Professional Documents
Culture Documents
VESSEL:
PRODUCT:
TANK
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.61
9.30
16.73
16.93
17.91
17.08
16.87
16.98
18.24
7.28
18.312
9.008
16.439
16.640
17.621
16.786
16.580
16.693
17.929
6.969
27
3,183
559
483
116
425
504
430
9
357
168
20,019
3,518
3,037
728
2,671
3,172
2,703
59
2,248
Nil
18.135
Nil
Nil
Nil
18.164
NIL
NIL
18.510
12.060
6,093
38,321
967
SL.S
OIL VOL
Volume
V.C.F.
G.O.V.
TEMP
OIL VOLUME
W.C.F
@ 60F
TABLE 11
CU.M.
VOL.(BBLS)
BBLS
17.845
17.443
0
110
17.875
12.673
18.204
11.749
0.6
204.58
80
0
0
4
1,287
168
19,909
3,518
3,037
728
2,591
3,172
2,703
55
961
31.0
32.5
31.2
31.0
30.6
31.6
30.9
30.7
29.8
30.8
87.8
90.5
88.2
87.8
87.1
88.9
87.6
87.3
85.6
87.4
1,480
79
36,840
887
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98615
0.98478
0.98593
0.98613
0.98648
0.98558
0.98625
0.98638
0.98723
0.98633
G.S.V.
G.S.V.
N.S.V.
165
19,606
3,468
2,995
718
2,554
3,128
2,666
54
948
0.248
39.212
5.202
5.990
1.077
5.11
6.256
3.999
0.135
2.370
165
19,567
3,463
2,989
717
2,549
3,122
2,662
54
946
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
235
36,302
878
36,232
876
PRODUCTION LOADING IN TO 6C
38,321
1,480
36,840
36,302
4,554
4,627
44.6
36,302
DRAFT FWD
7.30 m
AFT
0.20
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
2-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
20.772
2,459.356
435.032
375.687
90.026
320.331
392.616
334.447
6.783
118.907
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
4,554
8.30 m
21.104
2498.764
442.003
381.707
91.468
325.464
398.903
339.806
6.892
120.813
4,627
TRIM
LIST
1.00 m
NIL
MASTER
Staff
Surya Putra Jaya Master
Crude Storage
Santos Rep.
Lifting
967
Last Lifting
BS and W %
0.20
36,840
36,302
36,232
308
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
36,302
Water
Offtake
79
1,480
83,454
Loading/Incoming Temp
42.0
Specific Gravity
31.6
PFW PH
0
Note:
10
Vol (m3)
Kg
Soft Waste
0.00
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Biological Waste
Note :
Comments
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
235,612
### 74,326
###
1,296
235,612
73,030
Service Vessel
MDO
0
0
Meetings
Type
Time
Supervisory Meeting
06.30
16.30
Comment
1. Review previous day activity
2. Check & Maintenance LSA & FFA
3. Maintenance on deck
4. Transfer Condensat Waste In To Tank 6 C
5. Closing finding work place inspection
6. General Overhaule Auxiliary Engine No.2
7. Maintenance RO No.1
8. Cleaning Sludge Case Cade Tank
Incidents
Type
NIL
Drills
Type
Reference
Time
Comments
Comment
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
2480 / 36233
e Vessel
Comment
nk 6 C
n
No.2
t. activity
lay down
Comment
Mooring/Unmooring :
Bunkering/Debunkering :
ENGINE :
1. General Overhaule Auxiliary Engine No.2
2. Maintenance RO No.1
3. Cleaned & Removed Sludge Case Cade Tank
2.
PERMIT TO WORK
2.1
J HA
3. BUNKERS(M3)
PW
MW
HW
CSE
IP
VAL
433
1655
1655
374
167
897
374
167
897
M.F.O
M.D.O
CONS
0
1,296
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
14
OSD
200
REC
0
IN
CONS
0
OUT
433
210264
264
210528
1131
Since
210528
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
02-Jan-17
@2400 HRS
TOTAL
3533
3531
TRANS
0
0
ROB
45
123
ROB
200
POB
22
ROB
235,612
73,030
`
28-Nov-13
Previous
Today
Total
0
0
0
0
1595
2598
3
0
41
0
0
0
0
2
22
0
0
0
0
0
0
0
1597
2620
3
0
41
NIL
NIL
NIL
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Remarks
NIL
NIL
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
01
235,612
235,612
02
235,612
235,612
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Remarks
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
25
Jul
13
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
15
Jul
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
4,964
TOTAL
9,915
320
Averag
e/Day
4,951
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
80
TOTAL
150
70
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
22
22
0
0
0
0
22
22
TOTAL
44
44
REMARKS
1 IHWAN ASRUL
Rank
Location
Description
Action/Commen
t
Tank Cleaning
Scheduled
Positive /
Negative
Total
Positive
Positive
2 IYYANG
C/O
3 ANDI A UNIT
2/O
Positive
4 INDRA
3/O
Deck Area
Positive
5 JULY MANGIRI
C/E
Engine Room
Positive
6 ACO AKBAR
2/E
RO Room
Positive
7 IRVAN TAHIR
3/E
Positive
8 HENDRA PRATAMA
4/E
Positive
9 NIKO
E/E
Engine Room
10 AANG
Bosun
Overhaul Scheduled
Maintenance RO No.1
Good
Positive
Main Deck
Good
Positive
AB
Main Deck
Positive
12 UDIYANTO
AB
Main Deck
Positive
13 BAYU SEGARA
AB
Main Deck
Positive
14 DEDI
OS
Main Deck
Positive
15 SAIFUL IMAM
FTR
Overhaul Scheduled
Positive
16 ELIK BUDIANTO
FTR
Overhaul Scheduled
Positive
17 SUAIB
MTM
Overhaul Scheduled
Positive
18 NUR ALI
MTM
RO Room
Done
Positive
19 MASRUDI
C/Cook
Galley
Good
Positive
20 ROCHIM
COOK
Galley
Done
Positive
21 RANGGUN JAWI
STWD
Done
Positive
22 BOBI MANGOTO
STWD
Done
Positive
TOTAL 22