,450
15,490,000
14,459,411
3,273,650
18,160,000
16,922,420
2,556,250
17,660,000
18,593,650
3,194,050
11,820,000
14,239,045
6,149,600
75,000
2,910,000
3,582,000
7,098,350
2,693,000
262,653,000
266,911,941
128,157,900
6,093,000
296,548,000
301,215,231
162,342,750
6,995,000
6,093,000
2,743,000
1,995,000
REKAPITULASI UNIT M
(DIVISI TRUCKING) PT. SAMUDE
SELARAS
PERIODE 26 JULI - 25 AGU
RETRIBUSI
JULI &
AGUSTUS
R / L BERSIH
(19,330,300)
NO
500,000
8,471,140
500,000
(2,087,200)
CUSTO
PT.MER
500,000
745,200
500,000
3,377,650
Garuda
PT.
Petrokimi
PT. SPS
Holding
Div. PBM
500,000
1,482,550
PT. KAM
500,000
4,275,600
500,000
2,873,500
500,000
1,320,700
500,000
(3,388,050)
500,000
(2,829,500)
5,000,000
(5,088,710)
4,363,900
120,750
(2,906,750)
7,753,852
6,656,950
5,040,488
9,872,248
6,449,480
2,929,100
(123,352)
JUMLAH
7,199,201
3,094,300
8,772,750
12,182,348
(1,360,000)
7,184,362
5,484,300
(1,679,500)
2,040,000
0
1,885,750
12,313,340
1,089,250
11,191,160
4,304,850
11,185,761
11,623,170
15,399,600
8,014,445
(6,209,350)
2,364,880
9,565,140
10,620,000
0
176,422,423
5,000,000
171,333,713
RETRIBUSI
JULI &
AGUSTUS
R / L BERSIH
(19,330,300)
500,000
8,471,140
500,000
(2,087,200)
500,000
745,200
500,000
4,275,600
500,000
2,873,500
500,000
(2,829,500)
3,000,000
(7,881,560)
4,363,900
120,750
(2,906,750)
7,753,852
5,040,488
9,872,248
6,449,480
2,929,100
(123,352)
7,199,201
3,094,300
8,772,750
12,182,348
(1,360,000)
(1,679,500)
2,040,000
0
12,313,340
1,089,250
11,191,160
4,304,850
11,185,761
11,623,170
15,399,600
8,014,445
(6,209,350)
0
132,661,041
3,000,000
124,779,481
INCOME
OUT
R/L
BERSIH
NO
CUSTO
INCOME
MER
OUT
R/L
BERSIH
Bp. Agus
Bp. Didit
1,770,300
775,000
995,300
Cik Giok
720,000
495,000
225,000
2,640,000 2,400,000
240,000
4,250,000 4,125,000
125,000
Div. Shipping
1,225,000
360,000
865,000
Edi Trans
775,000
360,000
415,000
Ibu Kanis
1,337,000
700,000
637,000
Ibu Lusi
1,600,000
780,000
820,000
Kwee Giembing
1,040,000
690,000
350,000
10
PT. Almindo1,669,200
850,000
819,200
11
PT. APF
12
PT. BBA
13
14
PT. GCU
15
16
17
18
PT. Indomarco
######## ######## ########
19
20
21
PT. MSJ
467,500
270,000
940,000
197,500
420,000
22
PT. PEP
23
PT. Petrokimia
######## ######## ########
24
PT. PPI
25
26
PT. Rela
27
28
PT. SKM
29
30
31
PT. Wika
32
33
UD. Sumber########
Baru
8,535,000 6,403,250
JUMLAH
410000
471,960
NO
CUSTOMER
INCOME
83,608,000
PT. Petrokimia
73,588,000
68,322,600
Div. PBM
2,640,000
PT. KAM
4,250,000
JUMLAH
232,408,600
OUT
R / L BERSIH
75,831,000
7,777,000
62,797,000
10,791,000
58,908,325
9,414,275
2,400,000
240,000
4,125,000
125,000
204,061,325
28,347,275
LAPORAN
DIVISI TRUCKIN
B
NO.
NOPOL
LAMBUNG
B 01
H 1937 BW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
27
B 01
H 1937 BW
30
B 01
H 1937 BW
SAYUNG
B 01
H 1937 BW
BEKASI
B 01
H 1937 BW
SEMARANG
PUPUK
SEMARANG
JUMLAH
NO.
NOPOL
LAMBUNG
B 05
H 1911 DY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
28
SEMEN
SEMARANG
SEMEN
SEMARANG
B 05
H 1911 DY
30
B 05
H 1911 DY
B 05
H 1911 DY
B 05
H 1911 DY
PUPUK
SEMARANG
B 05
H 1911 DY
11
PUPUK
SEMARANG
SAYUNG
JUMLAH
NO.
NOPOL
LAMBUNG
B 12
H 1767 CW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
TUBAN
B 12
H 1767 CW
31
SUKABUMI
B 12
H 1767 CW
GRESIK
B 12
H 1766 CW
11
SEMARANG
PUPUK
JUMLAH
NO.
NOPOL
LAMBUNG
B 15
H 1897 EY
TGL
BLN
26
THN
CUSTOMER
KOMODITY
MUAT
TUBAN
B 15
H 1897 EY
31
GNG. PUTRI
B 15
H 1897 EY
SAYUNG
B 15
H 1897 EY
GNG. PUTRI
B 15
H 1897 EY
GRESIK
JUMLAH
NO.
NOPOL
LAMBUNG
B 16
H 1898 EY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
TUBAN
B 16
H 1898 EY
27
SUKABUMI
B 16
H 1898 EY
GRESIK
B 16
H 1898 EY
SEMARANG
B 16
H 1898 EY
SUKABUMI
B 16
H 1898 EY
11
SEMARANG
PUPUK
JUMLAH
NO.
NOPOL
LAMBUNG
B 17
H 1985 EY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
KAYU
PC. GADING
SUSU
BANDUNG
B 17
H 1985 EY
31
B 17
H 1985 EY
GRESIK
B 17
H 1985 EY
SEMARANG
B 17
H 1985 EY
11
SEMARANG
PUPUK
JUMLAH
NO.
NOPOL
LAMBUNG
B 18
H 1824 FY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
SAYUNG
B 18
H 1824 FY
GNG. PUTRI
B 18
H 1824 FY
GRESIK
B 18
H 1824 FY
SAYUNG
B 18
H 1824 FY
GNG. PUTRI
B 18
H 1824 FY
11
BATANG
JUMLAH
PUPUK
NO.
NOPOL
LAMBUNG
B 19
H 1825 FY
TGL
BLN
26
THN
CUSTOMER
KOMODITY
MUAT
TUBAN
B 19
H 1825 FY
30
SUKABUMI
B 19
H 1825 FY
GRESIK
B 19
H 1825 FY
PUPUK
SEMARANG
B 19
H 1825 FY
PUPUK
SEMARANG
JUMLAH
NO.
NOPOL
LAMBUNG
B 20
H 1936 FY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
31
PANDAAN
B 20
H 1936 FY
GNG. PUTRI
B 20
H 1936 FY
PANDAAN
B 20
H 1936 FY
SEMARANG
PUPUK
JUMLAH
NO.
NOPOL
LAMBUNG
B 21
H 1937 FY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
27
SEMARANG
B 21
H 1937 FY
30
SUSU
BANDUNG
B 21
H 1937 FY
CETAKAN
JAPANAN
B 21
H 1937 FY
SUKABUMI
B 21
H 1937 FY
GRESIK
B 21
H 1937 FY
SEMEN
SEMARANG
B 21
H 1937 FY
SEMEN
SEMARANG
B 21
H 1937 FY
10
SEMEN
SEMARANG
JUMLAH
NO.
NOPOL
LAMBUNG
B 22
H 1958 GY
B 22
H 1958 GY
TGL
BLN
THN
CUSTOMER
KOMODITY
26
27
PUPUK
MUAT
MRANGGEN
SAYUNG
B 22
H 1958 GY
31
GNG. PUTRI
B 22
H 1958 GY
GRESIK
B 22
H 1958 GY
SAYUNG
B 22
H 1958 GY
JAKARTA
JUMLAH
NO.
NOPOL
LAMBUNG
B 23
H 1760 AW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
TUBAN
B 23
H 1760 AW
31
SUKABUMI
B 23
H 1760 AW
SAYUNG
B 23
H 1760 AW
GNG. PUTRI
B 23
H 1760 AW
GRESIK
JUMLAH
NO.
NOPOL
LAMBUNG
B 24
H 1761 AW
TGL
BLN
THN
CUSTOMER
30
KOMODITY
BESI
MUAT
WARU
B 24
H 1761 AW
GRESIK
B 24
H 1761 AW
SAYUNG
B 24
H 1761 AW
JAKARTA
JUMLAH
NO.
NOPOL
LAMBUNG
C 01
H 1995 GY
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
SEMEN
SEMARANG
SEMEN
SEMARANG
C 01
H 1995 GY
30
C 01
H 1995 GY
SAYUNG
C 01
H 1995 GY
BEKASI
C 01
H 1995 GY
SEMARANG
PUPUK
JUMLAH
NO.
LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
D 01
H 1564 SY
27
SEMARANG
D 01
H 1564 SY
30
SEMARANG
D 01
H 1564 SY
SEMARANG
D 01
H 1564 SY
SEMEN
SEMARANG
D 01
H 1564 SY
SEMEN
SEMARANG
D 01
H 1564 SY
SEMEN
SEMARANG
D 01
H 1564 SY
SEMEN
SEMARANG
D 01
H 1564 SY
SEMARANG
D 01
H 1564 SY
SEMARANG
D 01
H 1564 SY
10
KEDELE
SEMARANG
D 01
H 1564 SY
13
SEMARANG
JUMLAH
NO.
NOPOL
LAMBUNG
E 01
B 9909 TYT
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
25
BATU BARA
PELABUHAN
E 01
B 9909 TYT
26
BATU BARA
PELABUHAN
E 01
B 9909 TYT
26
BATU BARA
PELABUHAN
E 01
B 9909 TYT
26
BATU BARA
KALIWUNGU
E 01
B 9909 TYT
26
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
27
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
27
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
27
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
28
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
28
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
28
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
29
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
29
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
29
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
29
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
30
BROWFIBER
PELABUHAN
E 01
B 9909 TYT
30
E 01
B 9909 TYT
30
E 01
B 9909 TYT
30
E 01
B 9909 TYT
31
E 01
B 9909 TYT
31
KALIWUNGU
E 01
B 9909 TYT
BATU BARA
SAYUNG
E 01
B 9909 TYT
BATU BARA
SAYUNG
E 01
B 9909 TYT
BATU BARA
SAYUNG
E 01
B 9909 TYT
BATU BARA
SAYUNG
E 01
B 9909 TYT
PELABUHAN
E 01
B 9909 TYT
BATU BARA
BUKIT ASAM
E 01
B 9909 TYT
BATU BARA
PELABUHAN
E 01
B 9909 TYT
BATU BARA
BUKIT ASAM
E 01
B 9909 TYT
BATU BARA
BUKIT ASAM
E 01
B 9909 TYT
10
BATU BARA
BUKIT ASAM
JUMLAH
NO.
NOPOL
LAMBUNG
E 02
B 9912 TYT
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
25
BATU BARA
BUKIT ASAM
PASIR
SALAM
E 02
B 9912 TYT
26
E 02
B 9912 TYT
26
PELABUHAN
E 02
B 9912 TYT
27
PELABUHAN
E 02
B 9912 TYT
27
PELABUHAN
E 02
B 9912 TYT
27
PELABUHAN
E 02
B 9912 TYT
27
PELABUHAN
E 02
B 9912 TYT
28
PELABUHAN
E 02
B 9912 TYT
28
BATU BARA
PELABUHAN
E 02
B 9912 TYT
29
BATU BARA
PELABUHAN
E 02
B 9912 TYT
29
PELABUHAN
E 02
B 9912 TYT
29
BATU BARA
PELABUHAN
E 02
B 9912 TYT
29
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
30
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
30
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
30
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
PELABUHAN
E 02
B 9912 TYT
PELABUHAN
E 02
B 9912 TYT
BATU BARA
BUKIT ASAM
E 02
B 9912 TYT
BATU BARA
BUKIT ASAM
E 02
B 9912 TYT
KALIWUNGU
E 02
B 9912 TYT
10
KALIWUNGU
JUMLAH
NO.
NOPOL
LAMBUNG
E 03
B 9914 TYT
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
25
PELABUHAN
E 03
B 9914 TYT
25
PELABUHAN
E 03
B 9914 TYT
26
PELABUHAN
E 03
B 9914 TYT
26
PELABUHAN
E 03
B 9914 TYT
26
PELABUHAN
E 03
B 9914 TYT
26
PELABUHAN
E 03
B 9914 TYT
26
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
27
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
27
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
27
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
28
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
28
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
28
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
29
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
29
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
29
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
30
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
30
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
30
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
30
BROW FIBER
PELABUHAN
E 03
B 9914 TYT
31
PASIR
PELABUHAN
E 03
B 9914 TYT
31
BATU BARA
SAYUNG
E 03
B 9914 TYT
BATU BARA
SAYUNG
E 03
B 9914 TYT
BATU BARA
SAYUNG
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
PELABUHAN
E 03
B 9914 TYT
KALIWUNGU
E 03
B 9914 TYT
10
KALIWUNGU
E 03
B 9914 TYT
13
BUKIT ASAM
BATU BARA
JUMLAH
NO.
NOPOL
LAMBUNG
E 04
H 1757 AQ
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
28
PELABUHAN
E 04
H 1757 AQ
28
PELABUHAN
E 04
H 1757 AQ
28
PELABUHAN
E 04
H 1757 AQ
28
PELABUHAN
E 04
H 1757 AQ
29
PELABUHAN
E 04
H 1757 AQ
29
PELABUHAN
E 04
H 1757 AQ
29
PELABUHAN
E 04
H 1757 AQ
29
PELABUHAN
E 04
H 1757 AQ
29
PELABUHAN
E 04
H 1757 AQ
29
PELABUHAN
E 04
H 1757 AQ
30
PELABUHAN
E 04
H 1757 AQ
30
PELABUHAN
E 04
H 1757 AQ
30
PELABUHAN
E 04
H 1757 AQ
30
PELABUHAN
E 04
H 1757 AQ
30
PELABUHAN
E 04
H 1757 AQ
30
PELABUHAN
E 04
H 1757 AQ
31
PELABUHAN
E 04
H 1757 AQ
31
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
PELABUHAN
E 04
H 1757 AQ
10
KALIWUNGU
E 04
H 1757 AQ
13
BUKIT ASAM
BATU BARA
JUMLAH
NO.
NOPOL
LAMBUNG
E 05
H 1759 AQ
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
25
BATU BARA
PELABUHAN
E 05
H 1759 AQ
26
BATU BARA
PELABUHAN
E 05
H 1759 AQ
26
BATU BARA
KALIWUNGU
E 05
H 1759 AQ
26
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
27
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
27
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
27
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
29
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
29
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
29
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
30
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
30
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
31
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
31
BATU BARA
SAYUNG
E 05
H 1759 AQ
BATU BARA
SAYUNG
E 05
H 1759 AQ
BATU BARA
SAYUNG
E 05
H 1759 AQ
BATU BARA
SAYUNG
E 05
H 1759 AQ
BATU BARA
BUKIT ASAM
E 05
H 1759 AQ
PELABUHAN
E 05
H 1759 AQ
BATU BARA
KALIWUNGU
E 05
H 1759 AQ
KALIWUNGU
E 05
H 1759 AQ
10
KALIWUNGU
E 05
H 1759 AQ
13
BUKIT ASAM
BATU BARA
JUMLAH
NO.
NOPOL
LAMBUNG
E 06
H 1761 AQ
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
27
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
27
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
27
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
29
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
29
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
29
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
31
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
31
E 06
H 1761 AQ
PELABUHAN
E 06
H 1761 AQ
BATU BARA
SAYUNG
E 06
H 1761 AQ
BATU BARA
SAYUNG
E 06
H 1761 AQ
BATU BARA
SAYUNG
E 06
H 1761 AQ
BATU BARA
SAYUNG
E 06
H 1761 AQ
PELABUHAN
E 06
H 1761 AQ
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
10
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
13
BATU BARA
SANGO
JUMLAH
NO.
NOPOL
LAMBUNG
E 07
H 1763 AQ
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
25
PELABUHAN
E 07
H 1763 AQ
25
PELABUHAN
E 07
H 1763 AQ
26
PELABUHAN
E 07
H 1763 AQ
26
PELABUHAN
E 07
H 1763 AQ
26
PELABUHAN
E 07
H 1763 AQ
26
PELABUHAN
E 07
H 1763 AQ
26
PELABUHAN
E 07
H 1763 AQ
26
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
27
PELABUHAN
E 07
H 1763 AQ
28
PELABUHAN
E 07
H 1763 AQ
28
PELABUHAN
E 07
H 1763 AQ
28
PELABUHAN
E 07
H 1763 AQ
28
PELABUHAN
E 07
H 1763 AQ
28
PELABUHAN
E 07
H 1763 AQ
29
PELABUHAN
E 07
H 1763 AQ
29
PELABUHAN
E 07
H 1763 AQ
29
PELABUHAN
E 07
H 1763 AQ
29
PELABUHAN
E 07
H 1763 AQ
29
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
29
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
29
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
30
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
30
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
31
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
31
PELABUHAN
E 07
H 1763 AQ
31
PELABUHAN
E 07
H 1763 AQ
31
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
SAYUNG
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
PELABUHAN
E 07
H 1763 AQ
BATU BARA
BUKIT ASAM
E 07
H 1763 AQ
BATU BARA
BUKIT ASAM
E 07
H 1763 AQ
KALIWUNGU
E 07
H 1763 AQ
10
KALIWUNGU
E 07
H 1763 AQ
13
BUKIT ASAM
BATU BARA
BATU BARA
JUMLAH
NO.
NOPOL
LAMBUNG
E 08
H 1765 AQ
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
25
PELABUHAN
E 08
H 1765 AQ
27
BATU BARA
PELABUHAN
E 08
H 1765 AQ
27
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
PELABUHAN
E 08
H 1765 AQ
28
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
29
PELABUHAN
E 08
H 1765 AQ
30
PELABUHAN
E 08
H 1765 AQ
30
PELABUHAN
E 08
H 1765 AQ
30
PELABUHAN
E 08
H 1765 AQ
30
PELABUHAN
E 08
H 1765 AQ
31
PELABUHAN
E 08
H 1765 AQ
31
PELABUHAN
E 08
H 1765 AQ
31
PELABUHAN
E 08
H 1765 AQ
31
PELABUHAN
E 08
H 1765 AQ
31
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
PELABUHAN
E 08
H 1765 AQ
10
KALIWUNGU
E 08
H 1765 AQ
13
BUKIT ASAM
BATU BARA
JUMLAH
NO.
NOPOL
LAMBUNG
E 09
H 1767 AQ
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
PELABUHAN
E 09
H 1767 AQ
PELABUHAN
E 09
H 1767 AQ
PELABUHAN
E 09
H 1767 AQ
PELABUHAN
E 09
H 1767 AQ
10
KALIWUNGU
E 09
H 1767 AQ
13
BUKIT ASAM
BATU BARA
JUMLAH
LAPORAN
D
B
NO.
NOPOL
LAMBUNG
B 14
H 1766 CW
TGL
BLN
27
THN
CUSTOMER
KOMODITY
MUAT
SAYUNG
B 14
H 1766 CW
31
B 14
H 1766 CW
SAYUNG
B 14
H 1766 CW
SUKABUMI
JUMLAH
NO.
NOPOL
LAMBUNG
B 25
H 1832 DW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
29
TUBAN
B 25
H 1832 DW
31
SUKABUMI
B 25
H 1832 DW
GRESIK
B 25
H 1832 DW
SEMARANG
PUPUK
JUMLAH
NO.
NOPOL
LAMBUNG
B 26
H 1910 DW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
SAYUNG
B 26
H 1910 DW
27
GNG. PUTRI
B 26
H 1910 DW
GRESIK
B 26
H 1910 DW
SAYUNG
B 26
H 1910 DW
GNG. PUTRI
B 26
H 1910 DW
11
SEMARANG
PUPUK
JUMLAH
NO.
NOPOL
LAMBUNG
D 03
H 1846 BW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
30
SEMARANG
D 03
H 1846 BW
31
KEDELE
SEMARANG
D 03
H 1846 BW
SEMEN
SEMARANG
D 03
H 1846 BW
SEMEN
SEMARANG
D 03
H 1846 BW
SEMEN
SEMARANG
D 03
H 1846 BW
KEDELE
SEMARANG
D 03
H 1846 BW
SEMARANG
D 03
H 1846 BW
SEMARANG
D 03
H 1846 BW
KEDELE
SEMARANG
D 03
H 1846 BW
10
SEMARANG
D 03
H 1846 BW
13
SEMARANG
JUMLAH
NO.
NOPOL
LAMBUNG
F 01
H 1831 DW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
31
SURABAYA
F 01
H 1831 DW
KALIWUNGU
F 01
H 1831 DW
BANDUNG
SUSU
JUMLAH
NO.
NOPOL
LAMBUNG
F 02
H 1842 DW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
26
SEMARANG
F 02
H 1842 DW
31
SURABAYA
F 02
H 1842 DW
KALIWUNGU
F 02
H 1842 DW
SUKABUMI
F 02
H 1842 DW
PASURUAN
JUMLAH
NO.
NOPOL
LAMBUNG
F 03
H 1956 DW
TGL
BLN
THN
CUSTOMER
KOMODITY
MUAT
27
PASURUAN
F 03
H 1956 DW
30
SEMARANG
F 03
H 1956 DW
PANDAAN
F 03
H 1956 DW
BEKASI
F 03
H 1956 DW
PASURUAN
JUMLAH
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
KR. ANYAR
25.000
64,000
1,600,000
720,000
50,000
SOLO
25.000
60,000
1,500,000
720,000
50,000
CIKAMPEK
25.000
140,000
3,500,000
1,450,000
100,000
PATI
25.210
150,000
3,781,500
2,070,000
100,000
BOYOLALI
27.000
55,000
1,485,000
570,000
50,000
469,000
11,866,500
5,530,000
350,000
127.210
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SOLO
25.000
60,000
1,500,000
720,000
50,000
SOLO
25.000
60,000
1,500,000
720,000
50,000
CIKAMPEK
25.000
140,000
3,500,000
1,450,000
100,000
SOLO
24.840
160,000
3,974,400
2,300,000
100,000
BOYOLALI
27.000
55,000
1,485,000
570,000
50,000
BOYOLALI
26.000
55,000
1,430,000
560,000
50,000
530,000
13,389,400
6,320,000
400,000
152.840
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SUKABUMI
32.000
188,556
6,033,792
3,285,000
100,000
JEMBER
30.240
269,000
8,134,560
3,850,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
73,500
2,425,500
810,000
50,000
635,056
19,713,852
9,245,000
350,000
125.240
BONGKAR
SERANG
TONASE
33.000
TARIF
165,086
JUMLAH IN
5,447,838
SANGU
2,800,000
PREMI DRIVER
100,000
SEMARANG
30.000
171,000
5,130,000
1,850,000
100,000
CIKAMPEK
33.500
140,000
4,690,000
1,560,000
100,000
JOMBANG
30.000
217,000
6,510,000
3,120,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
797,086
24,897,838
10,630,000
500,000
156.500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SUKABUMI
33.000
188,556
6,222,348
3,455,000
100,000
SURABYA A
30.000
225,000
6,750,000
2,950,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
BEKASI
27.500
140,000
3,850,000
1,780,000
100,000
KUDUS
30.000
186,000
5,580,000
2,120,000
100,000
PURWODADI
45.000
33,000
1,485,000
530,000
50,000
876,556
27,007,348
12,135,000
550,000
195.500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
BANDUNG
30.032
140,000
4,204,480
1,800,000
100,000
MALANG BEJI
0.000
4,700,000
4,700,000
2,700,000
100,000
BATANG
32.000
104,000
3,328,000
1,300,000
100,000
KUNINGAN
30.000
100,000
3,000,000
1,450,000
100,000
PURWODADI
34.000
33,000
1,122,000
550,000
50,000
126.032
5,077,000
16,354,480
7,800,000
450,000
TONASE
TARIF
BONGKAR
JUMLAH IN
SANGU
PREMI DRIVER
CIKAMPEK
30.000
140,000
4,200,000
1,500,000
100,000
SURABAYA
30.160
210,000
6,333,600
2,700,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
CIKAMPEK
33.000
140,000
4,620,000
1,560,000
100,000
KUDUS
30.000
171,000
5,130,000
2,140,000
100,000
PURWODADI
33.000
34,000
1,122,000
530,000
50,000
799,000
24,525,600
9,730,000
550,000
186.160
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SUKABUMI
33.000
188,556
6,222,348
3,455,000
100,000
SURABAYA
30.000
225,000
6,750,000
2,950,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
BREBES
33.000
80,000
2,640,000
1,100,000
50,000
BREBES
33.000
80,000
2,640,000
1,100,000
50,000
677,556
21,372,348
9,905,000
400,000
159.000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
JATAKE JABABEKA
25.000
215,000
5,375,000
3,200,000
100,000
MALANG
30.203
217,000
6,554,051
3,050,000
100,000
180,000
4,500,000
1,900,000
100,000
73,000
2,409,000
1,100,000
50,000
685,000
18,838,051
9,250,000
350,000
BREBES
33.000
113.203
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
KUNINGAN
30.000
100,000
3,000,000
1,450,000
100,000
SURABAYA
0.000
3,900,000
3,900,000
2,350,000
100,000
BOGOR
0.000
6,450,000
6,450,000
2,600,000
100,000
SURABAYA
30.410
225,000
6,842,250
2,950,000
100,000
BATANG
31.000
104,000
3,224,000
1,320,000
100,000
SOLO
33.000
60,000
1,980,000
880,000
50,000
SOLO
33.000
60,000
1,980,000
880,000
50,000
SOLO
33.000
60,000
1,980,000
880,000
50,000
10,959,000
29,356,250
13,310,000
650,000
190.410
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
35.000
35,000
1,225,000
300,000
50,000
CIKAMPEK
35.000
140,000
4,900,000
1,600,000
100,000
SURABAYA
30.000
210,000
6,300,000
2,550,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
CIKAMPEK
33.500
140,000
4,690,000
1,560,000
100,000
PURWOKERTO
30.000
200,000
6,000,000
2,700,000
100,000
829,000
26,235,000
10,010,000
550,000
193.500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SUKABUMI
33.000
188,556
6,222,348
3,305,000
100,000
SEMARANG
30.000
186,000
5,580,000
1,950,000
100,000
CIKAMPE
33.500
140,000
4,690,000
1,560,000
100,000
MADIUN
30.000
217,000
6,510,000
2,940,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
835,556
26,122,348
11,055,000
500,000
156.500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SURABAYA
31.000
25,000
775,000
300,000
50,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
CIKAMPEK
34.000
140,000
4,760,000
1,580,000
100,000
PURWOKERTO
30.000
200,000
6,000,000
2,700,000
100,000
469,000
14,655,000
5,880,000
350,000
125.000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SOLO
20.000
60,000
1,200,000
620,000
50,000
SOLO
20.000
60,000
1,200,000
620,000
50,000
CIKAMPEK
20.000
140,000
2,800,000
1,350,000
100,000
PT. PEPSI
18.120
150,000
2,718,000
1,700,000
100,000
BOYOLALI
20.000
55,000
1,100,000
450,000
50,000
98.120
465,000
9,018,000
4,740,000
350,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
KLATEN
8.000
70,000
560,000
350,000
20,000
PARAKAN
8.000
60,000
480,000
340,000
20,000
MUNTILAN
8.000
70,000
560,000
350,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
65,000
650,000
400,000
20,000
SOLO
10.000
65,000
650,000
400,000
20,000
WONOSARI
8.000
85,000
680,000
450,000
20,000
KLATEN
8.000
65,000
520,000
350,000
20,000
720,000
6,500,000
4,240,000
220,000
100.000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
KALIWUNGU
26.390
18,500
488,215
200,000
20,000
KALIWUNGU
25.120
18,500
464,720
200,000
20,000
KALIWUNGU
25.210
18,500
466,385
200,000
20,000
BATANG
25.390
48,000
1,218,720
600,000
20,000
PATI
17.340
45,000
780,300
450,000
20,000
PATI
18.390
45,000
827,550
450,000
20,000
PATI
20.190
45,000
908,550
450,000
20,000
PATI
17.760
45,000
799,200
450,000
20,000
PATI
19.980
45,000
899,100
450,000
20,000
PATI
19.600
45,000
882,000
450,000
20,000
PATI
18.850
45,000
848,250
450,000
20,000
PATI
18.850
45,000
848,250
450,000
20,000
PATI
19.320
45,000
869,400
450,000
20,000
PATI
20.880
45,000
939,600
450,000
20,000
PATI
19.010
45,000
855,450
450,000
20,000
PATI
20.240
45,000
910,800
450,000
20,000
TOSSA
26.230
19,000
498,370
200,000
20,000
TOSSA
22.890
19,000
434,910
200,000
20,000
TOSSA
28.670
19,000
544,730
200,000
20,000
TOSSA
27.650
19,000
525,350
200,000
20,000
SUKOHARJO
26.880
75,000
2,016,000
850,000
20,000
SRITEX
26.110
67,000
1,749,370
825,000
20,000
SRITEX
25.770
67,000
1,726,590
850,000
20,000
SRITEX
26.610
67,000
1,782,870
850,000
20,000
SRITEX
26.100
67,000
1,748,700
850,000
20,000
SRITEX
27.950
65,000
1,816,750
825,000
20,000
BANTUL
26.170
73,000
1,910,410
925,000
20,000
SOLO
25.680
65,000
1,669,200
825,000
20,000
BANTUL
26.110
73,000
1,906,030
925,000
20,000
BANTUL
26.530
73,000
1,936,690
925,000
20,000
BANTUL
26.560
73,000
1,938,880
925,000
20,000
728.430
1,484,500
35,211,340
16,975,000
620,000
TONASE
TARIF
BONGKAR
JUMLAH IN
SANGU
PREMI DRIVER
BANTUL
25.140
73,000
1,835,220
925,000
20,000
SEMARANG
19.100
70,000
1,337,000
675,000
20,000
CEPIRING
22.990
31,000
712,690
290,000
20,000
CEPIRING
23.820
31,000
738,420
290,000
20,000
CEPIRING
23.310
31,000
722,610
290,000
20,000
CEPIRING
24.110
31,000
747,410
290,000
20,000
CEPIRING
24.800
31,000
768,800
290,000
20,000
CEPIRING
24.130
31,000
748,030
290,000
20,000
JEKULO
25.770
37,000
953,490
425,000
20,000
ENGGAL SUBUR
24.730
37,000
915,010
425,000
20,000
CEPIRING
24.560
31,000
761,360
290,000
20,000
JEKULO
24.570
37,000
909,090
425,000
20,000
PATI
17.630
45,000
793,350
425,000
20,000
PATI
21.110
45,000
949,950
450,000
20,000
PATI
19.300
45,000
868,500
450,000
20,000
PATI
19.880
45,000
894,600
450,000
20,000
SRITEX
24.200
65,000
1,573,000
825,000
20,000
SRITEX
25.760
65,000
1,674,400
825,000
20,000
BANTUL
25.290
73,000
1,846,170
925,000
20,000
BANTUL
27.000
73,000
1,971,000
925,000
20,000
SRITEX SUKOHARJO
25.140
67,000
1,684,380
850,000
20,000
SRITEX SUKOHARJO
25.210
67,000
1,689,070
850,000
20,000
517.550
1,061,000
25,093,550
11,880,000
440,000
TONASE
TARIF
BONGKAR
JUMLAH IN
SANGU
PREMI DRIVER
CPI
18.520
17,000
314,840
135,000
10,000
CPI
18.430
17,000
313,310
135,000
10,000
CPI
17.910
17,000
304,470
135,000
10,000
CPI
17.730
17,000
301,410
135,000
10,000
CPI
18.290
17,000
310,930
135,000
10,000
CPI
18.440
17,000
313,480
135,000
10,000
PATI
17.710
45,000
796,950
450,000
20,000
PATI
18.640
45,000
838,800
450,000
20,000
PATI
16.690
45,000
751,050
450,000
20,000
PATI
16.620
45,000
747,900
450,000
20,000
PATI
18.990
45,000
854,550
450,000
20,000
PATI
18.310
45,000
823,950
450,000
20,000
PATI
18.350
45,000
825,750
450,000
20,000
PATI
19.020
45,000
855,900
450,000
20,000
PATI
19.310
45,000
868,950
450,000
20,000
PATI
19.390
45,000
872,550
450,000
20,000
PATI
18.600
45,000
837,000
450,000
20,000
PATI
19.020
45,000
855,900
450,000
20,000
PATI
19.340
45,000
870,300
450,000
20,000
PATI
18.560
45,000
835,200
450,000
20,000
TOSSA
26.390
19,000
501,410
200,000
20,000
SRITEX
25.450
67,000
1,705,150
825,000
20,000
SRITEX
24.930
67,000
1,670,310
850,000
20,000
SRITEX
26.290
67,000
1,761,430
850,000
20,000
SRITEX
27.320
65,000
1,775,800
825,000
20,000
CEPIRING
23.360
31,000
724,160
290,000
20,000
CEPIRING
22.910
31,000
710,210
290,000
20,000
CEPIRING
24.570
31,000
761,670
290,000
20,000
CEPIRING
24.930
31,000
772,830
290,000
20,000
CEPIRING
24.910
31,000
772,210
290,000
20,000
CEPIRING
24.510
31,000
759,810
290,000
20,000
SRITEX SUKOHARJO
26.620
67,000
1,783,540
850,000
20,000
SRITEX SUKOHARJO
25.690
67,000
1,721,230
850,000
20,000
BANTUL
25.620
73,000
1,870,260
925,000
20,000
721.370
1,410,000
30,783,210
15,025,000
620,000
TONASE
TARIF
BONGKAR
JUMLAH IN
SANGU
PREMI DRIVER
CPI
19.490
17,000
331,330
135,000
10,000
CPI
19.840
17,000
337,280
135,000
10,000
CPI
19.980
17,000
339,660
135,000
10,000
CPI
19.360
17,000
329,120
135,000
10,000
CPI
19.400
17,000
329,800
135,000
10,000
CPI
19.390
17,000
329,630
135,000
10,000
CPI
19.010
17,000
323,170
135,000
10,000
CPI
19.780
17,000
336,260
135,000
10,000
CPI
19.440
17,000
330,480
135,000
10,000
CPI
19.670
17,000
334,390
135,000
10,000
CPI
20.100
17,000
341,700
135,000
10,000
CPI
19.240
17,000
327,080
135,000
10,000
CPI
20.080
17,000
341,360
135,000
10,000
CPI
19.550
17,000
332,350
135,000
10,000
CPI
19.750
17,000
335,750
135,000
10,000
CPI
19.260
17,000
327,420
135,000
10,000
CPI
19.030
17,000
323,510
135,000
10,000
CPI
18.800
17,000
319,600
135,000
10,000
CEPIRING
22.640
31,000
701,840
290,000
20,000
CEPIRING
24.080
31,000
746,480
290,000
20,000
CEPIRING
24.380
31,000
755,780
290,000
20,000
CEPIRING
24.530
31,000
760,430
290,000
20,000
CEPIRING
24.530
31,000
760,430
290,000
20,000
CEPIRING
24.750
31,000
767,250
290,000
20,000
CEPIRING
24.140
31,000
748,340
290,000
20,000
SRITEX SUKOHARJO
24.920
67,000
1,669,640
850,000
20,000
BANTUL
26.140
73,000
1,908,220
925,000
20,000
663,000
14,788,300
6,235,000
360,000
571.280
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
KALIWUNGU
24.840
18,500
459,540
200,000
20,000
KALIWUNGU
24.710
18,500
457,141
200,000
20,000
BATANG
26.610
48,000
1,277,280
600,000
20,000
PATI
17.440
45,000
784,800
450,000
20,000
PATI
18.880
45,000
849,600
450,000
20,000
PATI
17.970
45,000
808,650
450,000
20,000
PATI
18.640
45,000
838,800
450,000
20,000
PATI
20.920
45,000
941,400
450,000
20,000
PATI
18.520
45,000
833,400
450,000
20,000
PATI
19.720
45,000
887,400
450,000
20,000
PATI
20.380
45,000
917,100
450,000
20,000
PATI
18.850
45,000
848,250
450,000
20,000
PATI
16.450
45,000
740,250
450,000
20,000
PATI
18.140
45,000
816,300
450,000
20,000
PATI
19.230
45,000
865,350
450,000
20,000
PATI
20.440
45,000
919,800
450,000
20,000
PATI
19.440
45,000
874,800
450,000
20,000
SRITEX
26.130
67,000
1,750,710
825,000
20,000
SRITEX
26.320
67,000
1,763,440
825,000
20,000
SRITEX
25.760
67,000
1,725,920
825,000
20,000
SRITEX SUKOHARJO
26.200
67,000
1,755,400
850,000
20,000
BANTUL
26.270
73,000
1,917,710
925,000
20,000
CEPIRING
24.230
31,000
751,130
290,000
20,000
BATAMTEX
24.130
35,000
844,550
350,000
20,000
SRITEX SUKOHARJO
25.910
67,000
1,735,970
850,000
20,000
SRITEX SUKOHARJO
25.480
67,000
1,707,160
850,000
20,000
BANTUL
25.720
73,000
1,877,560
925,000
20,000
597.330
1,329,000
29,949,411
14,815,000
540,000
TONASE
TARIF
BONGKAR
JUMLAH IN
SANGU
PREMI DRIVER
PATI
18.160
45,000
817,200
450,000
20,000
PATI
15.900
45,000
715,500
450,000
20,000
PATI
17.970
45,000
808,650
450,000
20,000
PATI
16.970
45,000
763,650
450,000
20,000
PATI
18.250
45,000
821,250
450,000
20,000
PATI
18.030
45,000
811,350
450,000
20,000
PATI
19.660
45,000
884,700
450,000
20,000
PATI
18.500
45,000
832,500
450,000
20,000
PATI
19.610
45,000
882,450
450,000
20,000
PATI
18.990
45,000
854,550
450,000
20,000
PATI
18.630
45,000
838,350
450,000
20,000
PATI
20.420
45,000
918,900
450,000
20,000
PATI
20.350
45,000
915,750
450,000
20,000
PATI
19.910
45,000
895,950
450,000
20,000
PATI
19.000
45,000
855,000
450,000
20,000
PATI
17.880
45,000
804,600
450,000
20,000
SRITEX
27.570
75,000
2,067,750
850,000
20,000
SANGO
26.180
17,000
445,060
175,000
20,000
SRITEX
25.810
67,000
1,729,270
825,000
20,000
SRITEX
25.870
67,000
1,733,290
850,000
20,000
SRITEX
26.390
67,000
1,768,130
850,000
20,000
SRITEX
26.360
67,000
1,766,120
850,000
20,000
SRITEX
27.920
65,000
1,814,800
825,000
20,000
BANTUL
26.100
73,000
1,905,300
925,000
20,000
BANTUL
25.740
73,000
1,879,020
925,000
20,000
BANTUL
25.860
73,000
1,887,780
925,000
20,000
BANTUL
26.450
73,000
1,930,850
925,000
20,000
BANTUL
25.380
73,000
1,852,740
925,000
20,000
APAC INTI
BONGKAR
25.940
34,000
881,960
385,000
20,000
639.800
1,544,000
35,082,420
17,435,000
580,000
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
CPI
18.310
17,000
311,270
135,000
10,000
CPI
17.980
17,000
305,660
135,000
10,000
CPI
18.280
17,000
310,760
135,000
10,000
CPI
18.300
17,000
311,100
135,000
10,000
CPI
18.610
17,000
316,370
135,000
10,000
CPI
18.250
17,000
310,250
135,000
10,000
CPI
17.990
17,000
305,830
135,000
10,000
CPI
17.510
17,000
297,670
135,000
10,000
CPI
18.000
17,000
306,000
135,000
10,000
CPI
18.840
17,000
320,280
135,000
10,000
CPI
19.730
17,000
335,410
135,000
10,000
CPI
19.790
17,000
336,430
135,000
10,000
CPI
19.850
17,000
337,450
135,000
10,000
CPI
19.770
17,000
336,090
135,000
10,000
CPI
28.710
17,000
488,070
135,000
10,000
CPI
19.660
17,000
334,220
135,000
10,000
CPI
19.500
17,000
331,500
135,000
10,000
CPI
19.010
17,000
323,170
135,000
10,000
CPI
19.180
17,000
326,060
135,000
10,000
CPI
19.970
17,000
339,490
135,000
10,000
CPI
20.000
17,000
340,000
135,000
10,000
CPI
20.070
17,000
341,190
135,000
10,000
CPI
18.600
17,000
316,200
135,000
10,000
CPI
20.020
17,000
340,340
135,000
10,000
CPI
19.730
17,000
335,410
135,000
10,000
CPI
19.850
17,000
337,450
135,000
10,000
PATI
19.850
45,000
893,250
450,000
20,000
PATI
19.030
45,000
856,350
450,000
20,000
PATI
19.700
45,000
886,500
450,000
20,000
PATI
18.390
45,000
827,550
450,000
20,000
PATI
21.110
45,000
949,950
450,000
20,000
PATI
19.730
45,000
887,850
450,000
20,000
SANGO
25.560
17,000
434,520
175,000
20,000
SANGO
27.000
17,000
459,000
175,000
20,000
SANGO
25.180
17,000
428,060
175,000
20,000
SANGO
25.300
17,000
430,100
175,000
20,000
SANGO
25.360
17,000
431,120
175,000
20,000
SANGO
26.480
17,000
450,160
175,000
20,000
KALIWUNGU
24.390
18,500
451,215
200,000
20,000
KALIWUNGU
25.970
18,500
480,445
200,000
20,000
APAC INTI
26.790
34,000
910,860
360,000
20,000
SRITEX
25.650
65,000
1,667,250
825,000
20,000
SRITEX
24.900
65,000
1,618,500
825,000
20,000
SRITEX
26.300
67,000
1,762,100
850,000
20,000
SRITEX
29.510
65,000
1,918,150
825,000
20,000
SRITEX
26.720
65,000
1,736,800
825,000
20,000
BANTUL
26.030
73,000
1,900,190
925,000
20,000
BANTUL
26.270
73,000
1,917,710
925,000
20,000
SRITEX SUKOHARJO
25.060
67,000
1,679,020
850,000
20,000
SRITEX SUKOHARJO
25.470
67,000
1,706,490
850,000
20,000
BANTUL
27.080
73,000
1,976,840
925,000
20,000
1,565,000
36,253,650
16,645,000
760,000
1,118.340
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
CPI
19.080
17,000
324,360
135,000
10,000
SAYUNG
20.620
12,500
257,750
140,000
10,000
SAYUNG
21.170
12,500
264,625
140,000
10,000
SAYUNG
25.190
12,500
314,875
140,000
10,000
SAYUNG
25.190
12,500
314,875
140,000
10,000
SAYUNG
24.690
12,500
308,625
140,000
10,000
SAYUNG
25.680
12,500
321,000
140,000
10,000
SAYUNG
25.340
12,500
316,750
140,000
10,000
CEPIRING
24.320
31,000
753,920
290,000
20,000
CEPIRING
24.580
31,000
761,980
290,000
20,000
CEPIRING
24.810
31,000
769,110
290,000
20,000
CEPIRING
24.370
31,000
755,470
290,000
20,000
CEPIRING
23.970
31,000
743,070
290,000
20,000
CPI
19.820
17,000
336,940
135,000
10,000
CPI
19.140
17,000
325,380
135,000
10,000
CPI
19.690
17,000
334,730
135,000
10,000
CPI
20.080
17,000
341,360
135,000
10,000
CPI
19.450
17,000
330,650
135,000
10,000
CPI
19.390
17,000
329,630
135,000
10,000
CPI
19.590
17,000
333,030
135,000
10,000
CPI
20.220
17,000
343,740
135,000
10,000
CPI
19.260
17,000
327,420
135,000
10,000
CPI
20.360
17,000
346,120
135,000
10,000
CPI
19.720
17,000
335,240
135,000
10,000
CPI
19.340
17,000
328,780
135,000
10,000
SANGO
29.000
17,000
493,000
175,000
20,000
SANGO
26.340
17,000
447,780
175,000
20,000
SANGO
24.480
17,000
416,160
175,000
20,000
SANGO
26.640
17,000
452,880
175,000
20,000
KALIWUNGU
24.700
18,500
456,950
200,000
20,000
KALIWUNGU
26.050
18,500
481,925
200,000
20,000
KALIWUNGU
26.360
34,000
896,240
360,000
20,000
KALIWUNGU
26.420
18,500
488,770
200,000
20,000
KALIWUNGU
26.700
18,500
493,950
200,000
20,000
KALIWUNGU
26.200
18,500
484,700
200,000
20,000
KALIWUNGU
23.850
18,500
441,225
200,000
20,000
KALIWUNGU
24.890
18,500
460,465
200,000
20,000
KALIWUNGU
25.190
18,500
466,015
200,000
20,000
APAC INTI
24.670
18,500
456,395
200,000
20,000
CEPIRING
23.230
31,000
720,130
290,000
20,000
CEPIRING
23.760
31,000
736,560
290,000
20,000
CEPIRING
24.150
31,000
748,650
290,000
20,000
CEPIRING
23.940
31,000
742,140
290,000
20,000
CEPIRING
24.630
31,000
763,530
290,000
20,000
CEPIRING
24.030
31,000
744,930
290,000
20,000
CEPIRING
23.170
31,000
718,270
290,000
20,000
SRITEX SUKOHARJO
26.870
67,000
1,800,290
850,000
20,000
BANTUL
26.420
73,000
1,928,660
925,000
20,000
1,089,000
26,059,045
10,850,000
760,000
1,126.760
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
CEPIRING
24.750
31,000
767,250
290,000
20,000
CEPIRING
23.950
31,000
742,450
290,000
20,000
CEPIRING
23.930
31,000
741,830
290,000
20,000
CEPIRING
23.900
31,000
740,900
290,000
20,000
SRITEX SUKOHARJO
25.810
67,000
1,729,270
850,000
20,000
PALUR
25.290
70,000
1,770,300
750,000
20,000
261,000
6,492,000
2,760,000
120,000
147.630
OMZET
COST OPER
529,564,941
529,564
LAPORAN PERGERAKAN UNIT TRONTON
DIVISI TRUCKING PT. KPN
BULAN AGUSTUS 2012
BONGKAR
CIKAMPEK
TONASE
35.000
TARIF
140,000
JUMLAH IN
4,900,000
SANGU
1,600,000
PREMI DRIVER
100,000
SOLO
30.110
170,000
5,118,700
2,400,000
100,000
CIKAMPEK
33.500
140,000
4,690,000
1,560,000
100,000
SEMARANG
30.000
186,000
5,580,000
2,030,000
100,000
636,000
20,288,700
7,590,000
400,000
128.610
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
BOGOR
33.000
163,614
5,399,262
2,720,000
100,000
SURABAYA
30.428
225,000
6,846,300
2,950,000
100,000
BATANG
30.000
104,000
3,120,000
1,340,000
100,000
BREBES
34.000
80,000
2,720,000
1,100,000
50,000
572,614
18,085,562
8,110,000
350,000
127.428
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
CIKAMPEK
30.000
140,000
4,200,000
1,500,000
100,000
SURABAYA
30.075
210,000
6,315,750
2,650,000
100,000
BATANG
30.000
104,000
3,120,000
1,300,000
100,000
CIKAMPEK
34.000
140,000
4,760,000
1,580,000
100,000
PEKALONGAN
30.000
162,000
4,860,000
1,840,000
100,000
TEGAL
34.000
83,000
2,822,000
830,000
50,000
839,000
26,077,750
9,700,000
550,000
188.075
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PEKALONGAN
8.000
65,000
520,000
325,000
20,000
WONOSARI
8.000
85,000
680,000
450,000
20,000
SOLO
9.000
60,000
540,000
375,000
20,000
SOLO
9.000
60,000
540,000
375,000
20,000
SOLO
9.000
60,000
540,000
375,000
20,000
KUDUS
8.500
55,000
467,500
250,000
20,000
PEKALONGAN
8.000
65,000
520,000
325,000
20,000
SOLO
9.050
65,000
588,250
375,000
20,000
KUTOARJO
8.000
90,000
720,000
475,000
20,000
PURWOREJO
8.000
75,000
600,000
425,000
20,000
PARAKAN
8.000
60,000
480,000
340,000
20,000
740,000
6,195,750
4,090,000
220,000
92.550
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SEMARANG
30.000
110,000
3,300,000
1,150,000
100,000
BANDUNG
14.343
160,000
2,294,880
1,500,000
100,000
PEKALONGAN SEMARANG
0.000
2,750,000
2,750,000
1,500,000
100,000
44.343
3,020,000
8,344,880
4,150,000
300,000
TONASE
TARIF
BONGKAR
SURABAYA
JUMLAH IN
SANGU
PREMI DRIVER
23.000
110,000
2,530,000
1,150,000
100,000
180,000
4,500,000
1,800,000
100,000
BANDUNG
15.419
160,000
2,467,040
1,500,000
100,000
SURABAYA
30.000
225,000
6,750,000
2,850,000
100,000
MAGELANG
30.000
165,000
4,950,000
1,850,000
100,000
840,000
21,197,040
9,150,000
500,000
123.419
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
SEMARANG
30.000
130,000
3,900,000
1,450,000
100,000
SURABAYA
23.000
110,000
2,530,000
1,150,000
100,000
JABABEKA
25.000
210,000
5,250,000
2,950,000
100,000
SURABAYA
30.000
210,000
6,300,000
2,550,000
100,000
MAGELANG
30.000
165,000
4,950,000
1,850,000
100,000
825,000
22,930,000
9,950,000
500,000
138.000
OMZET
COST OPER
OMZET
COST OPER
123,119,682
OMZET ALL
COST OPERAT
652,684,623
#REF!
10,000
JUMLAH
OUT
780,000
820,000
10,000
780,000
720,000
PREMI KERNET
UM/ LEMBUR
KET
R/L
15,000
15,000
10,000
60,000
630,000
350,000
855,000
0 ####### #######
10,000
JUMLAH
OUT
780,000
720,000
10,000
780,000
720,000
PREMI KERNET
UM/ LEMBUR
KET
R/L
15,000
15,000
10,000
72,000 LEMBUR
10,000
70,000
PREMI KERNET
15,000
15,000
422,000
702,000
783,000
620,000
810,000
0 ####### #######
JUMLAH
R/L
OUT
200,000 NGOSONG 3,600,000 2,433,792
UM/ LEMBUR
KET
50,000 MUAT
4,015,000 4,119,560
15,000
1,415,000 1,705,000
10,000
870,000 1,555,500
55,000
PREMI KERNET
15,000
250,000
0 ####### #######
JUMLAH
R/L
OUT
200,000 NGOSONG 3,115,000 2,332,838
UM/ LEMBUR
KET
15,000
350,000
NGOSONG+MUAT 2,315,000 2,815,000
15,000
15,000
180,000
NGOSONG +MUAT 3,415,000 3,095,000
15,000
1,415,000 1,705,000
75,000
PREMI KERNET
15,000
15,000
1,065,000
0 ####### #######
JUMLAH
R/L
OUT
200,000 NGOSONG 3,770,000 2,452,348
UM/ LEMBUR
50,000
KET
15,000
1,415,000 1,705,000
15,000
1,895,000 1,955,000
15,000
250,000
NGOSONG+MUAT 2,485,000 3,095,000
10,000
85,000
590,000
500,000
895,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
50,000 BONGKAR 1,965,000 2,239,480
15,000
15,000
1,415,000 1,913,000
15,000
1,565,000 1,435,000
PREMI KERNET
UM/ LEMBUR
KET
10,000
70,000
610,000
100,000
512,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
300,000 BONGKAR 1,915,000 2,285,000
15,000
15,000
1,415,000 1,705,000
15,000
15,000
180,000
NGOSONG+MUAT 2,435,000 2,695,000
PREMI KERNET
UM/ LEMBUR
10,000
85,000
KET
590,000
910,000
532,000
0 ####### #######
PREMI KERNET
15,000
15,000
JUMLAH
R/L
OUT
200,000 NGOSONG 3,770,000 2,452,348
UM/ LEMBUR
50,000
KET
15,000
1,415,000 1,705,000
10,000
1,160,000 1,480,000
10,000
1,160,000 1,480,000
65,000
250,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
3,315,000 2,060,000
15,000
250,000
NGOSONG +muat 3,415,000 3,139,051
15,000
2,015,000 2,485,000
10,000
1,160,000 1,249,000
PREMI KERNET
55,000
UM/ LEMBUR
KET
250,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
1,565,000 1,435,000
15,000
15,000
2,715,000 3,735,000
PREMI KERNET
15,000
UM/ LEMBUR
50,000
KET
15,000
1,435,000 1,789,000
10,000
940,000 1,040,000
10,000
940,000 1,040,000
10,000
940,000 1,040,000
105,000
PREMI KERNET
10,000
15,000
150,000
UM/ LEMBUR
0 ####### #######
KET
JUMLAH
OUT
360,000
R/L
865,000
15,000
2,665,000 3,635,000
15,000
1,415,000 1,705,000
15,000
331,000 bongkar
2,006,000 2,684,000
15,000
200,000 ngosong
3,015,000 2,985,000
85,000
876,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
200,000 NGOSONG 3,620,000 2,602,348
15,000
2,065,000 3,515,000
PREMI KERNET
UM/ LEMBUR
KET
15,000
335,000 bongkar
15,000
15,000
1,415,000 1,705,000
75,000
715,000
2,010,000 2,680,000
0 ####### #######
10,000
JUMLAH
OUT
360,000
15,000
1,415,000 1,705,000
PREMI KERNET
UM/ LEMBUR
KET
R/L
415,000
15,000
335,000 bongkar
2,030,000 2,730,000
15,000
200,000 ngosong
3,015,000 2,985,000
55,000
0 ####### #######
JUMLAH
OUT
670,000
530,000
670,000
530,000
PREMI KERNET
UM/ LEMBUR
KET
200,000 bongkar
R/L
1,650,000 1,150,000
843,000
500,000
600,000
PREMI KERNET
535,000
275,000
UM/ LEMBUR
0 ####### #######
KET
JUMLAH
OUT
R/L
370,000
190,000
360,000
120,000
370,000
190,000
420,000
180,000
420,000
180,000
420,000
180,000
420,000
180,000
420,000
230,000
420,000
230,000
470,000
210,000
370,000
150,000
0 ####### #######
5,000
JUMLAH
OUT
225,000
263,215
5,000
225,000
239,720
5,000
225,000
241,385
5,000
625,000
593,720
5,000
475,000
305,300
5,000
475,000
352,550
5,000
475,000
433,550
5,000
475,000
324,200
5,000
475,000
424,100
5,000
475,000
407,000
5,000
475,000
373,250
5,000
475,000
373,250
5,000
475,000
394,400
5,000
475,000
464,600
5,000
475,000
380,450
5,000
475,000
435,800
5,000
225,000
273,370
5,000
225,000
209,910
5,000
225,000
319,730
PREMI KERNET
UM/ LEMBUR
KET
R/L
5,000
225,000
5,000
875,000 1,141,000
5,000
850,000
899,370
5,000
875,000
851,590
5,000
875,000
907,870
5,000
875,000
873,700
5,000
850,000
966,750
5,000
950,000
960,410
5,000
850,000
819,200
5,000
950,000
956,030
5,000
950,000
986,690
5,000
950,000
988,880
155,000
300,350
0 ####### #######
5,000
JUMLAH
OUT
950,000
885,220
5,000
700,000
637,000
5,000
315,000
397,690
5,000
315,000
423,420
5,000
315,000
407,610
5,000
315,000
432,410
5,000
315,000
453,800
5,000
315,000
433,030
5,000
450,000
503,490
5,000
450,000
465,010
5,000
315,000
446,360
5,000
450,000
459,090
5,000
450,000
343,350
5,000
475,000
474,950
5,000
475,000
393,500
5,000
475,000
419,600
5,000
850,000
723,000
5,000
850,000
824,400
PREMI KERNET
UM/ LEMBUR
KET
R/L
5,000
950,000
5,000
950,000 1,021,000
5,000
875,000
809,380
5,000
875,000
814,070
110,000
896,170
0 ####### #######
5,000
PAS
JUMLAH
OUT
150,000
5,000
PAS
150,000
163,310
5,000
PAS
150,000
154,470
5,000
PAS
150,000
151,410
5,000
PAS
150,000
160,930
5,000
PAS
150,000
163,480
5,000
475,000
321,950
5,000
475,000
363,800
5,000
475,000
276,050
5,000
475,000
272,900
5,000
475,000
379,550
5,000
475,000
348,950
5,000
475,000
350,750
5,000
475,000
380,900
5,000
475,000
393,950
5,000
475,000
397,550
5,000
475,000
362,000
5,000
475,000
380,900
5,000
475,000
395,300
5,000
475,000
360,200
5,000
225,000
276,410
5,000
850,000
855,150
5,000
875,000
795,310
5,000
875,000
886,430
5,000
850,000
925,800
5,000
315,000
409,160
PREMI KERNET
UM/ LEMBUR
KET
R/L
164,840
5,000
315,000
395,210
5,000
315,000
446,670
5,000
315,000
457,830
5,000
315,000
457,210
5,000
315,000
444,810
5,000
875,000
908,540
5,000
875,000
846,230
5,000
950,000
920,260
140,000
30,000
0 ####### #######
5,000PAS PLBHN
JUMLAH
OUT
150,000
5,000PAS PLBHN
150,000
187,280
5,000PAS PLBHN
150,000
189,660
5,000PAS PLBHN
150,000
179,120
5,000PAS PLBHN
150,000
179,800
5,000PAS PLBHN
150,000
179,630
5,000PAS PLBHN
150,000
173,170
5,000PAS PLBHN
150,000
186,260
5,000PAS PLBHN
150,000
180,480
5,000PAS PLBHN
150,000
184,390
5,000PAS PLBHN
150,000
191,700
5,000PAS PLBHN
150,000
177,080
5,000PAS PLBHN
150,000
191,360
5,000PAS PLBHN
150,000
182,350
5,000PAS PLBHN
150,000
185,750
5,000PAS PLBHN
150,000
177,420
5,000PAS PLBHN
150,000
173,510
5,000PAS PLBHN
150,000
169,600
5,000
315,000
386,840
5,000
315,000
431,480
5,000
315,000
440,780
5,000
315,000
445,430
PREMI KERNET
UM/ LEMBUR
KET
R/L
181,330
5,000
315,000
445,430
5,000
315,000
452,250
5,000
315,000
433,340
5,000
875,000
794,640
5,000
950,000
958,220
45,000
90,000
0 ####### #######
5,000
JUMLAH
OUT
225,000
234,540
5,000
225,000
232,141
5,000
625,000
652,280
5,000
475,000
309,800
5,000
475,000
374,600
5,000
475,000
333,650
5,000
475,000
363,800
5,000
475,000
466,400
5,000
475,000
358,400
5,000
475,000
412,400
5,000
475,000
442,100
5,000
475,000
373,250
5,000
475,000
265,250
5,000
475,000
341,300
5,000
475,000
390,350
5,000
475,000
444,800
5,000
475,000
399,800
5,000
850,000
900,710
5,000
850,000
913,440
5,000
850,000
875,920
5,000
875,000
880,400
5,000
950,000
967,710
5,000
315,000
436,130
5,000
375,000
469,550
5,000
875,000
860,970
PREMI KERNET
UM/ LEMBUR
KET
R/L
5,000
875,000
832,160
5,000
950,000
927,560
135,000
0 ####### #######
5,000
JUMLAH
OUT
475,000
342,200
5,000
475,000
240,500
5,000
475,000
333,650
5,000
475,000
288,650
5,000
475,000
346,250
5,000
475,000
336,350
5,000
475,000
409,700
5,000
475,000
357,500
5,000
475,000
407,450
5,000
475,000
379,550
5,000
475,000
363,350
5,000
475,000
443,900
5,000
475,000
440,750
5,000
475,000
420,950
5,000
475,000
380,000
5,000
475,000
329,600
5,000
875,000 1,192,750
5,000
200,000
245,060
5,000
850,000
879,270
5,000
875,000
858,290
5,000
875,000
893,130
5,000
875,000
891,120
5,000
850,000
964,800
5,000
950,000
955,300
5,000
950,000
929,020
5,000
950,000
937,780
5,000
950,000
980,850
5,000
950,000
902,740
PREMI KERNET
UM/ LEMBUR
KET
R/L
5,000
410,000
145,000
471,960
0 ####### #######
5,000PAS PLBHN
JUMLAH
OUT
150,000
5,000PAS PLBHN
150,000
155,660
5,000PAS PLBHN
150,000
160,760
5,000PAS PLBHN
150,000
161,100
5,000PAS PLBHN
150,000
166,370
5,000PAS PLBHN
150,000
160,250
5,000PAS PLBHN
150,000
155,830
5,000PAS PLBHN
150,000
147,670
5,000PAS PLBHN
150,000
156,000
5,000PAS PLBHN
150,000
170,280
5,000PAS PLBHN
150,000
185,410
5,000PAS PLBHN
150,000
186,430
5,000PAS PLBHN
150,000
187,450
5,000PAS PLBHN
150,000
186,090
5,000PAS PLBHN
150,000
338,070
5,000PAS PLBHN
150,000
184,220
5,000PAS PLBHN
150,000
181,500
5,000PAS PLBHN
150,000
173,170
5,000PAS PLBHN
150,000
176,060
5,000PAS PLBHN
150,000
189,490
5,000PAS PLBHN
150,000
190,000
5,000PAS PLBHN
150,000
191,190
5,000PAS PLBHN
150,000
166,200
5,000PAS PLBHN
150,000
190,340
5,000PAS PLBHN
150,000
185,410
5,000PAS PLBHN
150,000
187,450
5,000
475,000
418,250
5,000
475,000
381,350
5,000
475,000
411,500
PREMI KERNET
UM/ LEMBUR
KET
R/L
161,270
5,000
475,000
352,550
5,000
475,000
474,950
5,000
475,000
412,850
5,000
200,000
234,520
5,000
200,000
259,000
5,000
200,000
228,060
5,000
200,000
230,100
5,000
200,000
231,120
5,000
200,000
250,160
5,000
225,000
226,215
5,000
225,000
255,445
5,000
385,000
525,860
5,000
850,000
817,250
5,000
850,000
768,500
5,000
875,000
887,100
5,000
850,000 1,068,150
5,000
850,000
886,800
5,000
950,000
950,190
5,000
950,000
967,710
5,000
875,000
804,020
5,000
875,000
831,490
5,000
950,000 1,026,840
125,000
130,000
0 ####### #######
JUMLAH
OUT
150,000
174,360
150,000
107,750
150,000
114,625
150,000
164,875
150,000
164,875
150,000
158,625
150,000
171,000
PREMI KERNET
UM/ LEMBUR
0
KET
5,000PAS PLBHN
R/L
150,000
166,750
5,000
315,000
438,920
5,000
315,000
446,980
5,000
315,000
454,110
5,000
315,000
440,470
5,000
315,000
428,070
5,000PAS PLBHN
150,000
186,940
5,000PAS PLBHN
150,000
175,380
5,000PAS PLBHN
150,000
184,730
5,000PAS PLBHN
150,000
191,360
5,000PAS PLBHN
150,000
180,650
5,000PAS PLBHN
150,000
179,630
5,000PAS PLBHN
150,000
183,030
5,000PAS PLBHN
150,000
193,740
5,000PAS PLBHN
150,000
177,420
5,000PAS PLBHN
150,000
196,120
5,000PAS PLBHN
150,000
185,240
5,000PAS PLBHN
150,000
178,780
5,000
5,000PAS PLBHN
205,000
288,000
5,000
200,000
247,780
5,000
200,000
216,160
5,000
200,000
252,880
5,000
225,000
231,950
5,000
225,000
256,925
5,000
385,000
511,240
5,000
225,000
263,770
5,000
225,000
268,950
5,000
225,000
259,700
5,000
225,000
216,225
5,000
225,000
235,465
5,000
225,000
241,015
5,000
225,000
231,395
5,000
315,000
405,130
5,000
315,000
421,560
5,000
315,000
433,650
5,000
315,000
427,140
5,000
315,000
448,530
5,000
315,000
429,930
5,000
315,000
403,270
5,000
875,000
925,290
5,000
950,000
978,660
140,000
70,000
0 ####### #######
5,000
JUMLAH
OUT
315,000
452,250
5,000
315,000
427,450
5,000
315,000
426,830
5,000
315,000
425,900
5,000
875,000
854,270
5,000
775,000
995,300
PREMI KERNET
UM/ LEMBUR
30,000
KET
COST OPERATION
R/L
0 ####### #######
GROOS PROFIT
262,653,000
266,911,941
529,564,941
PREMI KERNET
15,000
JUMLAH
R/L
OUT
345,000 BONGKAR 2,060,000 2,840,000
UM/ LEMBUR
KET
15,000
15,000
331,000
15,000
50,000
60,000
826,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
200,000 NGOSONG 3,035,000 2,364,262
15,000
250,000
NGOSONG+MUAT 3,315,000 3,531,300
15,000
1,455,000 1,665,000
10,000
1,160,000 1,560,000
PREMI KERNET
UM/ LEMBUR
55,000
KET
450,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
300,000 BONGKAR 1,915,000 2,285,000
15,000
150,000
NGOSONG+MUAT 2,915,000 3,400,750
15,000
1,415,000 1,705,000
PREMI KERNET
UM/ LEMBUR
KET
15,000
335,000
15,000
180,000
ngosong+muat 2,135,000 2,725,000
10,000
890,000 1,932,000
85,000
965,000
0 ####### #######
JUMLAH
OUT
345,000
175,000
470,000
210,000
395,000
145,000
395,000
145,000
395,000
145,000
270,000
197,500
345,000
175,000
395,000
193,250
PREMI KERNET
UM/ LEMBUR
KET
R/L
495,000
225,000
445,000
155,000
360,000
120,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
1,265,000 2,035,000
15,000
1,615,000
15,000
1,615,000 1,135,000
PREMI KERNET
UM/ LEMBUR
45,000
KET
679,880
0 ####### #######
15,000
JUMLAH
R/L
OUT
1,265,000 1,265,000
15,000
1,915,000 2,585,000
15,000
1,615,000
PREMI KERNET
UM/ LEMBUR
KET
852,040
15,000
15,000
100,000
75,000
400,000
0 ####### #######
15,000
JUMLAH
R/L
OUT
100,000 NGOSONG 1,665,000 2,235,000
15,000
1,265,000 1,265,000
15,000
15,000
2,665,000 3,635,000
15,000
PREMI KERNET
UM/ LEMBUR
75,000
COST OPERATION
300,000
KET
0 ####### #######
GROOS PROFIT
COST OPERATION
58,896,000
GROOS PROFIT
64,223,682
64,
652,
321,549,000
#REF!
331,135,623
64,223,682
652,684,623
REKA
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 17
H 1985 EY
26
2012
KOMODITY
KAYU
MUAT
PC. GADING
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 09
H 1767 AQ
13
2012
KOMODITY
BATU BARA
MUAT
BUKIT ASAM
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
D 03
H 1846 BW
2012
KOMODITY
KEDELE
MUAT
SEMARANG
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 01
B 9909 TYT
2012
BATU BARA
PELABUHAN
E 02
B 9912 TYT
2012
BATU BARA
PELABUHAN
E 02
B 9912 TYT
2012
BATU BARA
PELABUHAN
E 02
B 9912 TYT
2012
BATU BARA
KALIWUNGU
E 02
B 9912 TYT
10
2012
BATU BARA
KALIWUNGU
E 03
B 9914 TYT
2012
BATU BARA
PELABUHAN
E 03
B 9914 TYT
2012
BATU BARA
KALIWUNGU
E 03
B 9914 TYT
10
2012
BATU BARA
KALIWUNGU
E 04
H 1757 AQ
10
2012
BATU BARA
KALIWUNGU
E 05
H 1759 AQ
2012
BATU BARA
KALIWUNGU
E 05
H 1759 AQ
10
2012
BATU BARA
KALIWUNGU
E 06
H 1761 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
KALIWUNGU
E 07
H 1763 AQ
10
2012
BATU BARA
KALIWUNGU
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
KOMODITY
MUAT
E 08
H 1765 AQ
10
2012
BATU BARA
KALIWUNGU
E 09
H 1767 AQ
10
2012
BATU BARA
KALIWUNGU
JUMLAH
REKAP
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 22
H 1958 GY
26
2012
KOMODITY
PUPUK
MUAT
MRANGGEN
JUMLAH
REKA
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 24
H 1761 AW
30
2012
KOMODITY
BESI
MUAT
WARU
JUMLAH
REKA
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 02
B 9912 TYT
26
2012
JUMLAH
KOMODITY
PASIR
MUAT
SALAM
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 01
H 1937 BW
27
2012
KOMODITY
MUAT
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
D 03
H 1846 BW
30
2012
KEDELE
SEMARANG
D 03
H 1846 BW
2012
KEDELE
SEMARANG
KOMODITY
MUAT
JUMLAH
REKAP
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 01
B 9909 TYT
2012
KOMODITY
BATU BARA
MUAT
PELABUHAN
JUMLAH
REKAP KER
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
F 01
H 1831 DW
2012
BENANG
KALIWUNGU
F 02
H 1842 DW
2012
BENANG
KALIWUNGU
KOMODITY
MUAT
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 01
B 9909 TYT
2012
BATU BARA
BUKIT ASAM
E 01
B 9909 TYT
2012
BATU BARA
BUKIT ASAM
E 01
B 9909 TYT
2012
BATU BARA
BUKIT ASAM
E 01
B 9909 TYT
10
2012
BATU BARA
BUKIT ASAM
E 02
B 9912 TYT
25
2012
BATU BARA
BUKIT ASAM
E 02
B 9912 TYT
2012
BATU BARA
BUKIT ASAM
E 02
B 9912 TYT
2012
BATU BARA
BUKIT ASAM
E 03
B 9914 TYT
13
2012
BATU BARA
BUKIT ASAM
E 04
H 1757 AQ
13
2012
BATU BARA
BUKIT ASAM
E 05
H 1759 AQ
2012
BATU BARA
BUKIT ASAM
E 05
H 1759 AQ
13
2012
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
2012
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
2012
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
2012
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
2012
BATU BARA
BUKIT ASAM
E 06
H 1761 AQ
10
2012
BATU BARA
BUKIT ASAM
E 07
H 1763 AQ
2012
BATU BARA
BUKIT ASAM
E 07
H 1763 AQ
2012
BATU BARA
BUKIT ASAM
KOMODITY
MUAT
E 07
H 1763 AQ
13
2012
BATU BARA
BUKIT ASAM
E 08
H 1765 AQ
13
2012
BATU BARA
BUKIT ASAM
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 01
H 1937 BW
2012
PUPUK
SAYUNG
B 05
H 1911 DY
2012
PUPUK
SAYUNG
B 14
H 1766 CW
27
2012
PUPUK
SAYUNG
B 14
H 1766 CW
2012
PUPUK
SAYUNG
B 15
H 1897 EY
2012
PUPUK
SAYUNG
B 18
H 1824 FY
26
2012
PUPUK
SAYUNG
B 18
H 1824 FY
2012
PUPUK
SAYUNG
B 22
H 1958 GY
27
2012
PUPUK
SAYUNG
B 22
H 1958 GY
2012
PUPUK
SAYUNG
B 23
H 1760 AW
2012
PUPUK
SAYUNG
B 24
H 1761 AW
2012
PUPUK
SAYUNG
B 26
H 1910 DW
26
2012
PUPUK
SAYUNG
B 26
H 1910 DW
2012
PUPUK
SAYUNG
C 01
H 1995 GY
2012
PUPUK
SAYUNG
KOMODITY
MUAT
JUMLAH
REKAP KERJA
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
KOMODITY
MUAT
D 03
H 1846 BW
2012
KEDELE
SEMARANG
JUMLAH
REKA
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 17
H 1985 EY
31
2012
SUSU
BANDUNG
B 21
H 1937 FY
30
2012
SUSU
BANDUNG
F 01
H 1831 DW
2012
SUSU
BANDUNG
KOMODITY
MUAT
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 12
H 1767 CW
26
2012
SEMEN
TUBAN
B 15
H 1897 EY
26
2012
SEMEN
TUBAN
B 16
H 1898 EY
26
2012
SEMEN
TUBAN
B 19
H 1825 FY
26
2012
SEMEN
TUBAN
B 23
H 1760 AW
26
2012
SEMEN
TUBAN
B 25
H 1832 DW
29
2012
SEMEN
TUBAN
KOMODITY
MUAT
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
D 03
H 1846 BW
31
2012
KEDELE
SEMARANG
D 01
H 1564 SY
10
2012
KEDELE
SEMARANG
KOMODITY
MUAT
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 12
H 1767 CW
31
2012
SUSU
SUKABUMI
B 15
H 1897 EY
31
2012
SUSU
GNG. PUTRI
B 15
H 1897 EY
2012
SUSU
GNG. PUTRI
B 16
H 1898 EY
27
2012
SUSU
SUKABUMI
B 18
H 1824 FY
2012
SUSU
GNG. PUTRI
B 19
H 1825 FY
30
SUSU
SUKABUMI
B 20
H 1936 FY
31
2012
SUSU
PANDAAN
B 20
H 1936 FY
2012
SUSU
GNG. PUTRI
B 20
H 1936 FY
2012
SUSU
PANDAAN
B 21
H 1937 FY
2012
SUSU
SUKABUMI
B 22
H 1958 GY
31
2012
SUSU
GNG. PUTRI
B 23
H 1760 AW
31
2012
SUSU
SUKABUMI
B 23
H 1760 AW
2012
SUSU
GNG. PUTRI
B 25
H 1832 DW
31
2012
SUSU
SUKABUMI
B 26
H 1910 DW
27
2012
SUSU
GNG. PUTRI
F 01
H 1831 DW
31
2012
MINYAK
SURABAYA
F 02
H 1842 DW
26
2012
BUMBU
SEMARANG
F 02
H 1842 DW
31
2012
BUMBU
SURABAYA
F 02
H 1842 DW
2012
SUSU
SUKABUMI
2012
KOMODITY
MUAT
F 03
H 1956 DW
27
2012
SABUN
PASURUAN
F 03
H 1956 DW
30
2012
BUMBU
SEMARANG
F 03
H 1956 DW
2012
SUSU
PANDAAN
F 03
H 1956 DW
2012
PERABOTAN
BEKASI
B 14
H 1766 CW
2012
SUSU
SUKABUMI
B 16
H 1898 EY
2012
SUSU
SUKABUMI
B 18
H 1824 FY
2012
SUSU
GNG. PUTRI
B 22
H 1958 GY
2012
SABUN
JAKARTA
B 24
H 1761 AW
2012
SABUN
JAKARTA
B 26
H 1910 DW
2012
SUSU
GNG. PUTRI
F 02
H 1842 DW
2012
SABUN
PASURUAN
F 03
H 1956 DW
2012
SABUN
PASURUAN
JUMLAH
REKAP KE
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 01
H 1937 BW
2012
KACANG
B 05
H 1911 DY
2012
B 14
H 1766 CW
31
2012
C 01
H 1995 GY
2012
KACANG
KOMODITY
MUAT
BEKASI
BEKASI
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 03
B 9914 TYT
25
2012
BUNGKIL
PELABUHAN
E 03
B 9914 TYT
25
2012
BUNGKIL
PELABUHAN
E 03
B 9914 TYT
26
2012
BUNGKIL
PELABUHAN
E 03
B 9914 TYT
26
2012
BUNGKIL
PELABUHAN
E 03
B 9914 TYT
26
2012
BUNGKIL
PELABUHAN
E 03
B 9914 TYT
26
2012
BUNGKIL
PELABUHAN
E 04
H 1757 AQ
28
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
28
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
28
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
28
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
29
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
29
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
29
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
29
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
29
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
29
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
30
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
30
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
30
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
30
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
30
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
30
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
31
2012
JAGUNG
PELABUHAN
E 04
H 1757 AQ
31
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
25
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
25
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
26
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
26
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
26
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
26
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
26
2012
BUNGKIL
PELABUHAN
KOMODITY
MUAT
E 07
H 1763 AQ
26
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
27
2012
BUNGKIL
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
27
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
28
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
28
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
28
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
28
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
28
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
29
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
29
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
29
2012
JAGUNG
PELABUHAN
E 07
H 1763 AQ
29
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
25
2012
BUNGKIL
PELABUHAN
E 08
H 1765 AQ
29
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
29
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
29
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
29
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
29
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
30
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
30
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
30
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
30
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
31
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
31
2012
JAGUNG
PELABUHAN
E 08
H 1765 AQ
31
2012
JAGUNG
PELABUHAN
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 01
B 9909 TYT
25
2012
BATU BARA
PELABUHAN
E 01
B 9909 TYT
26
2012
BATU BARA
PELABUHAN
E 01
B 9909 TYT
26
2012
BATU BARA
PELABUHAN
E 01
B 9909 TYT
26
2012
BATU BARA
KALIWUNGU
E 05
H 1759 AQ
25
2012
BATU BARA
PELABUHAN
E 05
H 1759 AQ
26
2012
BATU BARA
PELABUHAN
E 05
H 1759 AQ
26
2012
BATU BARA
KALIWUNGU
E 05
H 1759 AQ
2012
BATU BARA
KALIWUNGU
KOMODITY
MUAT
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
KOMODITY
E 01
B 9909 TYT
30
2012
PASIR KWARSA
PELABUHAN
E 01
B 9909 TYT
30
2012
PASIR KWARSA
PELABUHAN
E 01
B 9909 TYT
30
2012
PASIR KWARSA
PELABUHAN
E 01
B 9909 TYT
31
2012
PASIR KWARSA
PELABUHAN
E 03
B 9914 TYT
31
2012
PASIR
PELABUHAN
JUMLAH
MUAT
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 12
H 1767 CW
2012
PUPUK
GRESIK
B 16
H 1898 EY
2012
PUPUK
GRESIK
B 17
H 1985 EY
2012
PUPUK
GRESIK
B 18
H 1824 FY
2012
PUPUK
GRESIK
B 19
H 1825 FY
2012
PUPUK
GRESIK
B 21
H 1937 FY
2012
PUPUK
GRESIK
B 22
H 1958 GY
2012
PUPUK
GRESIK
B 24
H 1761 AW
2012
PUPUK
GRESIK
B 25
H 1832 DW
2012
PUPUK
GRESIK
B 26
H 1910 DW
2012
PUPUK
GRESIK
B 15
H 1897 EY
2012
PUPUK
GRESIK
B 23
H 1760 AW
2012
PUPUK
GRESIK
KOMODITY
MUAT
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 01
H 1937 BW
30
2012
SEMEN
SEMARANG
B 05
H 1911 DY
28
2012
SEMEN
SEMARANG
B 05
H 1911 DY
30
2012
SEMEN
SEMARANG
C 01
H 1995 GY
26
2012
SEMEN
SEMARANG
C 01
H 1995 GY
30
2012
SEMEN
SEMARANG
D 01
H 1564 SY
2012
SEMEN
SEMARANG
D 01
H 1564 SY
2012
SEMEN
SEMARANG
KOMODITY
MUAT
D 01
H 1564 SY
2012
SEMEN
SEMARANG
D 01
H 1564 SY
2012
SEMEN
SEMARANG
D 03
H 1846 BW
2012
SEMEN
SEMARANG
D 03
H 1846 BW
2012
SEMEN
SEMARANG
D 03
H 1846 BW
2012
SEMEN
SEMARANG
B 21
H 1937 FY
2012
SEMEN
SEMARANG
B 21
H 1937 FY
2012
SEMEN
SEMARANG
B 21
H 1937 FY
10
2012
SEMEN
SEMARANG
JUMLAH
REKA
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 19
H 1825 FY
2012
PUPUK
SEMARANG
B 01
H 1937 BW
2012
PUPUK
SEMARANG
B 05
H 1911 DY
2012
PUPUK
SEMARANG
B 19
H 1825 FY
2012
PUPUK
SEMARANG
B 20
H 1936 FY
2012
PUPUK
SEMARANG
B 25
H 1832 DW
2012
PUPUK
SEMARANG
C 01
H 1995 GY
2012
PUPUK
SEMARANG
B 05
H 1911 DY
11
2012
PUPUK
SEMARANG
B 12
H 1766 CW
11
2012
PUPUK
SEMARANG
B 16
H 1898 EY
11
2012
PUPUK
SEMARANG
B 17
H 1985 EY
11
2012
PUPUK
SEMARANG
B 18
H 1824 FY
11
2012
PUPUK
BATANG
B 26
H 1910 DW
11
2012
PUPUK
SEMARANG
JUMLAH
KOMODITY
MUAT
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
KOMODITY
E 01
B 9909 TYT
26
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
27
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
27
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
27
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
28
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
28
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
28
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
29
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
29
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
29
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
29
2012
BROWN FIBER
PELABUHAN
E 01
B 9909 TYT
30
2012
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
29
2012
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
30
2012
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
30
2012
BROWN FIBER
PELABUHAN
E 02
B 9912 TYT
30
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
26
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
27
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
27
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
27
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
28
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
28
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
28
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
29
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
29
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
29
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
30
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
30
2012
BROWN FIBER
PELABUHAN
MUAT
E 03
B 9914 TYT
30
2012
BROWN FIBER
PELABUHAN
E 03
B 9914 TYT
30
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
26
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
27
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
27
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
27
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
28
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
29
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
29
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
29
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
30
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
30
2012
BROWN FIBER
PELABUHAN
E 05
H 1759 AQ
31
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
26
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
27
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
27
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
27
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
28
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
29
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
29
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
29
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
30
2012
BROWN FIBER
PELABUHAN
E 06
H 1761 AQ
31
2012
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
29
2012
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
29
2012
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
29
2012
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
30
2012
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
30
2012
BROWN FIBER
PELABUHAN
E 07
H 1763 AQ
31
2012
BROWN FIBER
PELABUHAN
JUMLAH
REKAP KER
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 01
B 9909 TYT
31
2012
PASIR
KALIWUNGU
E 06
H 1761 AQ
31
2012
PASIR KWARSA
KALIWUNGU
KOMODITY
MUAT
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 01
B 9909 TYT
2012
BATU BARA
SAYUNG
E 01
B 9909 TYT
2012
BATU BARA
SAYUNG
E 01
B 9909 TYT
2012
BATU BARA
SAYUNG
E 01
B 9909 TYT
2012
BATU BARA
SAYUNG
E 02
B 9912 TYT
28
2012
BATU BARA
PELABUHAN
E 02
B 9912 TYT
29
2012
BATU BARA
PELABUHAN
E 02
B 9912 TYT
29
2012
BATU BARA
PELABUHAN
E 03
B 9914 TYT
31
2012
BATU BARA
SAYUNG
KOMODITY
MUAT
E 03
B 9914 TYT
2012
BATU BARA
SAYUNG
E 03
B 9914 TYT
2012
BATU BARA
SAYUNG
E 05
H 1759 AQ
31
2012
BATU BARA
SAYUNG
E 05
H 1759 AQ
2012
BATU BARA
SAYUNG
E 05
H 1759 AQ
2012
BATU BARA
SAYUNG
E 05
H 1759 AQ
2012
BATU BARA
SAYUNG
E 06
H 1761 AQ
2012
BATU BARA
SAYUNG
E 06
H 1761 AQ
2012
BATU BARA
SAYUNG
E 06
H 1761 AQ
2012
BATU BARA
SAYUNG
E 06
H 1761 AQ
2012
BATU BARA
SAYUNG
E 07
H 1763 AQ
2012
BATU BARA
SAYUNG
E 08
H 1765 AQ
27
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
27
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
28
2012
BATU BARA
PELABUHAN
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 02
B 9912 TYT
26
2012
RAW SUGAR
PELABUHAN
E 02
B 9912 TYT
27
2012
RAW SUGAR
PELABUHAN
E 02
B 9912 TYT
27
2012
RAW SUGAR
PELABUHAN
E 02
B 9912 TYT
27
2012
RAW SUGAR
PELABUHAN
E 02
B 9912 TYT
27
2012
RAW SUGAR
PELABUHAN
E 02
B 9912 TYT
28
2012
RAW SUGAR
PELABUHAN
E 02
B 9912 TYT
29
2012
RAW SUGAR
PELABUHAN
KOMODITY
MUAT
E 03
B 9914 TYT
2012
RAW SUGAR
PELABUHAN
E 03
B 9914 TYT
2012
RAW SUGAR
PELABUHAN
E 03
B 9914 TYT
2012
RAW SUGAR
PELABUHAN
E 03
B 9914 TYT
2012
RAW SUGAR
PELABUHAN
E 03
B 9914 TYT
2012
RAW SUGAR
PELABUHAN
E 03
B 9914 TYT
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 04
H 1757 AQ
2012
RAW SUGAR
PELABUHAN
E 05
H 1759 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
28
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
28
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
29
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
29
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
29
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 08
H 1765 AQ
2012
RAW SUGAR
PELABUHAN
E 09
H 1767 AQ
2012
RAW SUGAR
PELABUHAN
E 09
H 1767 AQ
2012
RAW SUGAR
PELABUHAN
E 09
H 1767 AQ
2012
RAW SUGAR
PELABUHAN
E 09
H 1767 AQ
2012
RAW SUGAR
PELABUHAN
JUMLAH
REKAP
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 06
H 1761 AQ
13
2012
KOMODITY
BATU BARA
MUAT
SANGO
JUMLAH
REK
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 21
H 1937 FY
2012
KOMODITY
CETAKAN
MUAT
JAPANAN
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
E 06
H 1761 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
31
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
31
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
31
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
E 07
H 1763 AQ
2012
BATU BARA
PELABUHAN
KOMODITY
MUAT
E 08
H 1765 AQ
31
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
31
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
E 08
H 1765 AQ
2012
BATU BARA
PELABUHAN
JUMLAH
REKAP K
DIVISI TRUCKING P
BUL
NO.
LAMBUN
NOPOL
TGL
BLN
THN
B 16
H 1898 EY
2012
KEDELE
SEMARANG
B 21
H 1937 FY
27
2012
KEDELE
SEMARANG
D 01
H 1564 SY
27
2012
KEDELE
SEMARANG
D 01
H 1564 SY
30
2012
KEDELE
SEMARANG
D 01
H 1564 SY
2012
KEDELE
SEMARANG
B 17
H 1985 EY
2012
KEDELE
SEMARANG
D 01
H 1564 SY
2012
KEDELE
SEMARANG
D 01
H 1564 SY
2012
KEDELE
SEMARANG
D 03
H 1846 BW
2012
KEDELE
SEMARANG
D 03
H 1846 BW
10
2012
KEDELE
SEMARANG
D 01
H 1564 SY
13
2012
KEDELE
SEMARANG
D 03
H 1846 BW
13
2012
KEDELE
SEMARANG
JUMLAH
KOMODITY
MUAT
BONGKAR
BANDUNG
TONASE
30.032
30.032
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
140,000
4,204,480 1,800,000
100,000
15,000
140,000
4,204,480 1,800,000
100,000
15,000
BONGKAR
PALUR
TONASE
25.290
25.290
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
70,000
1,770,300
750,000
20,000
5,000
70,000
1,770,300
750,000
20,000
5,000
BONGKAR
KUTOARJO
TONASE
8.000
8.000
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
90,000
720,000
475,000
20,000
90,000
720,000
475,000
20,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
SRITEX
27.950
65,000
1,816,750
825,000
20,000
5,000
SRITEX
24.200
65,000
1,573,000
825,000
20,000
5,000
SRITEX
25.760
65,000
1,674,400
825,000
20,000
5,000
SRITEX SUKOHARJO25.140
67,000
1,684,380
850,000
20,000
5,000
SRITEX SUKOHARJO25.210
67,000
1,689,070
850,000
20,000
5,000
SRITEX
27.320
65,000
1,775,800
825,000
20,000
5,000
SRITEX SUKOHARJO26.620
67,000
1,783,540
850,000
20,000
5,000
SRITEX SUKOHARJO25.690
67,000
1,721,230
850,000
20,000
5,000
SRITEX SUKOHARJO24.920
67,000
1,669,640
850,000
20,000
5,000
SRITEX SUKOHARJO25.910
67,000
1,735,970
850,000
20,000
5,000
SRITEX SUKOHARJO25.480
67,000
1,707,160
850,000
20,000
5,000
SRITEX
27.920
65,000
1,814,800
825,000
20,000
5,000
KALIWUNGU
24.390
18,500
451,215
200,000
20,000
5,000
KALIWUNGU
25.970
18,500
480,445
200,000
20,000
5,000
APAC INTI
26.790
34,000
910,860
360,000
20,000
5,000
SRITEX
25.650
65,000
1,667,250
825,000
20,000
5,000
SRITEX
24.900
65,000
1,618,500
825,000
20,000
5,000
SRITEX
29.510
65,000
1,918,150
825,000
20,000
5,000
SRITEX
26.720
65,000
1,736,800
825,000
20,000
5,000
SRITEX SUKOHARJO25.060
67,000
1,679,020
850,000
20,000
5,000
SRITEX SUKOHARJO25.470
67,000
1,706,490
850,000
20,000
5,000
KALIWUNGU
24.700
18,500
456,950
200,000
20,000
5,000
KALIWUNGU
26.050
18,500
481,925
200,000
20,000
5,000
KALIWUNGU
26.360
34,000
896,240
360,000
20,000
5,000
KALIWUNGU
26.420
18,500
488,770
200,000
20,000
5,000
KALIWUNGU
26.700
18,500
493,950
200,000
20,000
5,000
KALIWUNGU
26.200
18,500
484,700
200,000
20,000
5,000
KALIWUNGU
23.850
18,500
441,225
200,000
20,000
5,000
KALIWUNGU
24.890
18,500
460,465
200,000
20,000
5,000
KALIWUNGU
25.190
18,500
466,015
200,000
20,000
5,000
APAC INTI
24.670
18,500
456,395
200,000
20,000
5,000
SRITEX SUKOHARJO26.870
67,000
1,800,290
850,000
20,000
5,000
SRITEX SUKOHARJO25.810
67,000
1,729,270
850,000
20,000
5,000
41,470,665 ########
660,000
165,000
854.290
1,593,500
BONGKAR
PELABUHAN
TONASE
35.000
35.000
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
35,000
1,225,000
300,000
50,000
10,000
35,000
1,225,000
300,000
50,000
10,000
BONGKAR
SURABAYA
TONASE
31.000
31.000
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
25,000
775,000
300,000
50,000
10,000
25,000
775,000
300,000
50,000
10,000
BONGKAR
SEMARANG
TONASE
19.100
19.100
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
70,000
1,337,000
675,000
20,000
5,000
70,000
1,337,000
675,000
20,000
5,000
BONGKAR
KR. ANYAR
TONASE
25.000
25.000
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
64,000
1,600,000
720,000
50,000
10,000
64,000
1,600,000
720,000
50,000
10,000
TONASE
PEKALONGAN
8.000
65,000
520,000
325,000
20,000
PEKALONGAN
8.000
65,000
520,000
325,000
20,000
130,000
1,040,000
650,000
40,000
16.000
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
BONGKAR
PREMI KERNET
BONGKAR
SOLO
TONASE
25.680
25.680
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
65,000
1,669,200
825,000
20,000
5,000
65,000
1,669,200
825,000
20,000
5,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
BANDUNG
14.343
160,000
2,294,880 1,500,000
100,000
15,000
BANDUNG
15.419
160,000
2,467,040 1,500,000
100,000
15,000
320,000
4,761,920 3,000,000
200,000
30,000
29.762
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
BANTUL
26.170
73,000
1,910,410
925,000
20,000
5,000
BANTUL
26.110
73,000
1,906,030
925,000
20,000
5,000
BANTUL
26.530
73,000
1,936,690
925,000
20,000
5,000
BANTUL
26.560
73,000
1,938,880
925,000
20,000
5,000
BANTUL
25.140
73,000
1,835,220
925,000
20,000
5,000
BANTUL
25.290
73,000
1,846,170
925,000
20,000
5,000
BANTUL
27.000
73,000
1,971,000
925,000
20,000
5,000
BANTUL
25.620
73,000
1,870,260
925,000
20,000
5,000
BANTUL
26.140
73,000
1,908,220
925,000
20,000
5,000
BANTUL
26.270
73,000
1,917,710
925,000
20,000
5,000
BANTUL
25.720
73,000
1,877,560
925,000
20,000
5,000
BANTUL
26.100
73,000
1,905,300
925,000
20,000
5,000
BANTUL
25.740
73,000
1,879,020
925,000
20,000
5,000
BANTUL
25.860
73,000
1,887,780
925,000
20,000
5,000
BANTUL
26.450
73,000
1,930,850
925,000
20,000
5,000
BANTUL
25.380
73,000
1,852,740
925,000
20,000
5,000
BANTUL
26.030
73,000
1,900,190
925,000
20,000
5,000
BANTUL
26.270
73,000
1,917,710
925,000
20,000
5,000
BANTUL
27.080
73,000
1,976,840
925,000
20,000
5,000
BANTUL
26.420
73,000
1,928,660
925,000
20,000
5,000
38,097,240 ########
400,000
100,000
521.880
1,460,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
CIKAMPEK
25.000
140,000
3,500,000 1,450,000
100,000
15,000
CIKAMPEK
25.000
140,000
3,500,000 1,450,000
100,000
15,000
CIKAMPEK
35.000
140,000
4,900,000 1,600,000
100,000
15,000
CIKAMPEK
33.500
140,000
4,690,000 1,560,000
100,000
15,000
CIKAMPEK
33.500
140,000
4,690,000 1,560,000
100,000
15,000
CIKAMPEK
30.000
140,000
4,200,000 1,500,000
100,000
15,000
CIKAMPEK
33.000
140,000
4,620,000 1,560,000
100,000
15,000
CIKAMPEK
35.000
140,000
4,900,000 1,600,000
100,000
15,000
CIKAMPEK
33.500
140,000
4,690,000 1,560,000
100,000
15,000
CIKAMPE
33.500
140,000
4,690,000 1,560,000
100,000
15,000
CIKAMPEK
34.000
140,000
4,760,000 1,580,000
100,000
15,000
CIKAMPEK
30.000
140,000
4,200,000 1,500,000
100,000
15,000
CIKAMPEK
34.000
140,000
4,760,000 1,580,000
100,000
15,000
CIKAMPEK
20.000
140,000
2,800,000 1,350,000
100,000
195,000
435.000
1,960,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
KUDUS
8.500
8.500
55,000
467,500
250,000
20,000
55,000
467,500
250,000
20,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
MALANG BEJI
0.000
4,700,000
4,700,000 2,700,000
100,000
15,000
SURABAYA
0.000
3,900,000
3,900,000 2,350,000
100,000
15,000
PEKALONGAN SEMARANG
0.000
2,750,000
2,750,000 1,500,000
100,000
15,000
11,350,000
11,350,000 6,550,000
300,000
45,000
0.000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
SUKABUMI
32.000
188,556
6,033,792 3,285,000
100,000
15,000
SERANG
33.000
165,086
5,447,838 2,800,000
100,000
15,000
SUKABUMI
33.000
188,556
6,222,348 3,455,000
100,000
15,000
SUKABUMI
33.000
188,556
6,222,348 3,455,000
100,000
15,000
SUKABUMI
33.000
188,556
6,222,348 3,305,000
100,000
15,000
BOGOR
33.000
163,614
5,399,262 2,720,000
100,000
15,000
1,082,924
35,547,936 ########
600,000
90,000
197.000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
WONOSARI
8.000
85,000
680,000
450,000
20,000
WONOSARI
8.000
85,000
680,000
450,000
20,000
170,000
1,360,000
900,000
40,000
16.000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
JEMBER
30.240
269,000
8,134,560 3,850,000
100,000
15,000
SEMARANG
30.000
171,000
5,130,000 1,850,000
100,000
15,000
JOMBANG
30.000
217,000
6,510,000 3,120,000
100,000
15,000
SURABYA A
30.000
225,000
6,750,000 2,950,000
100,000
15,000
SURABAYA
30.160
210,000
6,333,600 2,700,000
100,000
15,000
SURABAYA
30.000
225,000
6,750,000 2,950,000
100,000
15,000
215,000
5,375,000 3,200,000
100,000
15,000
MALANG
30.203
217,000
6,554,051 3,050,000
100,000
15,000
TEGAL PEKALONGAN
25.000
180,000
4,500,000 1,900,000
100,000
15,000
SURABAYA
30.410
225,000
6,842,250 2,950,000
100,000
15,000
SURABAYA
30.000
210,000
6,300,000 2,550,000
100,000
15,000
SEMARANG
30.000
186,000
5,580,000 1,950,000
100,000
15,000
MADIUN
30.000
217,000
6,510,000 2,940,000
100,000
15,000
SURABAYA
30.428
225,000
6,846,300 2,950,000
100,000
15,000
SURABAYA
30.075
210,000
6,315,750 2,650,000
100,000
15,000
SEMARANG
30.000
110,000
3,300,000 1,150,000
100,000
15,000
SURABAYA
23.000
110,000
2,530,000 1,150,000
100,000
15,000
TEGAL PEKALONGAN
25.000
180,000
4,500,000 1,800,000
100,000
15,000
SURABAYA
225,000
6,750,000 2,850,000
100,000
15,000
30.000
SEMARANG
30.000
130,000
3,900,000 1,450,000
100,000
15,000
SURABAYA
23.000
110,000
2,530,000 1,150,000
100,000
15,000
JABABEKA
25.000
210,000
5,250,000 2,950,000
100,000
15,000
SURABAYA
30.000
210,000
6,300,000 2,550,000
100,000
15,000
SEMARANG
30.000
186,000
5,580,000 2,030,000
100,000
15,000
KUDUS
30.000
186,000
5,580,000 2,120,000
100,000
15,000
KUDUS
30.000
171,000
5,130,000 2,140,000
100,000
15,000
PURWOKERTO
30.000
200,000
6,000,000 2,700,000
100,000
15,000
PURWOKERTO
30.000
200,000
6,000,000 2,700,000
100,000
15,000
PEKALONGAN
30.000
162,000
4,860,000 1,840,000
100,000
15,000
MAGELANG
30.000
165,000
4,950,000 1,850,000
100,000
15,000
MAGELANG
30.000
165,000
4,950,000 1,850,000
100,000
15,000
465,000
897.516
5,922,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
PATI
25.210
150,000
3,781,500 2,070,000
100,000
15,000
SOLO
24.840
160,000
3,974,400 2,300,000
100,000
15,000
SOLO
30.110
170,000
5,118,700 2,400,000
100,000
15,000
PT. PEPSI
18.120
150,000
2,718,000 1,700,000
100,000
630,000
15,592,600 8,470,000
400,000
45,000
98.280
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
CPI
18.520
17,000
314,840
135,000
10,000
CPI
18.430
17,000
313,310
135,000
10,000
CPI
17.910
17,000
304,470
135,000
10,000
CPI
17.730
17,000
301,410
135,000
10,000
CPI
18.290
17,000
310,930
135,000
10,000
CPI
18.440
17,000
313,480
135,000
10,000
CPI
19.490
17,000
331,330
135,000
10,000
CPI
19.840
17,000
337,280
135,000
10,000
CPI
19.980
17,000
339,660
135,000
10,000
CPI
19.360
17,000
329,120
135,000
10,000
CPI
19.400
17,000
329,800
135,000
10,000
CPI
19.390
17,000
329,630
135,000
10,000
CPI
19.010
17,000
323,170
135,000
10,000
CPI
19.780
17,000
336,260
135,000
10,000
CPI
19.440
17,000
330,480
135,000
10,000
CPI
19.670
17,000
334,390
135,000
10,000
CPI
20.100
17,000
341,700
135,000
10,000
CPI
19.240
17,000
327,080
135,000
10,000
CPI
20.080
17,000
341,360
135,000
10,000
CPI
19.550
17,000
332,350
135,000
10,000
CPI
19.750
17,000
335,750
135,000
10,000
CPI
19.260
17,000
327,420
135,000
10,000
CPI
19.030
17,000
323,510
135,000
10,000
CPI
18.800
17,000
319,600
135,000
10,000
CPI
18.310
17,000
311,270
135,000
10,000
CPI
17.980
17,000
305,660
135,000
10,000
CPI
18.280
17,000
310,760
135,000
10,000
CPI
18.300
17,000
311,100
135,000
10,000
CPI
18.610
17,000
316,370
135,000
10,000
CPI
18.250
17,000
310,250
135,000
10,000
CPI
17.990
17,000
305,830
135,000
10,000
CPI
17.510
17,000
297,670
135,000
10,000
CPI
18.000
17,000
306,000
135,000
10,000
CPI
18.840
17,000
320,280
135,000
10,000
CPI
19.730
17,000
335,410
135,000
10,000
CPI
19.790
17,000
336,430
135,000
10,000
CPI
19.850
17,000
337,450
135,000
10,000
CPI
19.770
17,000
336,090
135,000
10,000
CPI
28.710
17,000
488,070
135,000
10,000
CPI
19.660
17,000
334,220
135,000
10,000
CPI
19.500
17,000
331,500
135,000
10,000
CPI
19.010
17,000
323,170
135,000
10,000
CPI
19.180
17,000
326,060
135,000
10,000
CPI
19.970
17,000
339,490
135,000
10,000
CPI
20.000
17,000
340,000
135,000
10,000
CPI
20.070
17,000
341,190
135,000
10,000
CPI
18.600
17,000
316,200
135,000
10,000
CPI
20.020
17,000
340,340
135,000
10,000
CPI
19.730
17,000
335,410
135,000
10,000
CPI
19.850
17,000
337,450
135,000
10,000
CPI
19.080
17,000
324,360
135,000
10,000
CPI
19.820
17,000
336,940
135,000
10,000
CPI
19.140
17,000
325,380
135,000
10,000
CPI
19.690
17,000
334,730
135,000
10,000
CPI
20.080
17,000
341,360
135,000
10,000
CPI
19.450
17,000
330,650
135,000
10,000
CPI
19.390
17,000
329,630
135,000
10,000
CPI
19.590
17,000
333,030
135,000
10,000
CPI
20.220
17,000
343,740
135,000
10,000
CPI
19.260
17,000
327,420
135,000
10,000
CPI
20.360
17,000
346,120
135,000
10,000
CPI
19.720
17,000
335,240
135,000
10,000
CPI
19.340
17,000
328,780
135,000
10,000
20,759,380 8,505,000
630,000
1,221.140
1,071,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
KALIWUNGU
26.390
18,500
488,215
200,000
20,000
5,000
KALIWUNGU
25.120
18,500
464,720
200,000
20,000
5,000
KALIWUNGU
25.210
18,500
466,385
200,000
20,000
5,000
BATANG
25.390
48,000
1,218,720
600,000
20,000
5,000
KALIWUNGU
24.840
18,500
459,540
200,000
20,000
5,000
KALIWUNGU
24.710
18,500
457,141
200,000
20,000
5,000
BATANG
26.610
48,000
1,277,280
600,000
20,000
5,000
BATAMTEX
24.130
35,000
844,550
350,000
20,000
5,000
5,676,551 2,550,000
160,000
40,000
202.400
223,500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
TOSSA
26.230
19,000
498,370
200,000
20,000
5,000
TOSSA
22.890
19,000
434,910
200,000
20,000
5,000
TOSSA
28.670
19,000
544,730
200,000
20,000
5,000
TOSSA
27.650
19,000
525,350
200,000
20,000
5,000
TOSSA
26.390
19,000
501,410
200,000
20,000
5,000
2,504,770 1,000,000
100,000
25,000
131.830
95,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
32.000
104,000
3,328,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
31.000
104,000
3,224,000 1,320,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,340,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
BATANG
30.000
104,000
3,120,000 1,300,000
100,000
15,000
180,000
363.000
1,248,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
SOLO
25.000
60,000
1,500,000
720,000
50,000
10,000
SOLO
25.000
60,000
1,500,000
720,000
50,000
10,000
SOLO
25.000
60,000
1,500,000
720,000
50,000
10,000
SOLO
20.000
60,000
1,200,000
620,000
50,000
SOLO
20.000
60,000
1,200,000
620,000
50,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
10.000
60,000
600,000
400,000
20,000
SOLO
9.000
60,000
540,000
375,000
20,000
SOLO
9.000
60,000
540,000
375,000
20,000
SOLO
9.000
60,000
540,000
375,000
20,000
SOLO
33.000
60,000
1,980,000
880,000
50,000
10,000
SOLO
33.000
60,000
1,980,000
880,000
50,000
10,000
SOLO
33.000
60,000
1,980,000
880,000
50,000
10,000
16,860,000 8,765,000
540,000
60,000
281.000
900,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
BREBES
33.000
80,000
2,640,000 1,100,000
50,000
10,000
BOYOLALI
27.000
55,000
1,485,000
570,000
50,000
10,000
BOYOLALI
27.000
55,000
1,485,000
570,000
50,000
10,000
BREBES
33.000
80,000
2,640,000 1,100,000
50,000
10,000
BREBES
33.000
73,000
2,409,000 1,100,000
50,000
10,000
BREBES
34.000
80,000
2,720,000 1,100,000
50,000
10,000
BOYOLALI
20.000
55,000
1,100,000
450,000
50,000
BOYOLALI
26.000
55,000
1,430,000
560,000
50,000
10,000
TEGAL PEKALONGAN
33.000
73,500
2,425,500
810,000
50,000
10,000
PURWODADI
45.000
33,000
1,485,000
530,000
50,000
10,000
PURWODADI
34.000
33,000
1,122,000
550,000
50,000
10,000
PURWODADI
33.000
34,000
1,122,000
530,000
50,000
10,000
TEGAL
34.000
83,000
2,822,000
830,000
50,000
10,000
24,885,500 9,800,000
650,000
120,000
412.000
789,500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
PATI
17.340
45,000
780,300
450,000
20,000
5,000
PATI
18.390
45,000
827,550
450,000
20,000
5,000
PATI
20.190
45,000
908,550
450,000
20,000
5,000
PATI
17.760
45,000
799,200
450,000
20,000
5,000
PATI
19.980
45,000
899,100
450,000
20,000
5,000
PATI
19.600
45,000
882,000
450,000
20,000
5,000
PATI
18.850
45,000
848,250
450,000
20,000
5,000
PATI
18.850
45,000
848,250
450,000
20,000
5,000
PATI
19.320
45,000
869,400
450,000
20,000
5,000
PATI
20.880
45,000
939,600
450,000
20,000
5,000
PATI
19.010
45,000
855,450
450,000
20,000
5,000
PATI
20.240
45,000
910,800
450,000
20,000
5,000
PATI
17.630
45,000
793,350
425,000
20,000
5,000
PATI
21.110
45,000
949,950
450,000
20,000
5,000
PATI
19.300
45,000
868,500
450,000
20,000
5,000
PATI
19.880
45,000
894,600
450,000
20,000
5,000
PATI
17.710
45,000
796,950
450,000
20,000
5,000
PATI
18.640
45,000
838,800
450,000
20,000
5,000
PATI
16.690
45,000
751,050
450,000
20,000
5,000
PATI
16.620
45,000
747,900
450,000
20,000
5,000
PATI
18.990
45,000
854,550
450,000
20,000
5,000
PATI
18.310
45,000
823,950
450,000
20,000
5,000
PATI
18.350
45,000
825,750
450,000
20,000
5,000
PATI
19.020
45,000
855,900
450,000
20,000
5,000
PATI
19.310
45,000
868,950
450,000
20,000
5,000
PATI
19.390
45,000
872,550
450,000
20,000
5,000
PATI
18.600
45,000
837,000
450,000
20,000
5,000
PATI
19.020
45,000
855,900
450,000
20,000
5,000
PATI
19.340
45,000
870,300
450,000
20,000
5,000
PATI
18.560
45,000
835,200
450,000
20,000
5,000
PATI
17.440
45,000
784,800
450,000
20,000
5,000
PATI
18.880
45,000
849,600
450,000
20,000
5,000
PATI
17.970
45,000
808,650
450,000
20,000
5,000
PATI
18.640
45,000
838,800
450,000
20,000
5,000
PATI
20.920
45,000
941,400
450,000
20,000
5,000
PATI
18.520
45,000
833,400
450,000
20,000
5,000
PATI
19.720
45,000
887,400
450,000
20,000
5,000
PATI
20.380
45,000
917,100
450,000
20,000
5,000
PATI
18.850
45,000
848,250
450,000
20,000
5,000
PATI
16.450
45,000
740,250
450,000
20,000
5,000
PATI
18.140
45,000
816,300
450,000
20,000
5,000
PATI
19.230
45,000
865,350
450,000
20,000
5,000
PATI
20.440
45,000
919,800
450,000
20,000
5,000
PATI
19.440
45,000
874,800
450,000
20,000
5,000
PATI
18.160
45,000
817,200
450,000
20,000
5,000
PATI
15.900
45,000
715,500
450,000
20,000
5,000
PATI
17.970
45,000
808,650
450,000
20,000
5,000
PATI
16.970
45,000
763,650
450,000
20,000
5,000
PATI
18.250
45,000
821,250
450,000
20,000
5,000
PATI
18.030
45,000
811,350
450,000
20,000
5,000
PATI
19.660
45,000
884,700
450,000
20,000
5,000
PATI
18.500
45,000
832,500
450,000
20,000
5,000
PATI
19.610
45,000
882,450
450,000
20,000
5,000
PATI
18.990
45,000
854,550
450,000
20,000
5,000
PATI
18.630
45,000
838,350
450,000
20,000
5,000
PATI
20.420
45,000
918,900
450,000
20,000
5,000
PATI
20.350
45,000
915,750
450,000
20,000
5,000
PATI
19.910
45,000
895,950
450,000
20,000
5,000
PATI
19.000
45,000
855,000
450,000
20,000
5,000
PATI
17.880
45,000
804,600
450,000
20,000
5,000
PATI
19.850
45,000
893,250
450,000
20,000
5,000
PATI
19.030
45,000
856,350
450,000
20,000
5,000
PATI
19.700
45,000
886,500
450,000
20,000
5,000
PATI
18.390
45,000
827,550
450,000
20,000
5,000
PATI
21.110
45,000
949,950
450,000
20,000
5,000
PATI
19.730
45,000
887,850
450,000
20,000
5,000
330,000
1,247.940
2,970,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
SUKOHARJO
26.880
75,000
2,016,000
850,000
20,000
5,000
SRITEX
27.570
75,000
2,067,750
850,000
20,000
5,000
4,083,750 1,700,000
40,000
10,000
54.450
150,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
SRITEX
26.110
67,000
1,749,370
825,000
20,000
5,000
SRITEX
25.770
67,000
1,726,590
850,000
20,000
5,000
SRITEX
26.610
67,000
1,782,870
850,000
20,000
5,000
SRITEX
26.100
67,000
1,748,700
850,000
20,000
5,000
JEKULO
25.770
37,000
953,490
425,000
20,000
5,000
ENGGAL SUBUR
24.730
37,000
915,010
425,000
20,000
5,000
JEKULO
24.570
37,000
909,090
425,000
20,000
5,000
SRITEX
25.450
67,000
1,705,150
825,000
20,000
5,000
SRITEX
24.930
67,000
1,670,310
850,000
20,000
5,000
SRITEX
26.290
67,000
1,761,430
850,000
20,000
5,000
SRITEX
26.130
67,000
1,750,710
825,000
20,000
5,000
SRITEX
26.320
67,000
1,763,440
825,000
20,000
5,000
SRITEX
25.760
67,000
1,725,920
825,000
20,000
5,000
SRITEX SUKOHARJO26.200
67,000
1,755,400
850,000
20,000
5,000
SRITEX
25.810
67,000
1,729,270
825,000
20,000
5,000
SRITEX
25.870
67,000
1,733,290
850,000
20,000
5,000
SRITEX
26.390
67,000
1,768,130
850,000
20,000
5,000
SRITEX
26.360
67,000
1,766,120
850,000
20,000
5,000
SRITEX
26.300
67,000
1,762,100
850,000
20,000
5,000
SAYUNG
20.620
12,500
257,750
140,000
10,000
SAYUNG
21.170
12,500
264,625
140,000
10,000
SAYUNG
25.190
12,500
314,875
140,000
10,000
SAYUNG
25.190
12,500
314,875
140,000
10,000
SAYUNG
24.690
12,500
308,625
140,000
10,000
SAYUNG
25.680
12,500
321,000
140,000
10,000
SAYUNG
25.340
12,500
316,750
140,000
10,000
32,774,890 ########
450,000
95,000
659.350
1,270,500
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
CEPIRING
22.990
31,000
712,690
290,000
20,000
5,000
CEPIRING
23.820
31,000
738,420
290,000
20,000
5,000
CEPIRING
23.310
31,000
722,610
290,000
20,000
5,000
CEPIRING
24.110
31,000
747,410
290,000
20,000
5,000
CEPIRING
24.800
31,000
768,800
290,000
20,000
5,000
CEPIRING
24.130
31,000
748,030
290,000
20,000
5,000
CEPIRING
24.560
31,000
761,360
290,000
20,000
5,000
CEPIRING
23.360
31,000
724,160
290,000
20,000
5,000
CEPIRING
22.910
31,000
710,210
290,000
20,000
5,000
CEPIRING
24.570
31,000
761,670
290,000
20,000
5,000
CEPIRING
24.930
31,000
772,830
290,000
20,000
5,000
CEPIRING
24.910
31,000
772,210
290,000
20,000
5,000
CEPIRING
24.510
31,000
759,810
290,000
20,000
5,000
CEPIRING
22.640
31,000
701,840
290,000
20,000
5,000
CEPIRING
24.080
31,000
746,480
290,000
20,000
5,000
CEPIRING
24.380
31,000
755,780
290,000
20,000
5,000
CEPIRING
24.530
31,000
760,430
290,000
20,000
5,000
CEPIRING
24.530
31,000
760,430
290,000
20,000
5,000
CEPIRING
24.750
31,000
767,250
290,000
20,000
5,000
CEPIRING
24.140
31,000
748,340
290,000
20,000
5,000
CEPIRING
24.230
31,000
751,130
290,000
20,000
5,000
CEPIRING
24.320
31,000
753,920
290,000
20,000
5,000
CEPIRING
24.580
31,000
761,980
290,000
20,000
5,000
CEPIRING
24.810
31,000
769,110
290,000
20,000
5,000
CEPIRING
24.370
31,000
755,470
290,000
20,000
5,000
CEPIRING
23.970
31,000
743,070
290,000
20,000
5,000
CEPIRING
23.230
31,000
720,130
290,000
20,000
5,000
CEPIRING
23.760
31,000
736,560
290,000
20,000
5,000
CEPIRING
24.150
31,000
748,650
290,000
20,000
5,000
CEPIRING
23.940
31,000
742,140
290,000
20,000
5,000
CEPIRING
24.630
31,000
763,530
290,000
20,000
5,000
CEPIRING
24.030
31,000
744,930
290,000
20,000
5,000
CEPIRING
23.170
31,000
718,270
290,000
20,000
5,000
CEPIRING
24.750
31,000
767,250
290,000
20,000
5,000
CEPIRING
23.950
31,000
742,450
290,000
20,000
5,000
CEPIRING
23.930
31,000
741,830
290,000
20,000
5,000
CEPIRING
23.900
31,000
740,900
290,000
20,000
5,000
27,642,080 ########
740,000
185,000
891.680
1,147,000
BONGKAR
APAC INTI
TONASE
25.940
25.940
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
34,000
881,960
385,000
20,000
5,000
34,000
881,960
385,000
20,000
5,000
BONGKAR
BOGOR
TONASE
0.000
0.000
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
6,450,000
6,450,000 2,600,000
100,000
15,000
6,450,000
6,450,000 2,600,000
100,000
15,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
SANGO
26.180
17,000
445,060
175,000
20,000
5,000
SANGO
25.560
17,000
434,520
175,000
20,000
5,000
SANGO
27.000
17,000
459,000
175,000
20,000
5,000
SANGO
25.180
17,000
428,060
175,000
20,000
5,000
SANGO
25.300
17,000
430,100
175,000
20,000
5,000
SANGO
25.360
17,000
431,120
175,000
20,000
5,000
SANGO
26.480
17,000
450,160
175,000
20,000
5,000
SANGO
29.000
17,000
493,000
175,000
20,000
5,000
SANGO
26.340
17,000
447,780
175,000
20,000
5,000
SANGO
24.480
17,000
416,160
175,000
20,000
5,000
SANGO
26.640
17,000
452,880
175,000
20,000
5,000
4,887,840 1,925,000
220,000
55,000
287.520
187,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI
DRIVER
PREMI KERNET
BEKASI
27.500
140,000
3,850,000 1,780,000
100,000
15,000
KUNINGAN
30.000
100,000
3,000,000 1,450,000
100,000
15,000
KLATEN
8.000
70,000
560,000
350,000
20,000
PARAKAN
8.000
60,000
480,000
340,000
20,000
MUNTILAN
8.000
70,000
560,000
350,000
20,000
KUNINGAN
30.000
100,000
3,000,000 1,450,000
100,000
15,000
SOLO
10.000
65,000
650,000
400,000
20,000
SOLO
10.000
65,000
650,000
400,000
20,000
SOLO
9.050
65,000
588,250
375,000
20,000
PURWOREJO
8.000
75,000
600,000
425,000
20,000
KLATEN
8.000
65,000
520,000
350,000
20,000
PARAKAN
8.000
60,000
480,000
340,000
20,000
14,938,250 8,010,000
480,000
45,000
164.550
935,000
UM/ LEMBUR
JUMLAH
OUT
KET
R/L
50,000
50,000
0 1,965,000 2,239,480
UM/ LEMBUR
JUMLAH
OUT
KET
UM/ LEMBUR
775,000
995,300
775,000
995,300
JUMLAH
OUT
KET
R/L
R/L
495,000
225,000
495,000
225,000
UM/ LEMBUR
KET
JUMLAH
OUT
R/L
850,000
966,750
850,000
723,000
850,000
824,400
875,000
809,380
875,000
814,070
850,000
925,800
875,000
908,540
875,000
846,230
875,000
794,640
875,000
860,970
875,000
832,160
850,000
964,800
225,000
226,215
225,000
255,445
385,000
525,860
850,000
817,250
850,000
768,500
850,000 1,068,150
850,000
886,800
875,000
804,020
875,000
831,490
225,000
231,950
225,000
256,925
385,000
511,240
225,000
263,770
225,000
268,950
225,000
259,700
225,000
216,225
225,000
235,465
225,000
241,015
225,000
231,395
UM/ LEMBUR
854,270
865,000
360,000
865,000
R/L
360,000
415,000
360,000
415,000
JUMLAH
OUT
0
R/L
360,000
JUMLAH
OUT
KET
875,000
JUMLAH
OUT
KET
UM/ LEMBUR
925,290
0 ######## ########
KET
UM/ LEMBUR
875,000
R/L
700,000
637,000
700,000
637,000
UM/ LEMBUR
JUMLAH
OUT
KET
UM/ LEMBUR
UM/ LEMBUR
820,000
780,000
820,000
R/L
345,000
175,000
345,000
175,000
690,000
350,000
JUMLAH
OUT
KET
780,000
JUMLAH
OUT
KET
R/L
R/L
850,000
819,200
850,000
819,200
UM/ LEMBUR
KET
UM/ LEMBUR
JUMLAH
OUT
R/L
1,615,000
679,880
1,615,000
852,040
0 3,230,000 1,531,920
KET
JUMLAH
OUT
R/L
950,000
960,410
950,000
956,030
950,000
986,690
950,000
988,880
950,000
885,220
950,000
896,170
950,000 1,021,000
950,000
920,260
950,000
958,220
950,000
967,710
950,000
927,560
950,000
955,300
950,000
929,020
950,000
937,780
950,000
980,850
950,000
902,740
950,000
950,190
950,000
967,710
950,000 1,026,840
950,000
0
UM/ LEMBUR
250,000
978,660
0 ######## ########
KET
JUMLAH
OUT
R/L
250,000 BONGKAR
1,815,000 1,685,000
345,000
331,000
335,000
300,000
330,000
345,000 BONGKAR
2,060,000 2,840,000
331,000 bongkar
2,006,000 2,684,000
335,000 bongkar
2,010,000 2,680,000
335,000
bongkar
2,030,000 2,730,000
300,000
335,000
200,000
bongkar
4,322,000
UM/ LEMBUR
1,650,000 1,150,000
0 ######## ########
KET
JUMLAH
OUT
R/L
UM/ LEMBUR
KET
270,000
197,500
270,000
197,500
JUMLAH
OUT
R/L
50,000
100,000
150,000
UM/ LEMBUR
0 7,045,000 4,305,000
KET
200,000 NGOSONG
JUMLAH
OUT
R/L
3,600,000 2,433,792
200,000
200,000
200,000
200,000
200,000
1,200,000
0 ######## ########
UM/ LEMBUR
JUMLAH
OUT
KET
UM/ LEMBUR
KET
50,000 MUAT
R/L
470,000
210,000
470,000
210,000
940,000
420,000
JUMLAH
OUT
R/L
4,015,000 4,119,560
350,000
NGOSONG+MUAT 2,315,000 2,815,000
180,000
NGOSONG +MUAT 3,415,000 3,095,000
50,000
100,000
50,000
250,000
NGOSONG +muat 3,415,000 3,139,051
2,015,000 2,485,000
50,000
180,000 NGOSONG
3,235,000 3,275,000
250,000
NGOSONG+MUAT 3,315,000 3,531,300
150,000
NGOSONG+MUAT 2,915,000 3,400,750
1,265,000 2,035,000
1,265,000 1,265,000
1,915,000 2,585,000
300,000
100,000
100,000
50,000
250,000
NGOSONG+MUAT 2,485,000 3,095,000
180,000
NGOSONG+MUAT 2,435,000 2,695,000
200,000 ngosong
3,015,000 2,985,000
200,000
3,015,000 2,985,000
ngosong
100,000
3,420,000
0 ######## ########
UM/ LEMBUR
100,000
KET
75,000
375,000
R/L
100,000 NGOSONG
100,000
JUMLAH
OUT
2,515,000 1,459,400
1,875,000
843,000
0 9,290,000 6,302,600
UM/ LEMBUR
JUMLAH
OUT
KET
R/L
5,000
PAS
150,000
164,840
5,000
PAS
150,000
163,310
5,000
PAS
150,000
154,470
5,000
PAS
150,000
151,410
5,000
PAS
150,000
160,930
5,000
PAS
150,000
163,480
5,000
PAS PLBHN
150,000
181,330
5,000
PAS PLBHN
150,000
187,280
5,000
PAS PLBHN
150,000
189,660
5,000
PAS PLBHN
150,000
179,120
5,000
PAS PLBHN
150,000
179,800
5,000
PAS PLBHN
150,000
179,630
5,000
PAS PLBHN
150,000
173,170
5,000
PAS PLBHN
150,000
186,260
5,000
PAS PLBHN
150,000
180,480
5,000
PAS PLBHN
150,000
184,390
5,000
PAS PLBHN
150,000
191,700
5,000
PAS PLBHN
150,000
177,080
5,000
PAS PLBHN
150,000
191,360
5,000
PAS PLBHN
150,000
182,350
5,000
PAS PLBHN
150,000
185,750
5,000
PAS PLBHN
150,000
177,420
5,000
PAS PLBHN
150,000
173,510
5,000
PAS PLBHN
150,000
169,600
5,000
PAS PLBHN
150,000
161,270
5,000
PAS PLBHN
150,000
155,660
5,000
PAS PLBHN
150,000
160,760
5,000
PAS PLBHN
150,000
161,100
5,000
PAS PLBHN
150,000
166,370
5,000
PAS PLBHN
150,000
160,250
5,000
PAS PLBHN
150,000
155,830
5,000
PAS PLBHN
150,000
147,670
5,000
PAS PLBHN
150,000
156,000
5,000
PAS PLBHN
150,000
170,280
5,000
PAS PLBHN
150,000
185,410
5,000
PAS PLBHN
150,000
186,430
5,000
PAS PLBHN
150,000
187,450
5,000
PAS PLBHN
150,000
186,090
5,000
PAS PLBHN
150,000
338,070
5,000
PAS PLBHN
150,000
184,220
5,000
PAS PLBHN
150,000
181,500
5,000
PAS PLBHN
150,000
173,170
5,000
PAS PLBHN
150,000
176,060
5,000
PAS PLBHN
150,000
189,490
5,000
PAS PLBHN
150,000
190,000
5,000
PAS PLBHN
150,000
191,190
5,000
PAS PLBHN
150,000
166,200
5,000
PAS PLBHN
150,000
190,340
5,000
PAS PLBHN
150,000
185,410
5,000
PAS PLBHN
150,000
187,450
5,000
PAS PLBHN
150,000
174,360
5,000
PAS PLBHN
150,000
186,940
5,000
PAS PLBHN
150,000
175,380
5,000
PAS PLBHN
150,000
184,730
5,000
PAS PLBHN
150,000
191,360
5,000
PAS PLBHN
150,000
180,650
5,000
PAS PLBHN
150,000
179,630
5,000
PAS PLBHN
150,000
183,030
5,000
PAS PLBHN
150,000
193,740
5,000
PAS PLBHN
150,000
177,420
5,000
PAS PLBHN
150,000
196,120
5,000
PAS PLBHN
150,000
185,240
5,000
PAS PLBHN
150,000
178,780
315,000
0 9,450,000 ########
UM/ LEMBUR
KET
UM/ LEMBUR
R/L
225,000
263,215
225,000
239,720
225,000
241,385
625,000
593,720
225,000
234,540
225,000
232,141
625,000
652,280
375,000
469,550
0 2,750,000 2,926,551
KET
JUMLAH
OUT
JUMLAH
OUT
R/L
225,000
273,370
225,000
209,910
225,000
319,730
225,000
300,350
225,000
276,410
0 1,125,000 1,379,770
UM/ LEMBUR
KET
JUMLAH
OUT
R/L
1,415,000 1,705,000
1,415,000 1,705,000
1,415,000 1,913,000
1,415,000 1,705,000
1,415,000 1,705,000
1,435,000 1,789,000
1,415,000 1,705,000
1,415,000 1,705,000
1,455,000 1,665,000
1,415,000 1,705,000
1,415,000 1,705,000
1,415,000 1,705,000
0
UM/ LEMBUR
0 ######## ########
KET
JUMLAH
OUT
R/L
780,000
720,000
780,000
720,000
780,000
720,000
670,000
530,000
670,000
530,000
420,000
180,000
420,000
180,000
420,000
180,000
420,000
180,000
395,000
145,000
395,000
145,000
395,000
145,000
940,000 1,040,000
940,000 1,040,000
940,000 1,040,000
0
UM/ LEMBUR
0 9,365,000 7,495,000
KET
JUMLAH
OUT
R/L
1,160,000 1,480,000
72,000 LEMBUR
630,000
855,000
702,000
783,000
1,160,000 1,480,000
1,160,000 1,249,000
1,160,000 1,560,000
500,000
600,000
620,000
810,000
870,000 1,555,500
590,000
895,000
610,000
512,000
590,000
532,000
890,000 1,932,000
72,000
0 ######## ########
UM/ LEMBUR
KET
JUMLAH
OUT
R/L
475,000
305,300
475,000
352,550
475,000
433,550
475,000
324,200
475,000
424,100
475,000
407,000
475,000
373,250
475,000
373,250
475,000
394,400
475,000
464,600
475,000
380,450
475,000
435,800
450,000
343,350
475,000
474,950
475,000
393,500
475,000
419,600
475,000
321,950
475,000
363,800
475,000
276,050
475,000
272,900
475,000
379,550
475,000
348,950
475,000
350,750
475,000
380,900
475,000
393,950
475,000
397,550
475,000
362,000
475,000
380,900
475,000
395,300
475,000
360,200
475,000
309,800
475,000
374,600
475,000
333,650
475,000
363,800
475,000
466,400
475,000
358,400
475,000
412,400
475,000
442,100
475,000
373,250
475,000
265,250
475,000
341,300
475,000
390,350
475,000
444,800
475,000
399,800
475,000
342,200
475,000
240,500
475,000
333,650
475,000
288,650
475,000
346,250
475,000
336,350
475,000
409,700
475,000
357,500
475,000
407,450
475,000
379,550
475,000
363,350
475,000
443,900
475,000
440,750
475,000
420,950
475,000
380,000
475,000
329,600
475,000
418,250
475,000
381,350
UM/ LEMBUR
475,000
411,500
475,000
352,550
475,000
474,950
475,000
412,850
0 ######## ########
KET
JUMLAH
OUT
R/L
875,000 1,141,000
875,000 1,192,750
0
UM/ LEMBUR
0 1,750,000 2,333,750
KET
JUMLAH
OUT
R/L
850,000
899,370
875,000
851,590
875,000
907,870
875,000
873,700
450,000
503,490
450,000
465,010
450,000
459,090
850,000
855,150
UM/ LEMBUR
875,000
795,310
875,000
886,430
850,000
900,710
850,000
913,440
850,000
875,920
875,000
880,400
850,000
879,270
875,000
858,290
875,000
893,130
875,000
891,120
875,000
887,100
150,000
107,750
150,000
114,625
150,000
164,875
150,000
164,875
150,000
158,625
150,000
171,000
150,000
166,750
0 ######## ########
KET
JUMLAH
OUT
R/L
315,000
397,690
315,000
423,420
315,000
407,610
315,000
432,410
315,000
453,800
315,000
433,030
315,000
446,360
315,000
409,160
315,000
395,210
315,000
446,670
315,000
457,830
315,000
457,210
315,000
444,810
315,000
386,840
315,000
431,480
315,000
440,780
315,000
445,430
315,000
445,430
315,000
452,250
315,000
433,340
315,000
436,130
315,000
438,920
315,000
446,980
315,000
454,110
315,000
440,470
315,000
428,070
315,000
405,130
315,000
421,560
315,000
433,650
315,000
427,140
315,000
448,530
315,000
429,930
315,000
403,270
315,000
452,250
315,000
427,450
315,000
426,830
315,000
425,900
0 ######## ########
UM/ LEMBUR
JUMLAH
OUT
KET
UM/ LEMBUR
KET
R/L
410,000
471,960
410,000
471,960
JUMLAH
OUT
R/L
2,715,000 3,735,000
0
UM/ LEMBUR
0 2,715,000 3,735,000
KET
JUMLAH
OUT
R/L
200,000
245,060
200,000
234,520
200,000
259,000
200,000
228,060
200,000
230,100
200,000
231,120
200,000
250,160
5,000
PAS PLBHN
5,000
UM/ LEMBUR
205,000
288,000
200,000
247,780
200,000
216,160
200,000
252,880
0 2,205,000 2,682,840
KET
JUMLAH
OUT
R/L
1,895,000 1,955,000
1,565,000 1,435,000
370,000
190,000
360,000
120,000
370,000
190,000
1,565,000 1,435,000
420,000
230,000
420,000
230,000
395,000
193,250
445,000
155,000
370,000
150,000
360,000
120,000
0 8,535,000 6,403,250
331,135,623
LAPOR
DIVISI TRUCK
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 02
H 1801 CY
28
A 02
H 1801 CY
31
A 02
H 1801 CY
A 02
H 1801 CY
A 02
H 1801 CY
A 02
H 1801 CY
A 02
H 1801 CY
10
A 02
H 1801 CY
10
A 02
H 1801 CY
11
A 02
H 1801 CY
13
A 02
H 1801 CY
10
CONTAINER KOSONG
JUMLAH
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 04
H 1645 JE
27
A 04
H 1645 JE
27
A 04
H 1645 JE
30
A 04
H 1645 JE
A 04
H 1645 JE
A 04
H 1645 JE
A 04
H 1645 JE
10
A 04
H 1645 JE
10
A 04
H 1645 JE
11
A 04
H 1645 JE
12
A 04
H 1645 JE
13
A 04
H 1645 JE
13
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
A 07
H 1871 GH
27
A 07
H 1871 GH
27
A 07
H 1871 GH
30
A 07
H 1871 GH
31
A 07
H 1871 GH
A 07
H 1871 GH
A 07
H 1871 GH
A 07
H 1871 GH
10
A 07
H 1871 GH
13
A 07
H 1871 GH
13
A 07
H 1871 GH
13
A 07
H 1871 GH
14
KOMODITY
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
A 08
H 1844 BW
25
A 08
H 1844 BW
27
A 08
H 1844 BW
27
A 08
H 1844 BW
27
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
A 08
H 1844 BW
10
A 08
H 1844 BW
13
A 08
H 1844 BW
13
A 08
H 1844 BW
14
A 08
H 1844 BW
14
KOMODITY
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 11
H 1830 AQ
27
A 11
H 1830 AQ
27
A 11
H 1830 AQ
31
A 11
H 1830 AQ
A 11
H 1830 AQ
A 11
H 1830 AQ
A 11
H 1830 AQ
10
A 11
H 1830 AQ
10
A 11
H 1830 AQ
11
A 11
H 1830 AQ
12
A 11
H 1830 AQ
13
A 11
H 1830 AQ
13
A 11
H 1820 AQ
14
A 11
H 1820 AQ
14
LAPOR
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 05
H 1302 KE
26
A 05
H 1302 KE
27
A 05
H 1302 KE
27
A 05
H 1302 KE
31
A 05
H 1302 KE
A 05
H 1302 KE
A 05
H 1302 KE
A 05
H 1302 KE
A 05
H 1302 KE
10
A 05
H 1302 KE
12
A 05
H 1302 KE
13
A 05
H 1302 KE
13
A 05
H 1302 KE
14
A 05
H 1302 KE
14
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 06
H 1622 JE
27
A 06
H 1622 JE
27
A 06
H 1622 JE
31
A 06
H 1622 JE
A 06
H 1622 JE
A 06
H 1622 JE
10
A 06
H 1622 JE
10
A 06
H 1622 JE
10
A 06
H 1622 JE
11
A 06
H 1622 JE
13
A 06
H 1622 JE
13
A 06
H 1622 JE
14
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 09
H 1759 DW
28
A 09
H 1759 DW
31
A 09
H 1759 DW
A 09
H 1759 DW
A 09
H 1759 DW
A 09
H 1759 DW
10
A 09
H 1759 DW
13
NO. LAMBUNG
NOPOL
TGL
BLN
THN
CUSTOMER
KOMODITY
A 10
H 1761 DW
A 10
H 1761 DW
10
A 10
H 1761 DW
13
JUMLAH
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
KUDUS
PELABUHAN
0.000
950,000
950,000
525,000
25,000
SEMARANG
BOGOR
0.000
6,000,000
6,000,000
2,200,000
80,000
KLARI
SUBAH
30.439
110,000
3,348,290
2,000,000
80,000
PELABUHAN
SLEMAN
0.000
1,900,000
1,900,000
950,000
25,000
PELABUHAN
BATANG
0.000
1,200,000
1,200,000
700,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
900,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
30.439
19,860,000
23,098,290
11,575,000
360,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
SPD
PELABUHAN
0.000
500,000
500,000
190,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
800,000
25,000
PELABUHA N
SLEMAN
0.000
1,900,000
1,900,000
800,000
25,000
SPD
PELABUHAN
0.000
500,000
500,000
190,000
25,000
TAYU PATI
PELABUHAN
0.000
1,300,000
1,300,000
650,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
800,000
25,000
TAYU PATI
PELABUHAN
0.000
1,300,000
1,300,000
650,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
0.000
11,200,000
11,200,000
5,080,000
300,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
BUKIT PERAK
PELABUAHN
0.000
500,000
500,000
215,000
25,000
PELABUHAN
SLEMAN
0.000
1,900,000
1,900,000
840,000
25,000
PELABUHAN
SLEMAN
0.000
1,900,000
1,900,000
850,000
25,000
BOYOLALI
SEMARANG
0.000
2,500,000
2,500,000
700,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
925,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
BATANG
0.000
1,200,000
1,200,000
600,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
925,000
25,000
0.000
14,300,000
14,300,000
6,055,000
300,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
PT. CARGIL
0.000
500,000
500,000
190,000
25,000
PELABUHAN
PT. GCU
0.000
450,000
450,000
190,000
25,000
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
215,000
25,000
PELABUHAN
PT. CARGIL
0.000
600,000
600,000
225,000
25,000
PELABUHAN
KWSN. CANDI
0.000
450,000
450,000
190,000
25,000
PELABUHAN
KWSN. CANDI
0.000
450,000
450,000
190,000
25,000
PELABUHAN
KWSN. CANDI
0.000
450,000
450,000
190,000
25,000
PELABUHAN
NAYATI
0.000
450,000
450,000
190,000
25,000
PELABUHAN
LIK
0.000
500,000
500,000
190,000
25,000
PELABUHAN
LIK
0.000
500,000
500,000
190,000
25,000
PELABUHAN
NGALIYAN
0.000
500,000
500,000
225,000
25,000
PELABUHAN
LIK
0.000
500,000
500,000
190,000
25,000
PELABUHAN
LIK
0.000
500,000
500,000
190,000
25,000
PELABUHAN
NAYATI
0.000
450,000
450,000
190,000
25,000
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
215,000
25,000
PELABUHAN
PT. CARGIL
0.000
600,000
600,000
225,000
25,000
PELABUHAN
PT. GCU
0.000
450,000
450,000
190,000
25,000
PELABUHAN
PT. GCU
0.000
450,000
450,000
190,000
25,000
PELABUHAN
PT. GCU
0.000
450,000
450,000
190,000
25,000
PELABUHAN
PT. CARGIL
0.000
600,000
600,000
250,000
25,000
0.000
9,950,000
9,950,000
4,015,000
500,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
SPD
PELABUHAN
0.000
500,000
500,000
190,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
800,000
25,000
PELABUHAN
NAYATI
0.000
450,000
450,000
200,000
25,000
BUKIT PERAK
PELABUHAN
0.000
500,000
500,000
225,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
800,000
25,000
JEPARA
PELABUHAN
0.000
1,000,000
1,000,000
500,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
0.000
9,650,000
9,650,000
4,315,000
350,000
OMZET
COST OPERATIO
68,198,290
33
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
225,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
NAYATI
0.000
450,000
450,000
200,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
925,000
25,000
PELABUHAN
SLEMAN
0.000
1,900,000
1,900,000
850,000
25,000
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
225,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
800,000
25,000
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
215,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
925,000
25,000
SLEMAN
PELABUHAN
0.000
1,600,000
1,600,000
800,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
0.000
13,500,000
13,500,000
6,165,000
350,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
925,000
25,000
JEPARA
PELABUHAN
0.000
950,000
950,000
450,000
25,000
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
215,000
25,000
BUKIT PERAK
PELABUHAN
0.000
550,000
550,000
225,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
925,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
PELABUHAN
PT. GCU
0.000
500,000
500,000
200,000
25,000
JEPARA
PELABUHAN
0.000
950,000
950,000
500,000
25,000
0.000
9,800,000
9,800,000
4,440,000
300,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
0.000
13,300,000
13,300,000
7,175,000
175,000
MUAT
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
PREMI DRIVER
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
PELABUHAN
JOGJA
0.000
1,900,000
1,900,000
1,025,000
25,000
0.000
5,700,000
5,700,000
3,075,000
OMZET
75,000
COST OPERATIO
42,300,000
OMZET ALL
110,498,290
22
COST OPERATION
56
PREMI KERNET
15,000
UM/
LEMBUR
25,000
KET
R/L
INAP 1,090,000
810,000
560,000
390,000
10,000
20,000
20,000
JUMLAH
OUT
2,300,000 3,700,000
60,000
15,000
990,000
910,000
10,000
710,000
490,000
10,000
235,000
265,000
INAP 1,090,000
810,000
15,000
940,000
660,000
15,000
1,065,000
835,000
15,000
1,065,000
835,000
15,000
160,000
PREMI KERNET
25,000
110,000
UM/
LEMBUR
0 ######## ########
KET
JUMLAH
OUT
R/L
10,000
235,000
265,000
10,000
235,000
265,000
10,000
225,000
275,000
15,000
840,000
760,000
15,000
840,000 1,060,000
10,000
225,000
275,000
10,000
685,000
615,000
10,000
235,000
265,000
15,000
840,000
760,000
10,000
685,000
615,000
10,000
235,000
265,000
10,000
235,000
265,000
135,000
PREMI KERNET
UM/
LEMBUR
0 5,515,000 5,685,000
KET
JUMLAH
OUT
R/L
10,000
235,000
265,000
10,000
235,000
265,000
10,000
250,000
250,000
15,000
880,000 1,020,000
15,000
890,000 1,010,000
10,000
735,000 1,765,000
15,000
INAP 1,015,000
885,000
10,000
235,000
265,000
10,000
635,000
565,000
10,000
235,000
265,000
10,000
235,000
265,000
15,000
965,000
935,000
140,000
50,000
50,000
0 6,545,000 7,755,000
PREMI KERNET
10,000
UM/
LEMBUR
KET
R/L
250,000
250,000
10,000
225,000
225,000
10,000
275,000
275,000
260,000
340,000
10,000
225,000
225,000
10,000
250,000
200,000
10,000
225,000
225,000
10,000
225,000
225,000
225,000
275,000
10,000
225,000
275,000
10,000
285,000
215,000
10,000
225,000
275,000
10,000
225,000
275,000
10,000
225,000
225,000
10,000
250,000
300,000
10,000
260,000
340,000
10,000
225,000
225,000
10,000
225,000
225,000
10,000
225,000
225,000
10,000
285,000
315,000
10,000
10,000
200,000
25,000 INAP
JUMLAH
OUT
25,000 INAP
25,000 inap
75,000
0 4,815,000 5,135,000
PREMI KERNET
UM/
LEMBUR
KET
JUMLAH
OUT
R/L
10,000
235,000
265,000
10,000
235,000
265,000
10,000
225,000
275,000
15,000
840,000
760,000
10,000
235,000
215,000
10,000
260,000
240,000
10,000
235,000
265,000
10,000
235,000
265,000
15,000
840,000
760,000
10,000
535,000
465,000
10,000
235,000
265,000
10,000
235,000
265,000
10,000
235,000
265,000
10,000
235,000
265,000
150,000
COST OPERATION
33,895,000
0 4,815,000 4,835,000
GROOS PROFIT
34,303,290
PREMI KERNET
UM/
LEMBUR
KET
JUMLAH
OUT
R/L
10,000
260,000
290,000
10,000
235,000
265,000
10,000
235,000
215,000
15,000
965,000
935,000
15,000
890,000 1,010,000
10,000
260,000
290,000
15,000
840,000
760,000
10,000
250,000
300,000
inap 1,015,000
885,000
15,000
840,000
760,000
10,000
235,000
265,000
10,000
235,000
265,000
10,000
235,000
265,000
10,000
235,000
265,000
15,000
165,000
PREMI KERNET
50,000
50,000
UM/
LEMBUR
0 6,730,000 6,770,000
KET
JUMLAH
OUT
R/L
10,000
235,000
265,000
10,000
235,000
265,000
15,000
965,000
935,000
10,000
485,000
465,000
10,000
250,000
300,000
10,000
260,000
290,000
10,000
235,000
265,000
10,000
235,000
265,000
15,000
965,000
935,000
10,000
235,000
265,000
10,000
235,000
265,000
10,000
535,000
415,000
130,000
PREMI KERNET
UM/
LEMBUR
0 4,870,000 4,930,000
KET
JUMLAH
OUT
R/L
15,000
25,000
INAP 1,090,000
810,000
15,000
25,000
INAP 1,090,000
810,000
15,000
1,065,000
835,000
15,000
1,065,000
835,000
15,000
1,065,000
835,000
INAP 1,090,000
810,000
1,065,000
835,000
15,000
25,000
15,000
105,000
PREMI KERNET
75,000
UM/
LEMBUR
0 7,530,000 5,770,000
KET
JUMLAH
OUT
R/L
15,000
25,000
INAP 1,090,000
810,000
15,000
50,000
INAP 1,115,000
785,000
1,065,000
835,000
15,000
45,000
75,000
COST OPERATION
22,400,000
56,295,000
0 3,270,000 2,430,000
GROOS PROFIT
19,900,000
54,203,290
42,300,000
REKAP
DIVISI TRUC
NO.
LAMBUNG
A 07
NOPOL
TGL
BLN
THN
KOMODITY
H 1871 GH
2012
TIANG LSITRIK
JUMLAH
R
DIVISI TRUC
NO.
LAMBUNG
A 02
A 02
A 02
A 02
A 02
A 02
A 02
A 04
A 04
A 04
A 04
A 04
A 04
A 04
A 04
A 04
A 05
A 05
A 05
A 05
A 05
A 05
A 05
A 05
A 05
A 06
NOPOL
TGL
BLN
THN
KOMODITY
H 1801 CY
H 1801 CY
H 1801 CY
H 1801 CY
H 1801 CY
H 1801 CY
H 1801 CY
H 1645 JE
H 1645 JE
H 1645 JE
H 1645 JE
H 1645 JE
H 1645 JE
H 1645 JE
H 1645 JE
H 1645 JE
H 1302 KE
H 1302 KE
H 1302 KE
H 1302 KE
H 1302 KE
H 1302 KE
H 1302 KE
H 1302 KE
H 1302 KE
H 1622 JE
28
31
7
9
10
10
11
27
27
30
1
2
7
10
10
11
26
27
27
31
2
3
7
9
10
27
7
7
8
8
8
8
8
7
2
7
8
8
8
8
8
8
7
7
7
7
8
8
8
8
8
7
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
SUSU
KERTAS
POLYSTER
KAPAS
KEDELE
SUSU
GARMEN
KEDELE
KEDELE
POLYSTER
GARMEN
GARMEN
POLYSTER
ARANG
KEDELE
GARMEN
SABUN
KEDELE
ALAT DAPUR
SUSU
GARMEN
SABUN
GARMEN
SABUN
SUSU
KEDELE
A 06
A 06
A 06
A 06
A 06
A 06
A 06
A 06
A 07
A 07
A 07
A 07
A 07
A 07
A 07
A 02
A 04
A 04
A 04
A 05
A 05
A 05
A 06
A 06
A 07
A 07
A 07
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 08
A 09
A 09
H 1622 JE
H 1622 JE
H 1622 JE
H 1622 JE
H 1622 JE
H 1622 JE
H 1622 JE
H 1622 JE
H 1871 GH
H 1871 GH
H 1871 GH
H 1871 GH
H 1871 GH
H 1871 GH
H 1871 GH
H 1801 CY
H 1645 JE
H 1645 JE
H 1645 JE
H 1302 KE
H 1302 KE
H 1302 KE
H 1622 JE
H 1622 JE
H 1871 GH
H 1871 GH
H 1871 GH
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1844 BW
H 1759 DW
H 1759 DW
27
31
2
9
10
10
10
11
27
27
30
31
2
9
10
13
12
13
13
12
13
13
13
13
13
13
13
25
27
27
27
2
2
2
3
3
6
7
8
8
9
9
10
13
13
28
31
7
7
8
8
8
8
8
8
7
7
7
7
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
7
7
7
7
8
8
8
8
8
8
8
8
8
8
8
8
8
8
7
7
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
KEDELE
SUSU
MEUBEL
SABUN
SABUN
KEDELE
KEDELE
SUSU
KEDELE
KEDELE
SABUN
POLYSTER
GARMEN
SUSU
KEDELE
SUSU
ARANG
KEDELE
KEDELE
GARMEN
KEDELE
KEDELE
KEDELE
KAPAS
KAPAS
KEDELE
KEDELE
PAKAN TERNAK
KEDELE
SABUN
PAKAN TERNAK
KEDELE
KEDELE
KEDELE
ALAT DAPUR
PAKAN TERNAK
PAKAN TERNAK
JAMU
PAKAN TERNAK
PAKAN TERNAK
ALAT DAPUR
SABUN
PAKAN TERNAK
KEDELE
KEDELE
SUSU
SUSU
A 09
A 09
A 09
A 09
A 09
A 10
A 10
A 10
A 11
A 11
A 11
A 11
A 11
A 11
A 11
A 11
A 11
A 11
A 11
A 11
A 05
A 05
A 06
A 07
A 08
A 08
A 11
A 11
A 02
H 1759 DW
H 1759 DW
H 1759 DW
H 1759 DW
H 1759 DW
H 1761 DW
H 1761 DW
H 1761 DW
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1830 AQ
H 1302 KE
H 1302 KE
H 1622 JE
H 1871 GH
H 1844 BW
H 1844 BW
H 1820 AQ
H 1820 AQ
H 1801 CY
3
7
9
10
13
3
10
13
27
27
31
1
2
3
10
10
11
12
13
13
14
14
14
14
14
14
14
14
10
8
8
8
8
8
8
8
8
7
7
7
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
SUSU
SUSU
SUSU
SUSU
SUSU
SUSU
SUSU
SUSU
KEDELE
KEDELE
POLYSTER
GARMEN
ALAT DAPUR
SABUN
KEDELE
KEDELE
GARMEN
MEUBEL
KEDELE
KEDELE
KEDELE
KEDELE
MEUBEL
SUSU
KEDELE
PAKAN TERNAK
KEDELE
KEDELE
SUSU
JUMLAH
DIVISI TRUC
NO.
LAMBUNG
A 02
NOPOL
TGL
BLN
H 1801 CY
THN
2012
KOMODITY
CONTAINER KOSONG
JUMLAH
REKA
DIVISI TRUC
NO.
LAMBUNG
A 02
NOPOL
TGL
BLN
H 1801 CY
THN
2012
JUMLAH
KOMODITY
ASBES
MUAT
BONGKAR
BOYOLALI
SEMARANG
TONASE
0.000
0.000
TARIF
2,500,000
2,500,000
JUMLAH IN
2,500,000
2,500,000
SANGU
700,000
700,000
PREMI
DRIVER
25,000
25,000
MUAT
PELABUHAN
KUDUS
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
SLEMAN
PELABUHAN
PELABUHAN
SPD
SLEMAN
PELABUHA N
SPD
TAYU PATI
PELABUHAN
SLEMAN
BUKIT PERAK
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
BUKIT PERAK
SLEMAN
BUKIT PERAK
PELABUHAN
PELABUHAN
BONGKAR
JOGJA
PELABUHAN
SLEMAN
BATANG
PT. GCU
JOGJA
PELABUHAN
PT. GCU
PT. GCU
PELABUHAN
PELABUHAN
SLEMAN
PELABUHAN
PELABUHAN
PT. GCU
PELABUHAN
PELABUHAN
PT. GCU
NAYATI
JOGJA
SLEMAN
PELABUHAN
PELABUHAN
PELABUHAN
JOGJA
PT. GCU
TONASE
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
TARIF
1,900,000
950,000
1,900,000
1,200,000
500,000
1,900,000
1,600,000
500,000
500,000
500,000
1,600,000
1,900,000
500,000
1,300,000
500,000
1,600,000
550,000
500,000
450,000
1,900,000
1,900,000
550,000
1,600,000
550,000
1,900,000
500,000
JUMLAH IN
1,900,000
950,000
1,900,000
1,200,000
500,000
1,900,000
1,600,000
500,000
500,000
500,000
1,600,000
1,900,000
500,000
1,300,000
500,000
1,600,000
550,000
500,000
450,000
1,900,000
1,900,000
550,000
1,600,000
550,000
1,900,000
500,000
SANGU
1,025,000
525,000
950,000
700,000
200,000
1,025,000
900,000
200,000
200,000
190,000
800,000
800,000
190,000
650,000
200,000
800,000
225,000
200,000
200,000
925,000
850,000
225,000
800,000
215,000
925,000
200,000
PREMI
DRIVER
25,000
25,000
25,000
0
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
PELABUHAN
PELABUHAN
JEPARA
BUKIT PERAK
BUKIT PERAK
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
BUKIT PERAK
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
TAYU PATI
PELABUHAN
PELABUHAN
SLEMAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
BUKIT PERAK
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
BUKIT PERAK
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PT. GCU
JOGJA
PELABUHAN
PELABUHAN
PELABUHAN
PT. GCU
PT. GCU
JOGJA
PT. GCU
PT. GCU
PELABUAHN
SLEMAN
SLEMAN
JOGJA
PT. GCU
JOGJA
PELABUHAN
PT. GCU
PT. GCU
PELABUHAN
PT. GCU
PT. GCU
PT. GCU
PT. GCU
BATANG
PT. GCU
PT. GCU
PT. CARGIL
PT. GCU
PELABUHAN
PT. CARGIL
KWSN. CANDI
KWSN. CANDI
KWSN. CANDI
NAYATI
LIK
LIK
NGALIYAN
LIK
LIK
NAYATI
PELABUHAN
PT. CARGIL
PT. GCU
PT. GCU
JOGJA
JOGJA
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
500,000
1,900,000
950,000
550,000
550,000
500,000
500,000
1,900,000
500,000
500,000
500,000
1,900,000
1,900,000
1,900,000
500,000
1,900,000
1,300,000
500,000
500,000
1,600,000
500,000
500,000
500,000
500,000
1,200,000
500,000
500,000
500,000
450,000
550,000
600,000
450,000
450,000
450,000
450,000
500,000
500,000
500,000
500,000
500,000
450,000
550,000
600,000
450,000
450,000
1,900,000
1,900,000
500,000
1,900,000
950,000
550,000
550,000
500,000
500,000
1,900,000
500,000
500,000
500,000
1,900,000
1,900,000
1,900,000
500,000
1,900,000
1,300,000
500,000
500,000
1,600,000
500,000
500,000
500,000
500,000
1,200,000
500,000
500,000
500,000
450,000
550,000
600,000
450,000
450,000
450,000
450,000
500,000
500,000
500,000
500,000
500,000
450,000
550,000
600,000
450,000
450,000
1,900,000
1,900,000
200,000
925,000
450,000
215,000
225,000
200,000
200,000
925,000
200,000
200,000
215,000
840,000
850,000
925,000
200,000
1,025,000
650,000
200,000
200,000
800,000
200,000
200,000
200,000
200,000
600,000
200,000
200,000
190,000
190,000
215,000
225,000
190,000
190,000
190,000
190,000
190,000
190,000
225,000
190,000
190,000
190,000
215,000
225,000
190,000
190,000
1,025,000
1,025,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
SPD
SLEMAN
PELABUHAN
BUKIT PERAK
PELABUHAN
PELABUHAN
SLEMAN
JEPARA
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
JEPARA
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
PELABUHAN
JOGJA
JOGJA
JOGJA
JOGJA
JOGJA
JOGJA
JOGJA
JOGJA
PT. GCU
PT. GCU
PELABUHAN
PELABUHAN
NAYATI
PELABUHAN
PT. GCU
PT. GCU
PELABUHAN
PELABUHAN
PT. GCU
PT. GCU
PT. GCU
PT. GCU
PELABUHAN
JOGJA
PT. GCU
PT. CARGIL
PT. GCU
PT. GCU
JOGJA
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
500,000
500,000
500,000
1,600,000
450,000
500,000
500,000
500,000
1,600,000
1,000,000
500,000
500,000
500,000
500,000
950,000
1,900,000
450,000
600,000
500,000
500,000
1,900,000
98,650,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
500,000
500,000
500,000
1,600,000
450,000
500,000
500,000
500,000
1,600,000
1,000,000
500,000
500,000
500,000
500,000
950,000
1,900,000
450,000
600,000
500,000
500,000
1,900,000
98,650,000
1,025,000
1,025,000
1,025,000
1,025,000
1,025,000
1,025,000
1,025,000
1,025,000
200,000
200,000
190,000
800,000
200,000
225,000
200,000
200,000
800,000
500,000
200,000
200,000
200,000
200,000
500,000
925,000
190,000
250,000
200,000
200,000
1,025,000
46,995,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
25,000
2,525,000
MUAT
SEMARANG
BONGKAR
BOGOR
TONASE
0.000
0.000
TARIF
6,000,000
6,000,000
JUMLAH IN
6,000,000
6,000,000
SANGU
2,200,000
2,200,000
PREMI
DRIVER
80,000
80,000
MUAT
KLARI
BONGKAR
SUBAH
TONASE
30.439
30.439
TARIF
110,000
110,000
JUMLAH IN
3,348,290
3,348,290
SANGU
2,000,000
2,000,000
PREMI
DRIVER
80,000
80,000
PREMI
UM/ LEMBUR
KERNET
10,000
10,000
0
PREMI
UM/ LEMBUR
KERNET
15,000
25,000
10,000
15,000
10,000
10,000
15,000
25,000
15,000
10,000
10,000
10,000
15,000
15,000
10,000
10,000
10,000
15,000
10,000
10,000
10,000
15,000
15,000
10,000
15,000
10,000
15,000
50,000
10,000
KET
JUMLAH
R/L
OUT
735,000 1,765,000
0 735,000 1,765,000
JUMLAH
R/L
OUT
INAP 1,090,000 810,000
560,000 390,000
990,000 910,000
710,000 490,000
235,000 265,000
INAP 1,090,000 810,000
940,000 660,000
235,000 265,000
235,000 265,000
225,000 275,000
840,000 760,000
840,000 1,060,000
225,000 275,000
685,000 615,000
235,000 265,000
840,000 760,000
260,000 290,000
235,000 265,000
235,000 215,000
965,000 935,000
890,000 1,010,000
260,000 290,000
840,000 760,000
250,000 300,000
inap 1,015,000 885,000
235,000 265,000
KET
10,000
15,000
10,000
10,000
10,000
10,000
10,000
15,000
10,000
10,000
10,000
15,000
15,000
15,000
10,000
15,000
10,000
10,000
10,000
15,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
15,000
15,000
235,000 265,000
965,000 935,000
485,000 465,000
250,000 300,000
260,000 290,000
235,000 265,000
235,000 265,000
965,000 935,000
235,000 265,000
235,000 265,000
250,000 250,000
880,000 1,020,000
890,000 1,010,000
50,000
INAP 1,015,000 885,000
235,000 265,000
1,065,000 835,000
685,000 615,000
235,000 265,000
235,000 265,000
840,000 760,000
235,000 265,000
235,000 265,000
235,000 265,000
235,000 265,000
635,000 565,000
235,000 265,000
235,000 265,000
25,000 INAP
250,000 250,000
225,000 225,000
275,000 275,000
25,000 INAP
260,000 340,000
225,000 225,000
250,000 200,000
225,000 225,000
225,000 225,000
25,000 inap
225,000 275,000
225,000 275,000
285,000 215,000
225,000 275,000
225,000 275,000
225,000 225,000
250,000 300,000
260,000 340,000
225,000 225,000
225,000 225,000
25,000
INAP 1,090,000 810,000
25,000
INAP 1,090,000 810,000
15,000
15,000
15,000
15,000
15,000
15,000
15,000
15,000
10,000
10,000
10,000
15,000
10,000
10,000
10,000
10,000
15,000
10,000
10,000
10,000
10,000
10,000
10,000
15,000
10,000
10,000
10,000
10,000
15,000
1,180,000
25,000
INAP
25,000
50,000
INAP
INAP
375,000
PREMI
UM/ LEMBUR
KERNET
20,000
20,000
0
KET
1,065,000 835,000
1,065,000 835,000
1,065,000 835,000
1,090,000 810,000
1,065,000 835,000
1,090,000 810,000
1,115,000 785,000
1,065,000 835,000
235,000 265,000
235,000 265,000
225,000 275,000
840,000 760,000
235,000 215,000
260,000 240,000
235,000 265,000
235,000 265,000
840,000 760,000
535,000 465,000
235,000 265,000
235,000 265,000
235,000 265,000
235,000 265,000
535,000 415,000
965,000 935,000
225,000 225,000
285,000 315,000
235,000 265,000
235,000 265,000
1,065,000 835,000
######## ########
JUMLAH
R/L
OUT
2,300,000 3,700,000
0 2,300,000 3,700,000
PREMI
UM/ LEMBUR
KERNET
20,000
60,000
20,000
60,000
JUMLAH
R/L
OUT
INAP 2,160,000 1,188,290
0 2,160,000 1,188,290
KET
54,203,290
LAPORAN
DIVISI TRUCKING P
BUL
NOPOL
TGL
K 1914 E
19
K 1994 E
20
F 9474 FC 25
F 9483 FC 25
F 9488 FC 25
W 8711 UR 26
W 8710 UR 27
N 9356 US 27
K 1896 CB 28
K 1804 PP 28
B 9725 BZ 28
H 1574 ZW 28
B 9094 MR 28
E 9733 A
1
K 1530 MA 1
H 1612 JA
1
H 1589 WK 1
H 1600 WK 10
B 9940 SU 21
AA 1806 MF 2
H 1586 UA
2
H 1386 W
2
H 1793 DF
2
B 9432 BEH 2
H 1829 DF
2
B 9440 BEH 2
B 9403 BEH 2
B 9261 BEH 3
H 1916 GH 3
AE 8469 UB 22
B 9696 WT 22
AG 8535 UB 22
B 9780 MA 25
H 1306 JS
2
H 1306 JS
2
H 1472 RH 3
H 1587 WK 3
H 1455 WK 3
K 1865 BH
3
H 1797 AP
5
BLN
5
5
7
7
7
7
7
7
7
7
7
7
7
8
8
8
8
7
7
8
8
8
8
8
8
8
8
8
8
7
7
7
7
8
8
8
8
8
8
8
THN
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
CUSTOMER
PT. PETROKIMIA
PT. PETROKIMIA
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. SPS HOLDING
PUPUK KALTIM
PT. GARUDA MAS
PT. GARUDA MAS
PT. GARUDA MAS
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
KOMODITY
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
BERAS
PUPUK
PUPUK
PUPUK
PUPUK
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
MUAT
GRESIK
GRESIK
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
PATI
SEDAYU
SAYUNG
SAYUNG
SAYUNG
PATI
PATI
PATI
PATI
PATI
PATI
PATI
PATI
PT. PETROKIMIA
PT. PETROKIMIA
PT. PETROKIMIA
PT. PETROKIMIA
PT. SPS HOLDING
DIV. PBM
PT. GARUDA MAS
PT. SPS HOLDING
PT. SPS HOLDING
PT. SPS HOLDING
DIV. PBM
PUPUK
PUPUK
PUPUK
PUPUK
BERAS
JUMBO BAG
PUPUK
BERAS
BERAS
BERAS
JUMBO BAG
GRESIK
GRESIK
GRESIK
GRESIK
JUWONO
SEMARANG
SAYUNG
JUWONO
JUWONO
JUWONO
SEMARANG
BONGKAR
PURWODADI
PURWODADI
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
SEMARANG
SEMARANG
CIKAMPEK
CIKAMPEK
CIKAMPEK
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
BANYUMAS
BANYUMAS
BANYUMAS
BANYUMAS
SEMARANG
PATI
CIKAMPEK
SEMARANG
SEMARANG
SEMARANG
PATI
H 1318 MA
H 1534 JA
H 1443 WW 6
H 1374 UF
SEMARANG
PATI
PATI
SEMARANG
PATI
SEMARANG
PATI
SEMARANG
H 1367 WS
PATI
SEMARANG
H 1306 JS
JUWONO
SEMARANG
H 1751 ES
JUWONO
SEMARANG
H 1797 AP
JUWONO
SEMARANG
H 1798 AP
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
JUWONO
SEMARANG
H 1318 MA
H 1989 AP
H 1921 CF
H 1887 BF
H 1306 JS
H 1885 GS
H 1797 AP
H 1824 EG
H 1751 ES
6
6
6
6
7
7
7
7
7
7
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
H 1399 UY
PATI
SEMARANG
H 1459 LA
E 8269 L
H 9244 WK
H 9433 BEH
F 9116 F
F 9055 FA
F 9342 FB
F 9093 F
F 9102 F
F 9340 FA
F 9234 FA
B 9770 Z
H 1522 QS
H 1459 FY
H 1766 ER
H 1989 BP
H 1798 AP
H 1318 MA
B 9905 QS
7
7
7
7
2
2
2
2
2
2
2
2
8
8
8
8
8
8
8
8
10
5
7
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
PATI
PATI
PATI
PATI
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
GRESIK
SEMARANG
SEMARANG
SEMARANG
SEMARANG
BATANG
BATANG
BATANG
BATANG
BATANG
BATANG
BATANG
BATANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
BATANG
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
BATANG
BATANG
PURWODADI
PURWODADI
PURWODADI
B 9908 QZ
B 9725 QZ
K 1964 E
K 1901 E
K 1911 E
JUMBO BAG
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PATI
AG 8885 UR 9
K 1964 E
10
H 1957 AG 23
8
8
8
JUMLAH
GRESIK
GRESIK
PATI
PURWODADI
PURWODADI
SEMARANG
TARIF
104,000
104,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
50,000
85,000
140,000
140,000
140,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
117,000
117,000
117,000
117,000
55,000
880,000
140,000
55,000
55,000
55,000
880,000
JUMLAH IN
2,288,000
2,288,000
4,690,000
4,620,000
4,690,000
5,600,000
5,600,000
5,600,000
4,200,000
4,200,000
4,200,000
4,200,000
4,200,000
5,600,000
4,900,000
4,200,000
2,205,000
4,250,000
4,508,000
4,200,000
4,200,000
2,021,250
2,021,250
2,021,250
2,021,250
2,021,250
1,916,250
2,021,250
1,250,000
4,095,000
4,680,000
4,095,000
4,680,000
1,375,000
880,000
4,200,000
2,367,750
2,301,750
2,145,000
880,000
SANGU
0
0
0
0
0
0
0
0
350,000
400,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
450,000
1,800,000
2,100,000
1,800,000
2,100,000
600,000
0
0
0
0
0
0
JUAL
98,000
98,000
128,000
128,000
128,000
128,000
128,000
128,000
128,000
128,000
128,000
128,000
125,000
125,000
125,000
125,000
40,000
82,500
130,000
125,000
125,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
42,000
105,000
105,000
105,000
105,000
51,000
800,000
125,000
48,000
48,000
55,000
800,000
UNIT
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
BINTANG MULIA
BINTANG MULIA
BINTANG MULIA
BINTANG MULIA
HATI AGUNG
DIV LOGISTIK
DIV LOGISTIK
BINTANG MULIA
BINTANG MULIA
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
JLA
SKA
SKA
SKA
SKA
JLA
JLA
BINTANG MULIA
HATI AGUNG
HATI AGUNG
BAMBANG KIJONO
JLA
0.000
880,000
880,000
800,000 JLA
25.200
55,000
1,386,000
300,000
45,000 KENCANA
25.200
55,000
1,386,000
300,000
45,000 KENCANA
25.200
55,000
1,386,000
300,000
45,000 KENCANA
25.200
55,000
1,386,000
600,000
45,000 KENCANA
25.000
55,000
1,375,000
51,000 JLA
25.000
55,000
1,375,000
51,000 JLA
25.000
55,000
1,375,000
51,000 JLA
25.000
25.000
25.000
40.425
25.000
25.000
25.000
25.000
25.000
25.000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
1,375,000
1,375,000
1,375,000
2,223,375
1,375,000
1,375,000
1,375,000
1,375,000
1,375,000
1,375,000
0
0
0
0
0
600,000
600,000
0
0
0
51,000
51,000
51,000
40,000
51,000
51,000
51,000
51,000
51,000
51,000
26.255
55,000
1,444,025
300,000
45,000 KENCANA
26.250
26.250
39.600
40.000
25.000
25.000
25.000
25.000
25.000
25.000
25.000
32.000
25.200
25.200
25.200
25.000
25.000
25.000
32.000
32.000
32.000
30.000
30.000
30.000
55,000
55,000
55,000
55,000
104,000
104,000
104,000
104,000
104,000
104,000
104,000
104,000
55,000
55,000
55,000
55,000
55,000
55,000
104,000
104,000
104,000
133,000
133,000
133,000
1,443,750
1,443,750
2,178,000
2,200,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
2,600,000
3,328,000
1,386,000
1,386,000
1,386,000
1,375,000
1,375,000
1,375,000
3,328,000
3,328,000
3,328,000
3,990,000
3,990,000
3,990,000
300,000
300,000
0
0
0
0
0
0
0
0
0
0
600,000
600,000
600,000
0
0
0
0
0
0
0
0
0
45,000
45,000
40,000
40,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
95,000
56,000
56,000
56,000
51,000
51,000
51,000
95,000
95,000
95,000
93,000
93,000
93,000
JLA
JLA
JLA
HATI AGUNG
JLA
JLA
JLA
JLA
JLA
JLA
KENCANA
KENCANA
HATI AGUNG
HATI AGUNG
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
ARIMBI
ARIMBI
ARIMBI
JLA
JLA
JLA
WIGUNA
WIGUNA
WIGUNA
ABADI MOTOR
ABADI MOTOR
ABADI MOTOR
30.000
30.000
24.990
2,568.245
133,000
133,000
55,000
3,990,000
3,990,000
1,374,450
0
0
0
9,995,000
232,408,600
15,000,000
8,870,500
TONASE
22.000
22.000
33.500
33.000
33.500
40.000
40.000
40.000
30.000
30.000
30.000
30.000
30.000
40.000
35.000
30.000
44.100
50.000
32.200
30.000
30.000
40.425
40.425
40.425
40.425
40.425
38.325
40.425
25.000
35.000
40.000
35.000
40.000
25.000
0.000
30.000
43.050
41.850
39.000
0.000
KET
JUMLAH OUT
2,156,000
2,156,000
4,288,000
4,224,000
4,288,000
5,120,000
5,120,000
5,120,000
3,840,000
3,840,000
3,840,000
3,840,000
3,750,000
5,000,000
4,375,000
3,750,000
1,764,000
4,125,000
4,186,000
3,750,000
3,750,000
1,617,000
1,617,000
1,617,000
1,617,000
1,617,000
1,533,000
1,617,000
1,050,000
3,675,000
4,200,000
3,675,000
4,200,000
1,275,000
800,000
3,750,000
2,066,400
2,008,800
2,145,000
800,000
R/L
132,000
132,000
402,000
396,000
402,000
480,000
480,000
480,000
360,000
360,000
360,000
360,000
450,000
600,000
525,000
450,000
441,000
125,000
322,000
450,000
450,000
404,250
404,250
404,250
404,250
404,250
383,250
404,250
200,000
420,000
480,000
420,000
480,000
100,000
80,000
450,000
301,350
292,950
0
80,000
0.000
800,000
80,000
25.200
1,134,000
252,000
25.200
1,134,000
252,000
25.200
1,134,000
252,000
25.200
1,134,000
252,000
25.000
1,275,000
100,000
25.000
1,275,000
100,000
25.000
1,275,000
100,000
25.000
25.000
25.000
40.425
25.000
25.000
25.000
25.000
25.000
25.000
1,275,000
1,275,000
1,275,000
1,617,000
1,275,000
1,275,000
1,275,000
1,275,000
1,275,000
1,275,000
100,000
100,000
100,000
606,375
100,000
100,000
100,000
100,000
100,000
100,000
26.255
1,181,475
262,550
26.250
26.250
39.600
40.000
25.000
25.000
25.000
25.000
25.000
25.000
25.000
32.000
25.200
25.200
25.200
25.000
25.000
25.000
32.000
32.000
32.000
30.000
30.000
30.000
1,181,250 262,500
1,181,250 262,500
1,584,000 594,000
1,600,000 600,000
2,375,000 225,000
2,375,000 225,000
2,375,000 225,000
2,375,000 225,000
2,375,000 225,000
2,375,000 225,000
2,375,000 225,000
3,040,000 288,000
1,411,200
25,200
1,411,200
25,200
1,411,200
25,200
1,275,000 100,000
1,275,000 100,000
1,275,000 100,000
3,040,000 288,000
3,040,000 288,000
3,040,000 288,000
2,790,000 1,200,000
2,790,000 1,200,000
2,790,000 1,200,000
30.000
30.000
24.990
2,568.245
2,790,000 1,200,000
2,790,000 1,200,000
1,124,550 249,900
0 204,061,325 #######
RE
DIVISI TRUCKING
B
NOPOL
H 1306 JS
H 1797 AP
H 1318 MA
TGL
2
5
5
BLN
8
8
8
THN
2012
2012
2012
KOMODITY
JUMBO BAG
JUMBO BAG
JUMBO BAG
MUAT
SEMARANG
SEMARANG
SEMARANG
JUMLAH
REKAP
DIVISI TRUCKING
B
NOPOL
TGL
BLN
THN
F 9474 FC
F 9488 FC
25
25
25
7
7
7
2012
2012
2012
PUPUK
PUPUK
PUPUK
SAYUNG
SAYUNG
SAYUNG
W 8711 UR
26
2012
PUPUK
SAYUNG
W 8710 UR
H 1574 ZW
27
27
28
28
28
28
7
7
7
7
7
7
2012
2012
2012
2012
2012
2012
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
B 9094 MR
28
2012
PUPUK
SAYUNG
E 9733 A
1
1
1
21
2
2
3
8
8
8
7
8
8
8
2012
2012
2012
2012
2012
2012
2012
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
SAYUNG
PUPUK
SAYUNG
F 9483 FC
N 9356 US
K 1896 CB
K 1804 PP
B 9725 BZ
K 1530 MA
H 1612 JA
B 9940 SU
AA 1806 MF
H 1586 UA
H 1472 RH
KOMODITY
MUAT
JUMLAH
REKAP
DIVISI TRUCKING
NOPOL
BLN
5
5
7
7
7
7
8
8
THN
2012
2012
2012
2012
2012
2012
2012
2012
KOMODITY
PUPUK
PUPUK
MUAT
GRESIK
GRESIK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
F 9055 FA
TGL
19
20
22
22
22
25
2
2
PUPUK
GRESIK
F 9342 FB
2012
PUPUK
GRESIK
F 9093 F
2012
PUPUK
GRESIK
F 9102 F
2012
PUPUK
GRESIK
F 9340 FA
2012
PUPUK
GRESIK
F 9234 FA
2
2
8
8
10
5
7
8
9
10
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
PUPUK
GRESIK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
PUPUK
GRESIK
GRESIK
K 1914 E
K 1994 E
AE 8469 UB
B 9696 WT
AG 8535 UB
B 9780 MA
F 9116 F
B 9770 Z
B 9905 QS
B 9908 QZ
B 9725 QZ
K 1964 E
K 1901 E
K 1911 E
AG 8885 UR
K 1964 E
PUPUK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
GRESIK
JUMLAH
REKAP
DIVISI TRUCKING
B
NOPOL
H 1589 WK
H 1386 W
H 1793 DF
B 9432 BEH
H 1829 DF
B 9440 BEH
B 9403 BEH
B 9261 BEH
TGL
1
2
2
2
2
2
2
3
BLN
8
8
8
8
8
8
8
8
THN
2012
2012
2012
2012
2012
2012
2012
2012
KOMODITY
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
MUAT
PATI
PATI
PATI
PATI
PATI
PATI
PATI
PATI
8
8
8
2012
2012
2012
BERAS
PATI
BERAS
JUWONO
H 1587 WK
3
2
3
BERAS
JUWONO
H 1455 WK
2012
BERAS
JUWONO
K 1865 BH
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
BERAS
JUWONO
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
PATI
PATI
PATI
PATI
H 1798 AP
3
6
6
6
7
6
6
6
6
BERAS
JUWONO
H 1318 MA
2012
BERAS
JUWONO
H 1989 AP
6
6
7
7
7
7
7
7
7
7
7
7
7
8
8
8
8
8
8
23
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
BERAS
JUWONO
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
BERAS
PATI
BERAS
PATI
H 1916 GH
H 1306 JS
H 1534 JA
H 1443 WW
H 1374 UF
H 1367 WS
H 1306 JS
H 1751 ES
H 1797 AP
H 1921 CF
H 1887 BF
H 1306 JS
H 1885 GS
H 1797 AP
H 1824 EG
H 1751 ES
H 1399 UY
H 1459 LA
E 8269 L
H 9244 WK
H 9433 BEH
H 1522 QS
H 1459 FY
H 1766 ER
H 1989 BP
H 1798 AP
H 1318 MA
H 1957 AG
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
PATI
PATI
PATI
PATI
PATI
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUWONO
JUMLAH
RE
DIVISI TRUCKING
B
NOPOL
H 1600 WK
TGL
10
BLN
7
THN
2012
JUMLAH
KOMODITY
PUPUK
MUAT
SEDAYU
TONASE
0.000
0.000
0.000
0.000
TARIF
880,000
880,000
880,000
JUMLAH IN
880,000
880,000
880,000
2,640,000
2,640,000
SANGU
0
0
0
JUAL
UNIT
800,000 JLA
800,000 JLA
800,000 JLA
2,400,000
BONGKAR
TONASE
TARIF
JUMLAH IN
SANGU
JUAL
UNIT
CIKAMPEK
33.500
33.000
33.500
140,000
140,000
140,000
4,690,000
4,620,000
4,690,000
0
0
0
CIKAMPEK
40.000
140,000
5,600,000
CIKAMPEK
CIKAMPEK
40.000
40.000
30.000
30.000
30.000
30.000
140,000
140,000
140,000
140,000
140,000
140,000
5,600,000
5,600,000
4,200,000
4,200,000
4,200,000
4,200,000
0
0
350,000
400,000
0
0
CIKAMPEK
30.000
140,000
4,200,000
CIKAMPEK
40.000
35.000
30.000
32.200
30.000
30.000
30.000
140,000
140,000
140,000
140,000
140,000
140,000
140,000
5,600,000
4,900,000
4,200,000
4,508,000
4,200,000
4,200,000
4,200,000
0
0
0
0
0
0
0
125,000
125,000
125,000
130,000
125,000
125,000
125,000
2,520,000 83,608,000
750,000
2,285,000
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
CIKAMPEK
597.200
128,000
128,000
128,000
128,000
128,000
128,000
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
DIV LOGISTIK
BINTANG MULIA
BINTANG MULIA
BINTANG MULIA
DIV LOGISTIK
BINTANG MULIA
BINTANG MULIA
BINTANG MULIA
BONGKAR
BATANG
TONASE
22.000
22.000
35.000
40.000
35.000
40.000
25.000
25.000
TARIF
104,000
104,000
117,000
117,000
117,000
117,000
104,000
104,000
JUMLAH IN
2,288,000
2,288,000
4,095,000
4,680,000
4,095,000
4,680,000
2,600,000
2,600,000
BATANG
25.000
104,000
2,600,000
95,000 WIGUNA
BATANG
25.000
104,000
2,600,000
95,000 WIGUNA
BATANG
25.000
104,000
2,600,000
95,000 WIGUNA
BATANG
25.000
104,000
2,600,000
95,000 WIGUNA
BATANG
25.000
32.000
32.000
32.000
32.000
30.000
30.000
30.000
30.000
30.000
104,000
104,000
104,000
104,000
104,000
133,000
133,000
133,000
133,000
133,000
2,600,000
3,328,000
3,328,000
3,328,000
3,328,000
3,990,000
3,990,000
3,990,000
3,990,000
3,990,000
0
0
0
0
0
0
0
0
0
0
95,000
95,000
95,000
95,000
95,000
93,000
93,000
93,000
93,000
93,000
2,485,000 73,588,000
7,800,000
2,126,000
PURWODADI
PURWODADI
BANYUMAS
BANYUMAS
BANYUMAS
BANYUMAS
BATANG
BATANG
BATANG
BATANG
BATANG
PURWODADI
PURWODADI
PURWODADI
PURWODADI
PURWODADI
647.000
SANGU
0
0
1,800,000
2,100,000
1,800,000
2,100,000
0
0
JUAL
98,000
98,000
105,000
105,000
105,000
105,000
95,000
95,000
UNIT
DIV LOGISTIK
DIV LOGISTIK
SKA
SKA
SKA
SKA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
WIGUNA
ABADI MOTOR
ABADI MOTOR
ABADI MOTOR
ABADI MOTOR
ABADI MOTOR
BONGKAR
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
TONASE
44.100
40.425
40.425
40.425
40.425
40.425
38.325
40.425
TARIF
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
JUMLAH IN
2,205,000
2,021,250
2,021,250
2,021,250
2,021,250
2,021,250
1,916,250
2,021,250
SANGU
0
0
0
0
0
0
0
0
JUAL
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
UNIT
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
HATI AGUNG
SEMARANG
25.000
25.000
43.050
50,000
55,000
55,000
1,250,000
1,375,000
2,367,750
450,000
600,000
0
42,000 JLA
51,000 JLA
48,000 HATI AGUNG
SEMARANG
41.850
55,000
2,301,750
SEMARANG
SEMARANG
39.000
25.200
25.200
25.200
25.200
25.000
25.000
25.000
25.000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
2,145,000
1,386,000
1,386,000
1,386,000
1,386,000
1,375,000
1,375,000
1,375,000
1,375,000
0
300,000
300,000
300,000
600,000
0
0
0
0
SEMARANG
25.000
55,000
1,375,000
SEMARANG
25.000
40.425
25.000
25.000
25.000
25.000
25.000
25.000
26.255
26.250
26.250
39.600
40.000
25.200
25.200
25.200
25.000
25.000
25.000
24.990
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
1,375,000
2,223,375
1,375,000
1,375,000
1,375,000
1,375,000
1,375,000
1,375,000
1,444,025
1,443,750
1,443,750
2,178,000
2,200,000
1,386,000
1,386,000
1,386,000
1,375,000
1,375,000
1,375,000
1,374,450
0
0
0
600,000
600,000
0
0
0
300,000
300,000
300,000
0
0
600,000
600,000
600,000
0
0
0
0
51,000
40,000
51,000
51,000
51,000
51,000
51,000
51,000
45,000
45,000
45,000
40,000
40,000
56,000
56,000
56,000
51,000
51,000
51,000
45,000
2,265,000 68,322,600
6,450,000
1,977,000
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
SEMARANG
1,274.045
55,000
45,000
45,000
45,000
45,000
51,000
51,000
51,000
51,000
BAMBANG KIJONO
KENCANA
KENCANA
KENCANA
KENCANA
JLA
JLA
JLA
JLA
51,000 JLA
JLA
HATI AGUNG
JLA
JLA
JLA
JLA
JLA
JLA
KENCANA
KENCANA
KENCANA
HATI AGUNG
HATI AGUNG
ARIMBI
ARIMBI
ARIMBI
JLA
JLA
JLA
JAYA TRANSPORT
TONASE
50.000
50.000
TARIF
85,000
JUMLAH IN
4,250,000
85,000
4,250,000
SANGU
0
JUAL
UNIT
82,500 DIV LOGISTIK
82,500
TONASE
0.000
0.000
0.000
KET
0.000
TONASE
JUMLAH OUT
800,000
800,000
800,000
2,400,000
KET
JUMLAH OUT
R/L
80,000
80,000
80,000
240,000
R/L
33.500
33.000
33.500
4,288,000
4,224,000
4,288,000
402,000
396,000
402,000
40.000
5,120,000
480,000
40.000
40.000
30.000
30.000
30.000
30.000
5,120,000
5,120,000
3,840,000
3,840,000
3,840,000
3,840,000
480,000
480,000
360,000
360,000
360,000
360,000
30.000
3,750,000
450,000
40.000
35.000
30.000
32.200
30.000
30.000
30.000
5,000,000
4,375,000
3,750,000
4,186,000
3,750,000
3,750,000
3,750,000
600,000
525,000
450,000
322,000
450,000
450,000
450,000
75,831,000
7,777,000
597.200
TONASE
22.000
22.000
35.000
40.000
35.000
40.000
25.000
25.000
KET
JUMLAH OUT
2,156,000
2,156,000
3,675,000
4,200,000
3,675,000
4,200,000
2,375,000
2,375,000
R/L
132,000
132,000
420,000
480,000
420,000
480,000
225,000
225,000
25.000
2,375,000
225,000
25.000
2,375,000
225,000
25.000
2,375,000
225,000
25.000
2,375,000
225,000
25.000
32.000
32.000
32.000
32.000
30.000
30.000
30.000
30.000
30.000
2,375,000
3,040,000
3,040,000
3,040,000
3,040,000
2,790,000
2,790,000
2,790,000
2,790,000
2,790,000
225,000
288,000
288,000
288,000
288,000
1,200,000
1,200,000
1,200,000
1,200,000
1,200,000
0 62,797,000
10,791,000
647.000
TONASE
44.100
40.425
40.425
40.425
40.425
40.425
38.325
40.425
KET
JUMLAH OUT
1,764,000
1,617,000
1,617,000
1,617,000
1,617,000
1,617,000
1,533,000
1,617,000
R/L
441,000
404,250
404,250
404,250
404,250
404,250
383,250
404,250
25.000
25.000
43.050
1,050,000
1,275,000
2,066,400
200,000
100,000
301,350
41.850
2,008,800
292,950
39.000
25.200
25.200
25.200
25.200
25.000
25.000
25.000
25.000
2,145,000
1,134,000
1,134,000
1,134,000
1,134,000
1,275,000
1,275,000
1,275,000
1,275,000
0
252,000
252,000
252,000
252,000
100,000
100,000
100,000
100,000
25.000
1,275,000
100,000
25.000
40.425
25.000
25.000
25.000
25.000
25.000
25.000
26.255
26.250
26.250
39.600
40.000
25.200
25.200
25.200
25.000
25.000
25.000
24.990
1,275,000
1,617,000
1,275,000
1,275,000
1,275,000
1,275,000
1,275,000
1,275,000
1,181,475
1,181,250
1,181,250
1,584,000
1,600,000
1,411,200
1,411,200
1,411,200
1,275,000
1,275,000
1,275,000
1,124,550
100,000
606,375
100,000
100,000
100,000
100,000
100,000
100,000
262,550
262,500
262,500
594,000
600,000
25,200
25,200
25,200
100,000
100,000
100,000
249,900
0 58,908,325
9,414,275
1,274.045
TONASE
50.000
50.000
KET
JUMLAH OUT
4,125,000
4,125,000
R/L
125,000
125,000
28,347,275
PT.
B. 01 ( H 1937
BW )
UNDERSTEL
7
7
7
7
7
7
7
7
2012
2012
2012
2012
2012
2012
2012
2012
2012
6
6
11
24
24
8
8
8
8
8
2012
2012
2012
2012
2012
Onderdil
Harga
JUMLAH
B. 05 ( H 1911 DY
UNDERSTEL
7
7
2012
2012
2012
8
8
13
13
13
13
13
15
23
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
Onderdil
JUMLAH
B. 10 ( K 1863
BA )
Harga
UNDERSTEL
2012
27
2012
28
2012
28
2012
26
2012
27
2012
2012
2012
2012
2012
2012
2012
Onderdil
Harga
JUMLAH
B. 12 ( H 1767
CW )
UNDERSTEL
2012
28
2012
2012
2012
2012
Onderdil
Harga
JUMLAH
B. 15 ( H 1897 EY
)
UNDERSTEL
2012
2012
2012
2012
24
2012
Onderdil
Harga
JUMLAH
B. 16 ( H 1898 EY
)
TGL BLN THN
UNDERSTEL
Onderdil
Harga
28
2012
2012
2012
2012
2012
JUMLAH
B. 17 ( H 1985 FY
)
UNDERSTEL
Onderdil
Harga
2012
JUMLAH
B. 18 ( H 1824 FY
)
UNDERSTEL
7
7
2012
2012
2012
Onderdil
Harga
JUMLAH
B. 19 ( H 1825 FY
)
UNDERSTEL
2012
2012
2012
2012
2012
2012
2012
Onderdil
Harga
JUMLAH
B. 20 ( H 1936 FY
)
UNDERSTEL
2012
2012
2012
Onderdil
JUMLAH
Harga
B. 21 ( H 1937 FY
)
UNDERSTEL
2012
26
2012
26
2012
26
2012
27
2012
2012
Onderdil
Harga
JUMLAH
B. 22 ( H 1958
GY )
UNDERSTEL
2012
27
2012
27
2012
2012
2012
Onderdil
Harga
JUMLAH
B. 23 ( H 1760
AW )
UNDERSTEL
2012
2012
2012
Onderdil
JUMLAH
B. 24 ( H 1761
AW )
TGL BLN THN
26
2012
26
2012
28
2012
Harga
40,000
40,000
UNDERSTEL
Onderdil
MUR BAUT RODA BELAKANG
4PC
Harga
80,000
2012
2012
JUMLAH
80,000
C. 01 ( H 1995
GY )
UNDERSTEL
Onderdil
Harga
31
9,000
31
2012
2012
2012
2012
11
2012
13
2012
24
291,900
24
160,000
24
110,000
201,400
JUMLAH
D. 01 ( H 1564 SY
)
772,300
UNDERSTEL
Onderdil
Harga
JUMLAH
D. 02 ( H 1559 SY
)
UNDERSTEL
Onderdil
JUMLAH
Harga
0
UNDERSTEL
TOTAL
892,300
PT.
E. 01 ( B 9909
UNDERSTEL
Onderdil
7
7
7
7
2012
2012
2012
2012
2012
3
3
4
6
9
13
13
13
14
24
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
JUMLAH
Harga
36,900
201,400
80,000
21,100
99,000
438,400
E. 02 ( B 9912
TGL BLN THN
UNDERSTEL
Onderdil
27
28
28
28
7
7
7
7
2012
2012
2012
2012
2012
6
6
6
7
9
9
13
8
8
8
8
8
8
8
Harga
99,000
18,000
21,000
14
14
15
8
8
8
JUMLAH
170,000
300,000
20,000
628,000
E. 03 ( B 9914
UNDERSTEL
Onderdil
28
28
29
29
7
7
7
7
2012
2012
2012
2012
2012
2
2
2
2
2
2
4
6
6
6
9
9
9
9
9
10
12
13
23
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
PER TRONTON ES9020-1540
2012
2PC
2012 KARET DINGDONG 1PC
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
JUMLAH
Harga
964,000
101,200
1,065,200
E. 04 ( H 1757
TGL BLN THN
UNDERSTEL
Onderdil
Harga
30
31
7
7
2012
2012
18,000
1
1
2
2
3
8
8
8
8
8
21,100
201,400
142,500
6
6
6
7
10
10
10
10
13
15
15
23
24
8
8
8
8
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
JUMLAH
383,000
E. 05 ( H 1759
UNDERSTEL
Onderdil
26
2012
2012
3
6
6
6
6
6
6
6
8
8
8
8
8
8
8
8
8
8
2012
2012 BAUT RODA BELAKANG 1PC
2012
2012
2012
2012
2012
2012 REPAIRKIT BOSTER KOPLING
2012 BAWAH 1PC
JUMLAH
Harga
40,000
390,550
430,550
E. 06 ( H 1761
TGL BLN THN
26
26
7
7
2012
2012
2012
6
6
6
6
6
7
10
12
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
UNDERSTEL
Onderdil
Harga
13
13
14
14
16
8
8
8
8
8
2012
2012
2012
2012
2012
JUMLAH
148,500
17,500
416,500
80,000
662,500
E. 07 ( H 1763
UNDERSTEL
7
7
7
7
7
2012
2012
2012
2012
2012
2012
2
3
3
6
6
6
9
15
24
8
8
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
2012
2012
Onderdil
Harga
35,500
462,500
73,800
477,000
17,500
JUMLAH
1,066,300
E. 08 ( H 1765
TGL BLN THN
UNDERSTEL
26
26
26
28
27
27
28
28
7
7
7
7
7
7
7
7
Onderdil
2012 BUSHING BOGIE 2PC
2012 RING BOGIE 2PC
2012 SEAT ASSY TRUNION 1PC
2012
2012
2012
2012
2012
2012
3
6
6
6
6
6
8
8
8
8
8
8
2012
2012 R/K KOPLING ATAS 1PC
2012 R/K KOPLING BAWAH 1PC
2012 PER KOPLING BAWAH 1PC
2012
2012
Harga
170,000
50,000
922,200
142,600
330,550
15,000
7
13
13
8
8
8
2012
2012 BAUT RODA BELAKANG 1PC
2012
JUMLAH
49,500
1,679,850
E. 09 ( H 1767
TGL BLN THN
26
26
26
26
27
27
27
27
27
27
27
27
27
27
27
27
27
28
28
30
30
30
30
31
31
31
31
31
31
31
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
1
2
3
3
3
6
6
8
8
8
8
8
8
8
2012
2012
2012
2012
2012
2012
2012
UNDERSTEL
Onderdil
Harga
188,500
477,000
35,000
15,000
PENPER 1PC
RING PENPER 2PC
7
9
9
12
13
15
8
8
8
8
8
8
JUMLAH
5,100
720,600
UNDERSTEL
TOTAL
7,074,400
PT.
B. 14 ( H 1766
CW )
UNDERSTEL
Onderdil
Harga
26
201,400
26
21,100
26
18,000
2012
10,550
18,000
2012
2012
25
2012
201,400
JUMLAH
B. 25 ( H 1832
DW )
TGL BLN THN
26
2012
26
2012
26
2012
28
2012
470,450
UNDERSTEL
Onderdil
Harga
28
2012
28
2012
2012
2012
JUMLAH
B. 26 ( H 1910
DW )
UNDERSTEL
Onderdil
28
2012
30
2012
30
2012
2012
24
2012
JUMLAH
D. 03 ( H 1846
BW )
Harga
80,000
80,000
UNDERSTEL
Onderdil
Harga
JUMLAH
F. 01 ( H 1831
DW )
UNDERSTEL
Onderdil
Harga
2012
JUMLAH
F. 02 ( H 1842
DW )
UNDERSTEL
2012
24
2012
24
2012
24
2012
Onderdil
JUMLAH
F. 03 ( H 1956
DW )
Harga
UNDERSTEL
Onderdil
Harga
2012
JUMLAH
TOTAL
UNDERSTEL
550,450
TOTAL
UNDERSTEL
8,517,150
10
29,800
10
10
2012
2012
21
7
7
120,000
21
47,500
JUMLAH
F. 02 ( H 1842
DW )
UNDERSTEL
197,300
Onderdil
Harga
120,000
JUMLAH
F. 03 ( H 1956
DW )
UNDERSTEL
2012
2012
16
2012
16
2012
120,000
Onderdil
Harga
JUMLAH
TOTAL
UNDERSTEL
317,300
TOTAL
UNDERSTEL
317,300
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
ENGINE
Onderdil
990,000
BAN
Harga
Onderdil
BAN COST PER BULAN
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
990,000
Harga
3,780,700
1,485,000
19,000
47,700
63,000
129,700
5,265,700
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
495,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
BAN
Harga
Onderdil
Harga
1,485,000
5,831,250
7,316,250
ENGINE
Onderdil
1,485,000
1,485,000
ENGINE
Onderdil
495,000
BAN
Harga
Onderdil
Harga
BAN
Harga
Onderdil
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
0
Onderdil
BAN COST PER BULAN
VELG 750 1PC
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
0
Onderdil
Harga
91,200
ENGINE
Onderdil
1,485,000
BAN
Harga
Harga
8,261,500
575,000
10,321,500
ENGINE
1,485,000
BAN
Harga
Onderdil
Harga
1,485,000
ENGINE
Onderdil
1,485,000
3,672,500
ENGINE
Onderdil
2,187,500
2,300,000
990,000
4,025,000
7,315,000
BAN
Harga
Onderdil
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
Harga
1,485,000
1,485,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
72,500
BAN
Harga
Onderdil
Harga
990,000
5,599,750
ENGINE
BAN
Harga
Onderdil
Harga
1,485,000
1,485,000
ENGINE
Onderdil
4,609,750
77,000
77,000
Onderdil
1,485,000
11,116,100
ENGINE
Onderdil
9,631,100
BAN
Harga
Onderdil
BAN COST PER BULAN
Harga
5,100,000
1,485,000
2,300,000
8,885,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
1,485,000
2,675,000
4,160,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
ENGINE
BAN
389,000
71,076,800
ENGINE
Onderdil
BAN
Harga
Onderdil
BAN COST PER BULAN
ENGINE
Onderdil
1,485,000
4,046,500
BAN
Harga
Onderdil
BAN COST PER BULAN
Harga
2,561,500
700,200
Harga
8,162,400
1,485,000
700,200
9,647,400
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
125,000
BIAYA PERAWATAN BAN
BULAN JULI-AGUSTUS
125,000
990,000
ENGINE
Onderdil
990,000
BAN
Harga
Onderdil
Harga
495,000
1,150,000
1,645,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
439,500
700,200
1,139,700
495,000
ENGINE
Onderdil
495,000
BAN
Harga
Onderdil
Harga
495,000
495,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
495,000
ENGINE
Onderdil
495,000
BAN
Harga
Onderdil
Harga
2,200,000
18,600
BIAYA PERAWATAN BAN
BULAN AGUSTUS
495,000
2,218,600
495,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
186,900
77,000
2,200,000
239,600
495,000
2,703,500
495,000
ENGINE
BAN
6,887,000
18,803,900
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
2,631,250
1,485,000
4,116,250
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
1,485,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
5,489,800
1,150,000
1,485,000
8,124,800
ENGINE
Onderdil
1,485,000
BAN
Harga
Onderdil
Harga
ENGINE
Onderdil
BAN
Harga
Onderdil
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
0
ENGINE
Onderdil
Harga
1,485,000
1,485,000
BAN
Harga
Onderdil
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
Harga
1,485,000
1,485,000
ENGINE
Onderdil
BAN
Harga
Onderdil
BIAYA PERAWATAN BAN
BULAN JUNI-AGUSTUS
0
ENGINE
Harga
1,485,000
1,485,000
BAN
0
ENGINE
18,181,050
BAN
7,276,000
108,061,750
43,100
39,300
18,600
101,000
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
ENGINE
Onderdil
BAN
Harga
Onderdil
Harga
ENGINE
1,856,250
1,856,250
BAN
101,000
ENGINE
1,856,250
BAN
101,000
1,856,250
TRONTON
S, DIVISI TRUCKING
012
OIL
Onderdil
ETC
Harga
Onderdil
BAUT UK.14 1PC
BAUT UK.12 2PC
FLASER RITING 1PC
BOLP ENGKEL KECIL 5PC
BAUT UK.14 1PC
BAUT UK.12 2PC
FLASER RITING 1PC
BOLP ENGKEL KECIL 5PC
128,500
OIL
12,000
25,000
34,000
2,500
59,100
94,100
Onderdil
OLI REM 1LITER
OLI REM 1LITER
Harga
1,250
2,000
17,500
6,750
1,250
2,000
17,500
6,750
ETC
Harga
35,000
35,000
Onderdil
Harga
42,500
66,000
6,000
6,000
6,000
33,750
35,000
3,000
198,250
OIL
Onderdil
ETC
Harga
Onderdil
Harga
750
2,500
225,000
MESIN/MELENGKAPI RAKITAN
BAUT UK.10 1PC
BAUT UK.14 2PC
BELI BENSIN UNTUK REYEN
MESIN
ACCU N70 2PC
650,000
750
2,500
90,000
1,347,000
30,000
1,500
1,250
35,000
60,500
2,351,250
OIL
Onderdil
ETC
Harga
Onderdil
Harga
40,000
35,000
ETC
Harga
Onderdil
Harga
9,000
6,000
256,100
256,100
15,000
OIL
Onderdil
250,000
575,000
OIL
Onderdil
250,000
ETC
Harga
Onderdil
Harga
8,100
13,500
165,000
6,000
192,600
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OIL
Onderdil
ETC
Harga
Onderdil
Harga
2,700
70,000
3,163,100
OIL
5,400
3,120,000
306,400
Onderdil
35,000
ETC
Harga
236,400
236,400
Onderdil
Harga
5,400
4,050
3,000
12,450
OIL
Onderdil
ETC
Harga
Onderdil
Harga
10,000
4,050
2,700
6,000
204,000
460,000
22,750
OIL
Onderdil
ETC
Harga
Onderdil
Harga
20,000
236,400
236,400
28,100
OIL
Onderdil
ETC
Harga
Onderdil
Harga
70,000
70,000
OIL
Onderdil
8,100
ETC
Harga
Onderdil
Harga
210,000
20,000
230,000
OIL
Onderdil
ETC
Harga
Onderdil
Harga
1,500
75,000
5,400
7,500
275,800
310,800
89,400
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OLI
ETC
2,423,700
7,076,400
81,858,200
DUM TRUCK
S, DIVISI TRUCKING
012
OIL
Onderdil
ETC
Harga
25,500
25,500
25,500
70,000
Onderdil
59,100
29,550 ONGKOS LAS KNALPOT
BELI 2PC KARET KIP BOSTER
KOPLING POTONG
BAWAH LAYAR
ONGKOS
1BUAH
35,000 AIR ACCU 1BOTOL
PER KAMPAS REM BELAKANG
2PC
39,400
309,550
30,000
20,000
50,000
3,500
70,050
ETC
Harga
25,500
Onderdil
BIAYA LAS GANTI KLEM SASIS
ONGKOS LAS PANGKON
HIDROLISLAS
KANAN
KIRI
ONGKOS
PENGAMAN
SAMPING
70,000
75,000
30,000
278,550
OIL
Onderdil
OLI MESIN 1.5LITER
Harga
Harga
175,000
35,000
50,000
50,000
213,700
OIL
Onderdil
310,000
ETC
Harga
Onderdil
BIAYA OVERHOULE
PERSNELING
BIAYA GANTI REP KIT POMPA
POWERSTIR
BOLP DOBEL BESAR 1PC
BOLP ENGKEL KECIL 1PC
88,650
29,550
59,100
177,300
OIL
Onderdil
OLI REM 1LITER
40,000
8,100
5,400
20,000
4,000
5,000
150,000
3,000
1,350
200,000
80,000
25,000
50,000
1,344,550
ETC
Harga
Onderdil
35,000 PISTON KOPLING BAWAH 1PC
NEPEL SELANG 3PC
NEPEL ANGIN 4PC
SAMBUNGAN NEPEL ANGIN
1PC
SEALTAPE 1PC
Harga
650,000
100,000
1,350
1,350
Harga
36,900
37,500
60,000
17,500
1,500
35,000
ONGKOS SAMBUNG JUWEN
1BH
75,000
OIL
Onderdil
OIL
Onderdil
Onderdil
BELI KIP REM (KOPLING) 2PC
29,550
BELI 1BH HOSE NEPEL
25,500
HIDRHOLIC 04
108,350 BELI 1BH DN 04.04
BELI BENSIN UNTUK SUPPORT
PEMBELIAN
SPAREPART
BIAYA INSTALASI
KABEL (1
ROL
KABEL
+
4
LAMPU
+
BIAYA PERBAIKAN DINAMO
STARTER (GANTI SWIT)
NEPEL ANGIN 1PC
AIR ACCU 1BOTOL
35,000 NEPEL 1PC
198,400
175,000
10,000
20,000
750
40,000
15,000
17,500
1,457,400
ETC
Harga
250,000
700,000
750
Harga
12,000
35,000
15,000
20,000
250,000
650,000
15,000
3,000
10,000
1,010,000
ETC
Harga
Onderdil
BOLP HOLOGEN H4 1PC
BOLP ENGKEL KECIL 5PC
Harga
35,000
6,750
9,000
35,000
45,000
250,000
750,000
3,000
41,000
10,000
1,184,750
214,000
OIL
Onderdil
ETC
Harga
35,000
Onderdil
29,550
59,100 ONGKOS BOR TAP 8BH
ONGKOS PASANG CROSS
KOPEL
INSTALASI KABEL-KABEL DUM
59,100
TRUK (1 ROL
DINAMO
STARTER (GANTI
SULUR, BENDIX
DANPASANG
KOL
ONGKOS
BONGKAR
PER
BELAKANG
1
RODA
ONGKOS BUAT PENGAMAN
BAUT RODA BELAKANG DAN
BELI 1BUAH HOSE PIPA 06
35,000
217,750
OIL
Onderdil
Harga
150,000
80,000
50,000
250,000
650,000
150,000
50,000
35,000
1,415,000
ETC
Harga
Onderdil
Harga
70,000
3,000
1,350
100,000
60,000
75,000
250,000
750,000
2,250
35,000
215,000
25,500
BAUT UK.12 1PC
SEALTAPE 1PC
1,000
1,500
1,564,100
192,050
OIL
Onderdil
ETC
Harga
Onderdil
BOLP ENGKEL BESAR 2PC
BOLP DOBEL BESAR 2PC
MIKA STOPLAMP 2SET
LAMPU KOTA 1PC
KLAKSON 1PC
BOLP ENGKEL KECIL 2PC
NEPEL 1PC
KLEM SELANG 4PC
SEALTAPE 1PC
SELANG ANGIN 4METER
HANDLE PUTARAN KACA 2PC
HANDLE PINTU DALAM 1PC
KUNCI RODA 41 1PC
KLEM RADIATOR 1PC
FLASER RITING 1PC
KLEM ACCU 1SET
BAUT UK.14 6PC
Harga
2,700
2,700
30,000
3,000
70,000
2,700
10,000
6,000
1,500
90,000
12,100
47,100
233,500
3,000
17,500
15,000
7,500
70,000
100,000
100,000
100,000
3,750
135,100
20,000
30,000
30,000
50,000
125,000
70,000
20,000
6,000
40,000
60,000
330,000
7,000
8,000
250,000
750,000
105,000
59,100
164,100
OIL
50,000
40,000
26,000
40,000
3,015,150
ETC
1,954,900
11,579,500
S, DIVISI TRUCKING
012
OIL
Onderdil
ETC
Harga
Onderdil
Harga
6,750
SEALTAPE 1PC
1,500
8,100
2,700
70,000
64,050
OIL
Onderdil
45,000
ETC
Harga
Onderdil
Harga
8,100
9,000
1,000
85,000
8,100
ETC
Harga
Onderdil
BIAYA GANTI BAUT RODA DI
MANGKANG
BOLP ENGKEL KECIL 5PC
DONGKRAK 50TON 1PC
40,000
451,200
OIL
Onderdil
300,000
Harga
100,000
6,750
548,500
433,400
433,400
655,250
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OIL
Onderdil
ETC
Harga
Onderdil
Harga
7,500
5,400
9,000
21,900
OIL
Onderdil
ETC
Harga
Onderdil
Harga
OIL
ETC
538,400
OIL
1,192,400
ETC
4,917,000
19,848,300
3,000
11,100
OIL
Onderdil
8,100
ETC
Harga
Onderdil
Harga
OIL
Onderdil
ETC
Harga
Onderdil
Harga
5,400
6,750
6,000
35,000
OIL
18,150
ETC
35,000
OIL
29,250
ETC
35,000
#VALUE!
JUMLAH
1,250
2,000
17,500
6,750
1,250
2,000
17,500
6,750
990,000
12,000
25,000
34,000
37,500
59,100
1,212,600
JUMLAH
3,815,700
35,000
1,485,000
96,500
370,700
129,000
6,000
6,000
6,000
33,750
35,000
38,000
6,056,650
JUMLAH
750
2,500
225,000
650,000
750
2,500
585,000
1,347,000
30,000
1,500
26,750
35,000
2,906,750
JUMLAH
40,000
35,000
1,485,000
250,000
250,000
2,060,000
JUMLAH
1,485,000
9,000
6,000
5,831,250
256,100
7,587,350
JUMLAH
2,187,500
1,493,100
13,500
165,000
6,000
3,865,100
JUMLAH
1,485,000
1,485,000
JUMLAH
8,261,500
575,000
1,485,000
10,321,500
JUMLAH
2,300,000
1,280,000
78,000
2,700
4,025,000
3,120,000
70,000
10,875,700
JUMLAH
1,726,800
4,050
3,000
1,733,850
JUMLAH
9,694,700
297,550
2,700
6,000
204,000
1,485,000
11,689,950
JUMLAH
4,609,750
8,100
20,000
990,000
313,400
5,941,250
JUMLAH
70,000
1,485,000
40,000
1,595,000
JUMLAH
5,100,000
290,000
20,000
1,485,000
2,300,000
9,195,000
JUMLAH
45,500
201,400
1,560,000
5,400
2,675,000
275,800
7,500
291,900
160,000
110,000
5,332,500
JUMLAH
JUMLAH
GRAND TOTAL
81,858,200
JUMLAH
2,561,500
25,500
25,500
25,500
1,555,000
75,000
30,000
59,100
96,450
20,000
251,400
118,500
91,150
99,000
39,400
5,073,000
JUMLAH
8,187,900
175,000
1,485,000
869,200
18,000
21,000
123,650
50,000
79,550
170,000
300,000
20,000
11,499,300
JUMLAH
650,000
100,000
126,350
1,350
990,000
40,000
8,100
5,400
20,000
4,000
5,000
964,000
251,200
3,000
1,350
200,000
80,000
25,000
88,650
29,550
50,000
59,100
3,702,050
JUMLAH
71,900
37,500
573,000
38,600
1,500
236,400
142,500
75,000
250,000
700,000
750
1,150,000
175,000
45,000
108,650
750
35,000
40,000
15,000
37,200
19,700
3,753,450
JUMLAH
12,000
495,000
29,550
540,000
123,350
20,000
250,000
650,000
15,000
3,000
1,135,750
3,273,650
JUMLAH
35,000
6,750
495,000
38,550
35,000
45,000
250,000
750,000
59,100
29,550
78,800
168,500
58,500
416,500
80,000
10,000
2,556,250
JUMLAH
35,500
462,500
108,800
627,000
17,500
495,000
29,550
139,100
50,000
309,100
650,000
150,000
50,000
35,000
35,000
3,194,050
JUMLAH
170,000
50,000
922,200
70,000
2,305,000
1,350
118,600
60,000
495,000
104,550
427,600
1,080,550
17,250
35,000
215,000
25,500
50,500
1,500
6,149,600
JUMLAH
2,700
2,700
30,000
3,000
70,000
2,700
10,000
6,000
1,500
90,000
12,100
47,100
233,500
3,000
17,500
15,000
7,500
70,000
100,000
475,400
177,000
2,203,750
374,700
497,000
65,000
45,000
50,000
125,000
70,000
20,000
501,000
40,000
60,000
330,000
7,000
8,000
250,000
750,000
110,100
50,000
40,000
59,100
26,000
40,000
7,098,350
GRAND TOTAL
46,299,700
46,299,700
JUMLAH
2,874,400
22,600
18,000
1,485,000
271,400
10,550
18,000
8,100
2,700
45,000
4,755,750
JUMLAH
8,100
9,000
1,000
85,000
300,000
40,000
1,485,000
8,100
1,936,200
JUMLAH
100,000
5,496,550
1,698,500
1,485,000
80,000
433,400
9,293,450
JUMLAH
JUMLAH
1,485,000
1,485,000
JUMLAH
1,485,000
7,500
5,400
9,000
1,506,900
JUMLAH
1,485,000
1,485,000
GRAND TOTAL
20,462,300
20,462,300
GRAND TOTAL
148,620,200
148,620,200
75,900
39,300
18,600
128,100
47,500
309,400
JUMLAH
120,000
120,000
JUMLAH
1,856,250
5,400
41,750
6,000
1,909,400
GRAND TOTAL
2,338,800
2,338,800
GRAND TOTAL
2,338,800
#VALUE!
LAP
PT. SAMUDE
A. 01 ( H 1994 VW
TGL
BLN
THN
27
2012
27
2012
27
2012
27
2012
27
2012
28
2012
28
2012
30
2012
30
2012
30
2012
30
2012
30
2012
30
2012
30
2012
30
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
UNDERSTEL
Onderdil
ENGINE
Harga
530,400
442,400
177,200
836,000
360,000
390,000
234,000
Onderdil
2012
2012
2012
2012
2012
2012
10
2012
10
2012
10
2012
13
2012
14
2012
EMERGENCY VALVE
NISSAN 1PC
450,000
14
160,000
35,000
JUMLAH
3,615,000
A. 02 ( H 1801 CY )
TGL
BLN
THN
2012
2012
11
2012
24
2012
24
2012
24
2012
UNDERSTEL
Onderdil
ENGINE
Harga
JUMLAH
Onderdil
A. 03 ( H 1976 BY )
TGL
BLN
THN
2012
2012
UNDERSTEL
Onderdil
ENGINE
Harga
JUMLAH
Onderdil
A. 04 ( H 1645 JE )
TGL
BLN
THN
26
2012
27
2012
UNDERSTEL
Onderdil
ENGINE
Harga
Onderdil
31
31
2012
31
2012
2012
2012
29
2012
29
2012
JUMLAH
160,000
A. 07 ( H 1871 GH )
UNDERSTEL
TGL
BLN
THN
27
2012
2012
24
2012
Onderdil
ENGINE
Harga
Onderdil
160,000
JUMLAH
160,000
A. 08 ( H 1844 BW
UNDERSTEL
ENGINE
TGL
BLN
THN
30
2012
30
2012
2012
2012
2012
24
2012
24
2012
Onderdil
Harga
JUMLAH
Onderdil
A. 11 ( H 1506 PG )
TGL
BLN
THN
27
2012
UNDERSTEL
Onderdil
ENGINE
Harga
1,262,000
Onderdil
27
2012
27
27
2012
27
28
2012
28
2012
28
2012
28
2012
28
2012
28
2012
28
2012
28
2012
28
2012
28
2012
28
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
10
2012
14
2012
16
2012
546,000
151,500
52,500
70,000
16
2012
16
2012
JUMLAH
2,082,000
UNDERSTEL
TOTAL
ENGINE
6,017,000
222,6
LAPO
PT. SAMU
A. 05 ( H 1302 KE
TGL
BLN
THN
2012
2012
10
2012
10
2012
12
2012
13
2012
13
2012
16
2012
16
2012
16
2012
UNDERSTEL
Onderdil
JUMLAH
ENGINE
Harga
60,200
Onderdil
60,200
A. 06 ( H 1622 JE )
THN
UNDERSTEL
TGL
BLN
27
27
2012
28
2012
28
28
Onderdil
ENGINE
Harga
100,700
20,000
45,000
100,700
Onderdil
2012
2012
2012
10
2012
12
2012
13
2012
13
2012
16
2012
16
2012
24
2012
24
2012
24
2012
25
2012
25
2012
25
2012
25
2012
25
2012
25
2012
240,000
JUMLAH
506,400
A. 09 ( H 1759 DW
TGL
BLN
THN
26
2012
2012
25
2012
UNDERSTEL
Onderdil
ENGINE
Harga
JUMLAH
Onderdil
A. 10 ( H 1761 AW
THN
UNDERSTEL
ENGINE
TGL
BLN
28
202,400
30
202,400
31
2012
2012
Onderdil
Harga
Onderdil
2012
2012
24
2012
JUMLAH
TOTAL
404,800
UNDERSTEL
ENGINE
971,400
1,550,6
TOTAL
UNDERSTEL
ENGINE
6,988,400
1,773,2
ENGINE
TIRE
Harga
Onderdil
OIL
Harga
Onderdil
Harga
ENGINE
TIRE
Harga
Onderdil
OIL
Harga
Onderdil
59,100
59,100
39,400
1,485,000
ENGINE
157,600
TIRE
Harga
Onderdil
OIL
Harga
Onderdil
Harga
1,485,000
59,100
35,000
1,485,000
ENGINE
94,100
TIRE
Harga
Harga
Onderdil
COST PER BULAN
OIL
Harga
2,421,900
Onderdil
Harga
18,600
238,000
77,000
60,300
BIAYA PERAWATAN BAN
BULAN JULI-AGUSTUS
155,900
990,000
3,411,900
ENGINE
238,000
TIRE
Harga
Onderdil
OIL
Harga
Onderdil
Harga
990,000
990,000
ENGINE
39,400
TIRE
Harga
39,400
Onderdil
OIL
Harga
Onderdil
Harga
990,000
19,000
374,300
47,700
OLI GARDAN 1.5LITER
OLI PERSENELING 3LITER
66,700
990,000
ENGINE
Onderdil
51000
450,800
TIRE
Harga
25,500
OIL
Harga
Onderdil
Harga
990,000
OLI GARDAN 1.5 LITER
25,500
990,000
ENGINE
25,500
TIRE
222,600
OIL
9,351,900
1,005,400
ENGINE
BAN
Harga
Onderdil
OIL
Harga
Onderdil
Harga
990,000
OLI MESIN 1.5LITER
29,550
59,100
1,480,000
1,480,000
990,000
ENGINE
88,650
TIRE
Harga
Onderdil
OIL
Harga
Onderdil
Harga
1,485,000
OLI MESIN 1.5LITER
29,550
39,400
39,400
35,000
374,300
51,000
25,500
70,600
70,600
1,485,000
ENGINE
594,150
TIRE
Harga
Onderdil
OIL
Harga
2,434,750
1,485,000
Onderdil
Harga
3,919,750
ENGINE
29,550
TIRE
Harga
29,550
Onderdil
OIL
Harga
1,138,250
1,485,000
Onderdil
Harga
SLIWER 2PC
50,000
NGINE
2,673,250
TIRE
1,550,600
NGINE
OIL
9,068,000
TIRE
1,773,200
712,350
OIL
18,419,900
1,717,750
ETC
Onderdil
Harga
JUMLAH
11,000
11,000
235,200
143,000
SHOCK ABSORSER CABIN BELAKANG
2PC
143,000
498,500
498,500
498,500
498,500
122,600
122,600
122,600
122,600
1,900,000
1,900,000
250,000
250,000
350,000
350,000
225,000
225,000
72,000
72,000
75,900
75,900
85,200
85,200
88,400
88,400
3,000
3,000
1,600,000
1,600,000
40,000
570,400
442,400
177,200
836,000
360,000
390,000
234,000
35,000
4,482,400
4,482,400
9,000
9,000
590,000
590,000
150,000
150,000
101,000
101,000
4,000
4,000
40,000
40,000
5,000
5,000
1,500
1,500
SEALTAPE 3PC
4,500
4,500
7,000
457,000
RADIATOR 1PC
BAUT UK.17 4PC
160,000
11,715,300
ETC
Onderdil
Harga
15,330,300
JUMLAH
86,800
1,630,900
105,000
105,000
59,100
41,000
80,400
40,000
40,000
6,750
6,750
279,550
1,922,150
ETC
Onderdil
Harga
6,750
1,550,850
1,350
36,350
8,100
ETC
Onderdil
JUMLAH
Harga
1,587,200
JUMLAH
2,421,900
3,000
3,000
110,000
526,600
1,500
78,500
4,500
64,800
1,140,000
150,000
40,000
40,000
165,000
165,000
474,000
ETC
Onderdil
Harga
40,000
4,439,800
JUMLAH
200,000
990,000
750,000
750,000
39,400
790,000
ETC
Onderdil
Harga
1,979,400
JUMLAH
214,000
214,000
40,000
40,000
990,000
393,300
47,700
25,500
51,000
254,000
ETC
Onderdil
KENDANGAN KNALPOT
1PC
Harga
230,000
1,761,500
JUMLAH
1,492,000
460,000
1,006,000
151,500
52,500
70,000
80,000
80,000
40,000
40,000
10,000
10,000
30,000
30,000
10,000
10,000
150,000
150,000
200,000
200,000
75,000
75,000
500,000
500,000
260,000
260,000
75,000
75,000
ONGKOS BONGKAR
PASANG PER BUNTUT 2
RODA
ONGKOS BONGKAR PAS
PER GARDAN 2 RODA
ONGKOS BONGKAR
PASANG PER DEPAN 1
RODA
OVERHOULE GARDAN
990,000
6,750
32,250
2,500
2,500
6,000
6,000
750,000
750,000
550,000
550,000
200,000
200,000
750
750
40,000
40,000
75,000
75,000
105,000
105,000
50,000
50,000
20,000
20,000
20,000
20,000
40,000
40,000
41,000
41,000
40,000
40,000
4,067,000
7,164,500
ETC
GRAND TOTAL
17,587,950
ETC
Onderdil
Harga
34,184,850
34,184,850
JUMLAH
990,000
29,550
FLASHER RITING 1PC
17,500
17,500
45,000
45,000
59,100
50,000
50,000
40,000
1,580,200
41,000
41,000
40,000
40,000
40,000
40,000
273,500
ETC
Onderdil
CAT PUTIH 1KALENG
Harga
2,892,350
JUMLAH
41,000
141,700
1,800
1,800
6,750
26,750
6,000
51,000
100,700
1,485,000
29,550
SPION CK12 2PC
115,000
115,000
240,000
39,400
3,000
42,400
35,000
41,000
41,000
40,000
40,000
374,300
51,000
25,500
6,750
77,350
500
500
5,000
5,000
18,000
18,000
3,500
3,500
3,000
3,000
291,300
2,947,450
ETC
Onderdil
JUMLAH
Harga
2,434,750
1,485,000
ETC
Onderdil
Harga
29,550
3,949,300
JUMLAH
1,340,650
202,400
STOPLAMP 2PC
PERBAIKAN LAS KENTENG
DAN CAT MOBIL FUSO
SUPER GRIT
190,000
190,000
1,750,000
3,235,000
300,000
300,000
50,000
2,240,000
ETC
5,318,050
GRAND TOTAL
2,804,800
ETC
15,107,150
15,107,150
GRAND TOTAL
20,392,750
49,292,000
49,292,000