Professional Documents
Culture Documents
Agenda
Scope ASCP v/s MRP ASCP Data Flow Setups Item Attributes Plan Options Execute Plan Q&A
2
Key Capabilities
Plan all supply chain facilities simultaneously Short-term detailed scheduling and long-term aggregate planning are supported within a single plan Plans that consider both resource and material constraints Configure Oracle ASCP to optimize specific business criteria Allows many types of changes to supply, demand and resources to simulate changing business conditions Integrated solution
3
Plan alt. sources and alt. resources Plan with optimization rules (inv turns / ontime delivery) and penalty factors Constrained plan (ECC / EDD / lead time constraints) VMI Support New reports Powerful simulations Different calendars for shipping / manufacturing / receiving Multiple instance planning
4
QOH shown in supply/demand screen Multi-level pegging Ability to define queries and publish to planners Vertical Plan / Gnatt Chart
Staging tables
Custom programs
Plan Run
C re
ate Re Requ sch i si t edu ions le P / D O / R i scr eqs ete /Jo Job bs s
le Re
a se
m e co
me
a nd
tion
Initial Setups
Decide configuration Centralized v/s Distributed
Apply latest Rollup Collections RUP #25 (patch Patches #6751704) (Note 223026.1) Planning Engine RUP #30 (patch # 7286961) Get Advanced Supply Chain responsibilities Planner Advanced Planning Administrator
10
11
Define Demand class Define Master Demand Schedule (MDS) Refresh MDS
12
Define Plan
13
14
15
16
Execute Plan
Refresh MDS Run Data Collection Run Custom Data Cleanup Programs Run plan Consider creating request set Access Planners workbench
17
Planners Workbench
18
Release
19
Gotchyas
Sales order demand duplicated Inactive items coming over to plan Can not release configured items Planning Data Pull very slow
Run Refresh Collection Snapshots often Run Net change collection Set MSC:Purge Stg Tbl Cntrl to Yes Set MSC: Share Plan Partitions to No Set MSC:Write MBP Flat Files to Yes
Schema stats
20
Q&A
21