Vessel / Code / SCN Voy / Line / Type Berth No Agent / Svc. Route ETA & ATA Line In & Line Out WILHELM E / MOWH / AH48 011E / MOL / FD B11 MOL / SMX EB 25-Apr-13 23:59 26-Apr-13 01:30 25-Apr-13 23:59 26-Apr-13 07:15 1.52 Reason Ind. Pilot Booked 26-Apr-13 00:30 Port Stay (hrs) 6.63
Pilot Boarding In 26-Apr-13 00:30 Pilot Boarding Out 26-Apr-13 07:00 Berthed First Lift ATD 26-Apr-13 01:24 Vsl Wkg Hr 26-Apr-13 01:56 Last Lift 26-Apr-13 07:08 3.62 26-Apr-13 05:33
PRODUCTIVITY Crane Activities Container Moves Hatch Cover OH / OW Gear Box Total Moves Start Date/Time Comp. Date/Time Gross Svc. Time Gross Cr Rate C11 118 6 0 1 125 C12 92 4 0 1 97
26-Apr 01:59 26-Apr 01:56 26-Apr 05:33 26-Apr 05:14 3.57 34.98 3.30 29.44
Container Handling Discharge TS Discharge Loading TS Loading Restow Cnv. Restow Shifting
20' 41 34 28 21
40' 6 8 17
HC 2 49
34.15
60.66
34.52
GROSS VESSEL (GVP) Total Moves Container Moves Gear Box Moves Hatch Cover Moves Grand Total Moves 124 31 210 2 10 222 55 0 OPS TIME (FL - LL)
61.31
3.66
DELAYS
Before Operation
During Operation
TDR productivity notes: 1. CPTDR = Grand total moves / Ops Time / Crane ratio. 2. VP = Grand total moves / Ops Time. 3. GP = Grand total moves / Ops Time [- delays] / Crane ratio. 4. GVP = Grand total moves / Ops Time [- delays]. 5. Ops Time = [First Lift time or Berth time + 0.5hour, whichever lesser] until Last Lift time.