You are on page 1of 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.73
17.71
16.69
18.03
18.21
9.91
11.13
13.28
18.22
11.72

18.452
17.454
16.439
17.764
17.951
9.652
10.880
13.032
17.929
11.425

0
143
559
53
0
3,325
2,809
1,719
9
215

0
899
3,518
334
0
20,915
17,670
10,813
59
1,352

Nil
Nil
Nil
Nil
Nil
17.558
NIL
NIL
18.491
16.508

8,833

55,560
914

SL.S

OIL VOL

Volume
CU.M.

17.294

227.130

18.204
16.210

0.6
62.02

V.C.F.

G.O.V.

TEMP

VOL.(BBLS)

BBLS

0
0

1,429
0
0
4
390

0
899
3,518
334
0
19,486
17,670
10,813
55
962

31.0
32.5
31.2
31.0
30.6
32.5
32.0
31.9
29.8
30.8

87.8
90.5
88.2
87.8
87.1
90.5
89.6
89.4
85.6
87.4

1,822
62

53,736
852

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98615
0.98478
0.98593
0.98613
0.98648
0.98478
0.98525
0.98533
0.98723
0.98633

G.S.V.

G.S.V.

N.S.V.

0
885
3,468
329
0
19,189
17,410
10,655
54
949

0.000
1.770
5.202
0.659
0.000
38.38
34.820
21.309
0.135
2.372

0
883
3,463
329
0
19,151
17,375
10,633
54
946

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

290

52,939
841

52,834
839

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

55,560
1,822
53,736
52,939
6,642
6,748
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

52,939

DRAFT FWD

6.40 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
21-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
111.012
435.032
41.331
0.000
2,407.114
2,185.105
1,336.523
6.783
119.002

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

6,642

8.70 m

0.000
112.791
442.003
41.994
0.000
2445.684
2220.098
1357.939
6.892
120.909
6,748

TRIM
LIST

Capt. Ihwan Asrul

2.30 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

21-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Juanda Pard

Lifting

24 Hours Total (bbls)

914

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

53,736

Storage Net / G.S.V (Nbbls)

52,939

Storage Net / N.S.V (Nbbls)

52,834

Days to Tank Tops

301

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

52,939

Water

Offtake

Water Received 24hrs (bbls)

62

Total Water in Cargo (bbls)

1,822

Total P/W Received (bbls)

84,803

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

32.5

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

228,862

Service Vessel
MDO

### 67,602

###

1,352

228,862

66,250

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment
1. Review previous day activity
2. Weekly test LSA, FFA and Nav/GMDSS equipment
3. Maintenance main deck, etc at COT 6C and Slop S
4. Workplace inspection
5. Lifting materials
6. Maintenance RO No. 1
7. Maintenance A/E
8. Maintenance COPT No. 4
9. Weekly test safety device and emergency machinery

1. Review deck, engine and galley dept. activity


2. EHS and Security reinduction to all crew
3. Review the workplace inspection / SPKK
4. Ship drill / safety learn

Incidents
Type
NIL

Reference

Comments

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 20
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

19197 / 52762

e Vessel

Comment

DSS equipment
6C and Slop S

gency machinery

t. activity
crew
PKK

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
16.00: AHT Tegap Jaya port alongside
19.00: AHT. Tegap Jaya cast off

Bunkering/Debunkering :
16.06: Commenced transfer FW to AHT Tegap Jaya
18.48: Completed transfer FW: 30T to AHT Tegap Jaya

Personnel & Material Transfer :


05.30: 1 Person Santos Rep, 18 Persons Pkp & 1 Person Mafhindo by. KST.51 ( Out )
08.25: 4 Cradle Santos by. AHT Tegap Jaya ( Out )
15.20: Materials Santos by. AHT. Tegap Jaya ( In )
17.00: 18 Persons Pkp & 1 Person Mafhindo by. KST.51 ( In )
19.00: 1 Person Santos Rep by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos Rep and Contractor Personnel
2. Lifted materials
3. Maintenance main deck, etc. at COT 6C and Slop S
4. Weekly tested LSA, FFA, Nav/GMDSS equipment
5. Workplace inspection in forward store and pump room

ENGINE :
1. Lapping intake and exhaust valve cylinder head auxiliary engine for spare
2. Maintenance RO No.1
3. Installed governoor spare for A/E No.1 and running tested
4. Weekly tested safety device and emergency machinery
5. Running up A/E No.2 & 3 :
07.48 - 08.48: - Lifted 4 cradle santos to AHT. Tegap Jaya
13.00 - 16.00: - Lifted materials santos from AHT. Tegap Jaya

2.

PERMIT TO WORK

2.1
J HA
3. BUNKERS(M3)

PW

MW

HW

CSE

IP

VAL

442

1699
1699

374

170

946

374

170

946

M.F.O
M.D.O

CONS
0
1,352

RCVD
0
0

CONS

RCV

TRNSF

PROD

442

4. FRESH WATER (MT)


BLR

DOM

10

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

215148
240
215388

Days W/O LTI

30

18

OSD
200

REC
0
IN

CONS
0
OUT

20

20

1150

Since

215388
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

21-Jan-17

@2400 HRS

TOTAL
3638
3636

TRANS
0
0
ROB

50

ROB
228,862
66,250
`

126
ROB
200
POB

40
28-Nov-13

Previous

Today

Total

0
0
0
0
1634
2005
3
0
59

0
0
0
0
2
20
0
0
0

0
0
0
0
1636
2025
3
0
59

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

0
0

0
0

1,324
1,352

0
0

14.0
15.0

0.0
4.0

12.0
9.0

57,540

Transferred Materials

14

58,864
57,540

56,188

Transferred Materials

15

56,188

1,303

0.5

0.0

24.0

54,885

Transferred Materials

16

54,885

1,352

4.0

0.0

24.0

53,533

Transferred Materials

17

53,533

30,000

1,524

2.0

0.0

24.0

82,009

Warming up boiler

18

82,009

10,000

1,801

7.5

0.0

24.0

70,208

Internal Cargo Transferred

19

70,208

1,310

1.0

0.0

24.0

68,898

Transferred Materials

20

68,898

1,296

0.0

0.0

24.0

67,602

21

67,602

1,352

0.0

4.0

24.0

66,250

22
23
24
25
26
27
28
29
30
31

Transferred Materials

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14

231,612

231,612

15

231,612

231,612

16

231,612

231,612

17

231,612

231,612

18

231,612

2,750

228,862

19

228,862

228,862

20

228,862

228,862

21

228,862

228,862

22
23
24
25
26
27
28
29
30
31

Internal Cargo Transferred

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

262

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
11
12
12

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

160

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
7
8
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988
4,964
4,978
4,971
4,973

TOTAL 104,375
Averag
e/Day

JUL AUG SEP OCT NOV DEC

3,367

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
55
75
90

1,890

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
19-Jan-2017
20-Jan-2017
21-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
21
20
20

0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
1
1
1

0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
19
19

22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
44
40
40

TOTAL

449

10

265

724

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
21/Jan/17
Action/Commen
t

Positive /
Negative

Total

Advice to all crew prepared for lifting materials

Done

Positive

Main deck

Workplace inspection on deck and pump room

Well Done

Positive

2/O

Bridge

Weekly test Nav.Equipment and GMDSS radio


equipment result found satisfactory

Well Done

Positive

4 IHSANUDIN

3/O

On deck

Weekly test LSA and FFA equipment

Well Done

Positive

5 JULY MANGIRI

C/E

Engine room

supervise the installation of governoor for A/E


No.1

Done

Positive

6 AGUNG RISTIANTO

2/E

RO room

Maintenance RO no.1

Done

Positive

7 IRVAN TAHIR

3/E

Done

Positive

8 HENDRA PRATAMA

4/E

Done

Positive

9 SURYADINATA

E/E

Done

Positive

Reported by

Rank

Location

Master

Crew mess
room

2 DENNY DAVID PAULUS

C/O

3 CENG UMAR

1 IHWAN ASRUL

10 AANG

Description

Engine room Installed governoor for A/E No.1


On deck

Tested emergency fire pump and lifeboat engine

Engine room Assisted 3/E maintenance A/E No.1

Bosun

Lay down

Lifting materials as crane operator

Done

Positive

11 ACHMAD NURUL HUDA

AB

Accmdtn

Fire patrol around accomodation,deck etc

Done

Positive

12 UDIYANTO

AB

Lay down

Assisted boatswain lifting materials

Done

Positive

13 BAYU SEGARA

AB

Main deck

Lifting materials as signal man

Done

Positive

14 DEDI

OS

Lay down

Assisted boatswain lifting materials

Done

Positive

15 ELIK BUDIANTO

FTR

RO room

Assisted 2/E maintenance RO no.1

Done

Positive

16 SUAIB

MTM

Done

Positive

Lapping intake and exhaust valve cylinder head


Auxiliary engine for spare

Done

Positive

Checked Provision for request

Done

Positive

Assisted C/COOK prepared all crew have lunch

Done

Positive

Collected garbage into garbage bin

Done

Positive

17 CHULWAN NURFALLAH WIPER

Engine room Cleaned floor A/E area


Engine room

18 MASRUDI

C/Cook

Provision
store

19 BOBY MANGONTO

STWD

Galley

20 HARIANTO SULE TANAN STWD

Lay down

TOTAL 20

You might also like