You are on page 1of 21

ASCP - 101

A Beginners Guide to Implementing ASCP

Sandeep Gandhi Independent Consultant

Agenda

Scope ASCP v/s MRP ASCP Data Flow Setups Item Attributes Plan Options Execute Plan Q&A
2

Advanced Supply Chain Planning


Oracle Advanced Supply Chain Planning (ASCP) is a comprehensive planning solution that decides when and where supplies should be deployed within an extended supply chain.

Key Capabilities

Plan all supply chain facilities simultaneously Short-term detailed scheduling and long-term aggregate planning are supported within a single plan Plans that consider both resource and material constraints Configure Oracle ASCP to optimize specific business criteria Allows many types of changes to supply, demand and resources to simulate changing business conditions Integrated solution
3

ASCP v/s MRP


Oracles focus product Productivity enhancing UI


Plan alt. sources and alt. resources Plan with optimization rules (inv turns / ontime delivery) and penalty factors Constrained plan (ECC / EDD / lead time constraints) VMI Support New reports Powerful simulations Different calendars for shipping / manufacturing / receiving Multiple instance planning
4

QOH shown in supply/demand screen Multi-level pegging Ability to define queries and publish to planners Vertical Plan / Gnatt Chart

ASCP Data Flow


Application Data Store (ADS) Items, BOM, Routing, Sales Orders,MDS, Forecast, Inventory Planning ODS Load Operation Data Store (ODS) Cleaned up Operation Data Store (ODS) Planning Data Store (PDS)

Planning Data Pull

Staging tables

Custom programs

Plan Run

C re

ate Re Requ sch i si t edu ions le P / D O / R i scr eqs ete /Jo Job bs s

le Re

a se

m e co

me

a nd

tion

WIP Mass Load / Requisition Import / Reschedule PO / Reschedule Requisitions

Initial Setups
Decide configuration Centralized v/s Distributed

Apply latest Rollup Collections RUP #25 (patch Patches #6751704) (Note 223026.1) Planning Engine RUP #30 (patch # 7286961) Get Advanced Supply Chain responsibilities Planner Advanced Planning Administrator

Initial Setups Contd.


Define Instance

Define Orgs Assign Collection Groups

Initial Setups contd.


Run full data collection

Initial Setups contd.

Gather schema stats on MSC Grant Org access

Key Item Attributes

10

Key Item Attributes Contd.

11

Collecting Sales Orders


Define Demand class Define Master Demand Schedule (MDS) Refresh MDS

12

Define Plan

13

Plan Options Main Tab

14

Plan Options Org tab

15

Plan Options Constraints Tab

16

Execute Plan

Refresh MDS Run Data Collection Run Custom Data Cleanup Programs Run plan Consider creating request set Access Planners workbench

17

Planners Workbench

18

Release

19

Gotchyas

Sales order demand duplicated Inactive items coming over to plan Can not release configured items Planning Data Pull very slow

ODS Load takes a long time

Run Refresh Collection Snapshots often Run Net change collection Set MSC:Purge Stg Tbl Cntrl to Yes Set MSC: Share Plan Partitions to No Set MSC:Write MBP Flat Files to Yes

Plan takes a long time to run

File space issues

Schema stats

20

Q&A

Sandeep Gandhi sandeep.gandhi@usa.net 513-325-9026

21

You might also like