An Overview of Formwork Systems Used For High Rise Building at L&T Omkar Site
An Overview of Formwork Systems Used For High Rise Building at L&T Omkar Site
1. Pro e!t Overview. ". Formwork. #. $e%uirements of good Formwork. &. 'hy A() and *ivan &. *ivan & days !y!le. +. Automati! (limbing system ,A()- o.eration.
D
72 Floors
C
61 Floors
B
61 Floors
A
53 Floors
1. Project Overview
M M ii
M M i i
ACS
M M ii
M M ii
M M i i
Tower /
M M i i
AC S
M M i i
Tower (
M M i i
M M i i
Tower A
M M i i
AC S
M M i i
Tower 0
M M i i
AC S
M M i i
M M i i
2.FORMWORK
Formwork system is the key factor determining the success of a project in terms of Speed Quality Safety Cost Sustainability
February 53 "61&
Day 11 ere!tion of verti!al reinfor!ement bars and one side of the verti!al formwork Day 21 ere!tion of the se!ond side of the verti!al formwork and formwork for the slab Day 31 fi2ing reinfor!ement bars for slabs and !asting of walls and slabs Day 41 removal of verti!al form work .anels after "&hours3 .ro.s after 4 days3 floor slab formwork after ".+ days
February 53 "61&
February 53 "61&
16
February 53 "61&
11
February 53 "61&
1"
February 53 "61&
Stage 11Tying of reinfor!ement3 fi2ing of !limbing !one3 fi2ing of wall shutter and !on!reting Stage 21 Fi2ing of !limbing !one at 1st level and fi2ing shoe3 lifting wall .anel with all 1st level assembly by tower!rane3 tying of reinfor!ement3 fi2ing of wall shutter3 !asting Stage 31 /eshuttering of wall .anel3 fi2ing shoe on !limbing !one at "nd level Stage 41 Fi2ing of hydrauli! .um. at 1st level.
15
February 53 "61&
Stage 51 (limbing the wall .anel by hydrauli! .um.. Fi2ing all the se!ond level assembly of A(). Tying of reinfor!ement9fi2ing of !one9wall shuttering9!on!reting. Stage 61 /eshutteing .anel9fi2ing shoes of #rd level. Stage 71 (limbing the wall. Tying the reinfor!ement9fi2ing of !one9wall shuttering9!on!reting.
14